Every Day Counts Matt Schmitz Federal Highway Administration CA Division AGC Spring Conference Monterey May 11, 2011
Why the EDC Initiative? How long does it take to deploy innovation in the transportation industry? How long does a major project take to plan, design and construct?  2 years? 10 years? 5 years? 20+ years?
EDC  Vision “ Every Day Counts captures what I believe to be the sense of urgency with which we must pursue innovation.   It is my goal to reach out and engage FHWA employees as well as external stakeholders to deliver innovation that will enable us to become faster, better and smarter. “ Victor Mendez FHWA Administrator
EDC Model  Depends on: Vision Partnership Leadership ** State-Based Implementation ** ** Performance-Based **
EDC Pillars  Two Focus Areas: ,[object Object]
Shortening Project Delivery,[object Object]
Warm Mix Asphalt 1996:  Santa Clara County (40˚ F Reduction)
EDC Toolkit (15 Initiatives) Accelerating Technology and Innovation Deployment (5) ,[object Object]
Prefabricated Bridge Elements and Systems,[object Object]
EDC Toolkit (15 Initiatives) Accelerating Technology and Innovation Deployment (5) ,[object Object]
Prefabricated Bridge Elements and Systems
Safety Edge,[object Object]
EDC Toolkit (15 Initiatives) Accelerating Technology and Innovation Deployment (5) ,[object Object]
Prefabricated Bridge Elements and Systems
Safety Edge

Contenu connexe

En vedette

Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...Fairfax County
 
Improving Project Delivery Status Report
Improving Project DeliveryStatus ReportImproving Project DeliveryStatus Report
Improving Project Delivery Status ReportFairfax County
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 

En vedette (6)

Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
 
Improving Project Delivery Status Report
Improving Project DeliveryStatus ReportImproving Project DeliveryStatus Report
Improving Project Delivery Status Report
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Chocolate Presentation
Chocolate PresentationChocolate Presentation
Chocolate Presentation
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
Project management
Project managementProject management
Project management
 

Similaire à Thank You to Transportation Leaders for EDC Initiative Support

Title TBD: "18 hundred seconds"
Title TBD: "18 hundred seconds"Title TBD: "18 hundred seconds"
Title TBD: "18 hundred seconds"Joshua L. Davis
 
Overview of v process
Overview of v processOverview of v process
Overview of v processhart azac
 
Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Rio Wicaksono
 
Sustainability Seminar Series By Scott Boutwell Oct08
Sustainability Seminar Series By Scott Boutwell Oct08Sustainability Seminar Series By Scott Boutwell Oct08
Sustainability Seminar Series By Scott Boutwell Oct08Scott Boutwell, LEED AP
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013CCT International
 
Transit Asset Management BART - MTA NYC Transit Peer to Peer Exchange
Transit Asset Management BART - MTA NYC Transit Peer to Peer ExchangeTransit Asset Management BART - MTA NYC Transit Peer to Peer Exchange
Transit Asset Management BART - MTA NYC Transit Peer to Peer ExchangeMichael Salvato
 
The Construction Manager-General Contractor method for consctruction of trans...
The Construction Manager-General Contractor method for consctruction of trans...The Construction Manager-General Contractor method for consctruction of trans...
The Construction Manager-General Contractor method for consctruction of trans...Angel Damian Rivera-Saez
 
MSF ITC Strat Plan - Executive summary v11
MSF ITC Strat Plan - Executive summary v11MSF ITC Strat Plan - Executive summary v11
MSF ITC Strat Plan - Executive summary v11Joan Lluis
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Crosstown TO
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaNarendra Vasudeva
 
Transport for London's Transition to Agile Delivery
Transport for London's Transition to Agile DeliveryTransport for London's Transition to Agile Delivery
Transport for London's Transition to Agile DeliveryWSO2
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterIRJET Journal
 
MODERN TECHNOLOGIES USE IN TRANSPORTATION ENGINEERING
MODERN TECHNOLOGIES USE IN TRANSPORTATION ENGINEERINGMODERN TECHNOLOGIES USE IN TRANSPORTATION ENGINEERING
MODERN TECHNOLOGIES USE IN TRANSPORTATION ENGINEERINGIRJET Journal
 
Construction Project Essay
Construction Project EssayConstruction Project Essay
Construction Project EssayAshley Thomas
 
Developing A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement PlanDeveloping A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement Planguest79a6df3
 

Similaire à Thank You to Transportation Leaders for EDC Initiative Support (20)

Steve Healow
Steve HealowSteve Healow
Steve Healow
 
FTA ITS Training
FTA ITS TrainingFTA ITS Training
FTA ITS Training
 
Federal perspective from the Federal Highway Administration
Federal perspective from the Federal Highway AdministrationFederal perspective from the Federal Highway Administration
Federal perspective from the Federal Highway Administration
 
Title TBD: "18 hundred seconds"
Title TBD: "18 hundred seconds"Title TBD: "18 hundred seconds"
Title TBD: "18 hundred seconds"
 
Overview of v process
Overview of v processOverview of v process
Overview of v process
 
Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014
 
Sustainability Seminar Series By Scott Boutwell Oct08
Sustainability Seminar Series By Scott Boutwell Oct08Sustainability Seminar Series By Scott Boutwell Oct08
Sustainability Seminar Series By Scott Boutwell Oct08
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
 
Transit Asset Management BART - MTA NYC Transit Peer to Peer Exchange
Transit Asset Management BART - MTA NYC Transit Peer to Peer ExchangeTransit Asset Management BART - MTA NYC Transit Peer to Peer Exchange
Transit Asset Management BART - MTA NYC Transit Peer to Peer Exchange
 
The Construction Manager-General Contractor method for consctruction of trans...
The Construction Manager-General Contractor method for consctruction of trans...The Construction Manager-General Contractor method for consctruction of trans...
The Construction Manager-General Contractor method for consctruction of trans...
 
MSF ITC Strat Plan - Executive summary v11
MSF ITC Strat Plan - Executive summary v11MSF ITC Strat Plan - Executive summary v11
MSF ITC Strat Plan - Executive summary v11
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
Transport for London's Transition to Agile Delivery
Transport for London's Transition to Agile DeliveryTransport for London's Transition to Agile Delivery
Transport for London's Transition to Agile Delivery
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
 
MODERN TECHNOLOGIES USE IN TRANSPORTATION ENGINEERING
MODERN TECHNOLOGIES USE IN TRANSPORTATION ENGINEERINGMODERN TECHNOLOGIES USE IN TRANSPORTATION ENGINEERING
MODERN TECHNOLOGIES USE IN TRANSPORTATION ENGINEERING
 
EDC3_Action_Plan_2016-01-01 rev 1
EDC3_Action_Plan_2016-01-01 rev 1EDC3_Action_Plan_2016-01-01 rev 1
EDC3_Action_Plan_2016-01-01 rev 1
 
Construction Project Essay
Construction Project EssayConstruction Project Essay
Construction Project Essay
 
Developing A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement PlanDeveloping A Sustainable Transportation Environmental Improvement Plan
Developing A Sustainable Transportation Environmental Improvement Plan
 

Plus de AGC of California

General Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceGeneral Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceAGC of California
 
Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsAGC of California
 
Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2AGC of California
 
Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1AGC of California
 
The Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessThe Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessAGC of California
 
The Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsThe Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsAGC of California
 
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.AGC of California
 
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestSafety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestAGC of California
 
Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2AGC of California
 
Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2AGC of California
 

Plus de AGC of California (20)

General Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceGeneral Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC Conference
 
Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction Projects
 
Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2
 
Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1
 
Safety Forum
Safety ForumSafety Forum
Safety Forum
 
Market Outlook
Market Outlook Market Outlook
Market Outlook
 
Crisis Management
Crisis ManagementCrisis Management
Crisis Management
 
Crisis Management Checklist
Crisis Management ChecklistCrisis Management Checklist
Crisis Management Checklist
 
The Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessThe Cal/OSHA Appeals Process
The Cal/OSHA Appeals Process
 
Workers Compensation 101
Workers Compensation 101Workers Compensation 101
Workers Compensation 101
 
The Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsThe Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident Investigations
 
Skin Cancer Prevention
Skin Cancer PreventionSkin Cancer Prevention
Skin Cancer Prevention
 
Joplin Blitz Build 2012
Joplin Blitz Build 2012Joplin Blitz Build 2012
Joplin Blitz Build 2012
 
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
 
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestSafety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
 
Cliff Brewis Outlook 2012
Cliff Brewis Outlook 2012Cliff Brewis Outlook 2012
Cliff Brewis Outlook 2012
 
Barry Correa Outlook 2012
Barry Correa Outlook 2012Barry Correa Outlook 2012
Barry Correa Outlook 2012
 
Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2
 
Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2
 
Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012
 

Thank You to Transportation Leaders for EDC Initiative Support

Notes de l'éditeur

  1. As you have heard in the introductory remarks, the reason for the technology component of the Every Day Counts Initiative is quite evident. It takes too long for our industry to assess and implement technologies and innovations. The challenges that we faced on a daily basis include:Changing business practices;Transitioning from a design system to other processes; andThe costs and workforce issues of changing construction processes.
  2. Tasks:DOT and FHWA facilitates state based EDC effortSIT selects EDC priority initiatives in their stateCoordinates and collaborates with stakeholdersEstablishes implementation teams for each initiative