SlideShare une entreprise Scribd logo
1  sur  3
Shooting Schedule
Date: Wednesday the 29th January 2014.
Location: Nunnington Hall, Ryedale
Equipment:

Booked? (Y/N)

DSLR Camera

Y

Tripod

Y
Y

Memory Card

Y

Model Release forms

Models: The images will be part of a collection of eight photographs that document
Nunnington Hall. From Workers in the gardens preserving the National park to the
workers in the shops selling local produce from farms nearby. The models used will
be other people taking photographs as it is more of a documentary type of
photography rather than a photojournalist approach.

Props:Props used will only be that of what is found at Nunnington Hall, such as the
tables and chairs found in the interior of the site.

Risk assessment completed?Yes

Contingency:Should the images I want not being available at Nunnington Hall I will
go to a York College Football game and take photographs to document the game.
This will take place the following week from the trip at Eleven o’clock. A camera and
tripod have been booked again for the Monday of that week to prepare should the
Photographs taken at Nunnington Hall not up to a standard.
The location will be at York college and their sports field. A risk assessment has been
taken into consideration for the photography also.
Hazard
Football coming
close to camera

Person(s) /Equipment at Risk
Expensive Equipment can be damaged
and can be hurt by the football itself.

Risk Assessment
Name: Alan Smith
Project: Discovery/Photography
Location: Nunnington Hall

Risk Control Taken
Do not take the
photographs close to where
the ball can hit you. Stay a
good distance away.
Hazard

Person(s) / Equipment at Risk

Risk Control Taken

Tripping over due to weather
conditions or because of natural
environment at the site.

Could harm people and maybe
others around. Camera falling
may result in the lens being
scratched or even broken.

Having the strap over my head
supporting the camera and
making sure to look around the
surroundings.

Disturbing people’s privacy.

People in the photographs
taken may not want to be
pictured.

Making sure nobody is in the
way of the camera when
capturing an image. Also ask
people if they mind or not
being taken of.

Touching harmful equipment
(Gardening equipment)

The person who may get hurt,
the person responsible may be
at risk of being punished and
the equipment may be
damaged.

To not touch anything that has
been left by a worker, also be
aware of surroundings at all
times.

Darkroom exposure to chemical
agents.

It may lead to respiratory,
allergic, and nervous system
diseases.

Having breaks every 15 minutes
when in dark areas.

Someone falling over Tripod

This may lead to the person
tripping over to be harmed and
the tripod to potentially break.

To always keep the tripod close
by and not where someone can
walk near it.

Pedestrians/ people

Me be crowded and can fall on
the floor damaging equipment
and others.
Finding yourself lost from the
others and may be harmed.

To avoid going in areas where
there are a vast amount of
people.
To stay within the grounds at all
times and don’t go too far a
drift from the other students.

Person at risk of strain or the
camera and tripod may be in
danger of falling on the floor.

To make sure regular breaks
are taken to avoid neckand
back pain.

Getting lost

Ergonomic risk of handling heavy
equipment.
What Health and Safety legislation might you need to consider in this project?
Health and safety at work act 1974.I am to consider the general duties of the students when they the
care of the tutors. I will therefore look at students acting responsibly and being safe when around certain
sites or equipment. To also consider the tutors (People in charge of students behaviour) and the way
they should act. They should be trained to deal with certain aspects of the trip and to set an example on
how to behave in the premises of a National Park. They should also know whether the location of where
the students going is safe. Also instruct the students to take photographs without supervision.
Health and Safety (Display Screen Equipment) Regulations act 1992. This may be considered when
editing the images taken on the computer. Regular breaks to be taken to avoid eye problems.

Control of Hazardous and health (COSHH) regulations (2002). Registration, evaluation,
authorisation and restriction to chemicals (REACH) both of these are used for risk assessment

Provision and Use of Work Equipment Regulations 1998 (PUWER)

Contenu connexe

Tendances

Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Emack - Health and safety 6
Emack - Health and safety 6Emack - Health and safety 6
Emack - Health and safety 6rhsmediastudies
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentPodge0123
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentPodge0123
 
Passion Projects Jake
Passion Projects JakePassion Projects Jake
Passion Projects Jaketakahe2
 

Tendances (20)

Task 5!
Task 5!Task 5!
Task 5!
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Task 5!
Task 5!Task 5!
Task 5!
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Task 5
Task 5Task 5
Task 5
 
Task 5!
Task 5!Task 5!
Task 5!
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Health and-safety-park
Health and-safety-parkHealth and-safety-park
Health and-safety-park
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Emack - Health and safety 6
Emack - Health and safety 6Emack - Health and safety 6
Emack - Health and safety 6
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
HEALTH & SAFETY BSS
HEALTH & SAFETY BSSHEALTH & SAFETY BSS
HEALTH & SAFETY BSS
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Passion Projects Jake
Passion Projects JakePassion Projects Jake
Passion Projects Jake
 

En vedette

La Inteligencia Competitiva en las Multinacionales Catalanas (2004)
La Inteligencia Competitiva en las Multinacionales Catalanas (2004)La Inteligencia Competitiva en las Multinacionales Catalanas (2004)
La Inteligencia Competitiva en las Multinacionales Catalanas (2004)miniera
 
Cinéticas de crecimiento y consumo de nutrientes de microalgas en aguas resid...
Cinéticas de crecimiento y consumo de nutrientes de microalgas en aguas resid...Cinéticas de crecimiento y consumo de nutrientes de microalgas en aguas resid...
Cinéticas de crecimiento y consumo de nutrientes de microalgas en aguas resid...Hianara Garcia
 
Karim Makeen's CV (airline)
Karim Makeen's CV (airline)Karim Makeen's CV (airline)
Karim Makeen's CV (airline)Karim Makeen
 
Get a grip_dutch
Get a grip_dutchGet a grip_dutch
Get a grip_dutchjonton
 
PRÁCTICAS SOCIALES DEL LENGUAJE: "CURSO"
PRÁCTICAS SOCIALES DEL LENGUAJE: "CURSO"PRÁCTICAS SOCIALES DEL LENGUAJE: "CURSO"
PRÁCTICAS SOCIALES DEL LENGUAJE: "CURSO"alejandramolinav
 
Santiago sánchez-plan-de-vida-
Santiago sánchez-plan-de-vida-Santiago sánchez-plan-de-vida-
Santiago sánchez-plan-de-vida-sandra campaña
 
Aeroponic presentation
Aeroponic presentationAeroponic presentation
Aeroponic presentationSamson Ogbole
 
Ejercicios de aprendizaje Johana Burgos
Ejercicios de aprendizaje Johana BurgosEjercicios de aprendizaje Johana Burgos
Ejercicios de aprendizaje Johana Burgosdocumentos
 

En vedette (16)

La Inteligencia Competitiva en las Multinacionales Catalanas (2004)
La Inteligencia Competitiva en las Multinacionales Catalanas (2004)La Inteligencia Competitiva en las Multinacionales Catalanas (2004)
La Inteligencia Competitiva en las Multinacionales Catalanas (2004)
 
Cinéticas de crecimiento y consumo de nutrientes de microalgas en aguas resid...
Cinéticas de crecimiento y consumo de nutrientes de microalgas en aguas resid...Cinéticas de crecimiento y consumo de nutrientes de microalgas en aguas resid...
Cinéticas de crecimiento y consumo de nutrientes de microalgas en aguas resid...
 
Tecnologiasnaescola
TecnologiasnaescolaTecnologiasnaescola
Tecnologiasnaescola
 
Karim Makeen's CV (airline)
Karim Makeen's CV (airline)Karim Makeen's CV (airline)
Karim Makeen's CV (airline)
 
Tds tutorial
Tds tutorialTds tutorial
Tds tutorial
 
SFislington16
SFislington16SFislington16
SFislington16
 
transcript
transcripttranscript
transcript
 
Get a grip_dutch
Get a grip_dutchGet a grip_dutch
Get a grip_dutch
 
PRÁCTICAS SOCIALES DEL LENGUAJE: "CURSO"
PRÁCTICAS SOCIALES DEL LENGUAJE: "CURSO"PRÁCTICAS SOCIALES DEL LENGUAJE: "CURSO"
PRÁCTICAS SOCIALES DEL LENGUAJE: "CURSO"
 
Santiago sánchez-plan-de-vida-
Santiago sánchez-plan-de-vida-Santiago sánchez-plan-de-vida-
Santiago sánchez-plan-de-vida-
 
MOTODEV App Validator
MOTODEV App ValidatorMOTODEV App Validator
MOTODEV App Validator
 
Current CV Oct 16
Current CV Oct 16Current CV Oct 16
Current CV Oct 16
 
Aeroponic presentation
Aeroponic presentationAeroponic presentation
Aeroponic presentation
 
Fiebre icterico hemorragica, Alejandro Granada
Fiebre icterico hemorragica, Alejandro GranadaFiebre icterico hemorragica, Alejandro Granada
Fiebre icterico hemorragica, Alejandro Granada
 
Psl
Psl Psl
Psl
 
Ejercicios de aprendizaje Johana Burgos
Ejercicios de aprendizaje Johana BurgosEjercicios de aprendizaje Johana Burgos
Ejercicios de aprendizaje Johana Burgos
 

Similaire à Shooting schedule & risk assessment

Shooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentShooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentShooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Photography risk assessment portrait
Photography risk assessment portraitPhotography risk assessment portrait
Photography risk assessment portraitLewisDunn
 
Risk assessment sheet
Risk assessment sheetRisk assessment sheet
Risk assessment sheetmaialegg
 
Photography shoot risk assessment form portrait inside
Photography shoot risk assessment form portrait insidePhotography shoot risk assessment form portrait inside
Photography shoot risk assessment form portrait insideMegan Hughes
 
A2 media: Risk assessment
A2 media: Risk assessmentA2 media: Risk assessment
A2 media: Risk assessmentaniaburakowska
 
Risk assesmentformlandscape
Risk assesmentformlandscapeRisk assesmentformlandscape
Risk assesmentformlandscapeChloeKyri
 
Risk assesmentformlandscape
Risk assesmentformlandscapeRisk assesmentformlandscape
Risk assesmentformlandscapeChloeKyri
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentOliviaBolt
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentOliviaBolt
 
Safety assessment "Weary Traveller"
Safety assessment "Weary Traveller"Safety assessment "Weary Traveller"
Safety assessment "Weary Traveller"TheMightyGabes
 
Risk assesmentformportrait
Risk assesmentformportraitRisk assesmentformportrait
Risk assesmentformportraitChloeKyri
 
MEDIPhotography shoot risk assessment form
MEDIPhotography shoot risk assessment formMEDIPhotography shoot risk assessment form
MEDIPhotography shoot risk assessment formLydiaCharlotteCooke
 
Risk assessment(5)
Risk assessment(5)Risk assessment(5)
Risk assessment(5)Dan Bell
 

Similaire à Shooting schedule & risk assessment (20)

Task 5!
Task 5!Task 5!
Task 5!
 
Shooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentShooting Schedule & Risk Assessment
Shooting Schedule & Risk Assessment
 
Task 5
Task 5Task 5
Task 5
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentShooting Schedule & Risk Assessment
Shooting Schedule & Risk Assessment
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Photography risk assessment portrait
Photography risk assessment portraitPhotography risk assessment portrait
Photography risk assessment portrait
 
Risk assessment sheet
Risk assessment sheetRisk assessment sheet
Risk assessment sheet
 
Photography shoot risk assessment form portrait inside
Photography shoot risk assessment form portrait insidePhotography shoot risk assessment form portrait inside
Photography shoot risk assessment form portrait inside
 
A2 media: Risk assessment
A2 media: Risk assessmentA2 media: Risk assessment
A2 media: Risk assessment
 
Risk assesmentformlandscape
Risk assesmentformlandscapeRisk assesmentformlandscape
Risk assesmentformlandscape
 
Risk assesmentformlandscape
Risk assesmentformlandscapeRisk assesmentformlandscape
Risk assesmentformlandscape
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Health and safety
Health and safetyHealth and safety
Health and safety
 
Safety assessment "Weary Traveller"
Safety assessment "Weary Traveller"Safety assessment "Weary Traveller"
Safety assessment "Weary Traveller"
 
Risk assesmentformportrait
Risk assesmentformportraitRisk assesmentformportrait
Risk assesmentformportrait
 
MEDIPhotography shoot risk assessment form
MEDIPhotography shoot risk assessment formMEDIPhotography shoot risk assessment form
MEDIPhotography shoot risk assessment form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment(5)
Risk assessment(5)Risk assessment(5)
Risk assessment(5)
 

Plus de AlanSmith96

Graphic narrative resubmission!
Graphic narrative resubmission!Graphic narrative resubmission!
Graphic narrative resubmission!AlanSmith96
 
Graphic narrative resubmission!
Graphic narrative resubmission!Graphic narrative resubmission!
Graphic narrative resubmission!AlanSmith96
 
Writing copy resubmission!
Writing copy resubmission!Writing copy resubmission!
Writing copy resubmission!AlanSmith96
 
Writing copy resubmission!
Writing copy resubmission!Writing copy resubmission!
Writing copy resubmission!AlanSmith96
 
Writing copy resubmission
Writing copy resubmissionWriting copy resubmission
Writing copy resubmissionAlanSmith96
 
Social action resubmission !
Social action resubmission !Social action resubmission !
Social action resubmission !AlanSmith96
 
Design for advertising!
Design for advertising!Design for advertising!
Design for advertising!AlanSmith96
 
Design For Advertising (Task 3+)
Design For Advertising (Task 3+)Design For Advertising (Task 3+)
Design For Advertising (Task 3+)AlanSmith96
 
Design For Advertising Resubmission!
Design For Advertising Resubmission! Design For Advertising Resubmission!
Design For Advertising Resubmission! AlanSmith96
 
Task 9! Evaluation
Task 9! Evaluation Task 9! Evaluation
Task 9! Evaluation AlanSmith96
 

Plus de AlanSmith96 (20)

Graphic narrative resubmission!
Graphic narrative resubmission!Graphic narrative resubmission!
Graphic narrative resubmission!
 
Graphic narrative resubmission!
Graphic narrative resubmission!Graphic narrative resubmission!
Graphic narrative resubmission!
 
Writing copy resubmission!
Writing copy resubmission!Writing copy resubmission!
Writing copy resubmission!
 
Writing copy resubmission!
Writing copy resubmission!Writing copy resubmission!
Writing copy resubmission!
 
Writing copy resubmission
Writing copy resubmissionWriting copy resubmission
Writing copy resubmission
 
Task 4!
Task 4!Task 4!
Task 4!
 
Task 4
Task 4Task 4
Task 4
 
Task 4
Task 4Task 4
Task 4
 
Task 4!
Task 4!Task 4!
Task 4!
 
Task 10!!
Task 10!!Task 10!!
Task 10!!
 
Social Action
Social ActionSocial Action
Social Action
 
Social action resubmission !
Social action resubmission !Social action resubmission !
Social action resubmission !
 
Task 10!!
Task 10!!Task 10!!
Task 10!!
 
Design for advertising!
Design for advertising!Design for advertising!
Design for advertising!
 
Design For Advertising (Task 3+)
Design For Advertising (Task 3+)Design For Advertising (Task 3+)
Design For Advertising (Task 3+)
 
Task 6
Task 6Task 6
Task 6
 
Task 5
Task 5Task 5
Task 5
 
Task 4
Task 4Task 4
Task 4
 
Design For Advertising Resubmission!
Design For Advertising Resubmission! Design For Advertising Resubmission!
Design For Advertising Resubmission!
 
Task 9! Evaluation
Task 9! Evaluation Task 9! Evaluation
Task 9! Evaluation
 

Dernier

LESSON-1-MUSIC-Q4 also a reviewer mapeh.pptx
LESSON-1-MUSIC-Q4 also a reviewer mapeh.pptxLESSON-1-MUSIC-Q4 also a reviewer mapeh.pptx
LESSON-1-MUSIC-Q4 also a reviewer mapeh.pptxmatthewmirafuentes
 
Engineering Major for College_ Environmental Health Engineering by Slidesgo.pptx
Engineering Major for College_ Environmental Health Engineering by Slidesgo.pptxEngineering Major for College_ Environmental Health Engineering by Slidesgo.pptx
Engineering Major for College_ Environmental Health Engineering by Slidesgo.pptxDanielRemache4
 
+97470301568>> buy weed, thc oil,cbd oil, kush, hash in Doha qatar}}
+97470301568>> buy weed, thc oil,cbd oil, kush, hash in Doha qatar}}+97470301568>> buy weed, thc oil,cbd oil, kush, hash in Doha qatar}}
+97470301568>> buy weed, thc oil,cbd oil, kush, hash in Doha qatar}}Health
 
SB_ Pretzel and the puppies_ Rough_ RiverPhan (2024)
SB_ Pretzel and the puppies_ Rough_ RiverPhan (2024)SB_ Pretzel and the puppies_ Rough_ RiverPhan (2024)
SB_ Pretzel and the puppies_ Rough_ RiverPhan (2024)River / Thao Phan
 
Sui Generis Magazine volume one Kristen Murillo.pdf
Sui Generis Magazine volume one Kristen Murillo.pdfSui Generis Magazine volume one Kristen Murillo.pdf
Sui Generis Magazine volume one Kristen Murillo.pdfkristenmurillo218
 
Call Girls In Sindhudurg Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service E...
Call Girls In Sindhudurg Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service E...Call Girls In Sindhudurg Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service E...
Call Girls In Sindhudurg Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service E...Nitya salvi
 
Jaro je tady - Spring is here (Judith) 3
Jaro je tady - Spring is here (Judith) 3Jaro je tady - Spring is here (Judith) 3
Jaro je tady - Spring is here (Judith) 3wistariecz
 
WhatsApp-(# 9711106444 #)Call Girl in Noida Sector 80 Noida (Escorts) Delhi
WhatsApp-(# 9711106444 #)Call Girl in Noida Sector 80 Noida (Escorts) DelhiWhatsApp-(# 9711106444 #)Call Girl in Noida Sector 80 Noida (Escorts) Delhi
WhatsApp-(# 9711106444 #)Call Girl in Noida Sector 80 Noida (Escorts) Delhidelhimunirka15
 
一比一原版(YU学位证书)约克大学毕业证学历认证新版办理
一比一原版(YU学位证书)约克大学毕业证学历认证新版办理一比一原版(YU学位证书)约克大学毕业证学历认证新版办理
一比一原版(YU学位证书)约克大学毕业证学历认证新版办理txkonu
 
Theoretical Framework- Explanation with Flow Chart.docx
Theoretical Framework- Explanation with Flow Chart.docxTheoretical Framework- Explanation with Flow Chart.docx
Theoretical Framework- Explanation with Flow Chart.docxAman119787
 
Storyboard short: Ferrarius Tries to Sing
Storyboard short: Ferrarius Tries to SingStoryboard short: Ferrarius Tries to Sing
Storyboard short: Ferrarius Tries to SingLyneSun
 
Call Girls Sultanpur Just Call 📞 8617370543 Top Class Call Girl Service Avail...
Call Girls Sultanpur Just Call 📞 8617370543 Top Class Call Girl Service Avail...Call Girls Sultanpur Just Call 📞 8617370543 Top Class Call Girl Service Avail...
Call Girls Sultanpur Just Call 📞 8617370543 Top Class Call Girl Service Avail...Nitya salvi
 
Turn Off The Air Con - The Singapore Punk Scene
Turn Off The Air Con - The Singapore Punk SceneTurn Off The Air Con - The Singapore Punk Scene
Turn Off The Air Con - The Singapore Punk SceneLuca Vergano
 
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service AvailableNitya salvi
 
Museum of fine arts Lauren Simpson…………..
Museum of fine arts Lauren Simpson…………..Museum of fine arts Lauren Simpson…………..
Museum of fine arts Lauren Simpson…………..mvxpw22gfc
 
How to order fake Worcester State University diploma?
How to order fake Worcester State University diploma?How to order fake Worcester State University diploma?
How to order fake Worcester State University diploma?melodolykelton
 
architect Hassan Khalil portfolio Year 2024
architect Hassan Khalil portfolio  Year 2024architect Hassan Khalil portfolio  Year 2024
architect Hassan Khalil portfolio Year 2024hassan khalil
 
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...Nitya salvi
 
HUMA Final Presentation About Chicano Culture
HUMA Final Presentation About Chicano CultureHUMA Final Presentation About Chicano Culture
HUMA Final Presentation About Chicano Culturekarinamercado2462
 
如何办理(Flinders毕业证)弗林德斯大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)弗林德斯大学毕业证毕业证成绩单原版一比一如何办理(Flinders毕业证)弗林德斯大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)弗林德斯大学毕业证毕业证成绩单原版一比一8jg9cqy
 

Dernier (20)

LESSON-1-MUSIC-Q4 also a reviewer mapeh.pptx
LESSON-1-MUSIC-Q4 also a reviewer mapeh.pptxLESSON-1-MUSIC-Q4 also a reviewer mapeh.pptx
LESSON-1-MUSIC-Q4 also a reviewer mapeh.pptx
 
Engineering Major for College_ Environmental Health Engineering by Slidesgo.pptx
Engineering Major for College_ Environmental Health Engineering by Slidesgo.pptxEngineering Major for College_ Environmental Health Engineering by Slidesgo.pptx
Engineering Major for College_ Environmental Health Engineering by Slidesgo.pptx
 
+97470301568>> buy weed, thc oil,cbd oil, kush, hash in Doha qatar}}
+97470301568>> buy weed, thc oil,cbd oil, kush, hash in Doha qatar}}+97470301568>> buy weed, thc oil,cbd oil, kush, hash in Doha qatar}}
+97470301568>> buy weed, thc oil,cbd oil, kush, hash in Doha qatar}}
 
SB_ Pretzel and the puppies_ Rough_ RiverPhan (2024)
SB_ Pretzel and the puppies_ Rough_ RiverPhan (2024)SB_ Pretzel and the puppies_ Rough_ RiverPhan (2024)
SB_ Pretzel and the puppies_ Rough_ RiverPhan (2024)
 
Sui Generis Magazine volume one Kristen Murillo.pdf
Sui Generis Magazine volume one Kristen Murillo.pdfSui Generis Magazine volume one Kristen Murillo.pdf
Sui Generis Magazine volume one Kristen Murillo.pdf
 
Call Girls In Sindhudurg Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service E...
Call Girls In Sindhudurg Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service E...Call Girls In Sindhudurg Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service E...
Call Girls In Sindhudurg Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service E...
 
Jaro je tady - Spring is here (Judith) 3
Jaro je tady - Spring is here (Judith) 3Jaro je tady - Spring is here (Judith) 3
Jaro je tady - Spring is here (Judith) 3
 
WhatsApp-(# 9711106444 #)Call Girl in Noida Sector 80 Noida (Escorts) Delhi
WhatsApp-(# 9711106444 #)Call Girl in Noida Sector 80 Noida (Escorts) DelhiWhatsApp-(# 9711106444 #)Call Girl in Noida Sector 80 Noida (Escorts) Delhi
WhatsApp-(# 9711106444 #)Call Girl in Noida Sector 80 Noida (Escorts) Delhi
 
一比一原版(YU学位证书)约克大学毕业证学历认证新版办理
一比一原版(YU学位证书)约克大学毕业证学历认证新版办理一比一原版(YU学位证书)约克大学毕业证学历认证新版办理
一比一原版(YU学位证书)约克大学毕业证学历认证新版办理
 
Theoretical Framework- Explanation with Flow Chart.docx
Theoretical Framework- Explanation with Flow Chart.docxTheoretical Framework- Explanation with Flow Chart.docx
Theoretical Framework- Explanation with Flow Chart.docx
 
Storyboard short: Ferrarius Tries to Sing
Storyboard short: Ferrarius Tries to SingStoryboard short: Ferrarius Tries to Sing
Storyboard short: Ferrarius Tries to Sing
 
Call Girls Sultanpur Just Call 📞 8617370543 Top Class Call Girl Service Avail...
Call Girls Sultanpur Just Call 📞 8617370543 Top Class Call Girl Service Avail...Call Girls Sultanpur Just Call 📞 8617370543 Top Class Call Girl Service Avail...
Call Girls Sultanpur Just Call 📞 8617370543 Top Class Call Girl Service Avail...
 
Turn Off The Air Con - The Singapore Punk Scene
Turn Off The Air Con - The Singapore Punk SceneTurn Off The Air Con - The Singapore Punk Scene
Turn Off The Air Con - The Singapore Punk Scene
 
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Aligarh Just Call 8617370543 Top Class Call Girl Service Available
 
Museum of fine arts Lauren Simpson…………..
Museum of fine arts Lauren Simpson…………..Museum of fine arts Lauren Simpson…………..
Museum of fine arts Lauren Simpson…………..
 
How to order fake Worcester State University diploma?
How to order fake Worcester State University diploma?How to order fake Worcester State University diploma?
How to order fake Worcester State University diploma?
 
architect Hassan Khalil portfolio Year 2024
architect Hassan Khalil portfolio  Year 2024architect Hassan Khalil portfolio  Year 2024
architect Hassan Khalil portfolio Year 2024
 
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
Russian Call Girls Pilibhit Just Call 👉👉 📞 8617370543 Top Class Call Girl Ser...
 
HUMA Final Presentation About Chicano Culture
HUMA Final Presentation About Chicano CultureHUMA Final Presentation About Chicano Culture
HUMA Final Presentation About Chicano Culture
 
如何办理(Flinders毕业证)弗林德斯大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)弗林德斯大学毕业证毕业证成绩单原版一比一如何办理(Flinders毕业证)弗林德斯大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)弗林德斯大学毕业证毕业证成绩单原版一比一
 

Shooting schedule & risk assessment

  • 1. Shooting Schedule Date: Wednesday the 29th January 2014. Location: Nunnington Hall, Ryedale Equipment: Booked? (Y/N) DSLR Camera Y Tripod Y Y Memory Card Y Model Release forms Models: The images will be part of a collection of eight photographs that document Nunnington Hall. From Workers in the gardens preserving the National park to the workers in the shops selling local produce from farms nearby. The models used will be other people taking photographs as it is more of a documentary type of photography rather than a photojournalist approach. Props:Props used will only be that of what is found at Nunnington Hall, such as the tables and chairs found in the interior of the site. Risk assessment completed?Yes Contingency:Should the images I want not being available at Nunnington Hall I will go to a York College Football game and take photographs to document the game. This will take place the following week from the trip at Eleven o’clock. A camera and tripod have been booked again for the Monday of that week to prepare should the Photographs taken at Nunnington Hall not up to a standard. The location will be at York college and their sports field. A risk assessment has been taken into consideration for the photography also. Hazard Football coming close to camera Person(s) /Equipment at Risk Expensive Equipment can be damaged and can be hurt by the football itself. Risk Assessment Name: Alan Smith Project: Discovery/Photography Location: Nunnington Hall Risk Control Taken Do not take the photographs close to where the ball can hit you. Stay a good distance away.
  • 2. Hazard Person(s) / Equipment at Risk Risk Control Taken Tripping over due to weather conditions or because of natural environment at the site. Could harm people and maybe others around. Camera falling may result in the lens being scratched or even broken. Having the strap over my head supporting the camera and making sure to look around the surroundings. Disturbing people’s privacy. People in the photographs taken may not want to be pictured. Making sure nobody is in the way of the camera when capturing an image. Also ask people if they mind or not being taken of. Touching harmful equipment (Gardening equipment) The person who may get hurt, the person responsible may be at risk of being punished and the equipment may be damaged. To not touch anything that has been left by a worker, also be aware of surroundings at all times. Darkroom exposure to chemical agents. It may lead to respiratory, allergic, and nervous system diseases. Having breaks every 15 minutes when in dark areas. Someone falling over Tripod This may lead to the person tripping over to be harmed and the tripod to potentially break. To always keep the tripod close by and not where someone can walk near it. Pedestrians/ people Me be crowded and can fall on the floor damaging equipment and others. Finding yourself lost from the others and may be harmed. To avoid going in areas where there are a vast amount of people. To stay within the grounds at all times and don’t go too far a drift from the other students. Person at risk of strain or the camera and tripod may be in danger of falling on the floor. To make sure regular breaks are taken to avoid neckand back pain. Getting lost Ergonomic risk of handling heavy equipment.
  • 3. What Health and Safety legislation might you need to consider in this project? Health and safety at work act 1974.I am to consider the general duties of the students when they the care of the tutors. I will therefore look at students acting responsibly and being safe when around certain sites or equipment. To also consider the tutors (People in charge of students behaviour) and the way they should act. They should be trained to deal with certain aspects of the trip and to set an example on how to behave in the premises of a National Park. They should also know whether the location of where the students going is safe. Also instruct the students to take photographs without supervision. Health and Safety (Display Screen Equipment) Regulations act 1992. This may be considered when editing the images taken on the computer. Regular breaks to be taken to avoid eye problems. Control of Hazardous and health (COSHH) regulations (2002). Registration, evaluation, authorisation and restriction to chemicals (REACH) both of these are used for risk assessment Provision and Use of Work Equipment Regulations 1998 (PUWER)