Envisioning a Lean Future State for
                                    New Product Development
                        Focus: Capacity Management and Project Prioritization
                                                       by
                                            Ron Mascitelli, PMP
                                                 President
                                           Technology Perspectives
1.0 Executive Summary
        This monograph describes an integrated approach to achieving the maximum productivity and
profitability from finite product development resources. Specifically:

        •   The ability to handle more development projects, in less time, with the highest
            quality delivered to the customer.
        •   The ability to plan and execute development projects to shorter, more predictable schedules, and
            deliver the most critical “tent pole” projects on time, with all critical success factors achieved.
        •   Accomplish the above with a high level of agility and flexibility to accommodate a dynamically
            changing business and technology environment.
2.0 Portfolio Management and Project Prioritization
        It is almost inevitable that a highly creative firm will generate far more opportunities for new products
than can be achieved with the development resources that are available. This typically due to a lack of clear and
current capacity data. Unfortunately, a mismatch between the list of projects being pursued and the available
resource capacity will result in unpredictable schedules, delayed launch dates, and a great deal of unnecessary
turbulence in the organization. In this section, I will describe several straightforward steps that can lead to
effective, fact-based management of a firm’s project portfolio. These measures will ensure that finite
development resources will have the greatest impact on the future balance sheet of the company.
   Capacity-based Project Prioritization Metric
         Sometimes all it takes is a new metric. The classical approach to selecting and prioritizing new product
development projects involves two dimensions: projected profitability (net present value or the like), and
strategic importance (typically based on a subjective scoring system). Ideally, the highest priority projects will
have both a high economic impact and will strongly support the firm’s strategic goals. There is a critical
consideration that is missing from this two-dimensional world, however. Nowhere in this portfolio
management scheme is the finite capacity of the organization to execute development projects considered.
Instead, the matching of the project list to capacity is often done subjectively. Functional managers are asked if
they have adequate capacity, and in the absence of hard data, they tend to err on the optimistic side. Moreover,
some of the “high priority” projects identified using this two-dimensional approach may be capacity hogs,
whereas other opportunities might yield a far higher return from available resources. A third dimension (and a
third metric) is needed to make truly informed decisions in a finite capacity environment.
         I propose the addition of a productivity metric that divides the future profits generated by a proposed
new product by the estimated hours of design / development time. This ratio, in units of profit dollars per hour
of design / development time, offers an important new perspective on the desirability of a proposed project. If
taken in concert with the other two traditional metrics, portfolio management now becomes a three-dimensional

                                                        1
world, in which a truly excellent new opportunity will yield high total return, have positive strategic impact, and
will make efficient use of scarce development resources.

    The “Global” Priority List
         One of the most critical factors in successful project execution is the alignment of the entire
organization around a common set of priorities. Since virtually every function within a firm “touches” the
product development process at one time or another during development, this mandates that the entire firm
agree on a common (i.e., “global”) priority list for all active projects. Note that it is not sufficient to prioritize
just major projects; all projects that consume resources must be included. Why is this so important? Because
any misalignment of priorities among contributing functions (or by individual team members for that matter)
can lead to delays in the most important projects in the firm. Hence, a published list of all projects, in priority
order, should be available to anyone in the firm that participates in new product development.
         The challenge in achieving this ideal is that tough choices will have to be made. This is hard work, but
consider the alternative: if the executive team in your firm doesn’t make these tough calls, then by default, the
calls will be made by the designers and developers themselves. It is far better that the decision be made by the
strategic visionaries of the company, than by working-level individuals on a day-to-day basis.
    A / B / C Project Prioritization
         Imagine that we knew our product development capacity, by function and by month, and that we have
established the global priority list described above. With this knowledge, we could begin allocating resources
to projects in priority order, based on the stated needs of each team leader. Once the first project was fully
staffed, we would move on to the next project on the priority list, and so on. At some point, we would find that
project leader’s needs cannot be met, at least for some constraining functional area(s). Projects that are above
this point on the priority list have been fully staffed, and hence should have minimal schedule risk (assuming
manageable technical risks). We will classify this fortunate group as “A Projects”, as shown in Figure 1.
         Now we continue the process by allocating the remaining (albeit limited) resources to projects in
priority order until we cannot realistically consider the project to be viable from a staffing perspective. These
intermediate projects will still make progress, but will suffer from an increased level of schedule risk, and hence
will not have predictable completion dates (at least not down to the day – perhaps predictable to the quarter).
We will classify this group of less fortunate projects as “B Projects”. Finally, those projects below this
intermediate group we will classify as “C Projects”. This last group of projects we will put on hold, pending the
availability of freed-up resources from completed projects in categories A and B.
         This A/B/C prioritization will serve to arbitrate most resource conflict situations through a simple rule:
A Projects always win over B Projects. If an assigned team member can move forward the critical path of their
A Project, that would always be the correct course of action. Only when they cannot make progress on their A

                    Global Priority
                         List

                      Project 1                                    Fully staffed –
                      Project 2                                   High degree of
                      ….                  “A” Projects
                                                               schedule predictability
                      Project X

                                                                   Staffed with some
                      Project X+1                                resource constraints –
                      …                   “B” Projects          Increased schedule risk
                      Project Y
                                                                     but still viable

                                                                  Inadequate staffing
                      Project Y+1                                     to be viable –
                      ….                  “C” Projects             On hold pending
                                                                availability of resources


                 Figure 1: Classification of projects into A/B/C priorities, based on the
                                 availability of adequate resources.

                                                          2
Project assignment would they work on a B Project to which they have been assigned (essentially as their
“back-up” project). In this way, a firm would be assured that the most important projects in the company have
predictable schedule outcomes, at least from a resource availability perspective.
        This desirable situation cannot be achieved, however, without an understanding of resource capacity, by
function and time, as described above. In Section 3.0, I will discuss how this data can be efficiently harvested,
and how actual project performance can provide feedback to the system that will allow increased accuracy of
both project schedules and resource capacity over time.

3.0 Capacity and Workflow Management
        In this section, I will describe how development capacity can be quantified, tracked, and optimized.
Note that once this process is in operation it will not be excessively time-consuming for any individual to
maintain. Also note that it is fine to begin with very rough data, since the process provides feedback to refine
capacity estimates over time. Fortunately, even poor accuracy in this process is better than not having any fact-
based methodology for capacity management.

    A “Hoshin-like” Capacity Management System
         Let’s take it from the top (of Figure 2, that is). The process begins with a global priority list of projects
from all sources within your firm, divided into the A / B / C categories described above. As each A or B project
progresses, the project team leader (with help from functional management, if necessary) develops a
calendarized initial plan for resource requirements, by function and month. Although this initial plan may be
crude, it forms the starting point for a continuously updated, monthly planning activity.
         This information is fed in two directions: it is provided to the “strategic” committee for future capacity
planning purposes, and it is provided to each functional manager to enable real-time capacity management.
Note that the update periods shown in Figure 2 are just recommendations, but the functional areas should be
reassessing (and potentially reassigning) resource capacity on a monthly basis, using a simple spreadsheet tool
as a means to allocate their resources, as individuals with unique skills. Note that the functional managers must
include in their plans any drains on resource availability from sustaining operations, and only allocate resource
hours based on realistic availability to development projects. Initially, the capacity demands due to sustaining
support may be rough estimates, but over time these estimates will become more accurate as feedback is
provided from visual project boards (described below). Two simple rules apply to the allocation of resources in
each functional area:
        1) No development resource is allocated to more than two major projects, or three minor projects, in
           any monthly period. This is critical to maintaining focus on A Projects, and avoiding the waste and
           turbulence associated with an individual having too many projects. Among these project
           assignments, there should always be clear understanding of which projects can slip, if necessary, to
           ensure that “A” projects always meet their schedules.
        2) No development resource is allocated beyond 100 % of their realistically available capacity.
         Each month, the project team leaders will provide updated estimates of their resource needs to the
functional managers. If there is ever a resource shortfall, the A Projects always get their needed resources first.
If all A Projects cannot be satisfied, this should immediately raise a flag, and if the situation is serious enough,
should trigger action by upper management to resolve the conflict. Based on the monthly assignments of
individuals by functional managers, project teams will meet on a frequent basis to hold “stand-up meetings” in
front of visual project boards. The output of these workflow management meetings is a continuously updated
understanding of project status, progress, and future resource needs.
         Hence the loop can now close. As projects proceed, team leaders will determine if their staffing levels
are adequate, and will use that understanding to update their monthly resource requests as their projects move
forward. Functional managers will update their understanding of resource availability as better data on both
project and sustaining support demands are understood. Ultimately, the strategic management team will update
their high-level capacity model to incorporate this feedback, and so it goes. If this process seems complex, then
you should begin slowly, perhaps only focusing on functional areas that are known to be critical to project

                                                          3
“G lo b a l” P ro je c t
                                       P rio rity L is t
                                         (A / B / C )
                                  (U p d a te d o n 3 m o .
                                    R o llin g W in d o w )                                       P ro je c t T e a m s C o n d u c t
                                                                                          P ro je c t P la n n in g / R is k M it. E v e n ts
                                                                                            (O u tp u t: In itia l R e s o u rc e P la n s )
                                  1 2 M o n th C a p a c ity
                            P la n b y F u n c tio n a n d M o n th
                                       (U p d a te d o n                                 P ro je c t 1 – C a le n d a riz e d R e s o u rc e
                                3 m o . R o llin g W in d o w )                         R e q u ire m e n ts b y M o n th a n d F u n c tio n

                                                                                         P ro je c t 2 – C a le n d a riz e d R e s o u rc e
                             F e e d b a c k to P ro je c t T e a m s                   R e q u ire m e n ts b y M o n th a n d F u n c tio n
                                 o n A v a ila b le C a p a c ity
                                   a n d W o rk P ro g re s s
                                                                                         P ro je c t 3 – C a le n d a riz e d R e s o u rc e
                                                                                        R e q u ire m e n ts b y M o n th a n d F u n c tio n
                           M u lti-P ro je c t B d . fo r S m a lle r P ro j.




                                                                                                                                                                                                                                                           Naresh
                                                                                                                                                                                                                                                 Cassie
                                                                                            Priority




                                                                                                                                                                                                                                        Renee
                                                                                                                                                                                            Cathy
                                                                                                                                                       Harry




                                                                                                                                                                                                                         Nada

                                                                                                                                                                                                                                 Dave




                                                                                                                                                                                                                                                                     John
                                                                                                             P r o je c t L is t




                                                                                                                                                                      Jane




                                                                                                                                                                                                                                                                            Thor
                                                                                                                                                                                    Fred




                                                                                                                                                                                                                 Sara
                                                                                                                                                Dick
                                                                                                                                          Tom




                                                                                                                                                                                                     Ron
                                                                                                                                                                Sue




                                                                                                                                                                                                           Tim
                                                                                                                                                                             Liz
                                                                                                       (C u rr e n t & P la n n e d )


      U n p la n n e d                                                                      A
                                                                                                       A v a i la b le H o u rs *
                                                                                                       W id g e t 1 . 3
                                                                                                                                         8 0 1 2 0 1 2 0 1 6 0 1 2 0 1 60 1 6 0 1 6 0 1 4 0 8 0 1 2 0 1 2 0 1 6 0 1 2 0 1 6 0 1 6 0 1 6 0 1 4 0
                                                                                                                                         40                           80                   160             40                           80                          160
                                                                                            A          T h in g a m a jig A 3                   60             120           40                                  80             120             40

      S u s ta in in g                                                                      A          D o hicky U pd ate                              80                          40               100                 100                               40                60

                                    S ta n d -u p M e e tin g s /                           A          W h a t c h a m a c a llit        40                                  80                            40                                   100

       S u p p o rt /                                                                       B
                                                                                            B
                                                                                                       W id g e t 1 . 4
                                                                                                       T h in g a m a jig B 6
                                                                                                                                                40
                                                                                                                                                       20
                                                                                                                                                                      40           120
                                                                                                                                                                                                    20
                                                                                                                                                                                                                 40
                                                                                                                                                                                                                        20
                                                                                                                                                                                                                                        40                120
                                                                                                                                                                                                                                                                            40
                                        P ro je c t B o a rd s                              B          M in i -D o h i c k y                                   40                                                               40

     O th e r D ra in s                                                                     C
                                                                                            C
                                                                                                       B l u e s k y 6 .0
                                                                                                       D r e a m 1 .0
                                                                                            C
     o n C a p a c ity                                                                      C
                                                                                                       W is h 1 .0
                                                                                                       P ra y e r 1 .0
                                                                                                       S u s t a in in g S u p p o r t          20                           20                                                                                             20
                                                                                                       C u s to m e r S u p p o rt                     20                                           20                                                                      20
                                                                                                       O th e r? ? ?                                                         20                                                                 20



                                                                                                                         M o n th ly R e s o u rc e P la n
                                                                                                                           b y F u n c tio n a l A re a
                             S in g le P ro je c t B d . fo r L a rg e P ro j.


                     Figure 2: An integrated system for product development project prioritization,
                                    capacity management and project workflow management.
schedule, and on projects that are “tent-poles”. As the system begins to function, additional depth can be added
until all projects and all resources critical to new product development are included in the process.
    Visual Project Boards / Stand-up Meetings
        Basically, the visual project board is a central repository of information required for a team to plan and
execute their daily work. There are several types of visual project boards, and although the specifics are slightly
different, they all follow the same general format and are intended to accomplish the same purpose.
        In all cases, the visual project board has, at its core, a task-tracking tool referred to as a “Wall Gantt”.
This simple tool allows real-time tracking and allocation of resources, and has the flexibility to accommodate
rapidly changing demands and unexpected tasks. Other information is typically included on a project board,
including high-level status, project schedules, problem-solving initiatives, risk mitigation strategies, and so on.
Regardless of the format, the boards are highly interactive, and are the focus of frequent (ranging from three
times per week to daily) stand-up meetings. The stand-up meeting is a short duration (typically less than 15
minutes), high energy forum for updating the Wall Gantt, and as necessary, the other higher-level tracking tools
on the project board. Unplanned work (e.g., sustaining support) is captured on the project board along with
planned project work, such that all demands on team members’ time are accounted for.

                                                                                * * *
        Thus, we have a system for tracking, managing, planning, and optimizing the utilization of project
resources, from the highest strategic level, to the day-to-day activities of team members and support personnel.
As challenging as implementation of this system might seem, this methodology can provide a sustainable
competitive advantage to any firm by maximizing the output of new products, ensuring that the most critical
projects are completed on schedule, and allowing accurate future planning for growth.
                           For more information on our practical and integrated approach
                  to lean product development implementation, please contact us at 818-366-7488 or
                    by e-mail at techper@att.net, or visit our website at www.Design-for-Lean.com.
                                                                                  4

More Related Content

What's hot

Agile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryAgile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryVijay Brzee
 
Deliverables based planning handbook
Deliverables based planning handbookDeliverables based planning handbook
Deliverables based planning handbookGlen Alleman
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project ReportRISHABHSIINGH
 
The editors bookshelf
The editors bookshelfThe editors bookshelf
The editors bookshelfGlen Alleman
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlM Maged Hegazy, LLM, MBA, CCP, P3O
 
Making Agile Development work in Government Contracting
Making Agile Development work in Government ContractingMaking Agile Development work in Government Contracting
Making Agile Development work in Government ContractingGlen Alleman
 
Pmbok 4th edition chapter 7 - Project Cost Management
Pmbok 4th edition   chapter 7 - Project Cost Management Pmbok 4th edition   chapter 7 - Project Cost Management
Pmbok 4th edition chapter 7 - Project Cost Management Ahmad Maharma, PMP,RMP
 
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15Project Control | PROJ CTRL
 
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SANProject Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SANcj_barbosa
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1Craig Brown
 
Sharyl butler
Sharyl butlerSharyl butler
Sharyl butlerNASAPMC
 
Five immutable principles of project success
Five immutable principles of project successFive immutable principles of project success
Five immutable principles of project successGlen Alleman
 
Intro2 Pm
Intro2 PmIntro2 Pm
Intro2 Pmbgenotte
 
Seven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerSeven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerGlen Alleman
 
Pmbok 4th edition chapter 1 - Introduction to Project Management
Pmbok 4th edition   chapter 1 - Introduction to Project ManagementPmbok 4th edition   chapter 1 - Introduction to Project Management
Pmbok 4th edition chapter 1 - Introduction to Project ManagementAhmad Maharma, PMP,RMP
 
5 Key Chart Project Management (TM) Methodology
5 Key Chart Project Management (TM) Methodology5 Key Chart Project Management (TM) Methodology
5 Key Chart Project Management (TM) Methodologyjmcmahon89
 
Risk Management Guidance
Risk Management GuidanceRisk Management Guidance
Risk Management GuidanceGlen Alleman
 

What's hot (20)

Agile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryAgile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical Industry
 
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary LtdPROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
 
Deliverables based planning handbook
Deliverables based planning handbookDeliverables based planning handbook
Deliverables based planning handbook
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
The editors bookshelf
The editors bookshelfThe editors bookshelf
The editors bookshelf
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
 
080613 Mega-Project Schedule Integration & Management RCF Method-1
080613 Mega-Project Schedule Integration & Management RCF Method-1 080613 Mega-Project Schedule Integration & Management RCF Method-1
080613 Mega-Project Schedule Integration & Management RCF Method-1
 
Managing Project Success
Managing Project SuccessManaging Project Success
Managing Project Success
 
Making Agile Development work in Government Contracting
Making Agile Development work in Government ContractingMaking Agile Development work in Government Contracting
Making Agile Development work in Government Contracting
 
Pmbok 4th edition chapter 7 - Project Cost Management
Pmbok 4th edition   chapter 7 - Project Cost Management Pmbok 4th edition   chapter 7 - Project Cost Management
Pmbok 4th edition chapter 7 - Project Cost Management
 
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
 
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SANProject Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Sharyl butler
Sharyl butlerSharyl butler
Sharyl butler
 
Five immutable principles of project success
Five immutable principles of project successFive immutable principles of project success
Five immutable principles of project success
 
Intro2 Pm
Intro2 PmIntro2 Pm
Intro2 Pm
 
Seven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerSeven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project manager
 
Pmbok 4th edition chapter 1 - Introduction to Project Management
Pmbok 4th edition   chapter 1 - Introduction to Project ManagementPmbok 4th edition   chapter 1 - Introduction to Project Management
Pmbok 4th edition chapter 1 - Introduction to Project Management
 
5 Key Chart Project Management (TM) Methodology
5 Key Chart Project Management (TM) Methodology5 Key Chart Project Management (TM) Methodology
5 Key Chart Project Management (TM) Methodology
 
Risk Management Guidance
Risk Management GuidanceRisk Management Guidance
Risk Management Guidance
 

Viewers also liked

Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementationITZHAK123
 
Lean Product Development 101
Lean Product Development 101Lean Product Development 101
Lean Product Development 101Cloud Elements
 
Lean Product Development
Lean Product DevelopmentLean Product Development
Lean Product DevelopmentTim McMahon
 
Visual workflow management
Visual workflow managementVisual workflow management
Visual workflow managementBéla Ulicsák
 
Product lifecycle developing a global innovation culture
Product lifecycle   developing a global innovation culture Product lifecycle   developing a global innovation culture
Product lifecycle developing a global innovation culture strongandagile.co.uk
 
BFBM(5-2016) Lean in (lean transformation)
BFBM(5-2016) Lean in  (lean transformation)BFBM(5-2016) Lean in  (lean transformation)
BFBM(5-2016) Lean in (lean transformation)Hub Myanmar Company Limited
 
Generic Product Development Process
Generic Product Development ProcessGeneric Product Development Process
Generic Product Development ProcessRipal Maravia
 
new-product-development-process
new-product-development-processnew-product-development-process
new-product-development-processarunalapati
 

Viewers also liked (13)

Lean Product Development by Ron Mascitelli
Lean Product Development by Ron Mascitelli Lean Product Development by Ron Mascitelli
Lean Product Development by Ron Mascitelli
 
Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementation
 
Lean product development
Lean product developmentLean product development
Lean product development
 
Lean Product Development 101
Lean Product Development 101Lean Product Development 101
Lean Product Development 101
 
Lean Product Development
Lean Product DevelopmentLean Product Development
Lean Product Development
 
Visual workflow management
Visual workflow managementVisual workflow management
Visual workflow management
 
Product lifecycle developing a global innovation culture
Product lifecycle   developing a global innovation culture Product lifecycle   developing a global innovation culture
Product lifecycle developing a global innovation culture
 
Difficulties With Changing To A Lean Culture Part 02 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 02 By Mike ThelenDifficulties With Changing To A Lean Culture Part 02 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 02 By Mike Thelen
 
Difficulties With Changing To A Lean Culture Part 03 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 03 By Mike ThelenDifficulties With Changing To A Lean Culture Part 03 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 03 By Mike Thelen
 
BFBM(5-2016) Lean in (lean transformation)
BFBM(5-2016) Lean in  (lean transformation)BFBM(5-2016) Lean in  (lean transformation)
BFBM(5-2016) Lean in (lean transformation)
 
Generic Product Development Process
Generic Product Development ProcessGeneric Product Development Process
Generic Product Development Process
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
 
new-product-development-process
new-product-development-processnew-product-development-process
new-product-development-process
 

Similar to Future State for Lean Prod Dev by Ron Mascitelli Ame10.2

The gigaprogram challenge
The gigaprogram challengeThe gigaprogram challenge
The gigaprogram challengeBob Prieto
 
importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...Abdul Naqashbandi
 
Project Management Diploma
Project Management DiplomaProject Management Diploma
Project Management DiplomaTheunis Venter
 
Managing projects
Managing projectsManaging projects
Managing projectsNovoraj Roy
 
Engineering Project Management
Engineering Project Management Engineering Project Management
Engineering Project Management Nzar Braim
 
Is it time to rethink project managemnt theory
Is it time to rethink project managemnt theoryIs it time to rethink project managemnt theory
Is it time to rethink project managemnt theoryBob Prieto
 
MCP1
MCP1MCP1
MCP1PMI2011
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
How to Avoid Project Train Wrecks
How to Avoid Project Train WrecksHow to Avoid Project Train Wrecks
How to Avoid Project Train WrecksPete Luan
 
From arms race to green space
From arms race to green spaceFrom arms race to green space
From arms race to green spaceGlen Alleman
 
IT Project Management
IT Project ManagementIT Project Management
IT Project ManagementSravan Banka
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio managementGlen Alleman
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planningYasirHamour
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Risk Analysis Workbook
Risk Analysis WorkbookRisk Analysis Workbook
Risk Analysis Workbookdmdk12
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingStudy Stuff
 
Why Scheduling Mustn't Be Allowed to Become an Extinct Science
Why Scheduling Mustn't Be Allowed to Become an Extinct ScienceWhy Scheduling Mustn't Be Allowed to Become an Extinct Science
Why Scheduling Mustn't Be Allowed to Become an Extinct ScienceAcumen
 

Similar to Future State for Lean Prod Dev by Ron Mascitelli Ame10.2 (20)

Pm chapter 1
Pm chapter 1Pm chapter 1
Pm chapter 1
 
Pm chapter 1...
Pm chapter 1...Pm chapter 1...
Pm chapter 1...
 
The gigaprogram challenge
The gigaprogram challengeThe gigaprogram challenge
The gigaprogram challenge
 
importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...
 
Project Management Diploma
Project Management DiplomaProject Management Diploma
Project Management Diploma
 
Managing projects
Managing projectsManaging projects
Managing projects
 
Project control
Project controlProject control
Project control
 
Engineering Project Management
Engineering Project Management Engineering Project Management
Engineering Project Management
 
Is it time to rethink project managemnt theory
Is it time to rethink project managemnt theoryIs it time to rethink project managemnt theory
Is it time to rethink project managemnt theory
 
MCP1
MCP1MCP1
MCP1
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
How to Avoid Project Train Wrecks
How to Avoid Project Train WrecksHow to Avoid Project Train Wrecks
How to Avoid Project Train Wrecks
 
From arms race to green space
From arms race to green spaceFrom arms race to green space
From arms race to green space
 
IT Project Management
IT Project ManagementIT Project Management
IT Project Management
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planning
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Risk Analysis Workbook
Risk Analysis WorkbookRisk Analysis Workbook
Risk Analysis Workbook
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Why Scheduling Mustn't Be Allowed to Become an Extinct Science
Why Scheduling Mustn't Be Allowed to Become an Extinct ScienceWhy Scheduling Mustn't Be Allowed to Become an Extinct Science
Why Scheduling Mustn't Be Allowed to Become an Extinct Science
 

More from Association for Manufacturing Excellence

The Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesThe Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesAssociation for Manufacturing Excellence
 
Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Association for Manufacturing Excellence
 
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInHow and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInAssociation for Manufacturing Excellence
 

More from Association for Manufacturing Excellence (20)

AME Chicago 2019 Conference Preview
AME Chicago 2019 Conference PreviewAME Chicago 2019 Conference Preview
AME Chicago 2019 Conference Preview
 
Value Stream Mapping: Things We've Learned Since Learning to See
Value Stream Mapping: Things We've Learned Since Learning to SeeValue Stream Mapping: Things We've Learned Since Learning to See
Value Stream Mapping: Things We've Learned Since Learning to See
 
AME Lean Consortia
AME Lean ConsortiaAME Lean Consortia
AME Lean Consortia
 
AME San Diego 2018 Conference Preview
AME San Diego 2018 Conference PreviewAME San Diego 2018 Conference Preview
AME San Diego 2018 Conference Preview
 
Applying for the AME Excellence Award
Applying for the AME Excellence Award Applying for the AME Excellence Award
Applying for the AME Excellence Award
 
AME Boston International Conference Preview
AME Boston International Conference Preview AME Boston International Conference Preview
AME Boston International Conference Preview
 
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesThe Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
 
Slide share presentation - building a people-centric culture
Slide share presentation - building a people-centric cultureSlide share presentation - building a people-centric culture
Slide share presentation - building a people-centric culture
 
Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)
 
Love and Lean
Love and Lean Love and Lean
Love and Lean
 
Interviewing for Success
Interviewing for SuccessInterviewing for Success
Interviewing for Success
 
Sorry: LinkedIn "Event" app no longer exists
 Sorry: LinkedIn "Event" app no longer exists Sorry: LinkedIn "Event" app no longer exists
Sorry: LinkedIn "Event" app no longer exists
 
Fundamentals of LinkedIn Groups
Fundamentals of LinkedIn GroupsFundamentals of LinkedIn Groups
Fundamentals of LinkedIn Groups
 
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInHow and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
 
AME Leaders guide to LinkedIn: Networking & Connections
AME Leaders guide to LinkedIn: Networking & ConnectionsAME Leaders guide to LinkedIn: Networking & Connections
AME Leaders guide to LinkedIn: Networking & Connections
 
Retire the PDCA wedge
Retire the PDCA wedgeRetire the PDCA wedge
Retire the PDCA wedge
 
Advanced Social Networking
Advanced Social NetworkingAdvanced Social Networking
Advanced Social Networking
 
Getting started with social media
Getting started with social mediaGetting started with social media
Getting started with social media
 
Value stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environmentsValue stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environments
 
Difficulties With Changing To A Lean Culture Part 12 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 12 By Mike ThelenDifficulties With Changing To A Lean Culture Part 12 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 12 By Mike Thelen
 

Recently uploaded

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | â‚ą5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | â‚ą5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | â‚ą5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | â‚ą5k To 25k Wit...Suhani Kapoor
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...amitlee9823
 

Recently uploaded (20)

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | â‚ą5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | â‚ą5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | â‚ą5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | â‚ą5k To 25k Wit...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call đź‘— 7737669865 đź‘— Top Class Call Girl Service Bang...
 

Future State for Lean Prod Dev by Ron Mascitelli Ame10.2

  • 1. Envisioning a Lean Future State for New Product Development Focus: Capacity Management and Project Prioritization by Ron Mascitelli, PMP President Technology Perspectives 1.0 Executive Summary This monograph describes an integrated approach to achieving the maximum productivity and profitability from finite product development resources. Specifically: • The ability to handle more development projects, in less time, with the highest quality delivered to the customer. • The ability to plan and execute development projects to shorter, more predictable schedules, and deliver the most critical “tent pole” projects on time, with all critical success factors achieved. • Accomplish the above with a high level of agility and flexibility to accommodate a dynamically changing business and technology environment. 2.0 Portfolio Management and Project Prioritization It is almost inevitable that a highly creative firm will generate far more opportunities for new products than can be achieved with the development resources that are available. This typically due to a lack of clear and current capacity data. Unfortunately, a mismatch between the list of projects being pursued and the available resource capacity will result in unpredictable schedules, delayed launch dates, and a great deal of unnecessary turbulence in the organization. In this section, I will describe several straightforward steps that can lead to effective, fact-based management of a firm’s project portfolio. These measures will ensure that finite development resources will have the greatest impact on the future balance sheet of the company. Capacity-based Project Prioritization Metric Sometimes all it takes is a new metric. The classical approach to selecting and prioritizing new product development projects involves two dimensions: projected profitability (net present value or the like), and strategic importance (typically based on a subjective scoring system). Ideally, the highest priority projects will have both a high economic impact and will strongly support the firm’s strategic goals. There is a critical consideration that is missing from this two-dimensional world, however. Nowhere in this portfolio management scheme is the finite capacity of the organization to execute development projects considered. Instead, the matching of the project list to capacity is often done subjectively. Functional managers are asked if they have adequate capacity, and in the absence of hard data, they tend to err on the optimistic side. Moreover, some of the “high priority” projects identified using this two-dimensional approach may be capacity hogs, whereas other opportunities might yield a far higher return from available resources. A third dimension (and a third metric) is needed to make truly informed decisions in a finite capacity environment. I propose the addition of a productivity metric that divides the future profits generated by a proposed new product by the estimated hours of design / development time. This ratio, in units of profit dollars per hour of design / development time, offers an important new perspective on the desirability of a proposed project. If taken in concert with the other two traditional metrics, portfolio management now becomes a three-dimensional 1
  • 2. world, in which a truly excellent new opportunity will yield high total return, have positive strategic impact, and will make efficient use of scarce development resources. The “Global” Priority List One of the most critical factors in successful project execution is the alignment of the entire organization around a common set of priorities. Since virtually every function within a firm “touches” the product development process at one time or another during development, this mandates that the entire firm agree on a common (i.e., “global”) priority list for all active projects. Note that it is not sufficient to prioritize just major projects; all projects that consume resources must be included. Why is this so important? Because any misalignment of priorities among contributing functions (or by individual team members for that matter) can lead to delays in the most important projects in the firm. Hence, a published list of all projects, in priority order, should be available to anyone in the firm that participates in new product development. The challenge in achieving this ideal is that tough choices will have to be made. This is hard work, but consider the alternative: if the executive team in your firm doesn’t make these tough calls, then by default, the calls will be made by the designers and developers themselves. It is far better that the decision be made by the strategic visionaries of the company, than by working-level individuals on a day-to-day basis. A / B / C Project Prioritization Imagine that we knew our product development capacity, by function and by month, and that we have established the global priority list described above. With this knowledge, we could begin allocating resources to projects in priority order, based on the stated needs of each team leader. Once the first project was fully staffed, we would move on to the next project on the priority list, and so on. At some point, we would find that project leader’s needs cannot be met, at least for some constraining functional area(s). Projects that are above this point on the priority list have been fully staffed, and hence should have minimal schedule risk (assuming manageable technical risks). We will classify this fortunate group as “A Projects”, as shown in Figure 1. Now we continue the process by allocating the remaining (albeit limited) resources to projects in priority order until we cannot realistically consider the project to be viable from a staffing perspective. These intermediate projects will still make progress, but will suffer from an increased level of schedule risk, and hence will not have predictable completion dates (at least not down to the day – perhaps predictable to the quarter). We will classify this group of less fortunate projects as “B Projects”. Finally, those projects below this intermediate group we will classify as “C Projects”. This last group of projects we will put on hold, pending the availability of freed-up resources from completed projects in categories A and B. This A/B/C prioritization will serve to arbitrate most resource conflict situations through a simple rule: A Projects always win over B Projects. If an assigned team member can move forward the critical path of their A Project, that would always be the correct course of action. Only when they cannot make progress on their A Global Priority List Project 1 Fully staffed – Project 2 High degree of …. “A” Projects schedule predictability Project X Staffed with some Project X+1 resource constraints – … “B” Projects Increased schedule risk Project Y but still viable Inadequate staffing Project Y+1 to be viable – …. “C” Projects On hold pending availability of resources Figure 1: Classification of projects into A/B/C priorities, based on the availability of adequate resources. 2
  • 3. Project assignment would they work on a B Project to which they have been assigned (essentially as their “back-up” project). In this way, a firm would be assured that the most important projects in the company have predictable schedule outcomes, at least from a resource availability perspective. This desirable situation cannot be achieved, however, without an understanding of resource capacity, by function and time, as described above. In Section 3.0, I will discuss how this data can be efficiently harvested, and how actual project performance can provide feedback to the system that will allow increased accuracy of both project schedules and resource capacity over time. 3.0 Capacity and Workflow Management In this section, I will describe how development capacity can be quantified, tracked, and optimized. Note that once this process is in operation it will not be excessively time-consuming for any individual to maintain. Also note that it is fine to begin with very rough data, since the process provides feedback to refine capacity estimates over time. Fortunately, even poor accuracy in this process is better than not having any fact- based methodology for capacity management. A “Hoshin-like” Capacity Management System Let’s take it from the top (of Figure 2, that is). The process begins with a global priority list of projects from all sources within your firm, divided into the A / B / C categories described above. As each A or B project progresses, the project team leader (with help from functional management, if necessary) develops a calendarized initial plan for resource requirements, by function and month. Although this initial plan may be crude, it forms the starting point for a continuously updated, monthly planning activity. This information is fed in two directions: it is provided to the “strategic” committee for future capacity planning purposes, and it is provided to each functional manager to enable real-time capacity management. Note that the update periods shown in Figure 2 are just recommendations, but the functional areas should be reassessing (and potentially reassigning) resource capacity on a monthly basis, using a simple spreadsheet tool as a means to allocate their resources, as individuals with unique skills. Note that the functional managers must include in their plans any drains on resource availability from sustaining operations, and only allocate resource hours based on realistic availability to development projects. Initially, the capacity demands due to sustaining support may be rough estimates, but over time these estimates will become more accurate as feedback is provided from visual project boards (described below). Two simple rules apply to the allocation of resources in each functional area: 1) No development resource is allocated to more than two major projects, or three minor projects, in any monthly period. This is critical to maintaining focus on A Projects, and avoiding the waste and turbulence associated with an individual having too many projects. Among these project assignments, there should always be clear understanding of which projects can slip, if necessary, to ensure that “A” projects always meet their schedules. 2) No development resource is allocated beyond 100 % of their realistically available capacity. Each month, the project team leaders will provide updated estimates of their resource needs to the functional managers. If there is ever a resource shortfall, the A Projects always get their needed resources first. If all A Projects cannot be satisfied, this should immediately raise a flag, and if the situation is serious enough, should trigger action by upper management to resolve the conflict. Based on the monthly assignments of individuals by functional managers, project teams will meet on a frequent basis to hold “stand-up meetings” in front of visual project boards. The output of these workflow management meetings is a continuously updated understanding of project status, progress, and future resource needs. Hence the loop can now close. As projects proceed, team leaders will determine if their staffing levels are adequate, and will use that understanding to update their monthly resource requests as their projects move forward. Functional managers will update their understanding of resource availability as better data on both project and sustaining support demands are understood. Ultimately, the strategic management team will update their high-level capacity model to incorporate this feedback, and so it goes. If this process seems complex, then you should begin slowly, perhaps only focusing on functional areas that are known to be critical to project 3
  • 4. “G lo b a l” P ro je c t P rio rity L is t (A / B / C ) (U p d a te d o n 3 m o . R o llin g W in d o w ) P ro je c t T e a m s C o n d u c t P ro je c t P la n n in g / R is k M it. E v e n ts (O u tp u t: In itia l R e s o u rc e P la n s ) 1 2 M o n th C a p a c ity P la n b y F u n c tio n a n d M o n th (U p d a te d o n P ro je c t 1 – C a le n d a riz e d R e s o u rc e 3 m o . R o llin g W in d o w ) R e q u ire m e n ts b y M o n th a n d F u n c tio n P ro je c t 2 – C a le n d a riz e d R e s o u rc e F e e d b a c k to P ro je c t T e a m s R e q u ire m e n ts b y M o n th a n d F u n c tio n o n A v a ila b le C a p a c ity a n d W o rk P ro g re s s P ro je c t 3 – C a le n d a riz e d R e s o u rc e R e q u ire m e n ts b y M o n th a n d F u n c tio n M u lti-P ro je c t B d . fo r S m a lle r P ro j. Naresh Cassie Priority Renee Cathy Harry Nada Dave John P r o je c t L is t Jane Thor Fred Sara Dick Tom Ron Sue Tim Liz (C u rr e n t & P la n n e d ) U n p la n n e d A A v a i la b le H o u rs * W id g e t 1 . 3 8 0 1 2 0 1 2 0 1 6 0 1 2 0 1 60 1 6 0 1 6 0 1 4 0 8 0 1 2 0 1 2 0 1 6 0 1 2 0 1 6 0 1 6 0 1 6 0 1 4 0 40 80 160 40 80 160 A T h in g a m a jig A 3 60 120 40 80 120 40 S u s ta in in g A D o hicky U pd ate 80 40 100 100 40 60 S ta n d -u p M e e tin g s / A W h a t c h a m a c a llit 40 80 40 100 S u p p o rt / B B W id g e t 1 . 4 T h in g a m a jig B 6 40 20 40 120 20 40 20 40 120 40 P ro je c t B o a rd s B M in i -D o h i c k y 40 40 O th e r D ra in s C C B l u e s k y 6 .0 D r e a m 1 .0 C o n C a p a c ity C W is h 1 .0 P ra y e r 1 .0 S u s t a in in g S u p p o r t 20 20 20 C u s to m e r S u p p o rt 20 20 20 O th e r? ? ? 20 20 M o n th ly R e s o u rc e P la n b y F u n c tio n a l A re a S in g le P ro je c t B d . fo r L a rg e P ro j. Figure 2: An integrated system for product development project prioritization, capacity management and project workflow management. schedule, and on projects that are “tent-poles”. As the system begins to function, additional depth can be added until all projects and all resources critical to new product development are included in the process. Visual Project Boards / Stand-up Meetings Basically, the visual project board is a central repository of information required for a team to plan and execute their daily work. There are several types of visual project boards, and although the specifics are slightly different, they all follow the same general format and are intended to accomplish the same purpose. In all cases, the visual project board has, at its core, a task-tracking tool referred to as a “Wall Gantt”. This simple tool allows real-time tracking and allocation of resources, and has the flexibility to accommodate rapidly changing demands and unexpected tasks. Other information is typically included on a project board, including high-level status, project schedules, problem-solving initiatives, risk mitigation strategies, and so on. Regardless of the format, the boards are highly interactive, and are the focus of frequent (ranging from three times per week to daily) stand-up meetings. The stand-up meeting is a short duration (typically less than 15 minutes), high energy forum for updating the Wall Gantt, and as necessary, the other higher-level tracking tools on the project board. Unplanned work (e.g., sustaining support) is captured on the project board along with planned project work, such that all demands on team members’ time are accounted for. * * * Thus, we have a system for tracking, managing, planning, and optimizing the utilization of project resources, from the highest strategic level, to the day-to-day activities of team members and support personnel. As challenging as implementation of this system might seem, this methodology can provide a sustainable competitive advantage to any firm by maximizing the output of new products, ensuring that the most critical projects are completed on schedule, and allowing accurate future planning for growth. For more information on our practical and integrated approach to lean product development implementation, please contact us at 818-366-7488 or by e-mail at techper@att.net, or visit our website at www.Design-for-Lean.com. 4