SlideShare une entreprise Scribd logo
1  sur  7
Télécharger pour lire hors ligne
Offshore Construction Specialists Pte Ltd.
36 Kian Teck Road, , Singapore 628781
Tel: +65 6898-0210 / Fax +65 6898-0209
CURRICULUM VITAE
Page 1 of 7
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed
permission is granted by Offshore Construction Specialists Pte Ltd.
Aaron Lian Kian Hoe
Senior Field Engineer
Personal Information
Nationality : Malaysian
Race : Chinese
Date of Birth : 20th
January 1986
Marital Status : Married
Education
Bachelor of Civil Engineering (Hons.)
University Tenaga Nasional
Malaysia 2010
On Job Training and Courses
 BOSIET (Basic Offshore Safety Induction & Emergency Training)
 Travel Safely By Boat
Career Summary
Five years of experience in offshore construction and engineering acquiring significant
experience in the fabrication and installation of fixed offshore platforms throughout Asia
Pacific including associated submarine pipelines, risers and subsea tie-ins.
Work Experience
September 2011 to Present: Offshore Construction Specialists – Senior Field Engineer
Offshore Construction Specialists Pte Ltd
September 2011 to Jun 2014: Offshore Construction Specialists – Field Engineer
Offshore Construction Specialists Pte Ltd
On-going Project:
Client: Crowley Solution Inc.
Furie Kitchen Lights Platform Phase II
Senior Field Engineer based in Singapore, Houston and offshore Alaska preparing procedures,
mobilizing equipment and performing offshore Field Engineering duties on the Furie Kitchen lights
monopod located in the Cook Inlet in Alaska.
Offshore Construction Specialists Pte Ltd.
36 Kian Teck Road, , Singapore 628781
Tel: +65 6898-0210 / Fax +65 6898-0209
CURRICULUM VITAE
Page 2 of 7
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed
permission is granted by Offshore Construction Specialists Pte Ltd.
Specify assist on the Subcontractor equipment loadout at Singapore. Perform the tasks of supporting
in fabrication activities of the project installation aids with special emphasis to quality and accuracy.
Client: Supura Kencana
Thai Bhin Post Trenching Project
Senior Field Engineer responsible on the post trenching operation for the Thai Bhin 6km export
pipeline. Prepare the project deliverables including review the post trenching procedure and post
trenching equipment operation drawings.
Specify assist on the trenching equipment loadout at Batam and Johor Port. Organized the
mobilization of the post trenching and the mobilization of the trenching crews.
Client: PT.Timas Suprindo/ CNOOC
ASTI-A & MILA-A Installation Project
Senior Field Engineer responsible for the loadout, transportation and installation of the 2 main
topsides (ASTI-A and MILA-A) to be lifted with the TIMAS DLB01 onto the ASTI-A and MILA-A
preinstalled jacket located in BANUWATI-A Field nearby the offshore north Jakarta
Responsibilities included writing the installation procedures for topsides installation with the use of
DLB01. Specify materials for loadout on board of material barge, fabrication of the offshore platform
structures, supervision of welding works, Non-destructive test and load test for fabricated platform
structures.
Perform the tasks of supporting in fabrication activities with special emphasis to quality and accuracy.
Responsible for determining the specifications of product and arrange for the materials, equipment
and other required parts to be purchased
Completed Project:
Client : Crowley Solution Inc
Furie Kitchen Lights Platform Phase I
Offshore Construction Specialists Pte Ltd.
36 Kian Teck Road, , Singapore 628781
Tel: +65 6898-0210 / Fax +65 6898-0209
CURRICULUM VITAE
Page 3 of 7
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed
permission is granted by Offshore Construction Specialists Pte Ltd.
Field Engineer based in Houston and offshore Alaska preparing procedures, mobilizing equipment
and performing offshore Field Engineering duties on the Furie Kitchen lights monopod located in the
Cook Inlet in Alaska.
Client: Petronas Carigali /PT. Timas Suplindo
Ketapang Project – Post trenching of 27km 12’’ Export pipeline
Jetting Engineer responsible on the post trenching operation for the Bukit Tua, Ketapng 27km export
pipeline. Prepare the project deliverables including post trenching procedure and post trenching
equipments operation drawings.
Perform the feasibility study on the modification of the jet sled to suit the project. Specify assist on the
trenching equipment loadout at Batam and Singapore. Organized the mobilization of the post
trenching, pre commissioning equipment and the mobilization of the trenching crews.
Client: Pertamina PHE ONWJ
UL Project – Transportation and Installation for Offshore Jacket and Topside
Offshore Installation Engineer responsible for the loadout, transportation and installation of the 2 main
module packages (Jacket and Topside) to be lifted with the DLB01 onto the UL platform located West
Jakarta.
Responsibilities included writing the installation procedures for Jacket and topside installation with the
use of DLB01. Specify materials for loadout on board of material barge, fabrication of the offshore
platform structures, supervision of welding works, Non-destructive test and load test for fabricated
platform structures.
Installation of 12” x 6km in field pipelines from ULA to UW platform. Specify and assist in the
installation of the risers and subsea tie-ins on the ULA and UWA platform. Close supervision on the
production during the pipelay and riser guard installation. Perform the pre commissioning of the UL
pipeline with pigging and hydrotest after the completion of the subsea tie-ins.
Offshore Construction Specialists Pte Ltd.
36 Kian Teck Road, , Singapore 628781
Tel: +65 6898-0210 / Fax +65 6898-0209
CURRICULUM VITAE
Page 4 of 7
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed
permission is granted by Offshore Construction Specialists Pte Ltd.
Perform the tasks of supporting in fabrication activities with special emphasis to quality and accuracy.
Responsible for determining the specifications of product and arrange for the materials, equipment
and other required parts to be purchased
Client: Brunei Shell Petroleum – Swiber Offshore Pte Ltd
Airlift Jetting for the Pile Refusal Remedial Service
Jetting Engineer responsible on the loadout for the jetting spreads. Organize the mobilization of the
jetting equipments from Batam to Brunei. Prepare the project deliverables including Pile refusal
remedial with airlift jetting procedure and drawings.
Perform the feasibility study on the modification of the jet spread to suit the project. Perform the
function test on the feed pump and jet pump before mobilization to the field. Organize the setting up of
the equipments based on the deck layout.
Client: PT Timas Samudera
Loadout For DLB01 (Ex. DB26)
Lifting Engineer responsible on the heavy lifts and loading of 13 main equipments (Hammers and
stingers) from J.Ray Mcdermott Batam marine base onto material barge and DLB01 while PT Timas
Suplindo bought over the DLB01 from J.Ray Mcdermott.
Perform the lift analysis for the heavy lift of hammers and stingers weight various from 85mT to
300mT by using 800mT DLB01 Derrick Crane. Organize the loadout on the material barge and
perform the lifting equipments check. Supervision on the equipments modification works and NDT test
before the loadout for the hammers and stingers.
Responsibilities involve supervising the loadin of the heavy equipments from the material barge to the
storage yard by using Cometto. Organize the layout plan for the equipments at the storage yard and
perform the function test for the DLB01 derrick crane by using hammers.
Client: Sapura Clough
Gorgon Domgas Pipeline Installation
Offshore Construction Specialists Pte Ltd.
36 Kian Teck Road, , Singapore 628781
Tel: +65 6898-0210 / Fax +65 6898-0209
CURRICULUM VITAE
Page 5 of 7
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed
permission is granted by Offshore Construction Specialists Pte Ltd.
Jetting Engineer responsible on the pipeline installation and jetting work, prepare the project
deliverables including pipeline installation procedure, flexible flowline and umbilical procedure, Tie-in
installation procedure, riser and riser clamp installation procedure, pigging and hydro test and project
material and equipment (material requisition, material clarification and inspection)
Client: MCJV
Pipepull for Narrows Crossing
Pipepull Engineer responsible on the operation of the 4km twin pipeline pull from main land crossing
Narrows to Curtis Island. Perform the feasibility study on the pipepull operation across Narrows.
Planning for the buoyancy management on the pipeline and prepare the procedure for buoyancy
management plan.
Perform the task in supporting the fabrication of the foam buoys. Specify and assist in materials
loadout and mobilisation from the vendor fabrication yard and perform the lifting check on all the
related lifting activities from vendor. Specify and assist in conducting FAT for linear winch and HPU.
Supervision of the load test and equipments FAT for spoolers and winches.
Client: Essar India
Nand Gaurav Barge Modification Project
Field Engineer responsible on the procedure for modification work on Nand Gaurav pipelay barge.
Perform the feasibility study of the fabrication specification for Nand Gaurav. Prepare the fabrication
specification, QA plan, HSE plan and quality management plan for fabrication.
Client: Petronas Gas Berhad/ Perunding Ranhill Worley
LEKAS LNG Regasification Project
Lifting Engineer responsible on heavy lift and installation of 7 main modules on the regasification jetty.
Perform the feasibility study on the heavy lift of material skid, booster module, cooler module, crane
pedestal and machinery deck. Organize the loadout on the material barge for offshore installation and
perform the lifting equipments check.
Offshore Construction Specialists Pte Ltd.
36 Kian Teck Road, , Singapore 628781
Tel: +65 6898-0210 / Fax +65 6898-0209
CURRICULUM VITAE
Page 6 of 7
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed
permission is granted by Offshore Construction Specialists Pte Ltd.
Supervision on the module fabrication, welding works, Non-destructive test and load test for the
modules. Responsibilities involve supervising the offshore heavy engineered lifts
Client: Client: Target Energy
Modification and Installation for Mas Mulia Pipelay Barge
Field Engineer responsible on Modification of the pipelay barge. Specify and assist the materials
loadout from Singapore and on board of Mas Mulia at Batam. Perform the feasibility study on the
installation work for Mas Mulia and supervision for the installation work on board of Mas Mulia pipelay
barge. Responsibility on determine the specification of the installation and modification for the
sheaves and fairleads on board of Mas Mulia.
Client: Origin Energy
Yolla MLE (Mid Life Enhancement) Project
Offshore Installation Engineer responsible for the loadout, transportation and installation of the 4 main
module packages to be lifted with the Jascon 25 onto the Yolla platform located in central Bass Strait.
Perform feasibility study for caisson upend and installation with the use of Go Rigel. Responsibilities
on feasibility study for Accommodation & Compressor Modules installation with the use of Jascon 25.
Specify and assist in materials loadout on board of Jascon 25, fabrication of the offshore platform
structures, supervision of welding works, Non-destructive test and load test for fabricated platform
structures.
Perform the tasks of supporting in fabrication activities with special emphasis to quality and accuracy.
Responsible for determining the specifications of product and arrange for the materials, equipment
and other required parts to be purchased
April 2010 to September 2011: Antara Koh Sdn Bhd
Client: ATB Pte Ltd
Development of hydrocarbon storage and distribution facilities at Tg Bin Terminal, Johor,
Malaysia (May ’10 – September ’11).
Site Engineer for the construction of 1.8km Jetty and oil pipe support structures.
Offshore Construction Specialists Pte Ltd.
36 Kian Teck Road, , Singapore 628781
Tel: +65 6898-0210 / Fax +65 6898-0209
CURRICULUM VITAE
Page 7 of 7
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed
permission is granted by Offshore Construction Specialists Pte Ltd.
Responsibilities involve supervising the heavy engineered lifts, fabrication of the pipe support
structures, NDT and coating defect of the steel structure, launching work for heavy structures and
installation of mooring fender block.
Also involves in preparation of the punch list for defect structures and proposed remedy work for the
steel structures or concrete structures.

Contenu connexe

Tendances

Tendances (20)

CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
MOHD NAZRUL CV
MOHD NAZRUL CVMOHD NAZRUL CV
MOHD NAZRUL CV
 
Vegi Bala (International) - Final
Vegi Bala  (International) - FinalVegi Bala  (International) - Final
Vegi Bala (International) - Final
 
Introduction
IntroductionIntroduction
Introduction
 
mpita20_CV_Amec
mpita20_CV_Amecmpita20_CV_Amec
mpita20_CV_Amec
 
ElanCVdocx
ElanCVdocxElanCVdocx
ElanCVdocx
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
PTL Presentation
PTL PresentationPTL Presentation
PTL Presentation
 
CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015 CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015
 
Mohamed Fahim 2015
Mohamed Fahim 2015Mohamed Fahim 2015
Mohamed Fahim 2015
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016
 
OKHANI TED MOST RECENT
OKHANI TED MOST RECENTOKHANI TED MOST RECENT
OKHANI TED MOST RECENT
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Success Stories of IDS in Papua
Success Stories of IDS in PapuaSuccess Stories of IDS in Papua
Success Stories of IDS in Papua
 

Similaire à OCS CV Field Engr_Aaron Lian Kian Hoe_April 15

Similaire à OCS CV Field Engr_Aaron Lian Kian Hoe_April 15 (20)

Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
Curriculum vitae new (1) (1)
Curriculum vitae new (1) (1)Curriculum vitae new (1) (1)
Curriculum vitae new (1) (1)
 
Resume
Resume Resume
Resume
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
jayaprakash
jayaprakashjayaprakash
jayaprakash
 
Joseph raj resume
Joseph raj resumeJoseph raj resume
Joseph raj resume
 
JOSEPH_RESUME.DOC
JOSEPH_RESUME.DOCJOSEPH_RESUME.DOC
JOSEPH_RESUME.DOC
 
Khairul Amilin CV
Khairul Amilin CVKhairul Amilin CV
Khairul Amilin CV
 
Emmanuel C-CV2
Emmanuel C-CV2Emmanuel C-CV2
Emmanuel C-CV2
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
My CV Piping
My CV PipingMy CV Piping
My CV Piping
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 

OCS CV Field Engr_Aaron Lian Kian Hoe_April 15

  • 1. Offshore Construction Specialists Pte Ltd. 36 Kian Teck Road, , Singapore 628781 Tel: +65 6898-0210 / Fax +65 6898-0209 CURRICULUM VITAE Page 1 of 7 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd. Aaron Lian Kian Hoe Senior Field Engineer Personal Information Nationality : Malaysian Race : Chinese Date of Birth : 20th January 1986 Marital Status : Married Education Bachelor of Civil Engineering (Hons.) University Tenaga Nasional Malaysia 2010 On Job Training and Courses  BOSIET (Basic Offshore Safety Induction & Emergency Training)  Travel Safely By Boat Career Summary Five years of experience in offshore construction and engineering acquiring significant experience in the fabrication and installation of fixed offshore platforms throughout Asia Pacific including associated submarine pipelines, risers and subsea tie-ins. Work Experience September 2011 to Present: Offshore Construction Specialists – Senior Field Engineer Offshore Construction Specialists Pte Ltd September 2011 to Jun 2014: Offshore Construction Specialists – Field Engineer Offshore Construction Specialists Pte Ltd On-going Project: Client: Crowley Solution Inc. Furie Kitchen Lights Platform Phase II Senior Field Engineer based in Singapore, Houston and offshore Alaska preparing procedures, mobilizing equipment and performing offshore Field Engineering duties on the Furie Kitchen lights monopod located in the Cook Inlet in Alaska.
  • 2. Offshore Construction Specialists Pte Ltd. 36 Kian Teck Road, , Singapore 628781 Tel: +65 6898-0210 / Fax +65 6898-0209 CURRICULUM VITAE Page 2 of 7 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd. Specify assist on the Subcontractor equipment loadout at Singapore. Perform the tasks of supporting in fabrication activities of the project installation aids with special emphasis to quality and accuracy. Client: Supura Kencana Thai Bhin Post Trenching Project Senior Field Engineer responsible on the post trenching operation for the Thai Bhin 6km export pipeline. Prepare the project deliverables including review the post trenching procedure and post trenching equipment operation drawings. Specify assist on the trenching equipment loadout at Batam and Johor Port. Organized the mobilization of the post trenching and the mobilization of the trenching crews. Client: PT.Timas Suprindo/ CNOOC ASTI-A & MILA-A Installation Project Senior Field Engineer responsible for the loadout, transportation and installation of the 2 main topsides (ASTI-A and MILA-A) to be lifted with the TIMAS DLB01 onto the ASTI-A and MILA-A preinstalled jacket located in BANUWATI-A Field nearby the offshore north Jakarta Responsibilities included writing the installation procedures for topsides installation with the use of DLB01. Specify materials for loadout on board of material barge, fabrication of the offshore platform structures, supervision of welding works, Non-destructive test and load test for fabricated platform structures. Perform the tasks of supporting in fabrication activities with special emphasis to quality and accuracy. Responsible for determining the specifications of product and arrange for the materials, equipment and other required parts to be purchased Completed Project: Client : Crowley Solution Inc Furie Kitchen Lights Platform Phase I
  • 3. Offshore Construction Specialists Pte Ltd. 36 Kian Teck Road, , Singapore 628781 Tel: +65 6898-0210 / Fax +65 6898-0209 CURRICULUM VITAE Page 3 of 7 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd. Field Engineer based in Houston and offshore Alaska preparing procedures, mobilizing equipment and performing offshore Field Engineering duties on the Furie Kitchen lights monopod located in the Cook Inlet in Alaska. Client: Petronas Carigali /PT. Timas Suplindo Ketapang Project – Post trenching of 27km 12’’ Export pipeline Jetting Engineer responsible on the post trenching operation for the Bukit Tua, Ketapng 27km export pipeline. Prepare the project deliverables including post trenching procedure and post trenching equipments operation drawings. Perform the feasibility study on the modification of the jet sled to suit the project. Specify assist on the trenching equipment loadout at Batam and Singapore. Organized the mobilization of the post trenching, pre commissioning equipment and the mobilization of the trenching crews. Client: Pertamina PHE ONWJ UL Project – Transportation and Installation for Offshore Jacket and Topside Offshore Installation Engineer responsible for the loadout, transportation and installation of the 2 main module packages (Jacket and Topside) to be lifted with the DLB01 onto the UL platform located West Jakarta. Responsibilities included writing the installation procedures for Jacket and topside installation with the use of DLB01. Specify materials for loadout on board of material barge, fabrication of the offshore platform structures, supervision of welding works, Non-destructive test and load test for fabricated platform structures. Installation of 12” x 6km in field pipelines from ULA to UW platform. Specify and assist in the installation of the risers and subsea tie-ins on the ULA and UWA platform. Close supervision on the production during the pipelay and riser guard installation. Perform the pre commissioning of the UL pipeline with pigging and hydrotest after the completion of the subsea tie-ins.
  • 4. Offshore Construction Specialists Pte Ltd. 36 Kian Teck Road, , Singapore 628781 Tel: +65 6898-0210 / Fax +65 6898-0209 CURRICULUM VITAE Page 4 of 7 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd. Perform the tasks of supporting in fabrication activities with special emphasis to quality and accuracy. Responsible for determining the specifications of product and arrange for the materials, equipment and other required parts to be purchased Client: Brunei Shell Petroleum – Swiber Offshore Pte Ltd Airlift Jetting for the Pile Refusal Remedial Service Jetting Engineer responsible on the loadout for the jetting spreads. Organize the mobilization of the jetting equipments from Batam to Brunei. Prepare the project deliverables including Pile refusal remedial with airlift jetting procedure and drawings. Perform the feasibility study on the modification of the jet spread to suit the project. Perform the function test on the feed pump and jet pump before mobilization to the field. Organize the setting up of the equipments based on the deck layout. Client: PT Timas Samudera Loadout For DLB01 (Ex. DB26) Lifting Engineer responsible on the heavy lifts and loading of 13 main equipments (Hammers and stingers) from J.Ray Mcdermott Batam marine base onto material barge and DLB01 while PT Timas Suplindo bought over the DLB01 from J.Ray Mcdermott. Perform the lift analysis for the heavy lift of hammers and stingers weight various from 85mT to 300mT by using 800mT DLB01 Derrick Crane. Organize the loadout on the material barge and perform the lifting equipments check. Supervision on the equipments modification works and NDT test before the loadout for the hammers and stingers. Responsibilities involve supervising the loadin of the heavy equipments from the material barge to the storage yard by using Cometto. Organize the layout plan for the equipments at the storage yard and perform the function test for the DLB01 derrick crane by using hammers. Client: Sapura Clough Gorgon Domgas Pipeline Installation
  • 5. Offshore Construction Specialists Pte Ltd. 36 Kian Teck Road, , Singapore 628781 Tel: +65 6898-0210 / Fax +65 6898-0209 CURRICULUM VITAE Page 5 of 7 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd. Jetting Engineer responsible on the pipeline installation and jetting work, prepare the project deliverables including pipeline installation procedure, flexible flowline and umbilical procedure, Tie-in installation procedure, riser and riser clamp installation procedure, pigging and hydro test and project material and equipment (material requisition, material clarification and inspection) Client: MCJV Pipepull for Narrows Crossing Pipepull Engineer responsible on the operation of the 4km twin pipeline pull from main land crossing Narrows to Curtis Island. Perform the feasibility study on the pipepull operation across Narrows. Planning for the buoyancy management on the pipeline and prepare the procedure for buoyancy management plan. Perform the task in supporting the fabrication of the foam buoys. Specify and assist in materials loadout and mobilisation from the vendor fabrication yard and perform the lifting check on all the related lifting activities from vendor. Specify and assist in conducting FAT for linear winch and HPU. Supervision of the load test and equipments FAT for spoolers and winches. Client: Essar India Nand Gaurav Barge Modification Project Field Engineer responsible on the procedure for modification work on Nand Gaurav pipelay barge. Perform the feasibility study of the fabrication specification for Nand Gaurav. Prepare the fabrication specification, QA plan, HSE plan and quality management plan for fabrication. Client: Petronas Gas Berhad/ Perunding Ranhill Worley LEKAS LNG Regasification Project Lifting Engineer responsible on heavy lift and installation of 7 main modules on the regasification jetty. Perform the feasibility study on the heavy lift of material skid, booster module, cooler module, crane pedestal and machinery deck. Organize the loadout on the material barge for offshore installation and perform the lifting equipments check.
  • 6. Offshore Construction Specialists Pte Ltd. 36 Kian Teck Road, , Singapore 628781 Tel: +65 6898-0210 / Fax +65 6898-0209 CURRICULUM VITAE Page 6 of 7 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd. Supervision on the module fabrication, welding works, Non-destructive test and load test for the modules. Responsibilities involve supervising the offshore heavy engineered lifts Client: Client: Target Energy Modification and Installation for Mas Mulia Pipelay Barge Field Engineer responsible on Modification of the pipelay barge. Specify and assist the materials loadout from Singapore and on board of Mas Mulia at Batam. Perform the feasibility study on the installation work for Mas Mulia and supervision for the installation work on board of Mas Mulia pipelay barge. Responsibility on determine the specification of the installation and modification for the sheaves and fairleads on board of Mas Mulia. Client: Origin Energy Yolla MLE (Mid Life Enhancement) Project Offshore Installation Engineer responsible for the loadout, transportation and installation of the 4 main module packages to be lifted with the Jascon 25 onto the Yolla platform located in central Bass Strait. Perform feasibility study for caisson upend and installation with the use of Go Rigel. Responsibilities on feasibility study for Accommodation & Compressor Modules installation with the use of Jascon 25. Specify and assist in materials loadout on board of Jascon 25, fabrication of the offshore platform structures, supervision of welding works, Non-destructive test and load test for fabricated platform structures. Perform the tasks of supporting in fabrication activities with special emphasis to quality and accuracy. Responsible for determining the specifications of product and arrange for the materials, equipment and other required parts to be purchased April 2010 to September 2011: Antara Koh Sdn Bhd Client: ATB Pte Ltd Development of hydrocarbon storage and distribution facilities at Tg Bin Terminal, Johor, Malaysia (May ’10 – September ’11). Site Engineer for the construction of 1.8km Jetty and oil pipe support structures.
  • 7. Offshore Construction Specialists Pte Ltd. 36 Kian Teck Road, , Singapore 628781 Tel: +65 6898-0210 / Fax +65 6898-0209 CURRICULUM VITAE Page 7 of 7 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd. Responsibilities involve supervising the heavy engineered lifts, fabrication of the pipe support structures, NDT and coating defect of the steel structure, launching work for heavy structures and installation of mooring fender block. Also involves in preparation of the punch list for defect structures and proposed remedy work for the steel structures or concrete structures.