SlideShare une entreprise Scribd logo
1  sur  27
Télécharger pour lire hors ligne
1
APR 2014 | Q4 2013
Except for historical information, this presentation may contain certain “forward-looking” statements and information relating to
IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available
to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including
but not limited to, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and
economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision,
seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any
underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not
assume the obligation to update any forward-looking statement.
The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic
conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which
the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes
to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the Company’s
operations; the sufficiency of current working capital and the estimated cost and availability of funding
for the continued exploration and development of the Company’s exploration properties.
This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance
on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels of
activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking
statements.
NI43-101 QUALIFIED PERSON
George Gorzynski, P. Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the
technical information in this presentation.
Cautionary Statement
2
GROWING
ASSETS
CONTINUOUS
EXPLORATION
PRUDENT
MANAGEMENT
IMPACT Silver is a junior silver producer with low cost operations and a growing
portfolio of silver mines in south-central Mexico.
A cornerstone of IMPACT’s success is systematic exploration leading to rapid mine
development to increase mill throughput and generate near-term cash flow.
Focused on creating value by growth primarily through earnings, in the pursuit of building
a multimillion ounce precious metals producer.
Overview
3
Frederick W. Davidson, CA President, CEO, Director
President of IMPACT Silver and Energold Drilling Corp. Over 33 years of mining experience, including
holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines.
George Gorzynski, P. Eng. VP Exploration, Director
Over 30 years of exploration and mining experience; current Director of Tirex Resources, Defiance
Silver and Berkwood Resources.
Richard Younker, CA, CMC CFO
Held the senior financial consulting principal position at Woods Gordon; independent financial
consultant in public and private sectors.
Armando Alexandri COO
Over 35 years of mining experience in underground and open-pit mines as well as flotation and
cyanidation processing plants.
H. Walter Sellmer, P. Geo Director Held senior positions at Amax Exploration, Canamax Resources Inc. and TOTAL Energold Corp.
Victor Tanaka, P. Geo Director
President and CEO of Bayswater Uranium Corp. Held senior positions at Asamera Inc., Freeport
McMoRan Gold Corp., Aber Resources, Major General Resources, Fjordland Exploration and Pathfinder
Resources.
Richard Mazur, P. Geo, MBA Director
President and CEO of Forum Uranium Corp. and CEO of Alto Ventures Ltd. Held senior positions at
Canamax Resources and IMPACT Minerals.
Peter Tredger, P. Eng., MBA Director
Former Senior Officer of Thompson Creek Metals Company. Held senior positions at Glencairn Gold
(now B2Gold) and Wheaton River Minerals (now Goldcorp).
Jean-Pierre Bourtin, MBA Director
President of a private equity firm in Connecticut, USA. Former Treasurer of Xerox Corp., Latin
American and Emerging Markets.
Directors & Management
4
• Nearly 100% owned and operated 623 km² (62,300 ha)
mineral exploration land package in south-central Mexico.
• Two contiguous mineral districts with mining activities
dating back to the 1500s.
• A three hour drive southwest from Mexico City, with paved
road access to the gate of IMPACT’s Guadalupe Production
Center.
• Excellent infrastructure, with a modern power grid, ample
water supply and a skilled, 99% Mexican workforce.
• Many other significant mining operations within close
proximity.
5
Property Location in Mexico
• The Royal Mines of Zacualpan is one of the oldest
mining districts in the Americas, with nearly 500
years of recorded mining history.
• IMPACT’s 623 km² land package consists of two
large mineral districts and one subdistrict: The
Zacualpan District and the Capire-Mamatla
District, and the Valle de Oro subdistrict.
• IMPACT’s exploration work has catalogued over
3,500 old mine and mill workings, forming an
invaluable basis for modern and effective
exploration.
Prolific Mining History
6
Zacualpan District
Capire District
Valle de Oro
subdistrict
Early stage
exploration area
Mine and Production Center Location Map
• The 500-tpd Guadalupe Production Center is located
within the Zacualpan District.
• The Guadalupe Production Center receives ore from
three underground silver mines located within close
proximity:
• San Ramon Mine
• Noche Buena Mine
• Cuchara-Oscar Mine
• The 200-tpd Capire Production Centre is located
within the Capire-Mamatla District.
• The Capire Production Center commenced pilot
production in March 2013, with test operations
continuing with mineral feed from the adjacent
open-pit Capire Mine.
7
Long Term Goal and Mine Development Process
To build a profitable, mid-tier, multimillion ounce precious metals producing company with multiple
mines feeding multiple processing centres.
Exploration and Mine Development Process Flowchart
Over 3,000 old mine
workings and
prospects catalogued
in IMPACT’s ArcGIS
database
RESEARCH
Compile old mines
and prospects from
historic maps
FIELD WORK
Geological mapping,
surface and
underground rock
sampling
Select and prioritize
favorable areas and
prospects and design
the drill program
DRILLING
Drill program will
be results-driven and
implemented in
phases
Current targets:
• Capire (south)
• Mirasol
• La Condesa
• Santa Efigenia
• San Juan
MINE
DEVELOPMENT
Mine design, planning,
permitting and
construction
PRODUCTION
&
CASH FLOW
Pilot operations at
Capire Plant with plans
to expand to larger
scale production in the
future
• San Ramon
• Noche Buena
• Cuchara-Oscar
• Capire
8
Guadalupe Production
Centre
Zacualpan District
500 TPD
Flotation circuit
Operating near
capacity
Mill feed from
San Ramon, Noche
Buena & Cuchara-Oscar
Mines
(underground)
Capire Production
Centre
Capire-Mamatla District
200 TPD
Pilot plant with
expansion plans
Mill feed from
Capire Mine
(open-pit)
9
Guadalupe Production
Centre
Zacualpan District
500 TPD
Flotation circuit
operating near capacity
Mill feed from
San Ramon, Noche Buena &
Cuchara-Oscar Mines
(epithermal, underground)
Capire Production Centre
Capire-Mamatla District
200 TPD
Pilot plant operation with
expansion plans
Mill feed from
Capire Mine
(VMS, open-pit)
Two Production Centres
10
Guadalupe Production Centre
• Guadalupe Production Centre (500 tpd) • Flotation circuit produces silver-lead and zinc-silver
concentrates
11
Capire Mine and Production Centre
• Capire Mine (VMS, open-pit)• Capire Production Centre (200 tpd pilot plant)
San Ramon
Began production in 2008
Epithermal veins
Current primary producing
mine in the Zacualpan
District
Contribution of total
production in Q3 2013: 41%
Noche Buena
Began production in 2010
Epithermal veins in Valle de
Oro subdistrict located in the
Zacualpan District
Contribution of total
production in Q3 2013: 32%
Cuchara-Oscar
Corridor of wide, high-grade
epithermal veins linking
legacy mines within the
Cuchara Mine Complex in
the Zacualpan District
Contribution of total
production in Q3 2013: 27%
Capire
Volcanogenic sulfide
deposit with high-grade
polymetallic mineralization
in the Capire-Mamatla
District
Contribution of total
production in Q3 2013: 0%
(In commissioning phase)
Four Producing Silver Mines
12
Geology of Epithermal Vein Systems
Silver-rich at top of vein
200 – 1,000+ g/t Ag
Lead and Zinc-rich at
bottom of vein
60 – 150 g/t Ag
Gold-copper at depths
of 300 m+
Metal Zoning in Ore Shoots
Strike Length
150 – 420 m (500 – 1,400 ft)
Metal Level in Producing Mines
Surface – 0 m (0 ft)
150 m (500 ft)
300 m (1,000 ft)
Depth
13
Noche Buena Mine
San Ramon Mine
Valle de Oro subdistrict
Exploration property, includes Carlos Pacheco
gold-copper zone and San Juan Project
Cuchara-Oscar Mine
Exploration Targets
Zacualpan District
• Mirasol
• La Condesa
• Santa Efigenia
Capire-Mamatla District
• Manto Rico
• Guadalupe
• Aurora II
Valle de Oro Subdistrict
• Carlos Pacheco
• San Juan Project
• Huatescosco
Dominican Republic
• Early stage exploration on legacy
claims
623 km²
land package*
* Does not include the Dominican Republic claims
• An abundance of attractive exploration targets across Zacualpan and Capire districts to drive organic growth and
potentially advance into mine development and production.
14
Above: Statue of miner in Zacualpan’s town square, Mexico
Production Summary
Production Highlights Q4 2013 YE 2013 Change YE 2012
Silver production (oz) 153,512 682,526 +10% 620,515
Gold production (oz) 337 1269 +102% 629
Average mill head grade (silver
grams per tonne)
151 158 +14% 138
Total tonnes produced (t) 36,655 159,270 -6% 168,826
Tonnes produced per day 398 436 -6% 463
Revenue per production tonne
sold
$75 $84 -10% $94
Direct costs per production
tonne
$70 $68 +9% $62
15
Silver-Focused Producer
69.86%
4.79%
4.05% 7.73%
Metal Production Profile
Silver production (oz)
Lead production (t)
Zinc production (t)
Gold production (oz)
(CDN$000’000’s except EPS) YE 2013 YE 2012 YE 2011
Revenues $14.1 $15.9 $24.3
Operating expenses 11.3 $10.3 $10.1
Mine operating earnings (loss) $0.5 $4.0 $12.9
EBITDA ($4.6) $1.6 $13.0
Net earnings (loss) ($8.5) ($1.1) $7.6
Operating cash flow* $0.6 $3.3 $10.2
Debt Nil Nil Nil
Earnings (loss) per share – basic ($0.13) ($0.02) $0.12
Cash and cash equivalents $3.5 $16.0 $30.8
Working capital $6.9 $21.4 $31.2
16
*Before changes in non-cash working capital
Financial Highlights
The Company’s working capital and cash position decreased from the year ended December 31, 2012, as the Company continued to invest in
the development of the Capire Mine and Production Centre, as well as continued exploration in the Zacualpan District.
All prices in Canadian Dollars As of April 5, 2014
Common shares – Issued & Outstanding 68.1 M
Fully Diluted 74.8 M
Share Price $0.66
52wk Range $0.44 - $1.17
90-Day Average Daily Volume 72,963 Shares
Market Capitalization 45.0M
Insider and Institutional Ownership 14.9%
Options Issued 6.7 M
Warrants Nil
Corporate Summary (TSX-V: IPT)
17
Source: BigCharts.com
1-Year Chart Summary
2013
• 30,000 meter exploration drill program (completed)
• Increase average silver mill feed grade (completed: Q1-146 g/t Ag; Q2 – 163 g/t Ag; Q3 – 171 g/t Ag)
• Complete drilling at Mirasol Prospect and determine its potential as next producing mine (completed)
2014
• Continue drilling on the VMS targets in the Capire district
• Advance towards graduation from the TSX-V to the TSX
2015
• Consider the location of an additional production center in the Zacualpan District
• Define the size of the planned expansion at the Capire Processing Centre and to initiate construction the
larger processing plant
Plans for Growth
18
Contact Us
IMPACT Silver Corp.
TSX-V: IPT Frankfurt: IKL
Telephone 1-604-681-0172
Fax 1-604-681-6813
Email inquiries@impactsilver.com
Investor Relations Manager Jerry Huang MBA
Website www.impactsilver.com
Twitter @IMPACT_Silver
Corporate Address
Suite1100 - 543 Granville Street
Vancouver, BC, Canada V6C 1X8
19
Appendix I: Capire NI 43-101 Resource Estimate
Completed February 2011
Metal Content for Capire Mine Ag (oz) Au (oz) Cu (lb) Pb (lbs) Zn (lbs)
Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820
Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173
Measured & Indicated (M&I) 7,224,035 30,446 7,083,007 37,264,478 95,662,993
Inferred 435,959 1,919 475,594 2,260,089 5,823,490
Summary Table of Classified Mineral Resources – Measured & Indicated and Separate Inferred
Zone Classification Tonnes Ag (g/t) Au (g/t) Cu (%) Pb (%) Zn (%)
Capire M&I 3,104,944 46.46 0.19 0.06 0.33 0.93
Aurora 1 M&I 1,807,302 44.50 0.199 0.07 0.36 0.80
Total
M&I 4,912,246 45.74 0.193 0.06 0.34 0.88
Inferred 371,066 36.54 0.161 0.06 0.28 0.71
• Drilling in 2010 showed Capire and Aurora 1 to be one continuous zone, now referred to as Capire
• See National Instrument 43-101 Resource Estimate on the Company website at www.impactsilver.com
20
Appendix II: Capire Drill Highlights
A Selection of Capire Drill Highlights
Drill Hole From (m)
To
(m)
Interval
(m)
Ag (g/t) Au (g/t)
Pb
(%)
Zn
(%)
Cu
(%)
C12-06 78.25 80.30 2.05 507 1.81 2.20 4.02 0.41
including 79.30 80.30 1.00 929 3.27 2.77 5.27 0.63
and 105.70 110.80 5.10 183 0.20 1.05 2.45 0.13
C12-21 83.35 100.10 16.75 153 0.40 1.14 2.71 0.21
including 92.40 97.00 4.60 435 0.71 3.13 5.99 0.48
C12-25 13.20 23.35 10.15 107 0.58 0.90 2.43 0.10
including 13.20 15.25 2.05 315 0.91 2.93 8.19 0.25
• Drill holes listed above were drilled vertically and all intersections are estimated to be close to true width
• See IMPACT Silver News Release dated October 25, 2012
21
Appendix III: Mirasol Drill Highlights
A Selection of Mirasol Drill Highlights
Drill Hole Vein Name From (m)
To
(m)
Interval
(m)
Ag (g/t) Au (g/t)
Pb
(%)
Zn
(%)
Z12-71 Mirasol Central 73.9 82.9 8.98 183 0.030 0.07 0.14
including Mirasol Central 75.2 82.4 7.15 216 0.040 0.08 0.16
Z12-79 Mirasol Arriba 4 111.22 113.36 2.14 119 0.014 0.07 0.18
and Mirasol Arriba 3 127.25 128.40 1.15 400 0.034 0.13 0.08
and Mirasol Arriba 1 162.60 164.48 1.88 529 0.283 0.37 1.31
Z12-80 El Deshuesadero 83.45 85.15 1.70 931 0.30 1.03 2.10
Z12-85 Mirasol Arriba 3 114.65 116.00 1.35 792 0.143 0.48 0.16
Z12-86 Mirasol 176.56 177.60 1.04 337 0.023 0.15 0.76
• Discovered in November 2012, located 5.5km from Guadalupe Production Center, in Zacualpan
• Several high grade silver values discovered, with drill hole Z12-79 encountering seven distinct veins, all of which are contributing potentially economic silver
intersections. See IMPACT Silver News Releases dated January 28, 2013 and November 26, 2012
22
Appendix IV: Cuchara-Oscar Drill Highlights
A Selection of Cuchara-Oscar Drill Highlights
Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%)
Z11-46 92.10 97.75 5.65 1,007 0.07 0.50 1.1
including 96.70 97.75 1.05 4,580 0.26 1.70 4.0
and 108.95 111.70 2.75 1,128 0.51 0.90 1.4
Z11-55 21.80 22.85 1.05 435 0.01 0.15 0.24
Z11-64 36.60 43.20 6.60 223 0.08 0.18 0.52
Z11-69 0.70 3.35 2.65 408 0.62 0.73 1.12
Z11-74 21.35 22.35 1.00 1,875 0.74 2.65 6.88
Z12-05 92.50 97.60 5.10 234 0.05 0.14 0.49
Z12-08 22.36 45.75 23.39 115 0.02 0.12 0.36
• See IMPACT Silver News Releases dated October 26, 2011 and April 23, 2012
23
Appendix V: Valle de Oro Drill Highlights
A Selection of Carlos Pacheco Drill Highlights
Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Cu (%)
Z08-68 Top of intercept - 85.74 2.90 19.6 68 0.29
including Top of intercept - 85.74 1.0 49.7 59 0.31
Z12-13 192.30 199.00 6.70 3.84 28 0.54
including 192.30 195.05 2.75 8.47 56 1.12
Z12-23 229.85 230.95 1.10 3.82 84 0.54
A Selection of Intermediate Vein Drill Highlights
Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Pb (%) Zn (%)
Z12-16 100.00 114.30 14.30 0.04 82 0.09 0.19
including 100.00 106.50 6.50 0.06 119 0.06 0.14
Z12-18 57.00 59.00 2.00 0.20 337 0.23 0.43
Z12-23 26.10 28.10 2.00 0.22 207 0.10 0.15
• In addition to the gold-copper mineralization in the Carlos Pacheco vein, other drill holes intersected Ag-Pb-Zn mineralization in the Intermediate vein cluster, located midway between the
Carlos Pacheco and Noche Buena veins. See IMPACT Silver News Releases dated December 4, 2008 and July 11, 2012
24
Appendix VI: La Condesa Drill Highlights
A Selection of La Condesa Drill Highlights
Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%)
Z12-39 167.30 171.00 3.70 312 0.029 0.27 0.90
Z12-42 136.00 139.78 3.78 214 0.269 0.15 0.37
Z12-45 177.90 179.00 1.10 1,655 0.010 0.25 0.08
Z12-46 151.40 154.25 2.85 255 0.111 0.22 0.46
Z12-55 57.80 59.60 1.80 245 0.030 0.12 0.36
Z12-63 106.50 108.85 2.35 231 0.010 0.16 0.26
Z12-64 101.10 105.55 4.45 200 0.035 0.21 0.49
Z12-68 46.40 50.30 3.90 250 0.009 0.07 0.16
• La Condesa accessed through the underground workings of the historic Cuchara Mine, which is also used to access the Cuchara-Oscar Mine
• Mineralization from La Condesa is planned to augment the production from Cuchara-Oscar
• See IMPACT Silver News Release dated November 19, 2012
25
Appendix VII: San Juan Project Drill Highlights
A Selection of San Juan Project Area Drill Highlights
Drill Hole Vein Name From (m) To (m) True Width (m) Ag (g/t) Au (g/t) Pb (%) Zn (%)
Z13-40 61.70 63.15 1.31 7.9 3.956 0.10 0.19
Z13-42 Carlos Pacheco 119.30 128.60 9.02 21.3 3.894 0.98 3.28
including Carlos Pacheco 127.65 128.60 0.92 73.3 33.630 4.09 12.02
Z13-43 Carlos Pacheco 92.05 98.95 6.63 152.4 0.412 0.28 0.75
Z13-44 Noche Buena 11.60 14.00 2.07 1,409.8 0.963 0.29 0.34
including Carlos Pacheco 158.05 162.40 4.03 30.9 4.070 0.18 0.83
Z13-45 Carlos Pacheco 14.60 22.55 7.47 41.64 0.050 0.18 0.25
and Carlos Pacheco 169.00 173.00 3.78 18.3 9.350 0.04 0.08
• These first phase drill results are from the San Juan Project Area, located in the Valle de Oro subdistrict, adjacent to the producing Noche Buena Mine
• The San Juan Project Area encompasses a series of old mine workings containing multiple working levels located 150m to the north of the Noche
Buena Mine. These old working lie along the northern extension of the Carlos Pacheco Vein, where previous drilling intersected 19.6g/t gold across
2.9m and 3.84g/t gold across 6.7m. See IMPACT Silver News Release dated October 30, 2013 for details.
26
27

Contenu connexe

Tendances

20130524 impact-silver-corporate-presentation
20130524 impact-silver-corporate-presentation20130524 impact-silver-corporate-presentation
20130524 impact-silver-corporate-presentation
Adnet Communications
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
Adnet Communications
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
Adnet Communications
 
2013 IMPACT Silver Corporate Presentation
2013 IMPACT Silver Corporate Presentation2013 IMPACT Silver Corporate Presentation
2013 IMPACT Silver Corporate Presentation
Adnet Communications
 

Tendances (20)

Presentation
PresentationPresentation
Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
IMPACT Corporate Presentation
IMPACT Corporate PresentationIMPACT Corporate Presentation
IMPACT Corporate Presentation
 
20130524 impact-silver-corporate-presentation
20130524 impact-silver-corporate-presentation20130524 impact-silver-corporate-presentation
20130524 impact-silver-corporate-presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Impact Silver March 2019 Corporate Presentation
Impact Silver March 2019 Corporate PresentationImpact Silver March 2019 Corporate Presentation
Impact Silver March 2019 Corporate Presentation
 
201307 presentation
201307 presentation201307 presentation
201307 presentation
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
2013 IMPACT Silver Corporate Presentation
2013 IMPACT Silver Corporate Presentation2013 IMPACT Silver Corporate Presentation
2013 IMPACT Silver Corporate Presentation
 
Impact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate PresentationImpact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate Presentation
 
Impact Silver June 2015 Presentation
Impact Silver June 2015 PresentationImpact Silver June 2015 Presentation
Impact Silver June 2015 Presentation
 
Impact Silver Corporate Presentation June 2019
Impact Silver Corporate Presentation June 2019Impact Silver Corporate Presentation June 2019
Impact Silver Corporate Presentation June 2019
 
Nov2019 ipt
Nov2019 iptNov2019 ipt
Nov2019 ipt
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015
 

En vedette (8)

Sesión 2 mary
Sesión 2 marySesión 2 mary
Sesión 2 mary
 
Indicadores financieros
Indicadores financierosIndicadores financieros
Indicadores financieros
 
Optimizing With Your Merchant Partner
Optimizing With Your Merchant PartnerOptimizing With Your Merchant Partner
Optimizing With Your Merchant Partner
 
Geografia
GeografiaGeografia
Geografia
 
PACE - Law Presentation: Estate Planning for a Business Owner
PACE - Law Presentation: Estate Planning for a Business OwnerPACE - Law Presentation: Estate Planning for a Business Owner
PACE - Law Presentation: Estate Planning for a Business Owner
 
EF: Triatlo
EF: TriatloEF: Triatlo
EF: Triatlo
 
Expressive language disorder
Expressive language disorderExpressive language disorder
Expressive language disorder
 
Progetto Alimentiamiamoci
Progetto AlimentiamiamociProgetto Alimentiamiamoci
Progetto Alimentiamiamoci
 

Similaire à Presentation (11)

Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Impact Silver Presentation
Impact Silver PresentationImpact Silver Presentation
Impact Silver Presentation
 
2018 March Impact Silver Presentation
2018 March Impact Silver Presentation2018 March Impact Silver Presentation
2018 March Impact Silver Presentation
 
Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018
 
Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018
 
2017 aug-ipt-q2
2017 aug-ipt-q22017 aug-ipt-q2
2017 aug-ipt-q2
 
Impact Silver Corporate Presentation November 2017
Impact Silver Corporate Presentation November 2017Impact Silver Corporate Presentation November 2017
Impact Silver Corporate Presentation November 2017
 
Corporate Presentation - November 2015
Corporate Presentation - November 2015Corporate Presentation - November 2015
Corporate Presentation - November 2015
 
Dec20181011 ipt-ppt-for-website
Dec20181011 ipt-ppt-for-websiteDec20181011 ipt-ppt-for-website
Dec20181011 ipt-ppt-for-website
 
20160501 ipt ppt tor (1)
20160501 ipt ppt   tor (1)20160501 ipt ppt   tor (1)
20160501 ipt ppt tor (1)
 
Presentation
PresentationPresentation
Presentation
 

Plus de Adnet Communications

20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
Adnet Communications
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
Adnet Communications
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdf
Adnet Communications
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf
Adnet Communications
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation
Adnet Communications
 

Plus de Adnet Communications (20)

Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdf
 
Strategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationStrategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate Presentation
 
Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdf
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 Update
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation
 

Dernier

Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 

Dernier (20)

Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 

Presentation

  • 1. 1 APR 2014 | Q4 2013
  • 2. Except for historical information, this presentation may contain certain “forward-looking” statements and information relating to IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement. The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding for the continued exploration and development of the Company’s exploration properties. This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking statements. NI43-101 QUALIFIED PERSON George Gorzynski, P. Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the technical information in this presentation. Cautionary Statement 2
  • 3. GROWING ASSETS CONTINUOUS EXPLORATION PRUDENT MANAGEMENT IMPACT Silver is a junior silver producer with low cost operations and a growing portfolio of silver mines in south-central Mexico. A cornerstone of IMPACT’s success is systematic exploration leading to rapid mine development to increase mill throughput and generate near-term cash flow. Focused on creating value by growth primarily through earnings, in the pursuit of building a multimillion ounce precious metals producer. Overview 3
  • 4. Frederick W. Davidson, CA President, CEO, Director President of IMPACT Silver and Energold Drilling Corp. Over 33 years of mining experience, including holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines. George Gorzynski, P. Eng. VP Exploration, Director Over 30 years of exploration and mining experience; current Director of Tirex Resources, Defiance Silver and Berkwood Resources. Richard Younker, CA, CMC CFO Held the senior financial consulting principal position at Woods Gordon; independent financial consultant in public and private sectors. Armando Alexandri COO Over 35 years of mining experience in underground and open-pit mines as well as flotation and cyanidation processing plants. H. Walter Sellmer, P. Geo Director Held senior positions at Amax Exploration, Canamax Resources Inc. and TOTAL Energold Corp. Victor Tanaka, P. Geo Director President and CEO of Bayswater Uranium Corp. Held senior positions at Asamera Inc., Freeport McMoRan Gold Corp., Aber Resources, Major General Resources, Fjordland Exploration and Pathfinder Resources. Richard Mazur, P. Geo, MBA Director President and CEO of Forum Uranium Corp. and CEO of Alto Ventures Ltd. Held senior positions at Canamax Resources and IMPACT Minerals. Peter Tredger, P. Eng., MBA Director Former Senior Officer of Thompson Creek Metals Company. Held senior positions at Glencairn Gold (now B2Gold) and Wheaton River Minerals (now Goldcorp). Jean-Pierre Bourtin, MBA Director President of a private equity firm in Connecticut, USA. Former Treasurer of Xerox Corp., Latin American and Emerging Markets. Directors & Management 4
  • 5. • Nearly 100% owned and operated 623 km² (62,300 ha) mineral exploration land package in south-central Mexico. • Two contiguous mineral districts with mining activities dating back to the 1500s. • A three hour drive southwest from Mexico City, with paved road access to the gate of IMPACT’s Guadalupe Production Center. • Excellent infrastructure, with a modern power grid, ample water supply and a skilled, 99% Mexican workforce. • Many other significant mining operations within close proximity. 5 Property Location in Mexico
  • 6. • The Royal Mines of Zacualpan is one of the oldest mining districts in the Americas, with nearly 500 years of recorded mining history. • IMPACT’s 623 km² land package consists of two large mineral districts and one subdistrict: The Zacualpan District and the Capire-Mamatla District, and the Valle de Oro subdistrict. • IMPACT’s exploration work has catalogued over 3,500 old mine and mill workings, forming an invaluable basis for modern and effective exploration. Prolific Mining History 6 Zacualpan District Capire District Valle de Oro subdistrict Early stage exploration area
  • 7. Mine and Production Center Location Map • The 500-tpd Guadalupe Production Center is located within the Zacualpan District. • The Guadalupe Production Center receives ore from three underground silver mines located within close proximity: • San Ramon Mine • Noche Buena Mine • Cuchara-Oscar Mine • The 200-tpd Capire Production Centre is located within the Capire-Mamatla District. • The Capire Production Center commenced pilot production in March 2013, with test operations continuing with mineral feed from the adjacent open-pit Capire Mine. 7
  • 8. Long Term Goal and Mine Development Process To build a profitable, mid-tier, multimillion ounce precious metals producing company with multiple mines feeding multiple processing centres. Exploration and Mine Development Process Flowchart Over 3,000 old mine workings and prospects catalogued in IMPACT’s ArcGIS database RESEARCH Compile old mines and prospects from historic maps FIELD WORK Geological mapping, surface and underground rock sampling Select and prioritize favorable areas and prospects and design the drill program DRILLING Drill program will be results-driven and implemented in phases Current targets: • Capire (south) • Mirasol • La Condesa • Santa Efigenia • San Juan MINE DEVELOPMENT Mine design, planning, permitting and construction PRODUCTION & CASH FLOW Pilot operations at Capire Plant with plans to expand to larger scale production in the future • San Ramon • Noche Buena • Cuchara-Oscar • Capire 8
  • 9. Guadalupe Production Centre Zacualpan District 500 TPD Flotation circuit Operating near capacity Mill feed from San Ramon, Noche Buena & Cuchara-Oscar Mines (underground) Capire Production Centre Capire-Mamatla District 200 TPD Pilot plant with expansion plans Mill feed from Capire Mine (open-pit) 9 Guadalupe Production Centre Zacualpan District 500 TPD Flotation circuit operating near capacity Mill feed from San Ramon, Noche Buena & Cuchara-Oscar Mines (epithermal, underground) Capire Production Centre Capire-Mamatla District 200 TPD Pilot plant operation with expansion plans Mill feed from Capire Mine (VMS, open-pit) Two Production Centres
  • 10. 10 Guadalupe Production Centre • Guadalupe Production Centre (500 tpd) • Flotation circuit produces silver-lead and zinc-silver concentrates
  • 11. 11 Capire Mine and Production Centre • Capire Mine (VMS, open-pit)• Capire Production Centre (200 tpd pilot plant)
  • 12. San Ramon Began production in 2008 Epithermal veins Current primary producing mine in the Zacualpan District Contribution of total production in Q3 2013: 41% Noche Buena Began production in 2010 Epithermal veins in Valle de Oro subdistrict located in the Zacualpan District Contribution of total production in Q3 2013: 32% Cuchara-Oscar Corridor of wide, high-grade epithermal veins linking legacy mines within the Cuchara Mine Complex in the Zacualpan District Contribution of total production in Q3 2013: 27% Capire Volcanogenic sulfide deposit with high-grade polymetallic mineralization in the Capire-Mamatla District Contribution of total production in Q3 2013: 0% (In commissioning phase) Four Producing Silver Mines 12
  • 13. Geology of Epithermal Vein Systems Silver-rich at top of vein 200 – 1,000+ g/t Ag Lead and Zinc-rich at bottom of vein 60 – 150 g/t Ag Gold-copper at depths of 300 m+ Metal Zoning in Ore Shoots Strike Length 150 – 420 m (500 – 1,400 ft) Metal Level in Producing Mines Surface – 0 m (0 ft) 150 m (500 ft) 300 m (1,000 ft) Depth 13 Noche Buena Mine San Ramon Mine Valle de Oro subdistrict Exploration property, includes Carlos Pacheco gold-copper zone and San Juan Project Cuchara-Oscar Mine
  • 14. Exploration Targets Zacualpan District • Mirasol • La Condesa • Santa Efigenia Capire-Mamatla District • Manto Rico • Guadalupe • Aurora II Valle de Oro Subdistrict • Carlos Pacheco • San Juan Project • Huatescosco Dominican Republic • Early stage exploration on legacy claims 623 km² land package* * Does not include the Dominican Republic claims • An abundance of attractive exploration targets across Zacualpan and Capire districts to drive organic growth and potentially advance into mine development and production. 14 Above: Statue of miner in Zacualpan’s town square, Mexico
  • 15. Production Summary Production Highlights Q4 2013 YE 2013 Change YE 2012 Silver production (oz) 153,512 682,526 +10% 620,515 Gold production (oz) 337 1269 +102% 629 Average mill head grade (silver grams per tonne) 151 158 +14% 138 Total tonnes produced (t) 36,655 159,270 -6% 168,826 Tonnes produced per day 398 436 -6% 463 Revenue per production tonne sold $75 $84 -10% $94 Direct costs per production tonne $70 $68 +9% $62 15 Silver-Focused Producer 69.86% 4.79% 4.05% 7.73% Metal Production Profile Silver production (oz) Lead production (t) Zinc production (t) Gold production (oz)
  • 16. (CDN$000’000’s except EPS) YE 2013 YE 2012 YE 2011 Revenues $14.1 $15.9 $24.3 Operating expenses 11.3 $10.3 $10.1 Mine operating earnings (loss) $0.5 $4.0 $12.9 EBITDA ($4.6) $1.6 $13.0 Net earnings (loss) ($8.5) ($1.1) $7.6 Operating cash flow* $0.6 $3.3 $10.2 Debt Nil Nil Nil Earnings (loss) per share – basic ($0.13) ($0.02) $0.12 Cash and cash equivalents $3.5 $16.0 $30.8 Working capital $6.9 $21.4 $31.2 16 *Before changes in non-cash working capital Financial Highlights The Company’s working capital and cash position decreased from the year ended December 31, 2012, as the Company continued to invest in the development of the Capire Mine and Production Centre, as well as continued exploration in the Zacualpan District.
  • 17. All prices in Canadian Dollars As of April 5, 2014 Common shares – Issued & Outstanding 68.1 M Fully Diluted 74.8 M Share Price $0.66 52wk Range $0.44 - $1.17 90-Day Average Daily Volume 72,963 Shares Market Capitalization 45.0M Insider and Institutional Ownership 14.9% Options Issued 6.7 M Warrants Nil Corporate Summary (TSX-V: IPT) 17 Source: BigCharts.com 1-Year Chart Summary
  • 18. 2013 • 30,000 meter exploration drill program (completed) • Increase average silver mill feed grade (completed: Q1-146 g/t Ag; Q2 – 163 g/t Ag; Q3 – 171 g/t Ag) • Complete drilling at Mirasol Prospect and determine its potential as next producing mine (completed) 2014 • Continue drilling on the VMS targets in the Capire district • Advance towards graduation from the TSX-V to the TSX 2015 • Consider the location of an additional production center in the Zacualpan District • Define the size of the planned expansion at the Capire Processing Centre and to initiate construction the larger processing plant Plans for Growth 18
  • 19. Contact Us IMPACT Silver Corp. TSX-V: IPT Frankfurt: IKL Telephone 1-604-681-0172 Fax 1-604-681-6813 Email inquiries@impactsilver.com Investor Relations Manager Jerry Huang MBA Website www.impactsilver.com Twitter @IMPACT_Silver Corporate Address Suite1100 - 543 Granville Street Vancouver, BC, Canada V6C 1X8 19
  • 20. Appendix I: Capire NI 43-101 Resource Estimate Completed February 2011 Metal Content for Capire Mine Ag (oz) Au (oz) Cu (lb) Pb (lbs) Zn (lbs) Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820 Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173 Measured & Indicated (M&I) 7,224,035 30,446 7,083,007 37,264,478 95,662,993 Inferred 435,959 1,919 475,594 2,260,089 5,823,490 Summary Table of Classified Mineral Resources – Measured & Indicated and Separate Inferred Zone Classification Tonnes Ag (g/t) Au (g/t) Cu (%) Pb (%) Zn (%) Capire M&I 3,104,944 46.46 0.19 0.06 0.33 0.93 Aurora 1 M&I 1,807,302 44.50 0.199 0.07 0.36 0.80 Total M&I 4,912,246 45.74 0.193 0.06 0.34 0.88 Inferred 371,066 36.54 0.161 0.06 0.28 0.71 • Drilling in 2010 showed Capire and Aurora 1 to be one continuous zone, now referred to as Capire • See National Instrument 43-101 Resource Estimate on the Company website at www.impactsilver.com 20
  • 21. Appendix II: Capire Drill Highlights A Selection of Capire Drill Highlights Drill Hole From (m) To (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Cu (%) C12-06 78.25 80.30 2.05 507 1.81 2.20 4.02 0.41 including 79.30 80.30 1.00 929 3.27 2.77 5.27 0.63 and 105.70 110.80 5.10 183 0.20 1.05 2.45 0.13 C12-21 83.35 100.10 16.75 153 0.40 1.14 2.71 0.21 including 92.40 97.00 4.60 435 0.71 3.13 5.99 0.48 C12-25 13.20 23.35 10.15 107 0.58 0.90 2.43 0.10 including 13.20 15.25 2.05 315 0.91 2.93 8.19 0.25 • Drill holes listed above were drilled vertically and all intersections are estimated to be close to true width • See IMPACT Silver News Release dated October 25, 2012 21
  • 22. Appendix III: Mirasol Drill Highlights A Selection of Mirasol Drill Highlights Drill Hole Vein Name From (m) To (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z12-71 Mirasol Central 73.9 82.9 8.98 183 0.030 0.07 0.14 including Mirasol Central 75.2 82.4 7.15 216 0.040 0.08 0.16 Z12-79 Mirasol Arriba 4 111.22 113.36 2.14 119 0.014 0.07 0.18 and Mirasol Arriba 3 127.25 128.40 1.15 400 0.034 0.13 0.08 and Mirasol Arriba 1 162.60 164.48 1.88 529 0.283 0.37 1.31 Z12-80 El Deshuesadero 83.45 85.15 1.70 931 0.30 1.03 2.10 Z12-85 Mirasol Arriba 3 114.65 116.00 1.35 792 0.143 0.48 0.16 Z12-86 Mirasol 176.56 177.60 1.04 337 0.023 0.15 0.76 • Discovered in November 2012, located 5.5km from Guadalupe Production Center, in Zacualpan • Several high grade silver values discovered, with drill hole Z12-79 encountering seven distinct veins, all of which are contributing potentially economic silver intersections. See IMPACT Silver News Releases dated January 28, 2013 and November 26, 2012 22
  • 23. Appendix IV: Cuchara-Oscar Drill Highlights A Selection of Cuchara-Oscar Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z11-46 92.10 97.75 5.65 1,007 0.07 0.50 1.1 including 96.70 97.75 1.05 4,580 0.26 1.70 4.0 and 108.95 111.70 2.75 1,128 0.51 0.90 1.4 Z11-55 21.80 22.85 1.05 435 0.01 0.15 0.24 Z11-64 36.60 43.20 6.60 223 0.08 0.18 0.52 Z11-69 0.70 3.35 2.65 408 0.62 0.73 1.12 Z11-74 21.35 22.35 1.00 1,875 0.74 2.65 6.88 Z12-05 92.50 97.60 5.10 234 0.05 0.14 0.49 Z12-08 22.36 45.75 23.39 115 0.02 0.12 0.36 • See IMPACT Silver News Releases dated October 26, 2011 and April 23, 2012 23
  • 24. Appendix V: Valle de Oro Drill Highlights A Selection of Carlos Pacheco Drill Highlights Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Cu (%) Z08-68 Top of intercept - 85.74 2.90 19.6 68 0.29 including Top of intercept - 85.74 1.0 49.7 59 0.31 Z12-13 192.30 199.00 6.70 3.84 28 0.54 including 192.30 195.05 2.75 8.47 56 1.12 Z12-23 229.85 230.95 1.10 3.82 84 0.54 A Selection of Intermediate Vein Drill Highlights Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Pb (%) Zn (%) Z12-16 100.00 114.30 14.30 0.04 82 0.09 0.19 including 100.00 106.50 6.50 0.06 119 0.06 0.14 Z12-18 57.00 59.00 2.00 0.20 337 0.23 0.43 Z12-23 26.10 28.10 2.00 0.22 207 0.10 0.15 • In addition to the gold-copper mineralization in the Carlos Pacheco vein, other drill holes intersected Ag-Pb-Zn mineralization in the Intermediate vein cluster, located midway between the Carlos Pacheco and Noche Buena veins. See IMPACT Silver News Releases dated December 4, 2008 and July 11, 2012 24
  • 25. Appendix VI: La Condesa Drill Highlights A Selection of La Condesa Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z12-39 167.30 171.00 3.70 312 0.029 0.27 0.90 Z12-42 136.00 139.78 3.78 214 0.269 0.15 0.37 Z12-45 177.90 179.00 1.10 1,655 0.010 0.25 0.08 Z12-46 151.40 154.25 2.85 255 0.111 0.22 0.46 Z12-55 57.80 59.60 1.80 245 0.030 0.12 0.36 Z12-63 106.50 108.85 2.35 231 0.010 0.16 0.26 Z12-64 101.10 105.55 4.45 200 0.035 0.21 0.49 Z12-68 46.40 50.30 3.90 250 0.009 0.07 0.16 • La Condesa accessed through the underground workings of the historic Cuchara Mine, which is also used to access the Cuchara-Oscar Mine • Mineralization from La Condesa is planned to augment the production from Cuchara-Oscar • See IMPACT Silver News Release dated November 19, 2012 25
  • 26. Appendix VII: San Juan Project Drill Highlights A Selection of San Juan Project Area Drill Highlights Drill Hole Vein Name From (m) To (m) True Width (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z13-40 61.70 63.15 1.31 7.9 3.956 0.10 0.19 Z13-42 Carlos Pacheco 119.30 128.60 9.02 21.3 3.894 0.98 3.28 including Carlos Pacheco 127.65 128.60 0.92 73.3 33.630 4.09 12.02 Z13-43 Carlos Pacheco 92.05 98.95 6.63 152.4 0.412 0.28 0.75 Z13-44 Noche Buena 11.60 14.00 2.07 1,409.8 0.963 0.29 0.34 including Carlos Pacheco 158.05 162.40 4.03 30.9 4.070 0.18 0.83 Z13-45 Carlos Pacheco 14.60 22.55 7.47 41.64 0.050 0.18 0.25 and Carlos Pacheco 169.00 173.00 3.78 18.3 9.350 0.04 0.08 • These first phase drill results are from the San Juan Project Area, located in the Valle de Oro subdistrict, adjacent to the producing Noche Buena Mine • The San Juan Project Area encompasses a series of old mine workings containing multiple working levels located 150m to the north of the Noche Buena Mine. These old working lie along the northern extension of the Carlos Pacheco Vein, where previous drilling intersected 19.6g/t gold across 2.9m and 3.84g/t gold across 6.7m. See IMPACT Silver News Release dated October 30, 2013 for details. 26
  • 27. 27