Introduction and History of Toyota

Toyota Production System (TPS)
JIT and other TPS Terms
JIT Philosophy

JIT Process & Principles
Questions......

3

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation







4

Sakichi Toyoda (1867-1930)
Automatic Loom
Kiichiro Toyoda (1894- 1952)
Used chain conveyor into the Assembly line
Eiji Toyoda (1913)
Implementation of Jidoka and JIT

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

5
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

ANDON

JIT

GENCHI GENGUSTU

KANBAN

HEIJUNKA

KAIZEN

OSHIN

MUDA

JIDOKA

NEMAWASHI

JISHUKAN

POKAYOKE
YOKOTEN

6

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

One of the two main pillars of TPS. It
refers to the manufacturing and

The
pull system

conveyance of only “what is needed,
when is needed, and in the amount
needed in the system”.
Take time

Continuous
Fow

1. The Pull System
2. Continuous Flow Processing

3. Take time

7

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

JIT is a philosophy of continuous improvement in which non-valueadding activities (or wastes) are identified and removed for the

purposes of:
◧ Reducing Cost
◩ Improving Quality
◨ Improving Performance
◪ Improving Delivery
♦ Adding Flexibility
▬ Increase innovativeness

8

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

“A philosophy of manufacturing based on planned elimination of all
waste and continuous improvement of productivity. It encompasses

the successful execution of all manufacturing activities required to
produce a final product, from design engineering to delivery and
including all stages of conversion from raw material onward. The
primary elements include having only the required inventory when
needed; to improve quality to zero defects; to reduce lead time by
reducing setup times, queue lengths and lot sizes; to incrementally
revise the operations themselves; and to accomplish these things at
minimum cost."

9

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

10

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

⋑ Higher amount of machine/worker idle time
⋑ More efficient when demand pattern is stable

⋑ When there is a sudden change in the demand pattern it will take
time for JIT system to react since there is no central information
unit
⋑ It may be difficult and expensive to introduce

⋑ There is little room for mistakes as minimal stock is kept for reworking faulty product
⋑ Production is very reliant on suppliers and if stock is not delivered
on time, the whole production schedule can be delayed

11

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

⋑ Higher amount of machine/worker idle time
⋑ It requires more training, more consciousness, more employee

commitment
⋑ More difficult goals to be attained
⋑ Coordination between customer and suppliers need to be much
better and disciplined

12

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

A small time that is the key control for JIT production

13

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

A unique production control method
It can be based on supermarket method
Taiichi Ohno ,promoted the idea of JIT, applied this concept

KAN= card

BAN=signals

It is a Japanese word for card & the use of card is central to many

Japanese control systems including one at Toyota whose kanban
system has received

14

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

15

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

Non-value added. Muda is translated as waste
There are Seven types of muda
OVER
PRODUCTION
MOTIVE

WAITING

MUDA
CONVEYANCE

CORRECTION

INVENTORY

16

PROCESSING

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

Reduce Setup Times

All setup practices are wasteful because they add no value and they tie up
labor and equipment. By organizing procedures, using carts, and training
workers
Small-Lot Production
Producing things in large batches results in huge setup costs, high capital
cost of inventories. Because Toyota has found the way to make setups short
and inexpensive
Employee Involvement and Empowerment
Toyota organized their workers by forming teams and gave them the
responsibility and training to do many specialized tasks

17

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

Quality at the Source
To eliminate product defects, they must be discovered and corrected as
soon as possible. If a defect cannot be readily fixed, any worker can halt the
entire line by pulling a cord (called Jidoka)
Equipment Maintenance
Toyota operators are assigned primary responsibility for basic maintenance
since they are in the best position to detect signs of malfunctions
Pull Production
To reduce inventory holding costs and lead times, Toyota developed the
pull production method wherein the quantity of work performed at each
stage of the process is dictated solely by demand for materials from the
immediate next stage
Supplier Involvement
Toyota treats its suppliers as partners, as integral elements of Toyota
Production System (TPS)
18

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

A system of continuous improvement in which instances of Muda (waste)

are eliminated one-by-one at minimal cost. This is performed by all
employees rather than by specialists

19

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

20

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation

21

Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan

More Related Content

What's hot

Macro Economics For MBA
Macro Economics For MBAMacro Economics For MBA
Macro Economics For MBAMarria Pirwani
 
Business simulation game a new path to management education (v 1.2)
Business simulation game   a new path to management education (v 1.2)Business simulation game   a new path to management education (v 1.2)
Business simulation game a new path to management education (v 1.2)Ganesh S
 
Toyota Motor Manufacturing (Tmm)
Toyota Motor Manufacturing (Tmm)Toyota Motor Manufacturing (Tmm)
Toyota Motor Manufacturing (Tmm)shekhar619
 
Dell's Working Capital
Dell's Working CapitalDell's Working Capital
Dell's Working CapitalRohit Patidar
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing SystemAmar Keshari
 
Organizational Structure Analysis Apple Inc.
Organizational Structure Analysis Apple Inc.Organizational Structure Analysis Apple Inc.
Organizational Structure Analysis Apple Inc.TyagiAnubhav
 
Sony and the jk wedding dance
Sony and the jk wedding danceSony and the jk wedding dance
Sony and the jk wedding danceSwapnil Shah
 
Cisco System Inc. Implementing ERP
Cisco System Inc. Implementing ERPCisco System Inc. Implementing ERP
Cisco System Inc. Implementing ERPVinay Gk
 
Linear technology case analysis dividend payout policy
Linear technology case analysis dividend payout policyLinear technology case analysis dividend payout policy
Linear technology case analysis dividend payout policyHimanshu Gulia
 
A macroeconomic turnaround case study
A macroeconomic turnaround case study A macroeconomic turnaround case study
A macroeconomic turnaround case study bharath bhushan
 
Peter browning and continental white cap
Peter browning and continental white capPeter browning and continental white cap
Peter browning and continental white capBaidos Yernazarov
 
Sports Obermeyer Case
Sports Obermeyer CaseSports Obermeyer Case
Sports Obermeyer CaseGeeta Hansdah
 
Cavinkare Case study
Cavinkare Case studyCavinkare Case study
Cavinkare Case studyKabita Dhimal
 

What's hot (20)

Mansa-building-case
Mansa-building-caseMansa-building-case
Mansa-building-case
 
Process control polaroid
Process control polaroidProcess control polaroid
Process control polaroid
 
Toyota case study
Toyota case studyToyota case study
Toyota case study
 
Macro Economics For MBA
Macro Economics For MBAMacro Economics For MBA
Macro Economics For MBA
 
Ashi india limited
Ashi india limited Ashi india limited
Ashi india limited
 
Business simulation game a new path to management education (v 1.2)
Business simulation game   a new path to management education (v 1.2)Business simulation game   a new path to management education (v 1.2)
Business simulation game a new path to management education (v 1.2)
 
Toyota Motor Manufacturing (Tmm)
Toyota Motor Manufacturing (Tmm)Toyota Motor Manufacturing (Tmm)
Toyota Motor Manufacturing (Tmm)
 
Dell's Working Capital
Dell's Working CapitalDell's Working Capital
Dell's Working Capital
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing System
 
Organizational Structure Analysis Apple Inc.
Organizational Structure Analysis Apple Inc.Organizational Structure Analysis Apple Inc.
Organizational Structure Analysis Apple Inc.
 
Activity-based costing A Case study
Activity-based costing A Case studyActivity-based costing A Case study
Activity-based costing A Case study
 
Toyota- HBS case
Toyota- HBS caseToyota- HBS case
Toyota- HBS case
 
Sony and the jk wedding dance
Sony and the jk wedding danceSony and the jk wedding dance
Sony and the jk wedding dance
 
Cisco System Inc. Implementing ERP
Cisco System Inc. Implementing ERPCisco System Inc. Implementing ERP
Cisco System Inc. Implementing ERP
 
Linear technology case analysis dividend payout policy
Linear technology case analysis dividend payout policyLinear technology case analysis dividend payout policy
Linear technology case analysis dividend payout policy
 
A macroeconomic turnaround case study
A macroeconomic turnaround case study A macroeconomic turnaround case study
A macroeconomic turnaround case study
 
Peter browning and continental white cap
Peter browning and continental white capPeter browning and continental white cap
Peter browning and continental white cap
 
Sports Obermeyer Case
Sports Obermeyer CaseSports Obermeyer Case
Sports Obermeyer Case
 
Cavinkare Case study
Cavinkare Case studyCavinkare Case study
Cavinkare Case study
 
Enager Industries,Inc
Enager Industries,IncEnager Industries,Inc
Enager Industries,Inc
 

Viewers also liked

Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing pptSwati Luthra
 
Learning from Toyota - Engineering a Kaizen/Lean Summer Camp
Learning from Toyota - Engineering a Kaizen/Lean Summer CampLearning from Toyota - Engineering a Kaizen/Lean Summer Camp
Learning from Toyota - Engineering a Kaizen/Lean Summer CampTravis Allison
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyotaaneela yousaf
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations ManagementGargi Kapadia
 
Inventory Management System By RIBAMS Consultants
Inventory Management System By RIBAMS ConsultantsInventory Management System By RIBAMS Consultants
Inventory Management System By RIBAMS Consultantsdrkoi
 
Drink lean from the source at agile vancouver
Drink lean from the source at agile vancouverDrink lean from the source at agile vancouver
Drink lean from the source at agile vancouverKenji Hiranabe
 
Toyota Strike Karnataka 2005
Toyota Strike Karnataka 2005Toyota Strike Karnataka 2005
Toyota Strike Karnataka 2005Kapil Sahni
 
The Impact of Lean on Consumer Product Manufacturers
The Impact of Lean on Consumer Product ManufacturersThe Impact of Lean on Consumer Product Manufacturers
The Impact of Lean on Consumer Product ManufacturersFindWhitePapers
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass productionSophie Michelot
 
Just in Time or JIT KANBAN system
Just in Time or JIT KANBAN systemJust in Time or JIT KANBAN system
Just in Time or JIT KANBAN systemJanak Valaki (PhD)
 
kanban an integrated jit system
kanban an integrated jit systemkanban an integrated jit system
kanban an integrated jit systemSridhar Siddu
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
Kanban
KanbanKanban
Kanbanbramoe
 
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'amJust in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'amMd. Moazzem Hossain
 

Viewers also liked (20)

Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Learning from Toyota - Engineering a Kaizen/Lean Summer Camp
Learning from Toyota - Engineering a Kaizen/Lean Summer CampLearning from Toyota - Engineering a Kaizen/Lean Summer Camp
Learning from Toyota - Engineering a Kaizen/Lean Summer Camp
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations Management
 
JIT
JITJIT
JIT
 
Self Revolution
Self RevolutionSelf Revolution
Self Revolution
 
Inventory Management System By RIBAMS Consultants
Inventory Management System By RIBAMS ConsultantsInventory Management System By RIBAMS Consultants
Inventory Management System By RIBAMS Consultants
 
Drink lean from the source at agile vancouver
Drink lean from the source at agile vancouverDrink lean from the source at agile vancouver
Drink lean from the source at agile vancouver
 
Toyota Strike Karnataka 2005
Toyota Strike Karnataka 2005Toyota Strike Karnataka 2005
Toyota Strike Karnataka 2005
 
The Impact of Lean on Consumer Product Manufacturers
The Impact of Lean on Consumer Product ManufacturersThe Impact of Lean on Consumer Product Manufacturers
The Impact of Lean on Consumer Product Manufacturers
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass production
 
Just in Time or JIT KANBAN system
Just in Time or JIT KANBAN systemJust in Time or JIT KANBAN system
Just in Time or JIT KANBAN system
 
kanban an integrated jit system
kanban an integrated jit systemkanban an integrated jit system
kanban an integrated jit system
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Kanban
KanbanKanban
Kanban
 
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'amJust in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
 
Toyota Kaizen 5S #Infographic
Toyota Kaizen 5S #InfographicToyota Kaizen 5S #Infographic
Toyota Kaizen 5S #Infographic
 

Similar to JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)

Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...Enamul Khan
 
Operation management, toyota production system
Operation management, toyota production systemOperation management, toyota production system
Operation management, toyota production systemOmar Hamdan
 
Qcl 15-v4 challenge no. 5-institute of management, nirma university_krishan k...
Qcl 15-v4 challenge no. 5-institute of management, nirma university_krishan k...Qcl 15-v4 challenge no. 5-institute of management, nirma university_krishan k...
Qcl 15-v4 challenge no. 5-institute of management, nirma university_krishan k...Krishna Goyal
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 
What is Just-in-Time Inventory management .pptx
What is Just-in-Time Inventory management .pptxWhat is Just-in-Time Inventory management .pptx
What is Just-in-Time Inventory management .pptxShipyaarilogistics
 
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...Md.Nazrul Islam
 
F444652
F444652F444652
F444652aijbm
 
Trough External Service Management Improve Quality & Productivity
Trough External Service Management Improve Quality & ProductivityTrough External Service Management Improve Quality & Productivity
Trough External Service Management Improve Quality & ProductivityIJMER
 
Ji tstrategy
Ji tstrategyJi tstrategy
Ji tstrategynikpet83
 
Just In Time Analysis
Just In Time AnalysisJust In Time Analysis
Just In Time AnalysisAshim Roy
 
401207027_Tata Motors
401207027_Tata Motors401207027_Tata Motors
401207027_Tata MotorsSushant Gupta
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanMohamed Helmy
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and BoeingMutunga David
 
Project report on just in time
Project report on just in timeProject report on just in time
Project report on just in timeProjects Kart
 

Similar to JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System) (20)

Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
 
Operation management, toyota production system
Operation management, toyota production systemOperation management, toyota production system
Operation management, toyota production system
 
Qcl 15-v4 challenge no. 5-institute of management, nirma university_krishan k...
Qcl 15-v4 challenge no. 5-institute of management, nirma university_krishan k...Qcl 15-v4 challenge no. 5-institute of management, nirma university_krishan k...
Qcl 15-v4 challenge no. 5-institute of management, nirma university_krishan k...
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
A r m report
A r m reportA r m report
A r m report
 
What is Just-in-Time Inventory management .pptx
What is Just-in-Time Inventory management .pptxWhat is Just-in-Time Inventory management .pptx
What is Just-in-Time Inventory management .pptx
 
Module-4 JIT.ppt
Module-4 JIT.pptModule-4 JIT.ppt
Module-4 JIT.ppt
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
 
F444652
F444652F444652
F444652
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
Trough External Service Management Improve Quality & Productivity
Trough External Service Management Improve Quality & ProductivityTrough External Service Management Improve Quality & Productivity
Trough External Service Management Improve Quality & Productivity
 
Ji tstrategy
Ji tstrategyJi tstrategy
Ji tstrategy
 
Just In Time Analysis
Just In Time AnalysisJust In Time Analysis
Just In Time Analysis
 
401207027_Tata Motors
401207027_Tata Motors401207027_Tata Motors
401207027_Tata Motors
 
Ashu_Rastogi
Ashu_RastogiAshu_Rastogi
Ashu_Rastogi
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of Lean
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and Boeing
 
Project report on just in time
Project report on just in timeProject report on just in time
Project report on just in time
 

Recently uploaded

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 

Recently uploaded (20)

No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 

JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)

  • 1. Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 2. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation 2 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 3. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation Introduction and History of Toyota Toyota Production System (TPS) JIT and other TPS Terms JIT Philosophy JIT Process & Principles Questions...... 3 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 4. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation    4 Sakichi Toyoda (1867-1930) Automatic Loom Kiichiro Toyoda (1894- 1952) Used chain conveyor into the Assembly line Eiji Toyoda (1913) Implementation of Jidoka and JIT Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 5. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation 5
  • 6. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation ANDON JIT GENCHI GENGUSTU KANBAN HEIJUNKA KAIZEN OSHIN MUDA JIDOKA NEMAWASHI JISHUKAN POKAYOKE YOKOTEN 6 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 7. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation One of the two main pillars of TPS. It refers to the manufacturing and The pull system conveyance of only “what is needed, when is needed, and in the amount needed in the system”. Take time Continuous Fow 1. The Pull System 2. Continuous Flow Processing 3. Take time 7 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 8. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation JIT is a philosophy of continuous improvement in which non-valueadding activities (or wastes) are identified and removed for the purposes of: ◧ Reducing Cost ◩ Improving Quality ◨ Improving Performance ◪ Improving Delivery ♦ Adding Flexibility ▬ Increase innovativeness 8 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 9. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation “A philosophy of manufacturing based on planned elimination of all waste and continuous improvement of productivity. It encompasses the successful execution of all manufacturing activities required to produce a final product, from design engineering to delivery and including all stages of conversion from raw material onward. The primary elements include having only the required inventory when needed; to improve quality to zero defects; to reduce lead time by reducing setup times, queue lengths and lot sizes; to incrementally revise the operations themselves; and to accomplish these things at minimum cost." 9 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 10. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation 10 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 11. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation ⋑ Higher amount of machine/worker idle time ⋑ More efficient when demand pattern is stable ⋑ When there is a sudden change in the demand pattern it will take time for JIT system to react since there is no central information unit ⋑ It may be difficult and expensive to introduce ⋑ There is little room for mistakes as minimal stock is kept for reworking faulty product ⋑ Production is very reliant on suppliers and if stock is not delivered on time, the whole production schedule can be delayed 11 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 12. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation ⋑ Higher amount of machine/worker idle time ⋑ It requires more training, more consciousness, more employee commitment ⋑ More difficult goals to be attained ⋑ Coordination between customer and suppliers need to be much better and disciplined 12 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 13. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation A small time that is the key control for JIT production 13 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 14. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation A unique production control method It can be based on supermarket method Taiichi Ohno ,promoted the idea of JIT, applied this concept KAN= card BAN=signals It is a Japanese word for card & the use of card is central to many Japanese control systems including one at Toyota whose kanban system has received 14 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 15. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation 15 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 16. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation Non-value added. Muda is translated as waste There are Seven types of muda OVER PRODUCTION MOTIVE WAITING MUDA CONVEYANCE CORRECTION INVENTORY 16 PROCESSING Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 17. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation Reduce Setup Times All setup practices are wasteful because they add no value and they tie up labor and equipment. By organizing procedures, using carts, and training workers Small-Lot Production Producing things in large batches results in huge setup costs, high capital cost of inventories. Because Toyota has found the way to make setups short and inexpensive Employee Involvement and Empowerment Toyota organized their workers by forming teams and gave them the responsibility and training to do many specialized tasks 17 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 18. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation Quality at the Source To eliminate product defects, they must be discovered and corrected as soon as possible. If a defect cannot be readily fixed, any worker can halt the entire line by pulling a cord (called Jidoka) Equipment Maintenance Toyota operators are assigned primary responsibility for basic maintenance since they are in the best position to detect signs of malfunctions Pull Production To reduce inventory holding costs and lead times, Toyota developed the pull production method wherein the quantity of work performed at each stage of the process is dictated solely by demand for materials from the immediate next stage Supplier Involvement Toyota treats its suppliers as partners, as integral elements of Toyota Production System (TPS) 18 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 19. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation A system of continuous improvement in which instances of Muda (waste) are eliminated one-by-one at minimal cost. This is performed by all employees rather than by specialists 19 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 20. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation 20 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan
  • 21. Impact of JIT Inventory on procurement function in Perspective of Toyota Motor Corporation 21 Project Procurement and Contracts, MSPM, Riphah International University, Islamabad, Pakistan