SlideShare une entreprise Scribd logo
1  sur  22
CONSTRUCTED WETLANDS AS NATURE BASED SOLUTION FOR
RESTORATION AND PROVISION OF SERVICES
A CASE STUDY IN GRANOLLERS, BARCELONA
Joan García y Maria Solé
(Universitat Politècnica de Catalunya-BarcelonaTech, Spain)
Jornada de llançament del projecte ALERA
Granollers, 29 i 30 d’abril de 2015
www.gemma.upc.edu
https://www.youtube.com/watch?v=f3NEWb06jzo
http://gemma.upc.edu/
THE CONSTRUCTED WETLAND
IN CAN CABANYES, GRANOLLERS
Barcelona
Granollers
(population 60,000)
DESCRIPTION OF THE PROBLEM
• Can Cabanyes is a highly human-impacted area near the river
Congost in the municipality of Granollers.
• At the beginning of the 2000 in this area there were:
1. Old landfill
2. Uncontrolled orchards
3. Wastewater treatment plant
4. Solid waste treatment plant
5. Industrial park
6. Highway AP7
7. Circuit of Catalonia
8. River channeled
The city can not take advantage of the potential
services that could be obtained
THE PROPOSAL
• Clean up and restore the river environment with a series of
measures which can reconcile enviromental improvement
with the use of the area (ecosystem services)
• One of the measures was to build a 1 he constructed wetland
which is fed with the effluent of the Granollers wastewater
treatment plant
• Project leaded by Granollers city council and collaboration
GEMMA group (UPC). Finnancing source: city council and ERDF
(EU)
• Started operation in 2003; Construction: 72,000 €
• Different habitats
• 2 plant species (cattail and reed)
1. Shallow planted zones
2. Island
3. Deep unplanted zones
Effluent Influent
Section view
Plan view
THE WETLAND PROJECT
El proyecto2002 THE WETLAND PROJECT
El proyecto2003 THE WETLAND PROJECT
El proyecto2006 THE WETLAND PROJECT
El proyectoEl proyecto2006 THE WETLAND PROJECT
El proyectoEl proyecto2008 THE WETLAND PROJECT
El proyectoEl proyectoSUPPORTING SERVICES: IMPROVE AND RESTORE HABITATS
• More than 170 plant species
• Increase in populations of reptiles, birds and mammals
• Amphibians pond
El proyectoEl proyectoSUPPORTING SERVICES: IMPROVE AND RESTORE HABITATS
Newspaper “El 9 nou“ 21/05/2010
El proyectoEl proyectoSUPPORTING SERVICES: WATER QUALITY IMPROVEMENT
2004 2007 2010 2013
Flow, m3/d 90-120 120-
250
270-
330
270-
390
TSS, mg/L 46 13 8 10
NH3, mg N/L 4.5 13 2.7 0.6
FC, ulog/100 1.7 2.0 1.3 1.4
Ammonia,mgN/L
El proyectoEl proyectoCULTURAL SERVICES: RECREATIONAL AND EDUCATIONAL
El proyectoEl proyectoPROVISION SERVICES: WATER FOR IRRIGATION
2008
• Reclamation plant and
distribution network;
Construction: 500,000 €
• Finnancing source: City Council &
Catalan Water Agency
• Water for park irrigation
El proyectoEl proyectoFUTURE INNOVATION CHALLENGE:
INDUSTRIAL WATER REUSE
• Current uses of effluents mostly based on agricultural irrigation
are slowing the potential of water reuse:
1. Production and consumption points are in different places
2. Agriculture can’t pay for the cost of reclamation and the
projects need subsidy
• The perception problem and concept of “naturalization”
Naturalization
Effluents of a wastewater plant are discharged to an artificial
“naturalized” water body, and after a time period this water is reclaimed
and distributed. Therefore, the water source is not a wastewater
treatment plant, it is a restored ecosystem where natural physical,
chemical and biological reactions improve the water quality to the point
that it is a “new” water
El proyectoEl proyectoTHE PROJECT WHERE WE CAN TACKLE THIS
INNOVATION
Distribution network Industrial water
consumption
Industrial sectors
El proyectoEl proyectoREFERENCES ON THE WETLAND SYSTEM
• García, J. y Domingo, V. (2006). Reutilización de aguas depuradas para usos ambientales en
Granollers. Tenología del Agua 263, 62-68.
• Matamoros, V., García, J. and Bayona, J.M. (2008). Organic micropollutant removal in a full-
scale surface flow constructed wetland fed with secondary effluent. Water Research 42,
653-660.
• Llorens, E., Matamoros, V., Domingo, V., Bayona J.M. and García, J. (2009). Water quality
improvement in a full-scale tertiary constructed wetland: Effects on conventional and
specific organic contaminants. Science of the Total Envinronment 407, 2517-2524.
• Alfranca, O., García, J. and Varela, H. (2010). Economic valuation of a created wetland fed
with treated wastewater located in a peri-urban park in Catalonia, Spain. Water Science
and Technology 63, 891-898.
joan.garcia@upc.edu

Contenu connexe

Tendances

Final 5th Year Project Defense 2015
Final 5th Year Project Defense 2015Final 5th Year Project Defense 2015
Final 5th Year Project Defense 2015
lydia wayua
 
Wastewater treatmentinasmallvillage optionsforupgrading
Wastewater treatmentinasmallvillage optionsforupgradingWastewater treatmentinasmallvillage optionsforupgrading
Wastewater treatmentinasmallvillage optionsforupgrading
safwan patel
 
THE MARKETABILITY OF WASTEWATER REUSE IN ALEXANDRIA SANITARY DRAINAGE COMPANY
THE MARKETABILITY OF WASTEWATER REUSE IN ALEXANDRIA SANITARY DRAINAGE COMPANYTHE MARKETABILITY OF WASTEWATER REUSE IN ALEXANDRIA SANITARY DRAINAGE COMPANY
THE MARKETABILITY OF WASTEWATER REUSE IN ALEXANDRIA SANITARY DRAINAGE COMPANY
Helalley Helalley
 
1. L E C T 43 Slides 120111 U R., E
1. L  E  C  T 43 Slides 120111 U  R., E1. L  E  C  T 43 Slides 120111 U  R., E
1. L E C T 43 Slides 120111 U R., E
SG PHADKE
 
=Rain water harvesting =-
 =Rain water harvesting =- =Rain water harvesting =-
=Rain water harvesting =-
omg
 
Final Report_Edited by JC and KP
Final Report_Edited by JC and KPFinal Report_Edited by JC and KP
Final Report_Edited by JC and KP
Jared Cordes
 
Day 2 Innovative Programs
Day 2  Innovative ProgramsDay 2  Innovative Programs
Day 2 Innovative Programs
Greg Gearheart
 
Rempel_Berger_FINAL_Proposal
Rempel_Berger_FINAL_ProposalRempel_Berger_FINAL_Proposal
Rempel_Berger_FINAL_Proposal
Arthur Rempel
 

Tendances (20)

Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
 
Wastewater Irrigation in Developing Countries: Health Effects and Technical S...
Wastewater Irrigation in Developing Countries: Health Effects and Technical S...Wastewater Irrigation in Developing Countries: Health Effects and Technical S...
Wastewater Irrigation in Developing Countries: Health Effects and Technical S...
 
Scope of reuse of sewage for baroda city
Scope of reuse of sewage for baroda cityScope of reuse of sewage for baroda city
Scope of reuse of sewage for baroda city
 
Final 5th Year Project Defense 2015
Final 5th Year Project Defense 2015Final 5th Year Project Defense 2015
Final 5th Year Project Defense 2015
 
Wastewater treatmentinasmallvillage optionsforupgrading
Wastewater treatmentinasmallvillage optionsforupgradingWastewater treatmentinasmallvillage optionsforupgrading
Wastewater treatmentinasmallvillage optionsforupgrading
 
THE MARKETABILITY OF WASTEWATER REUSE IN ALEXANDRIA SANITARY DRAINAGE COMPANY
THE MARKETABILITY OF WASTEWATER REUSE IN ALEXANDRIA SANITARY DRAINAGE COMPANYTHE MARKETABILITY OF WASTEWATER REUSE IN ALEXANDRIA SANITARY DRAINAGE COMPANY
THE MARKETABILITY OF WASTEWATER REUSE IN ALEXANDRIA SANITARY DRAINAGE COMPANY
 
Treated wastewater for Irrigation
Treated wastewater for IrrigationTreated wastewater for Irrigation
Treated wastewater for Irrigation
 
1. L E C T 43 Slides 120111 U R., E
1. L  E  C  T 43 Slides 120111 U  R., E1. L  E  C  T 43 Slides 120111 U  R., E
1. L E C T 43 Slides 120111 U R., E
 
Wastewater reuse and waste audit
Wastewater reuse and waste auditWastewater reuse and waste audit
Wastewater reuse and waste audit
 
=Rain water harvesting =-
 =Rain water harvesting =- =Rain water harvesting =-
=Rain water harvesting =-
 
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
 
Final Report_Edited by JC and KP
Final Report_Edited by JC and KPFinal Report_Edited by JC and KP
Final Report_Edited by JC and KP
 
Drainage water management options and strategies
Drainage water management options and strategiesDrainage water management options and strategies
Drainage water management options and strategies
 
Water supply system
Water supply systemWater supply system
Water supply system
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
Day 2 Innovative Programs
Day 2  Innovative ProgramsDay 2  Innovative Programs
Day 2 Innovative Programs
 
Rempel_Berger_FINAL_Proposal
Rempel_Berger_FINAL_ProposalRempel_Berger_FINAL_Proposal
Rempel_Berger_FINAL_Proposal
 
Towards effective industrial water reuse at alexandria city
Towards effective industrial water  reuse at alexandria  cityTowards effective industrial water  reuse at alexandria  city
Towards effective industrial water reuse at alexandria city
 
Vaibhav ppt
Vaibhav pptVaibhav ppt
Vaibhav ppt
 
Mihai Grozavescu Aquatim - Timisoara demo case
Mihai Grozavescu Aquatim - Timisoara demo caseMihai Grozavescu Aquatim - Timisoara demo case
Mihai Grozavescu Aquatim - Timisoara demo case
 

En vedette

you are so special
you are so specialyou are so special
you are so special
Hareem Naz
 
CopyofMusicBusinessTheory
CopyofMusicBusinessTheoryCopyofMusicBusinessTheory
CopyofMusicBusinessTheory
Emma Moore
 
Christopher Monette Resume
Christopher Monette ResumeChristopher Monette Resume
Christopher Monette Resume
Chris Monette
 

En vedette (19)

Centenarian Article
Centenarian ArticleCentenarian Article
Centenarian Article
 
you are so special
you are so specialyou are so special
you are so special
 
282 863-1-pb
282 863-1-pb282 863-1-pb
282 863-1-pb
 
The all new 2016 xc90 is here!!
The all new 2016 xc90 is here!!The all new 2016 xc90 is here!!
The all new 2016 xc90 is here!!
 
Bologna Technology District
Bologna Technology DistrictBologna Technology District
Bologna Technology District
 
Felicitacion
FelicitacionFelicitacion
Felicitacion
 
CopyofMusicBusinessTheory
CopyofMusicBusinessTheoryCopyofMusicBusinessTheory
CopyofMusicBusinessTheory
 
Diversity of india
Diversity of indiaDiversity of india
Diversity of india
 
Class.aspera.chapter.1.intro
Class.aspera.chapter.1.introClass.aspera.chapter.1.intro
Class.aspera.chapter.1.intro
 
SSIS 2015 Longboat p point
SSIS 2015 Longboat p pointSSIS 2015 Longboat p point
SSIS 2015 Longboat p point
 
10452 concept final
10452 concept final10452 concept final
10452 concept final
 
You can create buttons and textfield in web
You can create buttons and textfield in webYou can create buttons and textfield in web
You can create buttons and textfield in web
 
Western Intellectual Insights for Muslim Policy Makers on Religion Based Economy
Western Intellectual Insights for Muslim Policy Makers on Religion Based EconomyWestern Intellectual Insights for Muslim Policy Makers on Religion Based Economy
Western Intellectual Insights for Muslim Policy Makers on Religion Based Economy
 
10WindsOfChange
10WindsOfChange10WindsOfChange
10WindsOfChange
 
Administrator performance appraisal
Administrator performance appraisalAdministrator performance appraisal
Administrator performance appraisal
 
Class.devops.chapter.3.hybrid
Class.devops.chapter.3.hybridClass.devops.chapter.3.hybrid
Class.devops.chapter.3.hybrid
 
Brown
BrownBrown
Brown
 
Christopher Monette Resume
Christopher Monette ResumeChristopher Monette Resume
Christopher Monette Resume
 
Formulas transmision de potencia
Formulas transmision de potenciaFormulas transmision de potencia
Formulas transmision de potencia
 

Similaire à Alera starting conference. UPC. Constructed wetlands.

ranjith_major_project_2333.pptx
ranjith_major_project_2333.pptxranjith_major_project_2333.pptx
ranjith_major_project_2333.pptx
19TK1132
 
Water Sensitive Urban Design
Water Sensitive Urban DesignWater Sensitive Urban Design
Water Sensitive Urban Design
Elisa Sutanudjaja
 
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
water-decade
 

Similaire à Alera starting conference. UPC. Constructed wetlands. (20)

Deisa - Water Treatment Engineering
Deisa - Water Treatment Engineering Deisa - Water Treatment Engineering
Deisa - Water Treatment Engineering
 
Curving the line to accelerated resource recovery: the Life Memory, INCOVER a...
Curving the line to accelerated resource recovery: the Life Memory, INCOVER a...Curving the line to accelerated resource recovery: the Life Memory, INCOVER a...
Curving the line to accelerated resource recovery: the Life Memory, INCOVER a...
 
The Green Deserts project - Using the Waterboxx
The Green Deserts project - Using the WaterboxxThe Green Deserts project - Using the Waterboxx
The Green Deserts project - Using the Waterboxx
 
ranjith_major_project_2333.pptx
ranjith_major_project_2333.pptxranjith_major_project_2333.pptx
ranjith_major_project_2333.pptx
 
Wastewater situation, common applied strategies, treatment
Wastewater situation, common applied strategies, treatmentWastewater situation, common applied strategies, treatment
Wastewater situation, common applied strategies, treatment
 
Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...
Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...
Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...
 
DSD-INT 2018 Hydrodynamic and Water Quality modelization of Cuerda del Pozo r...
DSD-INT 2018 Hydrodynamic and Water Quality modelization of Cuerda del Pozo r...DSD-INT 2018 Hydrodynamic and Water Quality modelization of Cuerda del Pozo r...
DSD-INT 2018 Hydrodynamic and Water Quality modelization of Cuerda del Pozo r...
 
Huerta de las Pilas - Acuifero english version
Huerta de las Pilas - Acuifero   english versionHuerta de las Pilas - Acuifero   english version
Huerta de las Pilas - Acuifero english version
 
The Canary Islands: World Laboratory for Water and Energy Technologies by Gon...
The Canary Islands: World Laboratory for Water and Energy Technologies by Gon...The Canary Islands: World Laboratory for Water and Energy Technologies by Gon...
The Canary Islands: World Laboratory for Water and Energy Technologies by Gon...
 
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]
 
NANO5CARBON
NANO5CARBONNANO5CARBON
NANO5CARBON
 
Low impact MAR activities and benchmarking - JSSS
Low impact MAR activities and benchmarking - JSSSLow impact MAR activities and benchmarking - JSSS
Low impact MAR activities and benchmarking - JSSS
 
DUMO Algacleaner - Applications and references
DUMO Algacleaner - Applications and referencesDUMO Algacleaner - Applications and references
DUMO Algacleaner - Applications and references
 
The end of scarcity? Water desalination as the new cornucopia for Mediterrane...
The end of scarcity? Water desalination as the new cornucopia for Mediterrane...The end of scarcity? Water desalination as the new cornucopia for Mediterrane...
The end of scarcity? Water desalination as the new cornucopia for Mediterrane...
 
Article on environment friendly technology in water industry
Article on environment friendly technology in water industryArticle on environment friendly technology in water industry
Article on environment friendly technology in water industry
 
Water Sensitive Urban Design
Water Sensitive Urban DesignWater Sensitive Urban Design
Water Sensitive Urban Design
 
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
 
Umu
UmuUmu
Umu
 
Spa navicelli di pisa english
Spa navicelli di pisa englishSpa navicelli di pisa english
Spa navicelli di pisa english
 
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - CaillibotteDSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
 

Dernier

Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
kumarajju5765
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
sexy call girls service in goa
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
kauryashika82
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 

Dernier (20)

Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 

Alera starting conference. UPC. Constructed wetlands.

  • 1. CONSTRUCTED WETLANDS AS NATURE BASED SOLUTION FOR RESTORATION AND PROVISION OF SERVICES A CASE STUDY IN GRANOLLERS, BARCELONA Joan García y Maria Solé (Universitat Politècnica de Catalunya-BarcelonaTech, Spain) Jornada de llançament del projecte ALERA Granollers, 29 i 30 d’abril de 2015
  • 4. THE CONSTRUCTED WETLAND IN CAN CABANYES, GRANOLLERS Barcelona Granollers (population 60,000)
  • 5. DESCRIPTION OF THE PROBLEM • Can Cabanyes is a highly human-impacted area near the river Congost in the municipality of Granollers. • At the beginning of the 2000 in this area there were: 1. Old landfill 2. Uncontrolled orchards 3. Wastewater treatment plant 4. Solid waste treatment plant 5. Industrial park 6. Highway AP7 7. Circuit of Catalonia 8. River channeled The city can not take advantage of the potential services that could be obtained
  • 6. THE PROPOSAL • Clean up and restore the river environment with a series of measures which can reconcile enviromental improvement with the use of the area (ecosystem services) • One of the measures was to build a 1 he constructed wetland which is fed with the effluent of the Granollers wastewater treatment plant • Project leaded by Granollers city council and collaboration GEMMA group (UPC). Finnancing source: city council and ERDF (EU)
  • 7. • Started operation in 2003; Construction: 72,000 € • Different habitats • 2 plant species (cattail and reed) 1. Shallow planted zones 2. Island 3. Deep unplanted zones Effluent Influent Section view Plan view THE WETLAND PROJECT
  • 8. El proyecto2002 THE WETLAND PROJECT
  • 9. El proyecto2003 THE WETLAND PROJECT
  • 10. El proyecto2006 THE WETLAND PROJECT
  • 11. El proyectoEl proyecto2006 THE WETLAND PROJECT
  • 12. El proyectoEl proyecto2008 THE WETLAND PROJECT
  • 13. El proyectoEl proyectoSUPPORTING SERVICES: IMPROVE AND RESTORE HABITATS • More than 170 plant species • Increase in populations of reptiles, birds and mammals • Amphibians pond
  • 14. El proyectoEl proyectoSUPPORTING SERVICES: IMPROVE AND RESTORE HABITATS Newspaper “El 9 nou“ 21/05/2010
  • 15. El proyectoEl proyectoSUPPORTING SERVICES: WATER QUALITY IMPROVEMENT 2004 2007 2010 2013 Flow, m3/d 90-120 120- 250 270- 330 270- 390 TSS, mg/L 46 13 8 10 NH3, mg N/L 4.5 13 2.7 0.6 FC, ulog/100 1.7 2.0 1.3 1.4 Ammonia,mgN/L
  • 16. El proyectoEl proyectoCULTURAL SERVICES: RECREATIONAL AND EDUCATIONAL
  • 17. El proyectoEl proyectoPROVISION SERVICES: WATER FOR IRRIGATION 2008 • Reclamation plant and distribution network; Construction: 500,000 € • Finnancing source: City Council & Catalan Water Agency • Water for park irrigation
  • 18.
  • 19. El proyectoEl proyectoFUTURE INNOVATION CHALLENGE: INDUSTRIAL WATER REUSE • Current uses of effluents mostly based on agricultural irrigation are slowing the potential of water reuse: 1. Production and consumption points are in different places 2. Agriculture can’t pay for the cost of reclamation and the projects need subsidy • The perception problem and concept of “naturalization” Naturalization Effluents of a wastewater plant are discharged to an artificial “naturalized” water body, and after a time period this water is reclaimed and distributed. Therefore, the water source is not a wastewater treatment plant, it is a restored ecosystem where natural physical, chemical and biological reactions improve the water quality to the point that it is a “new” water
  • 20. El proyectoEl proyectoTHE PROJECT WHERE WE CAN TACKLE THIS INNOVATION Distribution network Industrial water consumption Industrial sectors
  • 21. El proyectoEl proyectoREFERENCES ON THE WETLAND SYSTEM • García, J. y Domingo, V. (2006). Reutilización de aguas depuradas para usos ambientales en Granollers. Tenología del Agua 263, 62-68. • Matamoros, V., García, J. and Bayona, J.M. (2008). Organic micropollutant removal in a full- scale surface flow constructed wetland fed with secondary effluent. Water Research 42, 653-660. • Llorens, E., Matamoros, V., Domingo, V., Bayona J.M. and García, J. (2009). Water quality improvement in a full-scale tertiary constructed wetland: Effects on conventional and specific organic contaminants. Science of the Total Envinronment 407, 2517-2524. • Alfranca, O., García, J. and Varela, H. (2010). Economic valuation of a created wetland fed with treated wastewater located in a peri-urban park in Catalonia, Spain. Water Science and Technology 63, 891-898.