SlideShare a Scribd company logo
1 of 20
Made By:
 Abhishek Pachisia
B.Tech – IT (IV Year)
     090102801
₪ Also known as: WBS
₪ Project Decomposition Smaller components.
₪ Defines & Groups a project’s discrete work
  elements
  ↔ Helps organize
  ↔ Define the total work scope
₪One of the most valuable instruments
₪The most overlooked or poorly-constructed.
₪The WBS is the backbone of any project.

  Ex :
  Network diagram is derived from WBS.
  Thus, providing project schedule.
A Project has a Duration and consists of functions, activities and tasks.



                                                               Function
                      Project
                                                               Function


    Activity            Activity            Activity


    Activity            Activity            Activity


     Task          Task           Task        Task
﴾ Simplifying the project execution
﴾ Accurate and readable project organization.
﴾ Accurate assignment of responsibilities to the
  project team.
﴾ Indicates the project milestones and control
  points.
﴾ Helps to estimate the cost, time, and risk.
﴾ Illustrate the project scope, so the stakeholders
  can have a better understanding of the same.
€   100% rule
€   Mutually exclusive elements
€   Plan outcomes, not actions
€   Level of detail
€   Coding scheme
€   Terminal element
﴾ WBS should be viewed as a roadmap.
﴾ It should be descriptive, not vague.
﴾ It should list out all the steps down to the
  smallest level.
  » Ex: If 5 steps are there then all should be listed.
﴾ Assuming that “everyone knows what steps
  are required to complete the task” means
  failure.
₪ Elements of each WBS Element:
  €   The scope of the project, "deliverables" of the project.
  €   Start and end time of the scope of project.
  €   Budget for the scope of the project.
  €   Name of the person related to the scope of project.
₪No hard and fast rule.
  € Some rules for determining the smallest chunk:
       »   Thumb Rule
       »   If it makes sense Rule,
       »   80 hour rule,
       »   Three week/year rule, etc.
STEP - 1
₪List all major deliverables and the high-level
 tasks specifically mentioned or gleaned from
 the scope description.
₪Side note should delineate
  ↔What is to be considered.
  ↔What is out of scope, i.e. not to be considered.
STEP - 2
₪Select a deliverable.
  € Name all of the tasks required
₪Heading(known as Summary Task) -
 complete descriptive sentence.
₪Side note should delineate
  € What is to be considered.
  € What is out of scope, i.e. not to be considered.
STEP - 3
• Break down each task
  – For another project manager to fully follow the
    process.
• Provides
  – The basis for budget estimating
  – A checklist for monitoring and controlling.
STEP - 4
₪Rearrange the tasks and work packages
  £ For logical flow -> To perform the summary task.
₪Rearrange the summary tasks
  £ For Logical flow -> To perform the project.
₪Ensure
  £ Task headings are meaningful
  £ There is a balance between having enough tasks and
    work packages to provide enough detail without
    overkill.
↔Lists & Tables




                  ↔Trees
₪Set of specific definitions
  €Thoroughly describe the scope of each work element
  identified in the WBS
₪Components.
  €A tabular summary of the         €A work element dictionary sheet
  dictionary elements cross-           »Provides the title of the work
  referenced                           element,
     »WBS indenture level,             »The project contractor WBS
     »The WBS revision, the            and
     element title,                    »The contractor’s accounting
     »The project contractor WBS       codes, the budget and reporting
     code, and                         number, and
     »The contractor’s accounting      »A detailed description of the
     code (if desired).                work to be performed by this
                                       element, including deliverables
£ A WBS is not an exhaustive list of work.
  » Comprehensive classification of project scope.
£ A WBS is
  »   neither a project plan,
  »   a schedule,
  »   nor a chronological listing.
  »   Specifies what will be done, not how or when.
£ A WBS is not an organizational hierarchy,
  » It may be used when assigning responsibilities
MIL-STD-881C:
₪ Aircraft Systems WBS
₪ Electronic Systems WBS
₪ Missile Systems WBS
₪ Ordnance Systems WBS
₪ Sea Systems WBS
₪ Space Systems WBS
₪ Surface Vehicle Systems WBS
₪ Unmanned Air Vehicle Systems WBS
₪ Unmanned Maritime Systems WBS
₪ Launch Vehicle Systems WBS
₪ Automated Information Systems WBS
﴾ Work breakdown structures are great for developing
and validating the scope of a project.

﴾ Work breakdown structures are most powerful when
shown in a graphic style, similar to an organization
chart. They can also take on the form of a simple
outline.

﴾ Work breakdown structures allow people from various
backgrounds, disciplines, and perspectives to understand
the activities being planned.
Work breakdown structure

More Related Content

What's hot

How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)Insaf Ali Soomro PMP
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and schedulingAditi Garg
 
Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)stakeholdermap
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management - dyaksa hanindito
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and schedulingadeel hamid
 
Lect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationLect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationMubashir Ali
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 
Fundamentals of scheduling
Fundamentals of schedulingFundamentals of scheduling
Fundamentals of schedulingjmd2011
 

What's hot (20)

How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
 
Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and scheduling
 
Lect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationLect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost Estimation
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Project cost control
Project cost controlProject cost control
Project cost control
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Fundamentals of scheduling
Fundamentals of schedulingFundamentals of scheduling
Fundamentals of scheduling
 
Project Planning Scheduling
Project Planning SchedulingProject Planning Scheduling
Project Planning Scheduling
 
project management information system
project management information systemproject management information system
project management information system
 

Viewers also liked

WBS presentation
WBS presentationWBS presentation
WBS presentationjpstewar
 
Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...
Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...
Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...Kamran Rahat
 
Work Breakdown Structure Use This
Work Breakdown Structure Use ThisWork Breakdown Structure Use This
Work Breakdown Structure Use Thisproject management
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown StructureNicola2903
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structureStefan Csosz
 
Project control. Management
Project control. ManagementProject control. Management
Project control. ManagementMarius Miron
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 

Viewers also liked (8)

WBS presentation
WBS presentationWBS presentation
WBS presentation
 
Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...
Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...
Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...
 
Work Breakdown Structure Use This
Work Breakdown Structure Use ThisWork Breakdown Structure Use This
Work Breakdown Structure Use This
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structure
 
Project termination
Project terminationProject termination
Project termination
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 

Similar to Work breakdown structure

Work breakdown structurep
Work breakdown structurepWork breakdown structurep
Work breakdown structurepRavi Malik
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxChantellPantoja184
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docxaryan532920
 
Construction management
Construction managementConstruction management
Construction managementAbhishekR63
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxARITRYAKUMAR
 
Project Implementation.pdf
Project Implementation.pdfProject Implementation.pdf
Project Implementation.pdfssuserc0e4e0
 
WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxFillHackjack
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementtanishkagupta907
 
Ignore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own PerilIgnore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own PerilPraveen Malik, PMP
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectNirtiSingla
 
WBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project ManagementWBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project ManagementAnjali Rao
 
1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docxSONU61709
 
A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )Kimberly Williams
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfDipakBorse6
 

Similar to Work breakdown structure (20)

Work breakdown structurep
Work breakdown structurepWork breakdown structurep
Work breakdown structurep
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docx
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 
Babu 143
Babu 143Babu 143
Babu 143
 
Construction management
Construction managementConstruction management
Construction management
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptx
 
Project Implementation.pdf
Project Implementation.pdfProject Implementation.pdf
Project Implementation.pdf
 
Lect 3 wbs&obs
Lect 3 wbs&obs Lect 3 wbs&obs
Lect 3 wbs&obs
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptx
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project management
 
Project Managment WorkBook
Project Managment WorkBookProject Managment WorkBook
Project Managment WorkBook
 
Ignore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own PerilIgnore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own Peril
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
WBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project ManagementWBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project Management
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 
1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx
 
Prince.wbs.sow
Prince.wbs.sowPrince.wbs.sow
Prince.wbs.sow
 
A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
 

More from Abhishek Pachisia (20)

Telecom Industry
Telecom IndustryTelecom Industry
Telecom Industry
 
Strategic alignment model (SAM)
Strategic alignment model (SAM)Strategic alignment model (SAM)
Strategic alignment model (SAM)
 
V.G. siddhartha
V.G. siddharthaV.G. siddhartha
V.G. siddhartha
 
Boeing- The Frontiers
Boeing- The FrontiersBoeing- The Frontiers
Boeing- The Frontiers
 
Top Management of 5 recognized comapanies
Top Management of 5 recognized comapaniesTop Management of 5 recognized comapanies
Top Management of 5 recognized comapanies
 
Fourier transform
Fourier transformFourier transform
Fourier transform
 
Inference engine
Inference engineInference engine
Inference engine
 
IEEE 802.11
IEEE 802.11IEEE 802.11
IEEE 802.11
 
Cloud Service Models
Cloud Service ModelsCloud Service Models
Cloud Service Models
 
Exception handling in Java
Exception handling in JavaException handling in Java
Exception handling in Java
 
Perl
PerlPerl
Perl
 
Rpc
RpcRpc
Rpc
 
Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)
 
Hydrogen energy
Hydrogen energyHydrogen energy
Hydrogen energy
 
Rms titanic
Rms titanicRms titanic
Rms titanic
 
Vb.net (loop structure)
Vb.net (loop structure)Vb.net (loop structure)
Vb.net (loop structure)
 
Matrix Representation Of Graph
Matrix Representation Of GraphMatrix Representation Of Graph
Matrix Representation Of Graph
 
Tree
TreeTree
Tree
 
File System Implementation
File System ImplementationFile System Implementation
File System Implementation
 
Exception handling
Exception handlingException handling
Exception handling
 

Recently uploaded

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIShubhangi Sonawane
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 

Recently uploaded (20)

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

Work breakdown structure

  • 1. Made By: Abhishek Pachisia B.Tech – IT (IV Year) 090102801
  • 2. ₪ Also known as: WBS ₪ Project Decomposition Smaller components. ₪ Defines & Groups a project’s discrete work elements ↔ Helps organize ↔ Define the total work scope
  • 3.
  • 4. ₪One of the most valuable instruments ₪The most overlooked or poorly-constructed. ₪The WBS is the backbone of any project. Ex : Network diagram is derived from WBS. Thus, providing project schedule.
  • 5.
  • 6. A Project has a Duration and consists of functions, activities and tasks. Function Project Function Activity Activity Activity Activity Activity Activity Task Task Task Task
  • 7. ﴾ Simplifying the project execution ﴾ Accurate and readable project organization. ﴾ Accurate assignment of responsibilities to the project team. ﴾ Indicates the project milestones and control points. ﴾ Helps to estimate the cost, time, and risk. ﴾ Illustrate the project scope, so the stakeholders can have a better understanding of the same.
  • 8. 100% rule € Mutually exclusive elements € Plan outcomes, not actions € Level of detail € Coding scheme € Terminal element
  • 9. ﴾ WBS should be viewed as a roadmap. ﴾ It should be descriptive, not vague. ﴾ It should list out all the steps down to the smallest level. » Ex: If 5 steps are there then all should be listed. ﴾ Assuming that “everyone knows what steps are required to complete the task” means failure.
  • 10. ₪ Elements of each WBS Element: € The scope of the project, "deliverables" of the project. € Start and end time of the scope of project. € Budget for the scope of the project. € Name of the person related to the scope of project. ₪No hard and fast rule. € Some rules for determining the smallest chunk: » Thumb Rule » If it makes sense Rule, » 80 hour rule, » Three week/year rule, etc.
  • 11. STEP - 1 ₪List all major deliverables and the high-level tasks specifically mentioned or gleaned from the scope description. ₪Side note should delineate ↔What is to be considered. ↔What is out of scope, i.e. not to be considered.
  • 12. STEP - 2 ₪Select a deliverable. € Name all of the tasks required ₪Heading(known as Summary Task) - complete descriptive sentence. ₪Side note should delineate € What is to be considered. € What is out of scope, i.e. not to be considered.
  • 13. STEP - 3 • Break down each task – For another project manager to fully follow the process. • Provides – The basis for budget estimating – A checklist for monitoring and controlling.
  • 14. STEP - 4 ₪Rearrange the tasks and work packages £ For logical flow -> To perform the summary task. ₪Rearrange the summary tasks £ For Logical flow -> To perform the project. ₪Ensure £ Task headings are meaningful £ There is a balance between having enough tasks and work packages to provide enough detail without overkill.
  • 15. ↔Lists & Tables ↔Trees
  • 16. ₪Set of specific definitions €Thoroughly describe the scope of each work element identified in the WBS ₪Components. €A tabular summary of the €A work element dictionary sheet dictionary elements cross- »Provides the title of the work referenced element, »WBS indenture level, »The project contractor WBS »The WBS revision, the and element title, »The contractor’s accounting »The project contractor WBS codes, the budget and reporting code, and number, and »The contractor’s accounting »A detailed description of the code (if desired). work to be performed by this element, including deliverables
  • 17. £ A WBS is not an exhaustive list of work. » Comprehensive classification of project scope. £ A WBS is » neither a project plan, » a schedule, » nor a chronological listing. » Specifies what will be done, not how or when. £ A WBS is not an organizational hierarchy, » It may be used when assigning responsibilities
  • 18. MIL-STD-881C: ₪ Aircraft Systems WBS ₪ Electronic Systems WBS ₪ Missile Systems WBS ₪ Ordnance Systems WBS ₪ Sea Systems WBS ₪ Space Systems WBS ₪ Surface Vehicle Systems WBS ₪ Unmanned Air Vehicle Systems WBS ₪ Unmanned Maritime Systems WBS ₪ Launch Vehicle Systems WBS ₪ Automated Information Systems WBS
  • 19. ﴾ Work breakdown structures are great for developing and validating the scope of a project. ﴾ Work breakdown structures are most powerful when shown in a graphic style, similar to an organization chart. They can also take on the form of a simple outline. ﴾ Work breakdown structures allow people from various backgrounds, disciplines, and perspectives to understand the activities being planned.

Editor's Notes

  1. 100% ruleAn important design principle for work breakdown structures is called the 100% rule. It has been defined as follows:The 100% rule states that the WBS includes 100% of the work defined by the project scope and captures all deliverables – internal, external, interim – in terms of the work to be completed, including project management. The 100% rule is one of the most important principles guiding the development, decomposition and evaluation of the WBS. The rule applies at all levels within the hierarchy: the sum of the work at the “child” level must equal 100% of the work represented by the “parent” and the WBS should not include any work that falls outside the actual scope of the project, that is, it cannot include more than 100% of the work… It is important to remember that the 100% rule also applies to the activity level. The work represented by the activities in each work package must add up to 100% of the work necessary to complete the work package.Mutually exclusive elementsIn addition to the 100% rule, it is important that there is no overlap in scope definition between two elements of a work breakdown structure. This ambiguity could result in duplicated work or mis-communications about responsibility and authority. Such overlap could also cause confusion regarding project cost accounting. If the WBS element names are ambiguous, a WBS dictionary can help clarify the distinctions between WBS elements. The WBS Dictionary describes each component of the WBS with milestones, deliverables, activities, scope, and sometimes dates, resources, costs, quality.Plan outcomes, not actionsIf the work breakdown structure designer attempts to capture any action-oriented details in the WBS, s/he will likely include either too many actions or too few actions. Too many actions will exceed 100% of the parent's scope and too few will fall short of 100% of the parent's scope. It is consideredthat the best way to adhere to the 100% rule is to define WBS elements in terms of outcomes or results. This also ensures that the WBS is not overly prescriptive of methods, allowing for greater ingenuity and creative thinking on the part of the project participants. For new product development projects, the most common technique to ensure an outcome-oriented WBS is to use a product breakdown structure. Feature-driven software projects may use a similar technique which is to employ a feature breakdown structure. When a project provides professional services, a common technique is to capture all planned deliverables to create a deliverable-oriented WBS. Work breakdown structures that subdivide work by project phases (e.g. preliminary design phase, critical design phase) must ensure that phases are clearly separated by a deliverable also used in defining entry and exit criteria (e.g. an approved preliminary or critical design review).Level of detailOne must decide when to stop dividing work into smaller elements. This will assist in determining the duration of activities necessary to produce a deliverable defined by the WBS. There are several heuristics or "rules of thumb" used when determining the appropriate duration of an activity or group of activities necessary to produce a specific deliverable defined by the WBS.The first is the "80 hour rule" which means that no single activity or group of activities to produce a single deliverable should be more than 80 hours of effort.The second rule of thumb is that no activity or series of activities should be longer than a single reporting period. Thus if the project team is reporting progress monthly, then no single activity or series of activities should be longer than one month long.The last heuristic is the "if it makes sense" rule. Applying this rule of thumb, one can apply "common sense" when creating the duration of a single activity or group of activities necessary to produce a deliverable defined by the WBS.A work package at the activity level is a task that:can be realistically and confidently estimated;makes no sense practically to break down any further;can be completed in accordance with one of the heuristics defined above;produces a deliverable which is measurable; andforms a unique package of work which can be outsourced or contracted out.Coding schemeIt is common for work breakdown structure elements to be numbered sequentially to reveal the hierarchical structure. The purpose for the numbering is to provide a consistent approach to identifying and managing the WBS across like systems regardless of vendor or service.For example 1.1.2 Propulsion (in the example below) identifies this item as a Level 3 WBS element, since there are three numbers separated by a decimal point. A coding scheme also helps WBS elements to be recognized in any written context.A practical example of the WBS coding scheme is1.0 Aircraft System1.1 Air Vehicle1.1.1 Airframe 1.1.1.1 Airframe Integration, Assembly, Test and Checkout 1.1.1.2 Fuselage 1.1.1.3 Wing 1.1.1.4 Empennage 1.1.1.5 Nacelle 1.1.1.6 Other Airframe Components 1..n (Specify) 1.1.2 Propulsion 1.1.3 Vehicle Subsystems 1.1.4 Avionics1.2 System Engineering1.3 Program Management1.4 System Test and Evaluation1.5 Training1.6 Data1.7 Peculiar Support Equipment1.8 Common Support Equipment1.9 Operational/Site Activation1.10 Industrial Facilities1.11 Initial Spares and Repair PartsAn example in the software industry would be as follows:1267.1 Systems Integration 1267.1.1 Requirements Definition 1267.1.2 Regulations 1267.1.3 Scheduling 1267.1.4 Monitoring & Control 1267.1.5 Procurement Management 1267.1.6 Closeout1267.2 Design 1267.2.1 Conceptual Design 1267.2.2 Preliminary Design 1267.2.3 Final DesignTerminal elementA terminal element is the lowest element (activity or deliverable) in a work breakdown structure; it is not further subdivided. Terminal elements are the items that are estimated in terms of resource requirements, budget and duration; linked by dependencies; and scheduled. At the juncture of the WBS element and organization unit, control accounts and work packages are established and performance is planned, measured, recorded, and controlled.
  2. Vague: Not clear ( Cannot be understood)