SlideShare une entreprise Scribd logo
1  sur  3
ALAN F. HOOCZKO
1981 N. Stillwater Road Phone: (847) 392-7567
Arlington Heights, IL 60004 ahooczko@wowway.com
CAREER SUMMARY
Accomplished and diversified Engineer & Supervisor with experience in developing Lean Manufacturing processes and
implementing value added activities reducing costs in excess of $400K. This includes Kaizen / cross-functional scrap reduction
initiatives, OEE metrics and TPM activities increasing equipment effectiveness. Also, provided particular expertise in the areas of
project management and capital planning. Comprehensive knowledge of high/low volume mix of metals fabrication & assembly.
EDUCATION
Bradley University, Peoria, IL. (Co-op Program)
B.S. Manufacturing Engineering
PROFESSIONAL EXPERIENCE
Motorola Solutions – Schaumberg, IL 02/15 -
New Product Launch / Contract – Radio & Communication Equipment.
• Supported the assembly, diagnostic testing and final validation for a variety of radio & communication devices.
Abbott Diagnostics - Lake Forest, IL 03/14 – 09/14
Supplier Quality Engineer III (NPL) / Contract – Molded bottle, bottle top, bottle cap, septum & other components.
• Interacted with various suppliers monitoring their effectiveness. This included compiling observations and
analyzing the quality data (Cp/Cpk) for OQ / PQ final validation.
• Coordinated onsite visits to witness and document 21+ new products for their final release to production.
• Participated in prelaunch PFMEA, Control Plan & Process Flow reviews while monitoring CAPA effectiveness
for products in an ISO-13485 and ISO-14971 environment.
Honeywell (System Sensor) - St. Charles, IL 11/13 – 02/14
New Product Launch Engineer / Contract – Smoke alarms, CO2 detectors and Explosion Proof Pressure Switches.
• Interacted with various groups in the timely scheduling, assembly, testing and packaging approvals.
Omron Automotive Electronics - St. Charles, IL 04/12 – 08/13
New Product Launch Engineer (NPL) / Contract – Memory, Easy Entry and Power Door Lock switches.
• Managed NPI deliverables for testing, % yield and final product validation ensuring a 100% effectiveness rate.
• Coordinated readiness reviews, Product Validation’s (PV) and run-at-rate monitoring for final PPAP approvals.
BORG-WARNER AUTOMOTIVE - Bellwood, IL 08/11 – 03/12
New Product Launch Engineer (NPL) / Contract – Friction Products
Managed and supported New Product Launches for the Automotive & Industrial Friction Plate markets. This included Ford, GM,
Chrysler, Cummins-New Holland, Toyota, Caterpillar and Honda.
• Successfully launched (9) programs integrating Control Plans, Process Flow Diagrams, SPC tools & FMEA's.
• Interfaced with Product Engineering, Quality Assurance, team leaders & management to obtain 100% on time delivery.
Target Corp. - Arlington Heights, IL 09/07 - 08/11
Flow Logistics / Assist customers, Load/Unload product shipments, organize inventory and stock incoming deliveries
TUTHILL PUMP - Alsip IL 12/03 - 05/06
Cell Manufacturing Engineer & Supervisor - Flow Pro Products
Complete responsibility for developing machining and assembly processes, CNC Programming, specifying tooling, and
establishing quality procedures and gages.
• Supervised (10) 2nd
shift and subsequently 1st
shift production personnel in the manufacture of “Build-To-Order” Positive
Displacement Pumps for the OEM & processing markets.
ALAN HOOCZKO PAGE TWO
• Created +30 std. work & takt time studies in (3) production cells improving the std. cost accuracy/operator efficiency by 40%.
• Improved shaft manufacture by leading a Kaizen team in the development of a Lean manufacturing cell with single piece
flow. This utilized a Studer cylindrical grinder, Haas Vertical CNC Mill and W&S Lathe improving shaft quality & part
through-put from 4-days to 50- min. Also added a new hoist, (2) heavy duty bar stock racks & gage/ tooling cabinets.
• Led a Lean / SMED improvement event creating a multifunction Housing Machining Cell across a family of 6-part types.
This reduced setup time by 35% and throughput from an avg. of (3) days to 55-min. This included (2) Okuma Lathes, (2)
HAAS Vertical Mills, 1-Ton Denison Press, 1- Drill press and deburring station.
BORG-WARNER AUTOMOTIVE - Bellwood, IL 04/94 - 12/03
Staff Manufacturing Engineer & Supervisor – Friction Products
Managed and supported the high-volume manufacture of 190-million automotive & industrial friction plates for Ford, GM,
Chrysler, Caterpillar, Allison, Toyota and John Deere.
• Planned, designed and implemented the $1.4 million overhaul of (3) “friction plate” acid etch dipping lines. This
encompassed new tank designs, material upgrades, contractor coordination & the mandated secondary containment.
• Provided engineering and tooling support for the steel blanking production area improving material handling, safety
and process efficiency, saving +$59,000 annually. This included improved (Herr-Voss) stock leveling equipment, new
(ASC) un-coilers, (QC) collating conveyors and indexing accumulation spindles.
• Created a Lean process flow for friction plate manufacture by reducing process time from 8-days
To 2-days via work cells. This included the use of visual standards and in-line flatness gauging.
• Led several sub-groups in the successful implementation of the TS-16949 Automotive Quality initiatives and ISO-14001
Environmental Certifications. This included 5S, Control Plan, Preventive Maintenance & Set-up instruction audits.
BAXTER HEALTHCARE / REXAM - Mundelein, IL 03/91 - 11/93
Senior Manufacturing Engineer
Supported the 24/7 plant operations necessary to efficiently produce flexible medical packaging. This included vendor negotiation,
project justification, DOE results verification and product launch.
• Prepared sampling observations and laboratory tests for 10+ new products to support the DOE results for a series of
Medical Pouches (ISO-13485). This included destruction testing and water cased ink adhersion trials.
• Produced Value Improvement Project (VIP) savings of $76,000 via Pareto scrap analysis. Upgrades included improved
web processing equipment such as tension controls, servo drives and plastic film treaters.
• Managed the procurement and installation of an Ozone Monitoring System (Oha) that detects & warns of specific ozone
levels in a coating & laminating area. This was an OSHA, EPA and cGMP requirement that successfully avoided
operator injury and illness.
• Researched and coordinated the successful implementation of a Computerized Maintenance Management (Kurtz & Steel)
& Predictive Maintenance System (Entec) that reduced unplanned downtime and maintenance cost by 18%, saving
$43,750 the 1st
year.
Imperial Eastman - Niles, IL Manufacturing Engineer 11/85 – 03/91
Warner Electric - Roscoe, IL Manufacturing Engineer 06/80 – 11/85
TRAINING
Screening Experiment Course (DOE), Conducted by Baxter Healthcare
SPC Train-the-Trainer, Conducted by Baxter Healthcare
Six Sigma Training, (DMAIC) Conducted by Borg Warner
FMEA Certification Review, Conducted by Contemporary Consultants for Borg Warner
CERTIFICATIONS COMPUTER SKILLS
ISO-13485 / Medical Device Excel, Power Point, Word, SAP Data Entry
ISO-14971 / Risk Management AutoCAD, Micros Soft Project, Minitab
TS-16949 / Automotive
ISO-14000 / Environmental
RESUME   NO Healthcare  06 01 15

Contenu connexe

Tendances (20)

TONYA RESUME 112816
TONYA RESUME 112816TONYA RESUME 112816
TONYA RESUME 112816
 
Resume_ Girish
Resume_ GirishResume_ Girish
Resume_ Girish
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
James Resume
James ResumeJames Resume
James Resume
 
jim1res2016
jim1res2016jim1res2016
jim1res2016
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
Resume dennis r. barrick 3-18-2018
Resume   dennis r. barrick 3-18-2018Resume   dennis r. barrick 3-18-2018
Resume dennis r. barrick 3-18-2018
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
petrock patricia resume final
petrock patricia resume finalpetrock patricia resume final
petrock patricia resume final
 
Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016
 
Robert Marcus Resume (4-1-15)
Robert Marcus Resume (4-1-15)Robert Marcus Resume (4-1-15)
Robert Marcus Resume (4-1-15)
 
Chandrasekaran
ChandrasekaranChandrasekaran
Chandrasekaran
 
StuartMcDonaldResume 2016
StuartMcDonaldResume   2016StuartMcDonaldResume   2016
StuartMcDonaldResume 2016
 
Ravi Kiran Balabhadruni
Ravi Kiran BalabhadruniRavi Kiran Balabhadruni
Ravi Kiran Balabhadruni
 
Ivy - CV
Ivy - CVIvy - CV
Ivy - CV
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukri
 
Resume%27-2
Resume%27-2Resume%27-2
Resume%27-2
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 

En vedette

En vedette (9)

Alan Jordan Resume 2.PDF
Alan Jordan Resume 2.PDFAlan Jordan Resume 2.PDF
Alan Jordan Resume 2.PDF
 
AkankshaMaurya_Resume
AkankshaMaurya_ResumeAkankshaMaurya_Resume
AkankshaMaurya_Resume
 
Adam Michael Sacks - Resume
Adam Michael Sacks - ResumeAdam Michael Sacks - Resume
Adam Michael Sacks - Resume
 
Petra cv
Petra cvPetra cv
Petra cv
 
AFeolaResume (Dec2015)
AFeolaResume (Dec2015)AFeolaResume (Dec2015)
AFeolaResume (Dec2015)
 
AKirchgraber_Resume
AKirchgraber_ResumeAKirchgraber_Resume
AKirchgraber_Resume
 
Al Resume linkin
Al Resume linkinAl Resume linkin
Al Resume linkin
 
abdallah cv
abdallah cvabdallah cv
abdallah cv
 
Resume 050216 for DC Corp Jobs
Resume 050216 for DC Corp JobsResume 050216 for DC Corp Jobs
Resume 050216 for DC Corp Jobs
 

Similaire à RESUME NO Healthcare 06 01 15

Similaire à RESUME NO Healthcare 06 01 15 (20)

Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
 
Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
 
Jurg hauptli resume
Jurg hauptli resumeJurg hauptli resume
Jurg hauptli resume
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
RobertKulick_2016
RobertKulick_2016RobertKulick_2016
RobertKulick_2016
 
VMarschner Resume 05-2015
VMarschner Resume 05-2015VMarschner Resume 05-2015
VMarschner Resume 05-2015
 
RobertKulick2016
RobertKulick2016RobertKulick2016
RobertKulick2016
 
Carl schuetts resume
Carl schuetts resumeCarl schuetts resume
Carl schuetts resume
 
RBG_DQE_0117
RBG_DQE_0117RBG_DQE_0117
RBG_DQE_0117
 
J H Scott Resume
J H Scott ResumeJ H Scott Resume
J H Scott Resume
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
 
PAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WDPAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WD
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
JOHN CLARK Resume
JOHN CLARK ResumeJOHN CLARK Resume
JOHN CLARK Resume
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 

RESUME NO Healthcare 06 01 15

  • 1. ALAN F. HOOCZKO 1981 N. Stillwater Road Phone: (847) 392-7567 Arlington Heights, IL 60004 ahooczko@wowway.com CAREER SUMMARY Accomplished and diversified Engineer & Supervisor with experience in developing Lean Manufacturing processes and implementing value added activities reducing costs in excess of $400K. This includes Kaizen / cross-functional scrap reduction initiatives, OEE metrics and TPM activities increasing equipment effectiveness. Also, provided particular expertise in the areas of project management and capital planning. Comprehensive knowledge of high/low volume mix of metals fabrication & assembly. EDUCATION Bradley University, Peoria, IL. (Co-op Program) B.S. Manufacturing Engineering PROFESSIONAL EXPERIENCE Motorola Solutions – Schaumberg, IL 02/15 - New Product Launch / Contract – Radio & Communication Equipment. • Supported the assembly, diagnostic testing and final validation for a variety of radio & communication devices. Abbott Diagnostics - Lake Forest, IL 03/14 – 09/14 Supplier Quality Engineer III (NPL) / Contract – Molded bottle, bottle top, bottle cap, septum & other components. • Interacted with various suppliers monitoring their effectiveness. This included compiling observations and analyzing the quality data (Cp/Cpk) for OQ / PQ final validation. • Coordinated onsite visits to witness and document 21+ new products for their final release to production. • Participated in prelaunch PFMEA, Control Plan & Process Flow reviews while monitoring CAPA effectiveness for products in an ISO-13485 and ISO-14971 environment. Honeywell (System Sensor) - St. Charles, IL 11/13 – 02/14 New Product Launch Engineer / Contract – Smoke alarms, CO2 detectors and Explosion Proof Pressure Switches. • Interacted with various groups in the timely scheduling, assembly, testing and packaging approvals. Omron Automotive Electronics - St. Charles, IL 04/12 – 08/13 New Product Launch Engineer (NPL) / Contract – Memory, Easy Entry and Power Door Lock switches. • Managed NPI deliverables for testing, % yield and final product validation ensuring a 100% effectiveness rate. • Coordinated readiness reviews, Product Validation’s (PV) and run-at-rate monitoring for final PPAP approvals. BORG-WARNER AUTOMOTIVE - Bellwood, IL 08/11 – 03/12 New Product Launch Engineer (NPL) / Contract – Friction Products Managed and supported New Product Launches for the Automotive & Industrial Friction Plate markets. This included Ford, GM, Chrysler, Cummins-New Holland, Toyota, Caterpillar and Honda. • Successfully launched (9) programs integrating Control Plans, Process Flow Diagrams, SPC tools & FMEA's. • Interfaced with Product Engineering, Quality Assurance, team leaders & management to obtain 100% on time delivery. Target Corp. - Arlington Heights, IL 09/07 - 08/11 Flow Logistics / Assist customers, Load/Unload product shipments, organize inventory and stock incoming deliveries TUTHILL PUMP - Alsip IL 12/03 - 05/06 Cell Manufacturing Engineer & Supervisor - Flow Pro Products Complete responsibility for developing machining and assembly processes, CNC Programming, specifying tooling, and establishing quality procedures and gages. • Supervised (10) 2nd shift and subsequently 1st shift production personnel in the manufacture of “Build-To-Order” Positive Displacement Pumps for the OEM & processing markets.
  • 2. ALAN HOOCZKO PAGE TWO • Created +30 std. work & takt time studies in (3) production cells improving the std. cost accuracy/operator efficiency by 40%. • Improved shaft manufacture by leading a Kaizen team in the development of a Lean manufacturing cell with single piece flow. This utilized a Studer cylindrical grinder, Haas Vertical CNC Mill and W&S Lathe improving shaft quality & part through-put from 4-days to 50- min. Also added a new hoist, (2) heavy duty bar stock racks & gage/ tooling cabinets. • Led a Lean / SMED improvement event creating a multifunction Housing Machining Cell across a family of 6-part types. This reduced setup time by 35% and throughput from an avg. of (3) days to 55-min. This included (2) Okuma Lathes, (2) HAAS Vertical Mills, 1-Ton Denison Press, 1- Drill press and deburring station. BORG-WARNER AUTOMOTIVE - Bellwood, IL 04/94 - 12/03 Staff Manufacturing Engineer & Supervisor – Friction Products Managed and supported the high-volume manufacture of 190-million automotive & industrial friction plates for Ford, GM, Chrysler, Caterpillar, Allison, Toyota and John Deere. • Planned, designed and implemented the $1.4 million overhaul of (3) “friction plate” acid etch dipping lines. This encompassed new tank designs, material upgrades, contractor coordination & the mandated secondary containment. • Provided engineering and tooling support for the steel blanking production area improving material handling, safety and process efficiency, saving +$59,000 annually. This included improved (Herr-Voss) stock leveling equipment, new (ASC) un-coilers, (QC) collating conveyors and indexing accumulation spindles. • Created a Lean process flow for friction plate manufacture by reducing process time from 8-days To 2-days via work cells. This included the use of visual standards and in-line flatness gauging. • Led several sub-groups in the successful implementation of the TS-16949 Automotive Quality initiatives and ISO-14001 Environmental Certifications. This included 5S, Control Plan, Preventive Maintenance & Set-up instruction audits. BAXTER HEALTHCARE / REXAM - Mundelein, IL 03/91 - 11/93 Senior Manufacturing Engineer Supported the 24/7 plant operations necessary to efficiently produce flexible medical packaging. This included vendor negotiation, project justification, DOE results verification and product launch. • Prepared sampling observations and laboratory tests for 10+ new products to support the DOE results for a series of Medical Pouches (ISO-13485). This included destruction testing and water cased ink adhersion trials. • Produced Value Improvement Project (VIP) savings of $76,000 via Pareto scrap analysis. Upgrades included improved web processing equipment such as tension controls, servo drives and plastic film treaters. • Managed the procurement and installation of an Ozone Monitoring System (Oha) that detects & warns of specific ozone levels in a coating & laminating area. This was an OSHA, EPA and cGMP requirement that successfully avoided operator injury and illness. • Researched and coordinated the successful implementation of a Computerized Maintenance Management (Kurtz & Steel) & Predictive Maintenance System (Entec) that reduced unplanned downtime and maintenance cost by 18%, saving $43,750 the 1st year. Imperial Eastman - Niles, IL Manufacturing Engineer 11/85 – 03/91 Warner Electric - Roscoe, IL Manufacturing Engineer 06/80 – 11/85 TRAINING Screening Experiment Course (DOE), Conducted by Baxter Healthcare SPC Train-the-Trainer, Conducted by Baxter Healthcare Six Sigma Training, (DMAIC) Conducted by Borg Warner FMEA Certification Review, Conducted by Contemporary Consultants for Borg Warner CERTIFICATIONS COMPUTER SKILLS ISO-13485 / Medical Device Excel, Power Point, Word, SAP Data Entry ISO-14971 / Risk Management AutoCAD, Micros Soft Project, Minitab TS-16949 / Automotive ISO-14000 / Environmental