SlideShare une entreprise Scribd logo
1  sur  3
CV of Salma Akhter
Salma Akhter
Sharminsalma30@gmail.com
Dhaka,Bangladesh
Mobile: 01757 391 515
Object Overview
To succeed in an environment of growth and excellence and earn a job
which provides me job Satisfaction and self-development and help me
achieve personal as well as organization goals.
1. Name
2. Father’s Name
3. Father’s Name :
SALMA AKHTER
Mostafa Kamal
Shanaz Begum
4. Date of Birth Jan 03,1988 Nationality: Bangladeshi
5. Education • Diploma in Architecture
• BSc in Civil Engineering from IEB
6. Membership of
Professional
Associations
AMIEB (Associate member’s of institute of Engineers, Bangladesh)
7. Other Training
• Computer software training on Staad. Pro, MS Word, MS Excel,
CorelDraw, Photo Paint, Microsoft Photo Editor, Adobe Photoshop,
Adobe Power Point, AutoCAD, Arc-View etc.
• Auto CAD 2004, 2006, 2007, 2012,2013,2014,2015,2016 Arc-View
with the basic concepts of Engineering Drawing, Drafting and Advance
Auto CAD Features; Practices including standard conversion and
Mapping using digitizer
• Windows-XP, Windows-2000, Windows-98-95, DOS, NC, NU, etc.
Familiar with DOS and Windows operating system and trouble
shooting software & hardware. Installation maintains support
personnel computers servers plotters and printers.
8. Countries of Work
Experience
Bangladesh – 8.0 Years
9. Languages
10. Present Address:
11. Permanent Address
Speaking Reading Writing
English Good Good Good
Bangla (mother tongue) Good Good Good
181/Ka, Block-C, 1st Colony, Lalkuthi, Mirpur, Dhaka-1216.
Cell-01757391515, 01818018442
Do
12. Employment Record :
From (Year) To (Year) Employer Position held
Page 1 of 3
CV of Salma Akhter
Feb, 2008 To Date ACE Consultants Ltd. AutoCAD Opereator
13. Detailed Tasks
Assigned
Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
• To prepare
utility drawing,
pile, pile cap,
pier, pier cap &
I- girder, box
girder etc. of
flyover at MMFP
• Drafting 80m
steel
through,45m
semi through,
30m steel plate
girder &
Combined
Bridge of RBCP
Project
• Drafting
Abutment, pier
& 2v, 3v box
culvert
• Conducting all
CAD drafting
works in design
review, design
modifications
and working
drawings
• Conducting all
CAD drafting of
as built drawing.
• Conducting any
other CAD
drafting
Name of assignment or project Mogbazar- Mouchak Flyover Project, LGED,
Bangladesh
Year: May 2012 to till today
Location: Bangla Motor to Malibagh police line, Malibagh Rail gate to Kakraill and
Satrasta more to Holifamily Hospital in Dhaka.
Client: LGED, Bangladesh
Main project features The Project involves Construction of 08Km Flyover Project.
Position held: AutoCAD Technician
Activities performed: Responsible to prepare road cross section & Utilities
drawings, pile, pile cap, pier column, pier cap, I-girder & Box girder and road
alignment etc.
Name of assignment or project: Conversion of Meter Gauge (MG) Track into Dual
Gauge (DG) on Parbatipur-kanchan-Panchagarh and Kanchan-Birol Section and MG
Track into Broad Gauge (BG) Birol Station- Birol Border Section of Bangladesh
Railway.
Year: April 2011 to April. 2012
Location: Parbatipur-Kanchan-Panchagar and Kanchan-Birol Station-Birol border.
Client: Bangladesh Railway (BR)
Main project features The Project involves construction of 120 Box Culverts, 18
minor steel Bridges and 08 major steel Bridges replacing of old bridges.
Position held: AutoCAD Technician
Activities performed: Responsible for development of all structural drawings of
RCC Box Culvert 1V vent & 2V vent, RCC foundation, Abutment & Pier of minor and
major Bridges and steel superstructure of minor & major Bridges using civil 3D.
Name of assignment or project: Dhaka Water supply and Sanitation Project (DS-10)
Year: Dec 2010 to March 2011; 04 months
Location: Dhaka City Corporation`
Client: Dhaka Water Supply and Sewerage Authority.
Main project features The Project involves construction of Digun Khal and Gerani
Khal (Up Stream & Downstream).
Position held: AutoCAD Technician
Activities performed: Responsible for development of all drawings of Key Map,
Long & Cross Section, RCC Box Culvert, Open RCC U-Type Channel & Demarcation
Pillar, Rectangular RCC Channel, Waste Dumping Bin etc.
Name of assignment or project: Dhaka-Chittagong Railway Development Project,
BR (JICA Financed), Bangladesh
Year: Oct 2009 to Nov 2010; 13 months
Location: Laksam to Chinki Astana on Dhaka-Chittagong Railway
Client: Bangladesh Railway (BR)
Main project features The Project involves construction of 61Km Double Tracking
(CDT), Improvement of Pahartoli Workshop (IPW), Remodelling of Chittagong Station
Yard (RCSY), Skill Development Program (SDP) and Universal Design (UD).
Position held: AutoCAD Technician
Activities performed: Responsible for development of all structural drawings of PSC
and RCC Bridges, Box Culvert 1V, Box Culvert 2V, Pipe Culvert and Rail Track
Alignment using Auto CAD R-2007/2010 and development of as built drawing of
Page 2 of 3
CV of Salma Akhter
Pahartoli Workshop & Chittagong Station yard.
Name of assignment or project: Secondary Town integrating Flood Protection
Project.
Year: May 2009 to Sep 2009; 4 months
Location: Kustia
Client: Water Development Board, Bangladesh
Main project features The Project involves for construction of flood Protection
Structure.
Position held: AutoCAD Technician
Activities performed: Responsible for development of all structural drawings for
Regulator using Auto CAD
R-2004/.
Name of assignment or project: Bangladesh Railway Sector Improvement Project-
Implementation Consulting Services, Bangladesh Railway (BR) (ADB Financed),
Bangladesh
Year: Feb 2008 to April 2009, 15 months
Location: Dhaka – Tongi, Tongi - Bhairab Bazar, Bogra-Jamtoli, Khulna-Parbatipur
Client: Bangladesh Railway (BR)
Main project features The Project involves improvement/reconstruction of 64Km
(Tongi-Bhairab) Rail Track alignment of national standard including construction of
62 bridges and culverts.
Position held: AutoCAD Technician
Activities performed: Development of all structural drawings of PSC and RCC
bridges, Box Culvert, Pipe Culvert and Rail Alignment using Auto CAD R-2004/2007
and as built drawing of Signalling & Station yard of Bogra-Jamtoly and Kulna-
Parbatipur.
____________________ Date: __________________
(Signature) Day / Month / Year
Page 3 of 3

Contenu connexe

Tendances

RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1Rahul Thosar
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_TienDuong Nguyen
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniPrasad Kulkarni
 
CV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMANCV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMANwasif
 
CAD DESIGNER (CIVIL & PIPING) 13 YEARS EXPERIENCE
CAD DESIGNER (CIVIL & PIPING) 13 YEARS EXPERIENCECAD DESIGNER (CIVIL & PIPING) 13 YEARS EXPERIENCE
CAD DESIGNER (CIVIL & PIPING) 13 YEARS EXPERIENCEVISAKH SASANKAN
 
NP Geotechnical Engineer
NP Geotechnical EngineerNP Geotechnical Engineer
NP Geotechnical EngineerN Prasanth
 
Precast Detailer/BIM Engineer
Precast Detailer/BIM EngineerPrecast Detailer/BIM Engineer
Precast Detailer/BIM EngineerBalindra Parit
 
CV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design EngineerCV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design EngineerEngr Abdullah
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CVTods Almeron
 

Tendances (20)

CYNIL CV-
CYNIL CV-CYNIL CV-
CYNIL CV-
 
CV of M Saidul Islam.os
CV of M Saidul Islam.osCV of M Saidul Islam.os
CV of M Saidul Islam.os
 
RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1
 
CV - Sasikumar M
CV - Sasikumar MCV - Sasikumar M
CV - Sasikumar M
 
RESUME
RESUMERESUME
RESUME
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
CV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMANCV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMAN
 
anil resume
anil resumeanil resume
anil resume
 
Balaji M Design Engineer
Balaji M Design EngineerBalaji M Design Engineer
Balaji M Design Engineer
 
CAD DESIGNER (CIVIL & PIPING) 13 YEARS EXPERIENCE
CAD DESIGNER (CIVIL & PIPING) 13 YEARS EXPERIENCECAD DESIGNER (CIVIL & PIPING) 13 YEARS EXPERIENCE
CAD DESIGNER (CIVIL & PIPING) 13 YEARS EXPERIENCE
 
CURRICULAM DKS1
CURRICULAM DKS1CURRICULAM DKS1
CURRICULAM DKS1
 
parthiresume1
parthiresume1parthiresume1
parthiresume1
 
Gaurav Kumar
Gaurav KumarGaurav Kumar
Gaurav Kumar
 
Engr. Mohammed Alauddin CV
Engr. Mohammed Alauddin CVEngr. Mohammed Alauddin CV
Engr. Mohammed Alauddin CV
 
NP Geotechnical Engineer
NP Geotechnical EngineerNP Geotechnical Engineer
NP Geotechnical Engineer
 
Precast Detailer/BIM Engineer
Precast Detailer/BIM EngineerPrecast Detailer/BIM Engineer
Precast Detailer/BIM Engineer
 
CV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design EngineerCV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design Engineer
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CV
 

En vedette (20)

CV of Raisa Tamanna Khan
CV of Raisa Tamanna KhanCV of Raisa Tamanna Khan
CV of Raisa Tamanna Khan
 
CV, Dr. Tahmina Rahman Chowdhury
CV, Dr. Tahmina Rahman ChowdhuryCV, Dr. Tahmina Rahman Chowdhury
CV, Dr. Tahmina Rahman Chowdhury
 
Komal_CV new
Komal_CV newKomal_CV new
Komal_CV new
 
Salma's CV
Salma's CVSalma's CV
Salma's CV
 
Kati Sr BUYER
Kati Sr BUYER Kati Sr BUYER
Kati Sr BUYER
 
Female objectification in bangladesh
Female objectification in bangladeshFemale objectification in bangladesh
Female objectification in bangladesh
 
Proshanta Das CV Bangladesh ver 2
Proshanta Das CV Bangladesh ver 2Proshanta Das CV Bangladesh ver 2
Proshanta Das CV Bangladesh ver 2
 
Updated CV 24 Jan 2016
Updated CV 24 Jan 2016Updated CV 24 Jan 2016
Updated CV 24 Jan 2016
 
CV AYUB Ali _December 2015
CV AYUB Ali _December 2015CV AYUB Ali _December 2015
CV AYUB Ali _December 2015
 
cv en
cv encv en
cv en
 
CV Of Shrity
CV Of ShrityCV Of Shrity
CV Of Shrity
 
Lina Tantawy Resume new
Lina Tantawy Resume newLina Tantawy Resume new
Lina Tantawy Resume new
 
Hiba Alkhader
Hiba AlkhaderHiba Alkhader
Hiba Alkhader
 
Resume rukhsana
Resume rukhsanaResume rukhsana
Resume rukhsana
 
Shelida CV--October 2015
Shelida CV--October 2015Shelida CV--October 2015
Shelida CV--October 2015
 
sadia CV linkedin
sadia CV linkedinsadia CV linkedin
sadia CV linkedin
 
Sara+Naz
Sara+NazSara+Naz
Sara+Naz
 
CONTOH RESUME
CONTOH RESUME CONTOH RESUME
CONTOH RESUME
 
Contoh Resume Bahasa Melayu
Contoh Resume Bahasa MelayuContoh Resume Bahasa Melayu
Contoh Resume Bahasa Melayu
 
Contoh resume
Contoh resumeContoh resume
Contoh resume
 

Similaire à CV of Salma Akhter

Similaire à CV of Salma Akhter (20)

SHRAVANI RESUME
SHRAVANI RESUMESHRAVANI RESUME
SHRAVANI RESUME
 
Rayhan_CV..pdf
Rayhan_CV..pdfRayhan_CV..pdf
Rayhan_CV..pdf
 
Pushkar CV
Pushkar CV Pushkar CV
Pushkar CV
 
DMN-Sagheer
DMN-SagheerDMN-Sagheer
DMN-Sagheer
 
GANESH_ANKAM CIVIL AND STR DRAFTMAN(2)
GANESH_ANKAM CIVIL AND STR DRAFTMAN(2)GANESH_ANKAM CIVIL AND STR DRAFTMAN(2)
GANESH_ANKAM CIVIL AND STR DRAFTMAN(2)
 
GOPINATH K
GOPINATH KGOPINATH K
GOPINATH K
 
CV.Asad
CV.AsadCV.Asad
CV.Asad
 
Balaji Resume
Balaji ResumeBalaji Resume
Balaji Resume
 
Avijit_Roy_BIO_DATA
Avijit_Roy_BIO_DATAAvijit_Roy_BIO_DATA
Avijit_Roy_BIO_DATA
 
Bharath CV PYB
Bharath CV PYBBharath CV PYB
Bharath CV PYB
 
Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
 
Abhinandan_Sen_3D_CV_latest
Abhinandan_Sen_3D_CV_latestAbhinandan_Sen_3D_CV_latest
Abhinandan_Sen_3D_CV_latest
 
Ashwani Kumar- Design Engineer
Ashwani Kumar- Design EngineerAshwani Kumar- Design Engineer
Ashwani Kumar- Design Engineer
 
Pdms, autocad designer cv-_t_gunalan
Pdms, autocad designer cv-_t_gunalanPdms, autocad designer cv-_t_gunalan
Pdms, autocad designer cv-_t_gunalan
 
Kousik Rakshit_Planning Engineer_21.01.16
Kousik Rakshit_Planning Engineer_21.01.16Kousik Rakshit_Planning Engineer_21.01.16
Kousik Rakshit_Planning Engineer_21.01.16
 
Rahul Ghosh
Rahul GhoshRahul Ghosh
Rahul Ghosh
 
SAEED UR REHMAN KHAN cv11111
SAEED UR REHMAN KHAN cv11111SAEED UR REHMAN KHAN cv11111
SAEED UR REHMAN KHAN cv11111
 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
 
Narayana_Reddy_CV
Narayana_Reddy_CVNarayana_Reddy_CV
Narayana_Reddy_CV
 
Resume of Mostafa(rev.9)
Resume of Mostafa(rev.9)Resume of Mostafa(rev.9)
Resume of Mostafa(rev.9)
 

CV of Salma Akhter

  • 1. CV of Salma Akhter Salma Akhter Sharminsalma30@gmail.com Dhaka,Bangladesh Mobile: 01757 391 515 Object Overview To succeed in an environment of growth and excellence and earn a job which provides me job Satisfaction and self-development and help me achieve personal as well as organization goals. 1. Name 2. Father’s Name 3. Father’s Name : SALMA AKHTER Mostafa Kamal Shanaz Begum 4. Date of Birth Jan 03,1988 Nationality: Bangladeshi 5. Education • Diploma in Architecture • BSc in Civil Engineering from IEB 6. Membership of Professional Associations AMIEB (Associate member’s of institute of Engineers, Bangladesh) 7. Other Training • Computer software training on Staad. Pro, MS Word, MS Excel, CorelDraw, Photo Paint, Microsoft Photo Editor, Adobe Photoshop, Adobe Power Point, AutoCAD, Arc-View etc. • Auto CAD 2004, 2006, 2007, 2012,2013,2014,2015,2016 Arc-View with the basic concepts of Engineering Drawing, Drafting and Advance Auto CAD Features; Practices including standard conversion and Mapping using digitizer • Windows-XP, Windows-2000, Windows-98-95, DOS, NC, NU, etc. Familiar with DOS and Windows operating system and trouble shooting software & hardware. Installation maintains support personnel computers servers plotters and printers. 8. Countries of Work Experience Bangladesh – 8.0 Years 9. Languages 10. Present Address: 11. Permanent Address Speaking Reading Writing English Good Good Good Bangla (mother tongue) Good Good Good 181/Ka, Block-C, 1st Colony, Lalkuthi, Mirpur, Dhaka-1216. Cell-01757391515, 01818018442 Do 12. Employment Record : From (Year) To (Year) Employer Position held Page 1 of 3
  • 2. CV of Salma Akhter Feb, 2008 To Date ACE Consultants Ltd. AutoCAD Opereator 13. Detailed Tasks Assigned Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned • To prepare utility drawing, pile, pile cap, pier, pier cap & I- girder, box girder etc. of flyover at MMFP • Drafting 80m steel through,45m semi through, 30m steel plate girder & Combined Bridge of RBCP Project • Drafting Abutment, pier & 2v, 3v box culvert • Conducting all CAD drafting works in design review, design modifications and working drawings • Conducting all CAD drafting of as built drawing. • Conducting any other CAD drafting Name of assignment or project Mogbazar- Mouchak Flyover Project, LGED, Bangladesh Year: May 2012 to till today Location: Bangla Motor to Malibagh police line, Malibagh Rail gate to Kakraill and Satrasta more to Holifamily Hospital in Dhaka. Client: LGED, Bangladesh Main project features The Project involves Construction of 08Km Flyover Project. Position held: AutoCAD Technician Activities performed: Responsible to prepare road cross section & Utilities drawings, pile, pile cap, pier column, pier cap, I-girder & Box girder and road alignment etc. Name of assignment or project: Conversion of Meter Gauge (MG) Track into Dual Gauge (DG) on Parbatipur-kanchan-Panchagarh and Kanchan-Birol Section and MG Track into Broad Gauge (BG) Birol Station- Birol Border Section of Bangladesh Railway. Year: April 2011 to April. 2012 Location: Parbatipur-Kanchan-Panchagar and Kanchan-Birol Station-Birol border. Client: Bangladesh Railway (BR) Main project features The Project involves construction of 120 Box Culverts, 18 minor steel Bridges and 08 major steel Bridges replacing of old bridges. Position held: AutoCAD Technician Activities performed: Responsible for development of all structural drawings of RCC Box Culvert 1V vent & 2V vent, RCC foundation, Abutment & Pier of minor and major Bridges and steel superstructure of minor & major Bridges using civil 3D. Name of assignment or project: Dhaka Water supply and Sanitation Project (DS-10) Year: Dec 2010 to March 2011; 04 months Location: Dhaka City Corporation` Client: Dhaka Water Supply and Sewerage Authority. Main project features The Project involves construction of Digun Khal and Gerani Khal (Up Stream & Downstream). Position held: AutoCAD Technician Activities performed: Responsible for development of all drawings of Key Map, Long & Cross Section, RCC Box Culvert, Open RCC U-Type Channel & Demarcation Pillar, Rectangular RCC Channel, Waste Dumping Bin etc. Name of assignment or project: Dhaka-Chittagong Railway Development Project, BR (JICA Financed), Bangladesh Year: Oct 2009 to Nov 2010; 13 months Location: Laksam to Chinki Astana on Dhaka-Chittagong Railway Client: Bangladesh Railway (BR) Main project features The Project involves construction of 61Km Double Tracking (CDT), Improvement of Pahartoli Workshop (IPW), Remodelling of Chittagong Station Yard (RCSY), Skill Development Program (SDP) and Universal Design (UD). Position held: AutoCAD Technician Activities performed: Responsible for development of all structural drawings of PSC and RCC Bridges, Box Culvert 1V, Box Culvert 2V, Pipe Culvert and Rail Track Alignment using Auto CAD R-2007/2010 and development of as built drawing of Page 2 of 3
  • 3. CV of Salma Akhter Pahartoli Workshop & Chittagong Station yard. Name of assignment or project: Secondary Town integrating Flood Protection Project. Year: May 2009 to Sep 2009; 4 months Location: Kustia Client: Water Development Board, Bangladesh Main project features The Project involves for construction of flood Protection Structure. Position held: AutoCAD Technician Activities performed: Responsible for development of all structural drawings for Regulator using Auto CAD R-2004/. Name of assignment or project: Bangladesh Railway Sector Improvement Project- Implementation Consulting Services, Bangladesh Railway (BR) (ADB Financed), Bangladesh Year: Feb 2008 to April 2009, 15 months Location: Dhaka – Tongi, Tongi - Bhairab Bazar, Bogra-Jamtoli, Khulna-Parbatipur Client: Bangladesh Railway (BR) Main project features The Project involves improvement/reconstruction of 64Km (Tongi-Bhairab) Rail Track alignment of national standard including construction of 62 bridges and culverts. Position held: AutoCAD Technician Activities performed: Development of all structural drawings of PSC and RCC bridges, Box Culvert, Pipe Culvert and Rail Alignment using Auto CAD R-2004/2007 and as built drawing of Signalling & Station yard of Bogra-Jamtoly and Kulna- Parbatipur. ____________________ Date: __________________ (Signature) Day / Month / Year Page 3 of 3