Within weeks of the floods in November 2009, the Environment Agency had published an updated Flood Management Plan for the River Derwent. Although it outlined the need for some small scale hard engineering strategies, the overall preference was for soft engineering approaches to flood defence in the area. Some of these are outlined in this presentation. Use it to make notes onto your diagram in your handout. C. Hard & soft engineering strategies to reduce the impact of flooding
i. Hard Engineering Where there already are existing properties close to the river, it is recognised that small scale hard engineering defences are required, for example at Cockermouth: Maintain the  existing flood walls   & flood gate – without these a further 119 properties would be at risk. In total, the Derwent has over 49km of flood walls. Cockermouth North
A section of the flood wall at Cockermouth. If the discharge were to rise, the flood wall could act to keep the water in the channel and away from the buildings.
The flood gate at the footbridge in Cockermouth. This gate can be closed during very high discharge to keep the water in the channel and prevent flooding.
i. Hard Engineering Where there already are existing properties close to the river, it is recognised that small scale hard engineering defences are required, for example at Cockermouth: Maintain the  existing flood walls   & flood gate – without these a further 119 properties would be at risk. In total, the Derwent has over 49km of flood walls. Cockermouth North Continue to  dredge the channel  in Cockermouth itself to keep it clear and free-flowing.
ii. Soft Engineering The preference will be for soft engineering strategies, however, as these are more sustainable. Use  land use zoning  to ensure new development does not occur in areas of high flood risk, for example to the west of the hospital. Cockermouth North
Building should be restricted in the area to the west of the hospital. This is a map produced by the Environment Agency showing areas at risk of flooding.
ii. Soft Engineering Use  land use zoning  to ensure new development does not occur in areas of high flood risk. Cockermouth North In the upper course, near  Bassenthwaite Lake , flood defences for farmland should be removed to create  safe flood zones  on the floodplain around the Lake. Bassenthwaite Lake  This will also help reduce the pollutants reaching Bassenthwaite, which is an SSSI.
The rapid overland flow from the Cumbrian Mountains can be allowed to be stored on the floodplain around Bassenthwaite Lake, reducing the discharge moving downstream towards Cockermouth.

More Related Content

What's hot

Flood control presentation.pptx osun state
Flood control presentation.pptx osun stateFlood control presentation.pptx osun state
Flood control presentation.pptx osun stateBabatunde Olowookere
 
Methods Of Flood Control1274
Methods Of Flood Control1274Methods Of Flood Control1274
Methods Of Flood Control1274whiskeyhj
 
Rivers and coasts revision
Rivers and coasts revisionRivers and coasts revision
Rivers and coasts revisionbaumy
 
IB Geography: Drainage Basins: Channelisation
IB Geography: Drainage Basins: ChannelisationIB Geography: Drainage Basins: Channelisation
IB Geography: Drainage Basins: ChannelisationRichard Allaway
 
L12 ap soft engineering
L12 ap soft engineeringL12 ap soft engineering
L12 ap soft engineeringSHS Geog
 
Hard engineering ap
Hard engineering apHard engineering ap
Hard engineering apSHS Geog
 
Methods Of Flood Control
Methods Of Flood Control Methods Of Flood Control
Methods Of Flood Control HNurton
 
Flood control by Dr Sandeep Yadav
Flood control by Dr Sandeep YadavFlood control by Dr Sandeep Yadav
Flood control by Dr Sandeep YadavPradeep Yadav
 
River Channel Management Strategies
River Channel Management StrategiesRiver Channel Management Strategies
River Channel Management StrategiesCoral
 
Flooding on the somerset levels
Flooding on the somerset levelsFlooding on the somerset levels
Flooding on the somerset levelsNoel Jenkins
 
Flood control
Flood controlFlood control
Flood controltharamttc
 
IRJET- De-Silting Artifice for Dams
IRJET-  	  De-Silting Artifice for DamsIRJET-  	  De-Silting Artifice for Dams
IRJET- De-Silting Artifice for DamsIRJET Journal
 
Methods of flood control
Methods of flood controlMethods of flood control
Methods of flood controlvivek gami
 

What's hot (19)

Flood control presentation.pptx osun state
Flood control presentation.pptx osun stateFlood control presentation.pptx osun state
Flood control presentation.pptx osun state
 
Methods Of Flood Control1274
Methods Of Flood Control1274Methods Of Flood Control1274
Methods Of Flood Control1274
 
Rivers and coasts revision
Rivers and coasts revisionRivers and coasts revision
Rivers and coasts revision
 
IB Geography: Drainage Basins: Channelisation
IB Geography: Drainage Basins: ChannelisationIB Geography: Drainage Basins: Channelisation
IB Geography: Drainage Basins: Channelisation
 
L12 ap soft engineering
L12 ap soft engineeringL12 ap soft engineering
L12 ap soft engineering
 
Hard engineering ap
Hard engineering apHard engineering ap
Hard engineering ap
 
Impacts Of Floods
Impacts Of FloodsImpacts Of Floods
Impacts Of Floods
 
Methods Of Flood Control
Methods Of Flood Control Methods Of Flood Control
Methods Of Flood Control
 
Flood control by Dr Sandeep Yadav
Flood control by Dr Sandeep YadavFlood control by Dr Sandeep Yadav
Flood control by Dr Sandeep Yadav
 
River Channel Management Strategies
River Channel Management StrategiesRiver Channel Management Strategies
River Channel Management Strategies
 
Design of flood control structures
Design of flood control structuresDesign of flood control structures
Design of flood control structures
 
Flooding on the somerset levels
Flooding on the somerset levelsFlooding on the somerset levels
Flooding on the somerset levels
 
Flood control
Flood controlFlood control
Flood control
 
Causes of flooding
Causes of floodingCauses of flooding
Causes of flooding
 
Siltation
SiltationSiltation
Siltation
 
Flood Management
Flood ManagementFlood Management
Flood Management
 
IRJET- De-Silting Artifice for Dams
IRJET-  	  De-Silting Artifice for DamsIRJET-  	  De-Silting Artifice for Dams
IRJET- De-Silting Artifice for Dams
 
Methods of flood control
Methods of flood controlMethods of flood control
Methods of flood control
 
Flood
FloodFlood
Flood
 

Viewers also liked

Cumbrian Floods V2
Cumbrian Floods V2Cumbrian Floods V2
Cumbrian Floods V2guestaa245a6
 
Causes of the River Derwent Flood, 2009
Causes of the River Derwent Flood, 2009Causes of the River Derwent Flood, 2009
Causes of the River Derwent Flood, 2009A Hamill
 
Cumbria flood uk
Cumbria flood ukCumbria flood uk
Cumbria flood uktjd1987
 
Cumbria Flooding
Cumbria FloodingCumbria Flooding
Cumbria FloodingLiz Smith
 
Geography as revision rivers floods and management
Geography as revision   rivers floods and managementGeography as revision   rivers floods and management
Geography as revision rivers floods and managementklaudia666
 
Geography powerpoint july pakistan floods
Geography powerpoint july pakistan floodsGeography powerpoint july pakistan floods
Geography powerpoint july pakistan floodsstevenmarksmith
 

Viewers also liked (7)

Cumbrian Floods V2
Cumbrian Floods V2Cumbrian Floods V2
Cumbrian Floods V2
 
Causes of the River Derwent Flood, 2009
Causes of the River Derwent Flood, 2009Causes of the River Derwent Flood, 2009
Causes of the River Derwent Flood, 2009
 
Cumbria flood uk
Cumbria flood ukCumbria flood uk
Cumbria flood uk
 
Disaster response
Disaster responseDisaster response
Disaster response
 
Cumbria Flooding
Cumbria FloodingCumbria Flooding
Cumbria Flooding
 
Geography as revision rivers floods and management
Geography as revision   rivers floods and managementGeography as revision   rivers floods and management
Geography as revision rivers floods and management
 
Geography powerpoint july pakistan floods
Geography powerpoint july pakistan floodsGeography powerpoint july pakistan floods
Geography powerpoint july pakistan floods
 

Similar to The management of the flood hazard of the River Derwent

Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214Naoise
 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency SevernEstuary
 
How to improve water management decisions in Australia
How to improve water management decisions in AustraliaHow to improve water management decisions in Australia
How to improve water management decisions in AustraliaHydro International
 
Chapter 5 coastal structures
Chapter  5 coastal structuresChapter  5 coastal structures
Chapter 5 coastal structuresMohsin Siddique
 
Coastal Managament
Coastal ManagamentCoastal Managament
Coastal Managamentguest5a7e69
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_WebMike Bisland
 
Coastal erosion and control measures
Coastal erosion and control measuresCoastal erosion and control measures
Coastal erosion and control measuresSalmashaik26
 
Coastal erosion and control measures
Coastal erosion and control measuresCoastal erosion and control measures
Coastal erosion and control measuresKavitha Cingam
 
Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Robert Sharpe
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015Blase Townsing
 
Risk and standards based riprap design for grahamstown dam barker & hol...
Risk and standards based riprap design for grahamstown dam   barker & hol...Risk and standards based riprap design for grahamstown dam   barker & hol...
Risk and standards based riprap design for grahamstown dam barker & hol...Joseph Ng'ang'a Thuo
 
DCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence ReportDCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence ReportNaoise
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012Erin Vieira
 
Offshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesOffshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesTorben Haagh
 
underwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxunderwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxSaffanAhmed1
 
Flood management systems jb
Flood management systems jbFlood management systems jb
Flood management systems jbCKMCforstudents
 

Similar to The management of the flood hazard of the River Derwent (20)

Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214
 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
 
Shimna Flood Alleviation Scheme webinar
Shimna Flood Alleviation Scheme webinarShimna Flood Alleviation Scheme webinar
Shimna Flood Alleviation Scheme webinar
 
How to improve water management decisions in Australia
How to improve water management decisions in AustraliaHow to improve water management decisions in Australia
How to improve water management decisions in Australia
 
Virginia
VirginiaVirginia
Virginia
 
Chapter 5 coastal structures
Chapter  5 coastal structuresChapter  5 coastal structures
Chapter 5 coastal structures
 
Coastal Managament
Coastal ManagamentCoastal Managament
Coastal Managament
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_Web
 
Coastal erosion and control measures
Coastal erosion and control measuresCoastal erosion and control measures
Coastal erosion and control measures
 
Coastal erosion and control measures
Coastal erosion and control measuresCoastal erosion and control measures
Coastal erosion and control measures
 
Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005
 
Chapter two
Chapter twoChapter two
Chapter two
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
 
Risk and standards based riprap design for grahamstown dam barker & hol...
Risk and standards based riprap design for grahamstown dam   barker & hol...Risk and standards based riprap design for grahamstown dam   barker & hol...
Risk and standards based riprap design for grahamstown dam barker & hol...
 
Sedimentation.ppt
Sedimentation.pptSedimentation.ppt
Sedimentation.ppt
 
DCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence ReportDCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence Report
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
 
Offshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesOffshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processes
 
underwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxunderwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptx
 
Flood management systems jb
Flood management systems jbFlood management systems jb
Flood management systems jb
 

More from A Hamill

Formation of wave cut platform
Formation of wave cut platformFormation of wave cut platform
Formation of wave cut platformA Hamill
 
Formation of headland features
Formation of headland featuresFormation of headland features
Formation of headland featuresA Hamill
 
The cost of bringing up a child in the UK
The cost of bringing up a child in the UKThe cost of bringing up a child in the UK
The cost of bringing up a child in the UKA Hamill
 
Problems of Globalisation: anti-coke protests in India
Problems of Globalisation: anti-coke protests in IndiaProblems of Globalisation: anti-coke protests in India
Problems of Globalisation: anti-coke protests in IndiaA Hamill
 
Natural disasters in Developing Countries
Natural disasters in Developing CountriesNatural disasters in Developing Countries
Natural disasters in Developing CountriesA Hamill
 
Indicators of development
Indicators of developmentIndicators of development
Indicators of developmentA Hamill
 
The formation of waterfall
The formation of waterfallThe formation of waterfall
The formation of waterfallA Hamill
 
Sao Paulo - challenges of rapid urbanisation
Sao Paulo - challenges of rapid urbanisationSao Paulo - challenges of rapid urbanisation
Sao Paulo - challenges of rapid urbanisationA Hamill
 
Inner City Challenges in developed countries
Inner City Challenges in developed countriesInner City Challenges in developed countries
Inner City Challenges in developed countriesA Hamill
 

More from A Hamill (9)

Formation of wave cut platform
Formation of wave cut platformFormation of wave cut platform
Formation of wave cut platform
 
Formation of headland features
Formation of headland featuresFormation of headland features
Formation of headland features
 
The cost of bringing up a child in the UK
The cost of bringing up a child in the UKThe cost of bringing up a child in the UK
The cost of bringing up a child in the UK
 
Problems of Globalisation: anti-coke protests in India
Problems of Globalisation: anti-coke protests in IndiaProblems of Globalisation: anti-coke protests in India
Problems of Globalisation: anti-coke protests in India
 
Natural disasters in Developing Countries
Natural disasters in Developing CountriesNatural disasters in Developing Countries
Natural disasters in Developing Countries
 
Indicators of development
Indicators of developmentIndicators of development
Indicators of development
 
The formation of waterfall
The formation of waterfallThe formation of waterfall
The formation of waterfall
 
Sao Paulo - challenges of rapid urbanisation
Sao Paulo - challenges of rapid urbanisationSao Paulo - challenges of rapid urbanisation
Sao Paulo - challenges of rapid urbanisation
 
Inner City Challenges in developed countries
Inner City Challenges in developed countriesInner City Challenges in developed countries
Inner City Challenges in developed countries
 

The management of the flood hazard of the River Derwent

  • 1. Within weeks of the floods in November 2009, the Environment Agency had published an updated Flood Management Plan for the River Derwent. Although it outlined the need for some small scale hard engineering strategies, the overall preference was for soft engineering approaches to flood defence in the area. Some of these are outlined in this presentation. Use it to make notes onto your diagram in your handout. C. Hard & soft engineering strategies to reduce the impact of flooding
  • 2. i. Hard Engineering Where there already are existing properties close to the river, it is recognised that small scale hard engineering defences are required, for example at Cockermouth: Maintain the existing flood walls & flood gate – without these a further 119 properties would be at risk. In total, the Derwent has over 49km of flood walls. Cockermouth North
  • 3. A section of the flood wall at Cockermouth. If the discharge were to rise, the flood wall could act to keep the water in the channel and away from the buildings.
  • 4. The flood gate at the footbridge in Cockermouth. This gate can be closed during very high discharge to keep the water in the channel and prevent flooding.
  • 5. i. Hard Engineering Where there already are existing properties close to the river, it is recognised that small scale hard engineering defences are required, for example at Cockermouth: Maintain the existing flood walls & flood gate – without these a further 119 properties would be at risk. In total, the Derwent has over 49km of flood walls. Cockermouth North Continue to dredge the channel in Cockermouth itself to keep it clear and free-flowing.
  • 6. ii. Soft Engineering The preference will be for soft engineering strategies, however, as these are more sustainable. Use land use zoning to ensure new development does not occur in areas of high flood risk, for example to the west of the hospital. Cockermouth North
  • 7. Building should be restricted in the area to the west of the hospital. This is a map produced by the Environment Agency showing areas at risk of flooding.
  • 8. ii. Soft Engineering Use land use zoning to ensure new development does not occur in areas of high flood risk. Cockermouth North In the upper course, near Bassenthwaite Lake , flood defences for farmland should be removed to create safe flood zones on the floodplain around the Lake. Bassenthwaite Lake This will also help reduce the pollutants reaching Bassenthwaite, which is an SSSI.
  • 9. The rapid overland flow from the Cumbrian Mountains can be allowed to be stored on the floodplain around Bassenthwaite Lake, reducing the discharge moving downstream towards Cockermouth.