SlideShare une entreprise Scribd logo
1  sur  4
Télécharger pour lire hors ligne
THOUGHT LEADERS FOR MANUFACTURING & SUPPLY CHAIN
ARC INSIGHTS
By Dick Hill
The majority of Operating level KPIs
reported in ARC’s recent RPM survey
reflect translations of higher level
business performance objectives.
If KPI targets are not directly tied to
financial performance, how can plant
personnel be sure their decisions are
fueling corporate performance metrics
such as profitability?
INSIGHT# 2003-22ME
MAY 28, 2003
Are Your KPIs Helping You to Perform?
Keywords
KPI, RPM, Performance Metrics, Performance Visualization, OpX
Summary
When it comes to Key Performance Indicators (KPIs), many terms are used
to describe similar things. A recent ARC survey captured the types of KPIs
currently used at four levels of manufacturing management: Operator, Su-
pervisor, Plant/Mill Manager, or C-Level. The survey found that the
majority of Operator-level KPIs are translations of the higher level business
performance objectives to which upper-level man-
agement is held. While these KPIs are not always
directly related to financial performance, they have
a definite effect on the financial outcome. If KPI
targets are not directly tied to financial perform-
ance, how can plant personnel be sure their
decisions are increasing corporate performance fac-
tors such as profit? Conversely, many commonly
used KPIs appear to be driving counterproductive
corporate behavior.
Analysis
Many of our clients, in their quest to achieve Operational Excellence (OpX),
have asked the question: “Which KPIs should we use to manage
performance - particularly in real-time (RPM)?” ARC perceives an in-
creased awareness that Performance Targets are extremely important to
successful achievement of enterprise objectives. If KPIs are based on non-
real time information, or are themselves not dynamic enough to reflect
changes in objectives, then the wrong outcome is very likely to occur.
This ARC survey focused on what respondents considered Key Perform-
ance Indicators (KPIs) for each class of manufacturing personnel (i.e.,
Operator, Production Supervisor, Plant/Mill Manager, and C-Level). The
“Xs” in the results tables that follow indicate the most frequently cited KPIs
employed and their frequency of use at each of the four management levels.
ARC Insights, Page 2
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
Production and Inventory-based KPIs
Many terms are used to express production performance. Words such as
Units, Batches, Jobs or even just the term Production are presented as ratios
to other factors such as time (e.g. Units per Hour, Day, Shift, etc.). This is
sometimes inverted to show Time per Unit.
Inventory Turns is a KPI closely related to production. Material Shortages
and Inventory Errors are other KPIs used to manage Inventory. Product
Availability looks at inventory from the customer satisfaction side. Supply
or Supplier Performance was another KPI cited that relates to production
and inventory. A best practice KPI is Finished Goods Inventory Turns.
KPI “C” Level Plant Mgr. Supervisor Operator
Units per Time XX XXX XXX XXX
Units per Employee X XX XX XX
Production vs. Target X XXX XX XXX
Schedule Attainment XXX X X XX
1st
Pass Throughput X XXX X XXX
Inventory Turns XXX XXX XX XXX
Shortages X XX XX XXX
Errors X X XXX XX
Supplier Performance XX X XX XX
Over-emphasizing Production KPIs Can Foster Unwanted Behavior if the
Outcome Is Stuffing Inventory to Meet the KPI
Asset-based KPIs
Asset Utilization and Asset Availability are two key indicators that show
how well assets are being managed. Other ways of expressing these in-
clude Cycle Time, Down Time, Up Time, Idle Time, and OEE (overall
equipment effectiveness). Variations of the theme include Flexibility of As-
sets, Reliability, and Maintenance. Conspicuous by their absence in the
survey results are "optimum potential"-type KPIs. The measures cited by
the summary group tended to highlight asset performance against histori-
cal performance but not the true potential of their assets.
Quality-based KPIs
Quality, expressed both positively as Percent First Pass Quality or nega-
tively as Percent Scrap/Waste/Rejects, is another frequently used KPI.
ARC Insights, Page 3
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
Discrete manufacturing processes tend to use terms such as Fault Rate or
PPM Defects as Quality Performance Indicators.
Revenue, Cost, and Profit-based KPIs
The higher the KPIs are set in the organization, the more they tend to be
linked with financial performance. KPIs such as Gross Margin are often
described as C-Level KPIs. Cash Contribution per Unit Produced is an-
other revenue indicator. Other financial performance KPIs include Market
Share and Market Growth. Familiar business terms such as EBIT, EBITDA,
ROCE, and ROA are also used.
KPI “C” Level Plant Mgr. Supervisor Operator
Gross Profit Margin XXX XXX
Profit per Unit XXX XX
Profit as % of Sales XXX
ROA, ROCE, EBIT XXX XX
Productivity ($/Emp) XX XX XX XX
Revenue XXX XXX X
Market Growth XXX
Market Share XXX
Post Enron: Revenue-based KPIs Can Lead to Bad Behavior at the
Executive Ranks!
Cost Control, represented as Cost of Goods Sold, Cost per Unit Produced,
or simply a total Cost term, is very important in manufacturing today.
Energy per unit produced, Labor per Unit, Overhead and Expenses are
other cost-related KPIs. Cost of Quality, or Poor Quality, are ways of cap-
turing the relationship between quality and cost.
Customer Service and Satisfaction KPIs
Delivery and Order Fulfillment Performance bracket the Customer Service
spectrum of KPIs. Backlog, Shipments, and Service Levels also are related.
The On-Time Delivery KPI by itself can be misleading. If a delivery arrives
too early, in wrong quantities, or outside the quality specifications, the cus-
tomer will not be satisfied. A best practice KPI is the Perfect Order Metric
that combines several of these factors.
ARC Insights, Page 4
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
Health, Safety, and Environment (HSE)-based KPIs
Health, Safety and Environment are other performance issues that need to
be managed. In some industries a Safety measure is reported regularly.
Environmental issues are tracked regularly with a number of indicators that
are specific to the manufacturer (e.g. NOX, CO/CO2, H2S, etc.) Of course,
government regulations such as the US Government CFRs (Code of Federal
Regulations) are closely monitored and reported both within the manufac-
turer and often to the government overseer (EPA, FDA, etc.). KPIs in this
category are often simply called Legal Compliance.
KPI “C” Level Plant Mgr. Supervisor Operator
Safety XX XXX XX XX
Housekeeping X
Days w/ no lost time XX XXX XX X
Emissions XX XXX XX X
Legal Compliance XXX X
CFR (FDA, EPA, etc.) XX XXX XX
OSHA Compliance XX XXX XX
A Single Day’s Outage Can Eliminate a Year’s Profit in Some Industries
Recommendations
• Some or all of these categories might be valid ways to measure
performance for your particular operation. Managing them requires
that the measurement have the same time constant as the process. The
fact that so many of these commonly used KPIs do not relate directly to
real-time financial indicators makes them difficult to control.
• Look for suppliers that can help you link your production, quality, as-
set, and customer satisfaction performance indicators to costs in real-
time. This will allow you to make decisions that move you toward Op-
erational Excellence (OpX).
Please help us improve our deliverables to you – take our survey linked to this
transmittal e-mail or at www.arcweb.com/myarc in the Client Area. For further
information, contact your account manager or the authors at crhill@arcweb.com.
Recommended circulation: All EAS & MAS clients. ARC Insights are published
and copyrighted by ARC Advisory Group. The information is proprietary to ARC
and no part of it may be reproduced without prior permission from ARC.

Contenu connexe

En vedette

Material handling control system software extends supply chain visibility
Material handling control system software extends supply chain visibilityMaterial handling control system software extends supply chain visibility
Material handling control system software extends supply chain visibility
ARC Advisory Group
 
Sustainability: Process Field Networks
Sustainability: Process Field NetworksSustainability: Process Field Networks
Sustainability: Process Field Networks
ARC Advisory Group
 
Applying cmm model to asset information management
Applying cmm model to asset information managementApplying cmm model to asset information management
Applying cmm model to asset information management
ARC Advisory Group
 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next level
ARC Advisory Group
 
Fieldbus success stories and strategies
Fieldbus success stories and strategiesFieldbus success stories and strategies
Fieldbus success stories and strategies
ARC Advisory Group
 
Arc user survey plc supplier preferences
Arc user survey plc supplier preferencesArc user survey plc supplier preferences
Arc user survey plc supplier preferences
ARC Advisory Group
 
Opportunities Challenges for Food Beverage and CPG
Opportunities Challenges for Food Beverage and CPGOpportunities Challenges for Food Beverage and CPG
Opportunities Challenges for Food Beverage and CPG
ARC Advisory Group
 

En vedette (9)

In Plant Mobility Solutions
In Plant Mobility SolutionsIn Plant Mobility Solutions
In Plant Mobility Solutions
 
Material handling control system software extends supply chain visibility
Material handling control system software extends supply chain visibilityMaterial handling control system software extends supply chain visibility
Material handling control system software extends supply chain visibility
 
Sustainability: Process Field Networks
Sustainability: Process Field NetworksSustainability: Process Field Networks
Sustainability: Process Field Networks
 
Applying cmm model to asset information management
Applying cmm model to asset information managementApplying cmm model to asset information management
Applying cmm model to asset information management
 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next level
 
Fieldbus success stories and strategies
Fieldbus success stories and strategiesFieldbus success stories and strategies
Fieldbus success stories and strategies
 
Arc user survey plc supplier preferences
Arc user survey plc supplier preferencesArc user survey plc supplier preferences
Arc user survey plc supplier preferences
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
 
Opportunities Challenges for Food Beverage and CPG
Opportunities Challenges for Food Beverage and CPGOpportunities Challenges for Food Beverage and CPG
Opportunities Challenges for Food Beverage and CPG
 

Plus de ARC Advisory Group

Plus de ARC Advisory Group (20)

Eam guide-video-2015
Eam guide-video-2015Eam guide-video-2015
Eam guide-video-2015
 
Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected World
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall Short
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC Forum
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and Strategies
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover Fair
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003
 

Dernier

Dernier (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 

Are Your KPIs Helping You to Perform?

  • 1. THOUGHT LEADERS FOR MANUFACTURING & SUPPLY CHAIN ARC INSIGHTS By Dick Hill The majority of Operating level KPIs reported in ARC’s recent RPM survey reflect translations of higher level business performance objectives. If KPI targets are not directly tied to financial performance, how can plant personnel be sure their decisions are fueling corporate performance metrics such as profitability? INSIGHT# 2003-22ME MAY 28, 2003 Are Your KPIs Helping You to Perform? Keywords KPI, RPM, Performance Metrics, Performance Visualization, OpX Summary When it comes to Key Performance Indicators (KPIs), many terms are used to describe similar things. A recent ARC survey captured the types of KPIs currently used at four levels of manufacturing management: Operator, Su- pervisor, Plant/Mill Manager, or C-Level. The survey found that the majority of Operator-level KPIs are translations of the higher level business performance objectives to which upper-level man- agement is held. While these KPIs are not always directly related to financial performance, they have a definite effect on the financial outcome. If KPI targets are not directly tied to financial perform- ance, how can plant personnel be sure their decisions are increasing corporate performance fac- tors such as profit? Conversely, many commonly used KPIs appear to be driving counterproductive corporate behavior. Analysis Many of our clients, in their quest to achieve Operational Excellence (OpX), have asked the question: “Which KPIs should we use to manage performance - particularly in real-time (RPM)?” ARC perceives an in- creased awareness that Performance Targets are extremely important to successful achievement of enterprise objectives. If KPIs are based on non- real time information, or are themselves not dynamic enough to reflect changes in objectives, then the wrong outcome is very likely to occur. This ARC survey focused on what respondents considered Key Perform- ance Indicators (KPIs) for each class of manufacturing personnel (i.e., Operator, Production Supervisor, Plant/Mill Manager, and C-Level). The “Xs” in the results tables that follow indicate the most frequently cited KPIs employed and their frequency of use at each of the four management levels.
  • 2. ARC Insights, Page 2 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com Production and Inventory-based KPIs Many terms are used to express production performance. Words such as Units, Batches, Jobs or even just the term Production are presented as ratios to other factors such as time (e.g. Units per Hour, Day, Shift, etc.). This is sometimes inverted to show Time per Unit. Inventory Turns is a KPI closely related to production. Material Shortages and Inventory Errors are other KPIs used to manage Inventory. Product Availability looks at inventory from the customer satisfaction side. Supply or Supplier Performance was another KPI cited that relates to production and inventory. A best practice KPI is Finished Goods Inventory Turns. KPI “C” Level Plant Mgr. Supervisor Operator Units per Time XX XXX XXX XXX Units per Employee X XX XX XX Production vs. Target X XXX XX XXX Schedule Attainment XXX X X XX 1st Pass Throughput X XXX X XXX Inventory Turns XXX XXX XX XXX Shortages X XX XX XXX Errors X X XXX XX Supplier Performance XX X XX XX Over-emphasizing Production KPIs Can Foster Unwanted Behavior if the Outcome Is Stuffing Inventory to Meet the KPI Asset-based KPIs Asset Utilization and Asset Availability are two key indicators that show how well assets are being managed. Other ways of expressing these in- clude Cycle Time, Down Time, Up Time, Idle Time, and OEE (overall equipment effectiveness). Variations of the theme include Flexibility of As- sets, Reliability, and Maintenance. Conspicuous by their absence in the survey results are "optimum potential"-type KPIs. The measures cited by the summary group tended to highlight asset performance against histori- cal performance but not the true potential of their assets. Quality-based KPIs Quality, expressed both positively as Percent First Pass Quality or nega- tively as Percent Scrap/Waste/Rejects, is another frequently used KPI.
  • 3. ARC Insights, Page 3 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com Discrete manufacturing processes tend to use terms such as Fault Rate or PPM Defects as Quality Performance Indicators. Revenue, Cost, and Profit-based KPIs The higher the KPIs are set in the organization, the more they tend to be linked with financial performance. KPIs such as Gross Margin are often described as C-Level KPIs. Cash Contribution per Unit Produced is an- other revenue indicator. Other financial performance KPIs include Market Share and Market Growth. Familiar business terms such as EBIT, EBITDA, ROCE, and ROA are also used. KPI “C” Level Plant Mgr. Supervisor Operator Gross Profit Margin XXX XXX Profit per Unit XXX XX Profit as % of Sales XXX ROA, ROCE, EBIT XXX XX Productivity ($/Emp) XX XX XX XX Revenue XXX XXX X Market Growth XXX Market Share XXX Post Enron: Revenue-based KPIs Can Lead to Bad Behavior at the Executive Ranks! Cost Control, represented as Cost of Goods Sold, Cost per Unit Produced, or simply a total Cost term, is very important in manufacturing today. Energy per unit produced, Labor per Unit, Overhead and Expenses are other cost-related KPIs. Cost of Quality, or Poor Quality, are ways of cap- turing the relationship between quality and cost. Customer Service and Satisfaction KPIs Delivery and Order Fulfillment Performance bracket the Customer Service spectrum of KPIs. Backlog, Shipments, and Service Levels also are related. The On-Time Delivery KPI by itself can be misleading. If a delivery arrives too early, in wrong quantities, or outside the quality specifications, the cus- tomer will not be satisfied. A best practice KPI is the Perfect Order Metric that combines several of these factors.
  • 4. ARC Insights, Page 4 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com Health, Safety, and Environment (HSE)-based KPIs Health, Safety and Environment are other performance issues that need to be managed. In some industries a Safety measure is reported regularly. Environmental issues are tracked regularly with a number of indicators that are specific to the manufacturer (e.g. NOX, CO/CO2, H2S, etc.) Of course, government regulations such as the US Government CFRs (Code of Federal Regulations) are closely monitored and reported both within the manufac- turer and often to the government overseer (EPA, FDA, etc.). KPIs in this category are often simply called Legal Compliance. KPI “C” Level Plant Mgr. Supervisor Operator Safety XX XXX XX XX Housekeeping X Days w/ no lost time XX XXX XX X Emissions XX XXX XX X Legal Compliance XXX X CFR (FDA, EPA, etc.) XX XXX XX OSHA Compliance XX XXX XX A Single Day’s Outage Can Eliminate a Year’s Profit in Some Industries Recommendations • Some or all of these categories might be valid ways to measure performance for your particular operation. Managing them requires that the measurement have the same time constant as the process. The fact that so many of these commonly used KPIs do not relate directly to real-time financial indicators makes them difficult to control. • Look for suppliers that can help you link your production, quality, as- set, and customer satisfaction performance indicators to costs in real- time. This will allow you to make decisions that move you toward Op- erational Excellence (OpX). Please help us improve our deliverables to you – take our survey linked to this transmittal e-mail or at www.arcweb.com/myarc in the Client Area. For further information, contact your account manager or the authors at crhill@arcweb.com. Recommended circulation: All EAS & MAS clients. ARC Insights are published and copyrighted by ARC Advisory Group. The information is proprietary to ARC and no part of it may be reproduced without prior permission from ARC.