1. Outlines
Introduction
Economics of nuclear power
Nuclear power plants in India
Nuclear fission
Nuclear fuel and energy
Nuclear power plant and layout
Nuclear reactor
Merits of nuclear power plant
Demerits of nuclear power plant
Conclusion
References
2. Introduction
Need of electrical power
Requirement of nuclear power
1kg of Ur energy = 3000 tones of coal
Ur= 3millions times of coal
According to committee of government of
India(2001) nuclear power is cheaper by 8
to 10 paisa per Kwh than thermal plant
Suitable areas west up, N & W Rajasthan,
Punjab and Haryana
3. Nuclear Power plants in India
Na me of
Na me of Tarapur
Tarapur Kalpakkam
Kalpakkam Narora (UP)
Narora (UP) Kakrapar
Kakrapar
power plant/ (Maharatra) Rana Pratap Chennai(Ta
power plant/ (Maharatra) Rana Pratap Chennai(Ta (Gujarat)
(Gujarat)
Detail
Detail Sagar Kota
Sagar Kota mil Nadu)
mil Nadu)
Rajasthan
Rajasthan
Plant capacity 420MW
Plant capacity 420MW 440MW
440MW 470MW
470MW 470MW
470MW 470MW
470MW
No. and size ofof 2x210MW
No. and size 2x210MW 2x220MW
2x220MW 2X235MW
2X235MW 2X235MW
2X235MW 2X235MW
2X235MW
Units
Units
Type ofof
Type BWR
BWR PWR
PWR PWR PWR PWR
reactor
reactor
Coolant and
Coolant and Water Water Water Water Water
moderator
moderator
Steam
Steam 31.27Mpa 40.27MPa 40.27MPa 40.27MPa 40.27MPa
pressure and
pressure and 240C 250c 250c 250c 250c
tempt.
tempt.
Year ofof
Year 1969 1-1972 1-1984 1-1991 1-1992
commissionin
commissionin 2-1981 2-1986 2-1992 2-1994
gg
4. Nuclear fission
process of splitting of a heavy nucleus into two or
more small nuclei.
Two or more neutrons are produced by fission of
each nucleus.
In fission process a loss of mass of 0.2amu per
uranium atom occurs which converts Into 200MeV of
energy.
5. Nuclear fuel and energy
Nuclear fuels
Natural uranium,
enriched uranium
plutonium
Nuclear energy
Energy released by the fission of nuclei is called
nuclear energy
Uncontrolled chain reaction:-explosive
violence and atom bomb
Controlled chain reaction:-to generate
electricity
8. Merits of Nuclear power plant
Easy Transportation of Fuel
Required Small Area than other plants-
2000MW N.plant Required 80 acres. While
steam power plant of same capacity needs about
250acres.
Economic
Output control Flexible
Clean Power Plant compare to Thermal
can meet the future requarement
9. •Capital cost very high than other power plant
• Danger of Radio active pollution
• Fuel used is expensive
•Maintenance charge very high
•Disposal of product