The Sources of Job Stress among Project Managers
1.
2.

Hadi Minavand1* Mohammad Reza Faraj Tabrizi1 Shadiya Mohamed Saleh Baqutayan2*
International Business School / University Technology Malaysia (UTM), Jalan Semarak, 54100, Kuala
Lumpur, Malaysia
Perdana School of STI Policy / University Technology Malaysia (UTM), Jalan Semarak, 54100, Kuala
Lumpur, Malaysia
* E-mail of the corresponding authors: h_minavand@ymail.com / shadiya@ic.utm.my

Abstract
Organizational stress and workplace health have become an issue of great concern over the last decade. Although
some workplace stress is normal, but among project manager is excessive. Project managers are considered as
the key persons and one of the most important elements of any project, and their performance highly influences
on the overall success of the project. Due to the nature of their work, they tended to face a multitude of stressors
that always interfere with their productivity and impact their physical and emotional health. Current study
focuses on “job stress” as one of the main factors affecting project managers’ performance. Within this research,
preliminarily time pressure, workload, limited resources, limited authority and conflict were studied as the main
sources of job stress among project managers. Furthermore, and after conducting a pilot study, some other
factors were identified and added to the initial five factors. Eventually, the main survey focuses on twelve (12)
sources of stress that was carried out among thirty (30) international project managers; and eleven (11) factors
were introduced as the most important sources of stress among project managers.
Keywords: Job stress among project manager; conflict at workplace; sources of job stress
1. Introduction
While today is the era of high technology and modem achievement, a high performance is expected to be the
norm. Many organizations demand for a high level of quality, service and overall business success, therefore, the
pressure is felt on individuals at all levels of organization. Performance targets are becoming tougher to meet
with each succeeding year and the management staff is experiencing difficulty in fulfilling the challenge.
Anyone who has been ever involved in a project confirms that project environments in general are challengeable
and stressful at the same time. This is mostly because of the nature of project work, which is a temporary activity,
limited to a specific time and budget. Basically, four elements should be taken into account as the main features
of a project. These features consist of: goal, group of people (project team), specific duration of time, and limited
amount of money (Bars, 2006). Limitations of time and budget normally confront the project team, and
specifically the project manager with stressful conditions. Limitation of time results in “time pressure”,
limitation of budget causes “resource constraint” and both of the mentioned factors contribute to “high level of
responsibilities” and “heavy workload”. In addition, if the project is conducted within a matrix-structure
organization, the project manager has to deal with an extra challenge: job interference with functional managers;
this challenge not only amplifies the stress caused by above-mentioned factors, but also individually puts the
project manager into extra stressful situations. Furthermore, stress is sometimes caused by several kinds of
conflict in the project environment. Although general management is a high stress occupation, the level of stress
experienced by project managers is known to be even higher due to the conflicting demands of completing a
project on time, under budget, with a high quality to satisfy the stakeholders (Haynes & Love, 2004).
2. Literature Review
Job stress is an important concept in management sciences and one of the areas of interest for so many
researchers. It is frequently studied within several researches in both levels of theory and practice. Regarding the
temporary nature of project-based works, the workforce is highly exposed to job stress and its aftermaths. In this
part, the studies that have investigated the sources of job stress among project managers are reviewed. Among
the several sources of stress introduced by researchers, five factors (that affect the performance of a project
managers more than others) are selected to build the conceptual framework of current study. The literatures of
the studies related to these five factors are reviewed in the following sections.
2.1 Time Pressure
The responsibilities of project managers vary across industries and may depend on the company’s size, culture,
and level of maturity. However, some responsibilities are common among all project managers. Meeting the
deadlines of the project is one of these responsibilities (Berrie , 2009). Tukel and Rom (1995), found that in the
majority of large-size projects with more than 100 activities fail to meet their deadlines. They also conducted
another survey in 1998 among 91 project managers and reported that 56% of the respondent had exceeded the
deadlines of their projects. In the cases that the implementation of a project is assigned to a contractor, usually
94
Research on Humanities and Social Sciences
ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online)
Vol.3, No.16, 2013

www.iiste.org

some penalties are imposed on the contractor when deadlines are exceeded. Besides monetary penalties,
companies may incur huge losses in credibility when they fail to complete their project. In the majority of cases
the project manager is directly recognized as the responsible person for delays and penalties. As a result, time
pressure emerges as a prominent source of stress experienced by project managers (Barczak and Wilemon, 2003).
Time pressure is unique from other kinds of stress and so, needs special attention (Darrel, 2008). The stress
caused by high levels of time pressure can lead to passivity and avoidance reactions (Van Eerde, 2000). The
negative effects of time pressure in project workplaces can be moderated by applying social interaction processes
(Nordqvist et al, 2004); for example, by developing cooperation among the components of a project, the feelings
of belonging and social support can be strengthened which consequently leads to a considerable decrease in the
negative effects of job stress ( Hackman, 2000).
2.2 Constraints of Resources
Besides time, ‘budget’ is the other major limitation of any project. Limited budget automatically results in
limitation in all resources including materials, machinery, technology, labor, and natural resources such as land,
water and energy. Limited resources may aggravate exposure to stressful working conditions (Houtman et al,
2007). The project manager as the official who is directly responsible for the project’s resource management is
exposed to these stressful conditions, more than everyone else. “Resource constraint” is considered as one of the
most stressful situations experienced by project leaders (Campbell et al, 2007). According to the results of a
research conducted among a group of leaders, when the respondents were asked about the most important factor
which contributes to a leader’s stress, the majority of them introduced the constraint of resources as the main
source of stress (Campbell et al, 2007). In some cases limited resources inside a company, results in a rivalry
among project managers to grab a bigger portion of available resources for their own projects.
2.3 Workloads
Whenever limited resources are accompanied with time pressure, normally stakeholders are forced to multiply
their efforts and accept more responsibilities. This situation which is very common in project environments faces
the project team with a heavy workload. When the workload exceeds capabilities, stress is generated among the
team members. Job stress is defined as the deviation between the expected workload and the actual ability of
individuals in the project (Leung et al, 2007). Stress involves both quantitative (e.g. too many/few tasks) and a
qualitative (e.g., repetitive/complicated tasks) workloads (Leung et al, 2007). Regarding that the amount of
workload is determined by the level of responsibilities, it is predictable that project managers deal with heavy
workloads. An interview-based research among a group of project managers revealed that all interviewed project
managers recognize excessive workload as a stressor (Singh, 2003). The study proved that the performance of a
project manager will decline considerably over a maximum amount of workload. This could be because work
overload causes a feeling of being burnt-out leading to stress (Sutherland & Cooper 2000).
2.4 Conflict
Conflict is common in a wide range of human activities, from a minor disagreement and challenge between two
individuals, to political struggles among countries. Conflict is defined as “the opposition of interests, values or
objectives” (Sommerville & Langford, 1994). In a project environment, conflict is regarded as a very important
issue because it could hinder the progress (Sedström, 2007). Project environment, usually involves people from
different cultures and backgrounds. Hence, conflict is almost inevitable in such an environment. According to
Verma (1998), “when project team members interact during the course of completing their tasks and
responsibilities, there is always a potential for conflict”. From his point of view, it is impossible to gather some
people who are from a diverse background and norms and expect them to work together in a project environment
without any conflict. Different researchers have mentioned several reasons for conflict in a project environment.
The most common causes of conflict from the viewpoint of Sommerville and Langford (1994) could be
categorized into delays in progress, changes in functions, financial and budgetary issues, and various contractual
obligations. Regardless of different factors mentioned by researchers as the main causes of conflict in project
environment, almost all of them agree about a strong link between conflict and the level of stress
Sommerville and Langford (1994) conducted a research among project managers of construction projects to
assess the relationship between stress and conflict. The findings of their study proved that project managers’ job
stress is significantly related to their involvement in conflicts. Hyde et al (2006) argue that a project is a type of
work in which stress and conflict not only may occur, but also are considerably interlinked and the overall
performance is highly affected by these two factors.
2.5 Limited Authority
Nowadays, the majority of projects is organized in a matrix-structure systems. In spite of several advantages of
such systems, they have some important disadvantages. According to Kuprenas (2003) “confusion and conflict
over roles and responsibilities between functional managers leading functional teams and project managers
overseeing project performance” are the most important challenges of matrix-structure organizations. Actually in
matrix system, team members experience role confusion because they have to report to two managers at the

95
Research on Humanities and Social Sciences
ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online)
Vol.3, No.16, 2013

www.iiste.org

same time (Fig. 1), and after a while, the managers may find themselves in the middle of a conflict over tasks
and authorities.

Figure1- Matrix structure and dual responsibility of team members
Project managers in this organizational structure may find it difficult to exert influence over the team members
(Jacques, 2007). In a matrix system, tasks and authorities are distributed between project managers and
functional managers without a clear border. This characteristic causes ambiguity and conflict over areas such as
resource management (Larson & Gobeli, 1987), and personnel assignments (Greiner Schein, 1981). This
ambiguity results in a power struggle because each party attempts to clarify and define its responsibility and
accountability (Posner, 1986).
3. Conceptual framework
Based on the issues identified in the literature review as the sources of stress in a project environment, the
conceptual framework of the current study is laid out according the following model (Fig.2).

Figure 2- Preliminary Model of Study
As reflected in the model, five main stressors including time pressure, resource constraint, conflict, limited
authority and workload were selected to trace job stress in a project manager. This is the preliminary framework
of this study. It is evident that there are some other factors that may produce job stress among project managers.
Hence, we decided to consider enough flexibility for the framework. In order to achieve this purpose, the
suggested framework was applied to conduct a pilot study and the results of the study were analyzed to identify
the other sources of stress and build a new framework for the main survey (section5).
4. Research methodology
The above-mentioned conceptual framework was applied to conduct a pilot study with participation of 10 project
managers. The study was based on a questionnaire containing some open-ended questions. Each element of the
framework was focused and addressed by one descriptive question which was designed to assess the opinions
and personal experiences of respondents about that element. In addition, the respondents were requested to add
any other source of stress that was important from their viewpoints. As a result, so many stressors were
introduced by the participants in the pilot study. Among all suggested sources of stress, 7 sources were
frequently repeated by the majority of respondents. Hence, these seven factors were added to the preliminary
model to form a new framework with 12 elements (fig. 3). Based on this framework, a new questionnaire
containing some open-ended plus 12 Likert-scale questions was designed as the survey instrument.
An online platform was selected to conduct the survey. The questionnaire was uploaded on the internet and its
link was distributed via email, social networks, and other online media. Project managers from different fields
including construction, IT, and industrial projects were targeted for this survey. In order to avoid cultural
limitations, project managers from several countries in four continents were requested to answer the
questionnaire. Finally, 30 responses were collected from the managers of different projects in Singapore, India,
Iran, Turkey, Denmark, Portugal, South Africa, Panama, Philippines and Malaysia.

96
Research on Humanities and Social Sciences
ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online)
Vol.3, No.16, 2013

www.iiste.org

5. Data collection and analysis
As described earlier, a preliminary model was applied to conduct a pilot test in order to verify and develop the
model. During the pilot study, respondents introduced seven additional factors and the basic model was
transformed into the following framework (fig. 3).

Figure3 - Developed Framework after Pilot Research
The new model was applied to construct a new questionnaire and conduct the main survey. The summary of
respondents’ answers is presented in the following bar chart (fig. 4). According to the chart, the majority of
respondents believe that all suggested factors except cultural gap can cause the stressful project management
condition.
83.33%
76.67%

Workload
40.00%
Insecure Career

80.00%
63.33%
56.67%

Vague Scope

93.33%
86.67%

Internal Conflict
66.67%
Limited Authority

83.33%
90.00%
93.33%

Time Pressure
0.00%

100.00%

Figure 4- Summary of respondent’s supports to the elements of the model
In addition to the open-ended questions, respondents of the study were asked to tick on 12 Likert-scale questions
to determine the relative significance of each factor. The mean values of respondents’ answers to the mentioned
questions are summarized in the following figure (fig. 5). The bar chart provided in the figure shows that the
cultural gap has the minimum significance level among 12 suggested independent variables.
Workload

4.03

3.70
2.37

Insecure Career

3.87
3.17
3.37

Vague Scope

4.10
3.97

Internal Conflict
3.13
Limited Authority

3.77
4.03

Time Pressure
1.00

4.37
2.00

3.00

4.00

5.00

Figure 5- Relative Importance of Mean values
The above figure shows that from the viewpoint of the respondents, time pressure is the most important source of
stress (M=4.37), whereas cultural gap is the least important one (M=2.37). In order to check whether the above
difference between factors is statistically significant, Friedman test was applied in SPSS. Table 1 represents the
results of Friedman test. According to the table, with 99.9% confidence it could be claimed that there is a
significant difference between the above 12 factors (Chi-Square=56. 19, Sig. =0.000)
Table 1- Friedman Test for the Difference between Mean Ranks
N
30
Sources of job stress among project Chi-Square
56.195
managers
Df
11
Asymp. Sig.
.000
In other words, the difference between factors is statistically significant and the findings could be generalized
with enough degree of confidence.

97
Research on Humanities and Social Sciences
ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online)
Vol.3, No.16, 2013

www.iiste.org

After verifying the relative importance of factors, it is the time to decide on the final model. Figure 4 shows that
except cultural gaps, the other factors are supported by the absolute majority of respondents as the important
sources of stress. Moreover, fig. 5 illustrates that the mean values of respondents’ answers to Likert-scale
questions in all items except cultural gaps are bigger than 3. These facts lead us toward rejecting cultural gaps
and accepting the other 11 factors. Consequently, the below model (fig. 6) is suggested as the final model for the
most important factors that cause job stress in a project manager.

Figure 6- The final suggested model
6. Discussion
The five sources of stress initially posited by this study were strongly supported by the respondents. In addition,
some more stressors were identified within the pilot study and supported within the main survey.
Time pressure received the strongest support from respondents and 93% of them confirmed it as a main source
of stress. One of the respondents from Portugal stated that “as a project manager, I am normally under pressure
to complete the project on schedule to avoid delay penalty, and this issue exposes me to high degrees of job
stress”. It is almost evident that high levels of time pressure can produce stress, but its negative effects can be
moderated by cooperation and social interaction (Nordqvist, 2004).
Constraint of resources was also strongly supported by 90% of the respondents. A South African respondent
claimed that “I define a project as "applying limited resources to implement specific tasks in limited time”, and it
is evident that any limitation makes rivalry to obtain more, and rivalry normally results in stress”. Stress is often
caused by “trying to do more with less”; (Campbell et al, 2007). So, it is reasonable to introduce resource
constraint as one of the most important sources of stress for a project manager.
Although the family problem was not initially considered as a major stressor, but the results of the pilot study as
well as the main survey showed that this item is an important source of job stress among project managers.
According to a Malaysian project manager, “To me, it is the main source of stress; as a project manager I have to
travel several times a month and sometimes I have to stay for a long time at the project sites, far away from my
family. In such conditions, I normally get stressed because of the problems that may be faced by my family”.
The effect of family problems on individuals’ stress at the workplace is proven by several studies. According to
the American Psychological Association (2009), “more than half of adults report that family responsibilities are
a significant source of stress and 55% of employees say that job demands have interfered with responsibilities at
home in the past three months”. It is clear that the specific demands of project-based jobs (specifically project
management positions) can intensify the interference between workplace and home responsibilities and increase
the individual’s job stress.
Limited authority was another stress factor that was supported by 83% of the respondents. An Iranian respondent
said that “dealing with functional departments is so hard. It looks like that the authority of the project manager is
so limited”. Actually, lack of full authority over team members (as described in section 2-5), faces project
managers with stressful conditions. Having adequate authority can improve the possibilities of gaining control in
stressful situations, thereby influencing the work situation through relevant decisions (Zika, 2006)
Likewise ‘limited authority’, ‘weak organizational support’ was supported by 83% of the respondents.
Organizational support is defined as the extent to which an organization values its employees’ contributions, and
cares about them (Allen et al, 2008). Pathak (2012) claims that “organizational support lessens the individuals’
level of stress and indirectly affects their job satisfaction”. It seems that this factor has a critical effect on project
managers’ job stress and even sometimes can eclipse the other important factors. A Turkish project manager
claimed that “If the company supports me, I feel no stress even with limited time and budget”.
The survey also revealed that about 80% of the respondents agree on ‘insecure career’ as an important source of
stress. An Indian project manager stated that “When I feel that my working situation is not secure, how can I
concentrate on my project? It is an absolute source of stress. I never put maximum effort if I am at risk to be
fired and get laid off.” Coetzee and De Villiers (2010) argue that “the perception of increased job insecurity
could be a function of unemployment and temporary contracts”. They mention job stress as a side-effect of job

98
Research on Humanities and Social Sciences
ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online)
Vol.3, No.16, 2013

www.iiste.org

insecurity.
Conflict was one of the five factors proposed by the preliminary model of this study. But after conducting the
pilot study, the collected data led us toward dividing this concept into two categories of internal conflict and
external conflict. The internal conflict which was supported by 80% of the respondents, addresses the conflicts
between the project managers and other individuals (superiors, subordinates, or peers) inside the organization.
The external conflict on the other hand, addresses those conflicts that may occur between a project manager and
the external parties such as the client or the subcontractors. About 66% of the respondents have mentioned this
type of conflict as a major source of conflict. A Singaporean respondent stated that “in order to avoid conflict, I
usually try to improve my empathy, negotiation skills, understanding the abilities and charismatic appearance to
absorb everybody who is involved in the project”. In general, breakdown in communication is the most common
and most obvious source of conflict in projects (Verma, 1998).
Project managers often deal with extraordinary tasks and responsibilities. Most project managers complain that
they get stressed because they have to work overtime (Chiocchio, 2010). A project manager from Denmark
argued that “This is one of the most difficult aspects of project management. You have to manage a crossfunctional team and accomplish huge tasks and responsibilities within a short period of time. This heavy
workload, specifically at the peak of the project, is a terrible nightmare to the project manager.” Extended
exposure to heavy workload, results in psychological stress reactions (Zika et al, 2003). About 77% of the
respondents have stated that workload is a main source of stress.
A project manager normally has to manage a group of individuals from diverse backgrounds and disciplines
(Jacques et al, 2007). But the project manager may not have full abilities (knowledge, skills and experience) in
all the relevant specialties, and this could be a source of stress. About 67% of the respondents confirmed this
issue. A project manager from Denmark argued that “when your staffs realize that you do not have enough
knowledge and experience about what they do, after a while they may ignore you, or even cheat you. This could
be a source of a killing stress for a project manager”. Singh (2003) supports this argument. He takes into account
lack of enough information, skills and experience as a main source of stress among project manager.
If the project scope is not clear enough then the project manager gets stressed to deal with a vague scope of work.
About 57% of the respondents agreed on this argument. A respondent from Panama believe that “That is really
big cause of stress! When the client and the contractor have different perceptions about the scope of work, then
deliverables are vague and it is a source of stress”. As a whole, ambiguous project roles and continuous changes
in plans will result in psychological stress (Zikaet al, 2003).
Based on elaborations of the respondents, hiring an industrial psychologist could be so useful to mitigate the
amplitude of the stressors. Also, continuous consultation with a professional psychologist is necessary for
project-based organizations. There are several techniques that could be helpful in this area. For instance, team
building programs gather all staff somewhere out of the office and put them in a situation to struggle with several
natural and mental challenges in order to motivate them to learn how to solve the problems by team working.
7. Conclusion
The project manager has a significant role in conducting the project tasks and to delivering all deliverables in a
limited time with appropriate cost and quality to satisfy all stakeholders. Since a project is a temporary activity,
in most companies only few staffs are hired in project-based departments and the rest of the human resources of
the project are usually provided from functional departments of the company. Based on the model suggested by
this study, there are eleven major stressors that usually create a stressful project management circumstance. In
order to protect the projects, it is necessary to mitigate job stress in project managers using several techniques
such as hiring psychologists, conducting team building programs, giving more values to staff and paying
attention to their family problems. The role of the CEO is so significant to inject a positive energy among project
managers and project team members, also to initiate a fair appraisal system by identifying proper key
performance indicators (KPIs) in order to motivate different departments to collaborate with project managers
and create more values for the company. This close cooperation can lower the level of stress among project
managers, keep the company away from several internal conflicts, and facilitate the conditions for a better
organizational performance and more profitability.
References
Allen, M.W., Armstrong, D.J., Reid, M.F. and Riemenschneider, C.K. (2008), “Factors impacting the perceived
organizational support of IT employees”, Information & Management, Vol. 45, pp. 556-563.
American Psychological Association. (2009). Stress in America 2009. Retrieved from
http://www.apa.org/news/press/releases/stress-exec-summary.pdf
Baars, W. (2006). Project Management Handbook: version 1.1, Data Archiving and Networking Services, San
Francisco, USA

99
Research on Humanities and Social Sciences
ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online)
Vol.3, No.16, 2013

www.iiste.org

Barczak, G., & Wilemon, D. (2003). Team member experiences in new product development: views from the
trenches. R&D Management, 33(5), 463-479.
Berrie M.(2008) , Project Manager Responsibilities, PM Hut.( http://www.pmhut.com/project-managerresponsibilities)
Campbell, M., Baltes, J. I., Martin, A., & Meddings, K. (2007). The Stress of Leadership. Center for Creative
Leadership. htt p://www. ccl. org/leadership/pdf/research/StressofLeadership. pdf.
Chiocchio, F., Beaulieu, G., Boudrias, J. S., Rousseau, V., Aubé, C., & Morin, E. M. (2010). The Project
Involvement Index, psychological distress, and psychological well-being: Comparing workers from projectized
and non-projectized organizations. International Journal of Project Management, 28(3), 201-211.
Coetzee, M., & De Villiers, M. (2010). Sources of job stress, work engagement and career orientations of
employees in a South African fi nancial institution.Southern African Business Review, 14(1).
DARREL, C. S. F. (2008). Investigating the effects of time pressure on new product development teams.
Greiner, L. E., & Schein, V. E. (1981). The paradox of managing a project-oriented matrix: Establishing
coherence
Hackman JR, Wageman R, Ruddy TM, Ray CL.(2000), Team eff
ectiveness in theory and practice. Linking
theory with practice. Cooper CL, Locke EA, editors. Industrial and organizational psychology. USA: Blackwell;
p. 110–29.)
Haynes,N. S., & Love, P. E. (2004). Psychological adjustment and coping among construction project managers.
Construction management and economics, 22(2), 129-140.
Houtman, I., Jettinghof, K., & Cedillo, L. (2007). Raising awareness of stress at work in developing countries: a
modern hazard in a traditional working environment: advice to employers and worker representatives.
Jacques, P. H., Garger, J., & Thomas, M. (2007). Assessing leader behaviors in project managers. Management
Research News, 31(1), 4-11.
Kuprenas, J. A. (2003). Implementation and performance of a matrix organization structure. International
Journal of Project Management, 21(1), 51-62.
Larson, E. W., & Gobeli, D. H. (1987). Matrix management: contradictions and insights. California Management
Review, 29(4), 126-138.
Leung, M. Y., Sham, J., & Chan, Y. S. (2007). Adjusting Stressors–Job-Demand Stress in Preventing
Rustout/Burnout in Estimators. Surveying and Built Environment, 18(1), 17-26..
Nordqvist, S., Hovmark, S., & Zika-Viktorsson, A. (2004). Perceived time pressure and social processes in
project teams. International Journal of Project Management, 22(6), 463-468.
Pathak, D. (2012). Role of perceived organizational support on stress-satisfaction relationship: An empirical
study. Asian Journal of Management Research, 3(1), 153-177.
Posner, B. Z. (1986). What's all the fighting about? Conflicts in project management. Engineering Management,
IEEE Transactions on, (4), 207-211.
Schrader E. and Matheson A.(2009), A deeper look into stress and workloadin the BC public service, work
environment survey.
Sedström, O. (2007). Stress and conflict in project management. A mixed research study of a Swedish energy
company.
Singh, C. (2003) An Assessment Of Sources And Moderators Of Stress For Project Managers.
Sommerville, J., & Langford, V. (1994). Multivariate influences on the people side of projects: stress and
conflict. International Journal of Project Management, 12(4), 234-243.
Sutherland, V. J. & Cooper, C. L. 2000, Strategic stress management: an organisational approach
Tukel, O. I., & Rom, W. O. (1995)., Analysis of the Characteristics of Projects in Diverse Industries Working
paper, Cleveland State University, Cleveland, Ohio
Tukel, O. I., & Rom, W. O. (1998). Analysis of the characteristics of projects in diverse industries. Journal of
Operations Management, 16(1), 43-61.
Van Eerde, W. (2000). Procrastination: Self-regulation in initiating aversive goals. Applied Psychology , 49,
372–389.
Verma V. K. (1998), conflict management, PMI project management handbook
within chaos. Sloan Management Review, 22(2), 17-22.
Zika-Viktorsson, A., Hovmark, S., & Nordqvist, S. (2003). Psychosocial aspects of project work: a comparison
between product development and construction projects. International Journal of Project Management, 21(8),
563-569.
Zika-Viktorsson, A., Sundström, P., & Engwall, M. (2006). Project overload: An exploratory study of work and
management in multi-project settings.International Journal of Project Management, 24(5), 385-394.

100
This academic article was published by The International Institute for Science,
Technology and Education (IISTE). The IISTE is a pioneer in the Open Access
Publishing service based in the U.S. and Europe. The aim of the institute is
Accelerating Global Knowledge Sharing.
More information about the publisher can be found in the IISTE’s homepage:
http://www.iiste.org
CALL FOR JOURNAL PAPERS
The IISTE is currently hosting more than 30 peer-reviewed academic journals and
collaborating with academic institutions around the world. There’s no deadline for
submission. Prospective authors of IISTE journals can find the submission
instruction on the following page: http://www.iiste.org/journals/
The IISTE
editorial team promises to the review and publish all the qualified submissions in a
fast manner. All the journals articles are available online to the readers all over the
world without financial, legal, or technical barriers other than those inseparable from
gaining access to the internet itself. Printed version of the journals is also available
upon request of readers and authors.
MORE RESOURCES
Book publication information: http://www.iiste.org/book/
Recent conferences: http://www.iiste.org/conference/
IISTE Knowledge Sharing Partners
EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open
Archives Harvester, Bielefeld Academic Search Engine, Elektronische
Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial
Library , NewJour, Google Scholar

Contenu connexe

Similaire à The sources of job stress among project managers

BEST PRACTICES OF PM EFFECT ON PROJECT SUCCESS
BEST PRACTICES OF PM EFFECT ON  PROJECT SUCCESSBEST PRACTICES OF PM EFFECT ON  PROJECT SUCCESS
BEST PRACTICES OF PM EFFECT ON PROJECT SUCCESSMuhammad Awais
 
Running head ORGANIZATIONAL ASSESSMENT REPORT 1ORGANIZATION.docx
Running head ORGANIZATIONAL ASSESSMENT REPORT 1ORGANIZATION.docxRunning head ORGANIZATIONAL ASSESSMENT REPORT 1ORGANIZATION.docx
Running head ORGANIZATIONAL ASSESSMENT REPORT 1ORGANIZATION.docxcharisellington63520
 
Module 01 Discussion- Oxygenation and Physiological Needs Rubric
Module 01 Discussion- Oxygenation and Physiological Needs RubricModule 01 Discussion- Oxygenation and Physiological Needs Rubric
Module 01 Discussion- Oxygenation and Physiological Needs RubricIlonaThornburg83
 
Assignment 1. Project Success And How It Is Defined
Assignment 1. Project Success And How It Is DefinedAssignment 1. Project Success And How It Is Defined
Assignment 1. Project Success And How It Is DefinedJeff Brooks
 
An Investigation Into Project Team Dynamics And The Utilization Of Virtual En...
An Investigation Into Project Team Dynamics And The Utilization Of Virtual En...An Investigation Into Project Team Dynamics And The Utilization Of Virtual En...
An Investigation Into Project Team Dynamics And The Utilization Of Virtual En...Addison Coleman
 
PAPERS20 April 2013 ■ Project Management Jou.docx
PAPERS20 April 2013 ■ Project Management Jou.docxPAPERS20 April 2013 ■ Project Management Jou.docx
PAPERS20 April 2013 ■ Project Management Jou.docxdanhaley45372
 
Running head Organizing HR Projects 1O.docx
Running head Organizing HR Projects          1O.docxRunning head Organizing HR Projects          1O.docx
Running head Organizing HR Projects 1O.docxjeanettehully
 
Running head Organizing HR Projects 1O.docx
Running head Organizing HR Projects          1O.docxRunning head Organizing HR Projects          1O.docx
Running head Organizing HR Projects 1O.docxglendar3
 
Running head Organizing HR Projects 1O.docx
Running head Organizing HR Projects          1O.docxRunning head Organizing HR Projects          1O.docx
Running head Organizing HR Projects 1O.docxtodd581
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changinghenry KKK
 
Running head ASSIGNMENT 5 (CIS 517) .docx
Running head ASSIGNMENT 5 (CIS 517)                              .docxRunning head ASSIGNMENT 5 (CIS 517)                              .docx
Running head ASSIGNMENT 5 (CIS 517) .docxtoddr4
 
DocumentationIllustrated Excel 2013Unit K SAM Project 1aClef Note.docx
DocumentationIllustrated Excel 2013Unit K SAM Project 1aClef Note.docxDocumentationIllustrated Excel 2013Unit K SAM Project 1aClef Note.docx
DocumentationIllustrated Excel 2013Unit K SAM Project 1aClef Note.docxelinoraudley582231
 
Andoh and appiah 35751 38767-1-pb
Andoh and appiah 35751 38767-1-pbAndoh and appiah 35751 38767-1-pb
Andoh and appiah 35751 38767-1-pbRaphael Andoh
 
Project Management: Alignment at the top
Project Management: Alignment at the topProject Management: Alignment at the top
Project Management: Alignment at the topDavid Davis
 
Opportunities for learning fromcrises in projectsMarkus .docx
Opportunities for learning fromcrises in projectsMarkus .docxOpportunities for learning fromcrises in projectsMarkus .docx
Opportunities for learning fromcrises in projectsMarkus .docxcherishwinsland
 
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxCHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxcravennichole326
 
Teams and Project Performance.pdf
Teams and Project Performance.pdfTeams and Project Performance.pdf
Teams and Project Performance.pdfssuserb4bf60
 
Banking sector-project-by-mian-textilian
Banking sector-project-by-mian-textilianBanking sector-project-by-mian-textilian
Banking sector-project-by-mian-textiliangulfam shahzad
 

Similaire à The sources of job stress among project managers (20)

BEST PRACTICES OF PM EFFECT ON PROJECT SUCCESS
BEST PRACTICES OF PM EFFECT ON  PROJECT SUCCESSBEST PRACTICES OF PM EFFECT ON  PROJECT SUCCESS
BEST PRACTICES OF PM EFFECT ON PROJECT SUCCESS
 
Running head ORGANIZATIONAL ASSESSMENT REPORT 1ORGANIZATION.docx
Running head ORGANIZATIONAL ASSESSMENT REPORT 1ORGANIZATION.docxRunning head ORGANIZATIONAL ASSESSMENT REPORT 1ORGANIZATION.docx
Running head ORGANIZATIONAL ASSESSMENT REPORT 1ORGANIZATION.docx
 
Module 01 Discussion- Oxygenation and Physiological Needs Rubric
Module 01 Discussion- Oxygenation and Physiological Needs RubricModule 01 Discussion- Oxygenation and Physiological Needs Rubric
Module 01 Discussion- Oxygenation and Physiological Needs Rubric
 
Assignment 1. Project Success And How It Is Defined
Assignment 1. Project Success And How It Is DefinedAssignment 1. Project Success And How It Is Defined
Assignment 1. Project Success And How It Is Defined
 
An Investigation Into Project Team Dynamics And The Utilization Of Virtual En...
An Investigation Into Project Team Dynamics And The Utilization Of Virtual En...An Investigation Into Project Team Dynamics And The Utilization Of Virtual En...
An Investigation Into Project Team Dynamics And The Utilization Of Virtual En...
 
PAPERS20 April 2013 ■ Project Management Jou.docx
PAPERS20 April 2013 ■ Project Management Jou.docxPAPERS20 April 2013 ■ Project Management Jou.docx
PAPERS20 April 2013 ■ Project Management Jou.docx
 
Running head Organizing HR Projects 1O.docx
Running head Organizing HR Projects          1O.docxRunning head Organizing HR Projects          1O.docx
Running head Organizing HR Projects 1O.docx
 
Running head Organizing HR Projects 1O.docx
Running head Organizing HR Projects          1O.docxRunning head Organizing HR Projects          1O.docx
Running head Organizing HR Projects 1O.docx
 
Running head Organizing HR Projects 1O.docx
Running head Organizing HR Projects          1O.docxRunning head Organizing HR Projects          1O.docx
Running head Organizing HR Projects 1O.docx
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changing
 
Running head ASSIGNMENT 5 (CIS 517) .docx
Running head ASSIGNMENT 5 (CIS 517)                              .docxRunning head ASSIGNMENT 5 (CIS 517)                              .docx
Running head ASSIGNMENT 5 (CIS 517) .docx
 
L8-A1
L8-A1L8-A1
L8-A1
 
DocumentationIllustrated Excel 2013Unit K SAM Project 1aClef Note.docx
DocumentationIllustrated Excel 2013Unit K SAM Project 1aClef Note.docxDocumentationIllustrated Excel 2013Unit K SAM Project 1aClef Note.docx
DocumentationIllustrated Excel 2013Unit K SAM Project 1aClef Note.docx
 
Andoh and appiah 35751 38767-1-pb
Andoh and appiah 35751 38767-1-pbAndoh and appiah 35751 38767-1-pb
Andoh and appiah 35751 38767-1-pb
 
Project Management: Alignment at the top
Project Management: Alignment at the topProject Management: Alignment at the top
Project Management: Alignment at the top
 
CIA_application award paper
CIA_application award paperCIA_application award paper
CIA_application award paper
 
Opportunities for learning fromcrises in projectsMarkus .docx
Opportunities for learning fromcrises in projectsMarkus .docxOpportunities for learning fromcrises in projectsMarkus .docx
Opportunities for learning fromcrises in projectsMarkus .docx
 
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxCHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
 
Teams and Project Performance.pdf
Teams and Project Performance.pdfTeams and Project Performance.pdf
Teams and Project Performance.pdf
 
Banking sector-project-by-mian-textilian
Banking sector-project-by-mian-textilianBanking sector-project-by-mian-textilian
Banking sector-project-by-mian-textilian
 

Plus de Alexander Decker

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Alexander Decker
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inAlexander Decker
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesAlexander Decker
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksAlexander Decker
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dAlexander Decker
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceAlexander Decker
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifhamAlexander Decker
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaAlexander Decker
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenAlexander Decker
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksAlexander Decker
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget forAlexander Decker
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabAlexander Decker
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...Alexander Decker
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalAlexander Decker
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesAlexander Decker
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbAlexander Decker
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloudAlexander Decker
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveragedAlexander Decker
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenyaAlexander Decker
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health ofAlexander Decker
 

Plus de Alexander Decker (20)

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale in
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websites
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banks
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized d
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistance
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifham
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibia
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school children
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banks
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget for
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjab
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incremental
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniques
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo db
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloud
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveraged
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenya
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health of
 

Dernier

FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 

Dernier (20)

FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 

The sources of job stress among project managers

  • 1. Research on Humanities and Social Sciences ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online) Vol.3, No.16, 2013 www.iiste.org The Sources of Job Stress among Project Managers 1. 2. Hadi Minavand1* Mohammad Reza Faraj Tabrizi1 Shadiya Mohamed Saleh Baqutayan2* International Business School / University Technology Malaysia (UTM), Jalan Semarak, 54100, Kuala Lumpur, Malaysia Perdana School of STI Policy / University Technology Malaysia (UTM), Jalan Semarak, 54100, Kuala Lumpur, Malaysia * E-mail of the corresponding authors: h_minavand@ymail.com / shadiya@ic.utm.my Abstract Organizational stress and workplace health have become an issue of great concern over the last decade. Although some workplace stress is normal, but among project manager is excessive. Project managers are considered as the key persons and one of the most important elements of any project, and their performance highly influences on the overall success of the project. Due to the nature of their work, they tended to face a multitude of stressors that always interfere with their productivity and impact their physical and emotional health. Current study focuses on “job stress” as one of the main factors affecting project managers’ performance. Within this research, preliminarily time pressure, workload, limited resources, limited authority and conflict were studied as the main sources of job stress among project managers. Furthermore, and after conducting a pilot study, some other factors were identified and added to the initial five factors. Eventually, the main survey focuses on twelve (12) sources of stress that was carried out among thirty (30) international project managers; and eleven (11) factors were introduced as the most important sources of stress among project managers. Keywords: Job stress among project manager; conflict at workplace; sources of job stress 1. Introduction While today is the era of high technology and modem achievement, a high performance is expected to be the norm. Many organizations demand for a high level of quality, service and overall business success, therefore, the pressure is felt on individuals at all levels of organization. Performance targets are becoming tougher to meet with each succeeding year and the management staff is experiencing difficulty in fulfilling the challenge. Anyone who has been ever involved in a project confirms that project environments in general are challengeable and stressful at the same time. This is mostly because of the nature of project work, which is a temporary activity, limited to a specific time and budget. Basically, four elements should be taken into account as the main features of a project. These features consist of: goal, group of people (project team), specific duration of time, and limited amount of money (Bars, 2006). Limitations of time and budget normally confront the project team, and specifically the project manager with stressful conditions. Limitation of time results in “time pressure”, limitation of budget causes “resource constraint” and both of the mentioned factors contribute to “high level of responsibilities” and “heavy workload”. In addition, if the project is conducted within a matrix-structure organization, the project manager has to deal with an extra challenge: job interference with functional managers; this challenge not only amplifies the stress caused by above-mentioned factors, but also individually puts the project manager into extra stressful situations. Furthermore, stress is sometimes caused by several kinds of conflict in the project environment. Although general management is a high stress occupation, the level of stress experienced by project managers is known to be even higher due to the conflicting demands of completing a project on time, under budget, with a high quality to satisfy the stakeholders (Haynes & Love, 2004). 2. Literature Review Job stress is an important concept in management sciences and one of the areas of interest for so many researchers. It is frequently studied within several researches in both levels of theory and practice. Regarding the temporary nature of project-based works, the workforce is highly exposed to job stress and its aftermaths. In this part, the studies that have investigated the sources of job stress among project managers are reviewed. Among the several sources of stress introduced by researchers, five factors (that affect the performance of a project managers more than others) are selected to build the conceptual framework of current study. The literatures of the studies related to these five factors are reviewed in the following sections. 2.1 Time Pressure The responsibilities of project managers vary across industries and may depend on the company’s size, culture, and level of maturity. However, some responsibilities are common among all project managers. Meeting the deadlines of the project is one of these responsibilities (Berrie , 2009). Tukel and Rom (1995), found that in the majority of large-size projects with more than 100 activities fail to meet their deadlines. They also conducted another survey in 1998 among 91 project managers and reported that 56% of the respondent had exceeded the deadlines of their projects. In the cases that the implementation of a project is assigned to a contractor, usually 94
  • 2. Research on Humanities and Social Sciences ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online) Vol.3, No.16, 2013 www.iiste.org some penalties are imposed on the contractor when deadlines are exceeded. Besides monetary penalties, companies may incur huge losses in credibility when they fail to complete their project. In the majority of cases the project manager is directly recognized as the responsible person for delays and penalties. As a result, time pressure emerges as a prominent source of stress experienced by project managers (Barczak and Wilemon, 2003). Time pressure is unique from other kinds of stress and so, needs special attention (Darrel, 2008). The stress caused by high levels of time pressure can lead to passivity and avoidance reactions (Van Eerde, 2000). The negative effects of time pressure in project workplaces can be moderated by applying social interaction processes (Nordqvist et al, 2004); for example, by developing cooperation among the components of a project, the feelings of belonging and social support can be strengthened which consequently leads to a considerable decrease in the negative effects of job stress ( Hackman, 2000). 2.2 Constraints of Resources Besides time, ‘budget’ is the other major limitation of any project. Limited budget automatically results in limitation in all resources including materials, machinery, technology, labor, and natural resources such as land, water and energy. Limited resources may aggravate exposure to stressful working conditions (Houtman et al, 2007). The project manager as the official who is directly responsible for the project’s resource management is exposed to these stressful conditions, more than everyone else. “Resource constraint” is considered as one of the most stressful situations experienced by project leaders (Campbell et al, 2007). According to the results of a research conducted among a group of leaders, when the respondents were asked about the most important factor which contributes to a leader’s stress, the majority of them introduced the constraint of resources as the main source of stress (Campbell et al, 2007). In some cases limited resources inside a company, results in a rivalry among project managers to grab a bigger portion of available resources for their own projects. 2.3 Workloads Whenever limited resources are accompanied with time pressure, normally stakeholders are forced to multiply their efforts and accept more responsibilities. This situation which is very common in project environments faces the project team with a heavy workload. When the workload exceeds capabilities, stress is generated among the team members. Job stress is defined as the deviation between the expected workload and the actual ability of individuals in the project (Leung et al, 2007). Stress involves both quantitative (e.g. too many/few tasks) and a qualitative (e.g., repetitive/complicated tasks) workloads (Leung et al, 2007). Regarding that the amount of workload is determined by the level of responsibilities, it is predictable that project managers deal with heavy workloads. An interview-based research among a group of project managers revealed that all interviewed project managers recognize excessive workload as a stressor (Singh, 2003). The study proved that the performance of a project manager will decline considerably over a maximum amount of workload. This could be because work overload causes a feeling of being burnt-out leading to stress (Sutherland & Cooper 2000). 2.4 Conflict Conflict is common in a wide range of human activities, from a minor disagreement and challenge between two individuals, to political struggles among countries. Conflict is defined as “the opposition of interests, values or objectives” (Sommerville & Langford, 1994). In a project environment, conflict is regarded as a very important issue because it could hinder the progress (Sedström, 2007). Project environment, usually involves people from different cultures and backgrounds. Hence, conflict is almost inevitable in such an environment. According to Verma (1998), “when project team members interact during the course of completing their tasks and responsibilities, there is always a potential for conflict”. From his point of view, it is impossible to gather some people who are from a diverse background and norms and expect them to work together in a project environment without any conflict. Different researchers have mentioned several reasons for conflict in a project environment. The most common causes of conflict from the viewpoint of Sommerville and Langford (1994) could be categorized into delays in progress, changes in functions, financial and budgetary issues, and various contractual obligations. Regardless of different factors mentioned by researchers as the main causes of conflict in project environment, almost all of them agree about a strong link between conflict and the level of stress Sommerville and Langford (1994) conducted a research among project managers of construction projects to assess the relationship between stress and conflict. The findings of their study proved that project managers’ job stress is significantly related to their involvement in conflicts. Hyde et al (2006) argue that a project is a type of work in which stress and conflict not only may occur, but also are considerably interlinked and the overall performance is highly affected by these two factors. 2.5 Limited Authority Nowadays, the majority of projects is organized in a matrix-structure systems. In spite of several advantages of such systems, they have some important disadvantages. According to Kuprenas (2003) “confusion and conflict over roles and responsibilities between functional managers leading functional teams and project managers overseeing project performance” are the most important challenges of matrix-structure organizations. Actually in matrix system, team members experience role confusion because they have to report to two managers at the 95
  • 3. Research on Humanities and Social Sciences ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online) Vol.3, No.16, 2013 www.iiste.org same time (Fig. 1), and after a while, the managers may find themselves in the middle of a conflict over tasks and authorities. Figure1- Matrix structure and dual responsibility of team members Project managers in this organizational structure may find it difficult to exert influence over the team members (Jacques, 2007). In a matrix system, tasks and authorities are distributed between project managers and functional managers without a clear border. This characteristic causes ambiguity and conflict over areas such as resource management (Larson & Gobeli, 1987), and personnel assignments (Greiner Schein, 1981). This ambiguity results in a power struggle because each party attempts to clarify and define its responsibility and accountability (Posner, 1986). 3. Conceptual framework Based on the issues identified in the literature review as the sources of stress in a project environment, the conceptual framework of the current study is laid out according the following model (Fig.2). Figure 2- Preliminary Model of Study As reflected in the model, five main stressors including time pressure, resource constraint, conflict, limited authority and workload were selected to trace job stress in a project manager. This is the preliminary framework of this study. It is evident that there are some other factors that may produce job stress among project managers. Hence, we decided to consider enough flexibility for the framework. In order to achieve this purpose, the suggested framework was applied to conduct a pilot study and the results of the study were analyzed to identify the other sources of stress and build a new framework for the main survey (section5). 4. Research methodology The above-mentioned conceptual framework was applied to conduct a pilot study with participation of 10 project managers. The study was based on a questionnaire containing some open-ended questions. Each element of the framework was focused and addressed by one descriptive question which was designed to assess the opinions and personal experiences of respondents about that element. In addition, the respondents were requested to add any other source of stress that was important from their viewpoints. As a result, so many stressors were introduced by the participants in the pilot study. Among all suggested sources of stress, 7 sources were frequently repeated by the majority of respondents. Hence, these seven factors were added to the preliminary model to form a new framework with 12 elements (fig. 3). Based on this framework, a new questionnaire containing some open-ended plus 12 Likert-scale questions was designed as the survey instrument. An online platform was selected to conduct the survey. The questionnaire was uploaded on the internet and its link was distributed via email, social networks, and other online media. Project managers from different fields including construction, IT, and industrial projects were targeted for this survey. In order to avoid cultural limitations, project managers from several countries in four continents were requested to answer the questionnaire. Finally, 30 responses were collected from the managers of different projects in Singapore, India, Iran, Turkey, Denmark, Portugal, South Africa, Panama, Philippines and Malaysia. 96
  • 4. Research on Humanities and Social Sciences ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online) Vol.3, No.16, 2013 www.iiste.org 5. Data collection and analysis As described earlier, a preliminary model was applied to conduct a pilot test in order to verify and develop the model. During the pilot study, respondents introduced seven additional factors and the basic model was transformed into the following framework (fig. 3). Figure3 - Developed Framework after Pilot Research The new model was applied to construct a new questionnaire and conduct the main survey. The summary of respondents’ answers is presented in the following bar chart (fig. 4). According to the chart, the majority of respondents believe that all suggested factors except cultural gap can cause the stressful project management condition. 83.33% 76.67% Workload 40.00% Insecure Career 80.00% 63.33% 56.67% Vague Scope 93.33% 86.67% Internal Conflict 66.67% Limited Authority 83.33% 90.00% 93.33% Time Pressure 0.00% 100.00% Figure 4- Summary of respondent’s supports to the elements of the model In addition to the open-ended questions, respondents of the study were asked to tick on 12 Likert-scale questions to determine the relative significance of each factor. The mean values of respondents’ answers to the mentioned questions are summarized in the following figure (fig. 5). The bar chart provided in the figure shows that the cultural gap has the minimum significance level among 12 suggested independent variables. Workload 4.03 3.70 2.37 Insecure Career 3.87 3.17 3.37 Vague Scope 4.10 3.97 Internal Conflict 3.13 Limited Authority 3.77 4.03 Time Pressure 1.00 4.37 2.00 3.00 4.00 5.00 Figure 5- Relative Importance of Mean values The above figure shows that from the viewpoint of the respondents, time pressure is the most important source of stress (M=4.37), whereas cultural gap is the least important one (M=2.37). In order to check whether the above difference between factors is statistically significant, Friedman test was applied in SPSS. Table 1 represents the results of Friedman test. According to the table, with 99.9% confidence it could be claimed that there is a significant difference between the above 12 factors (Chi-Square=56. 19, Sig. =0.000) Table 1- Friedman Test for the Difference between Mean Ranks N 30 Sources of job stress among project Chi-Square 56.195 managers Df 11 Asymp. Sig. .000 In other words, the difference between factors is statistically significant and the findings could be generalized with enough degree of confidence. 97
  • 5. Research on Humanities and Social Sciences ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online) Vol.3, No.16, 2013 www.iiste.org After verifying the relative importance of factors, it is the time to decide on the final model. Figure 4 shows that except cultural gaps, the other factors are supported by the absolute majority of respondents as the important sources of stress. Moreover, fig. 5 illustrates that the mean values of respondents’ answers to Likert-scale questions in all items except cultural gaps are bigger than 3. These facts lead us toward rejecting cultural gaps and accepting the other 11 factors. Consequently, the below model (fig. 6) is suggested as the final model for the most important factors that cause job stress in a project manager. Figure 6- The final suggested model 6. Discussion The five sources of stress initially posited by this study were strongly supported by the respondents. In addition, some more stressors were identified within the pilot study and supported within the main survey. Time pressure received the strongest support from respondents and 93% of them confirmed it as a main source of stress. One of the respondents from Portugal stated that “as a project manager, I am normally under pressure to complete the project on schedule to avoid delay penalty, and this issue exposes me to high degrees of job stress”. It is almost evident that high levels of time pressure can produce stress, but its negative effects can be moderated by cooperation and social interaction (Nordqvist, 2004). Constraint of resources was also strongly supported by 90% of the respondents. A South African respondent claimed that “I define a project as "applying limited resources to implement specific tasks in limited time”, and it is evident that any limitation makes rivalry to obtain more, and rivalry normally results in stress”. Stress is often caused by “trying to do more with less”; (Campbell et al, 2007). So, it is reasonable to introduce resource constraint as one of the most important sources of stress for a project manager. Although the family problem was not initially considered as a major stressor, but the results of the pilot study as well as the main survey showed that this item is an important source of job stress among project managers. According to a Malaysian project manager, “To me, it is the main source of stress; as a project manager I have to travel several times a month and sometimes I have to stay for a long time at the project sites, far away from my family. In such conditions, I normally get stressed because of the problems that may be faced by my family”. The effect of family problems on individuals’ stress at the workplace is proven by several studies. According to the American Psychological Association (2009), “more than half of adults report that family responsibilities are a significant source of stress and 55% of employees say that job demands have interfered with responsibilities at home in the past three months”. It is clear that the specific demands of project-based jobs (specifically project management positions) can intensify the interference between workplace and home responsibilities and increase the individual’s job stress. Limited authority was another stress factor that was supported by 83% of the respondents. An Iranian respondent said that “dealing with functional departments is so hard. It looks like that the authority of the project manager is so limited”. Actually, lack of full authority over team members (as described in section 2-5), faces project managers with stressful conditions. Having adequate authority can improve the possibilities of gaining control in stressful situations, thereby influencing the work situation through relevant decisions (Zika, 2006) Likewise ‘limited authority’, ‘weak organizational support’ was supported by 83% of the respondents. Organizational support is defined as the extent to which an organization values its employees’ contributions, and cares about them (Allen et al, 2008). Pathak (2012) claims that “organizational support lessens the individuals’ level of stress and indirectly affects their job satisfaction”. It seems that this factor has a critical effect on project managers’ job stress and even sometimes can eclipse the other important factors. A Turkish project manager claimed that “If the company supports me, I feel no stress even with limited time and budget”. The survey also revealed that about 80% of the respondents agree on ‘insecure career’ as an important source of stress. An Indian project manager stated that “When I feel that my working situation is not secure, how can I concentrate on my project? It is an absolute source of stress. I never put maximum effort if I am at risk to be fired and get laid off.” Coetzee and De Villiers (2010) argue that “the perception of increased job insecurity could be a function of unemployment and temporary contracts”. They mention job stress as a side-effect of job 98
  • 6. Research on Humanities and Social Sciences ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online) Vol.3, No.16, 2013 www.iiste.org insecurity. Conflict was one of the five factors proposed by the preliminary model of this study. But after conducting the pilot study, the collected data led us toward dividing this concept into two categories of internal conflict and external conflict. The internal conflict which was supported by 80% of the respondents, addresses the conflicts between the project managers and other individuals (superiors, subordinates, or peers) inside the organization. The external conflict on the other hand, addresses those conflicts that may occur between a project manager and the external parties such as the client or the subcontractors. About 66% of the respondents have mentioned this type of conflict as a major source of conflict. A Singaporean respondent stated that “in order to avoid conflict, I usually try to improve my empathy, negotiation skills, understanding the abilities and charismatic appearance to absorb everybody who is involved in the project”. In general, breakdown in communication is the most common and most obvious source of conflict in projects (Verma, 1998). Project managers often deal with extraordinary tasks and responsibilities. Most project managers complain that they get stressed because they have to work overtime (Chiocchio, 2010). A project manager from Denmark argued that “This is one of the most difficult aspects of project management. You have to manage a crossfunctional team and accomplish huge tasks and responsibilities within a short period of time. This heavy workload, specifically at the peak of the project, is a terrible nightmare to the project manager.” Extended exposure to heavy workload, results in psychological stress reactions (Zika et al, 2003). About 77% of the respondents have stated that workload is a main source of stress. A project manager normally has to manage a group of individuals from diverse backgrounds and disciplines (Jacques et al, 2007). But the project manager may not have full abilities (knowledge, skills and experience) in all the relevant specialties, and this could be a source of stress. About 67% of the respondents confirmed this issue. A project manager from Denmark argued that “when your staffs realize that you do not have enough knowledge and experience about what they do, after a while they may ignore you, or even cheat you. This could be a source of a killing stress for a project manager”. Singh (2003) supports this argument. He takes into account lack of enough information, skills and experience as a main source of stress among project manager. If the project scope is not clear enough then the project manager gets stressed to deal with a vague scope of work. About 57% of the respondents agreed on this argument. A respondent from Panama believe that “That is really big cause of stress! When the client and the contractor have different perceptions about the scope of work, then deliverables are vague and it is a source of stress”. As a whole, ambiguous project roles and continuous changes in plans will result in psychological stress (Zikaet al, 2003). Based on elaborations of the respondents, hiring an industrial psychologist could be so useful to mitigate the amplitude of the stressors. Also, continuous consultation with a professional psychologist is necessary for project-based organizations. There are several techniques that could be helpful in this area. For instance, team building programs gather all staff somewhere out of the office and put them in a situation to struggle with several natural and mental challenges in order to motivate them to learn how to solve the problems by team working. 7. Conclusion The project manager has a significant role in conducting the project tasks and to delivering all deliverables in a limited time with appropriate cost and quality to satisfy all stakeholders. Since a project is a temporary activity, in most companies only few staffs are hired in project-based departments and the rest of the human resources of the project are usually provided from functional departments of the company. Based on the model suggested by this study, there are eleven major stressors that usually create a stressful project management circumstance. In order to protect the projects, it is necessary to mitigate job stress in project managers using several techniques such as hiring psychologists, conducting team building programs, giving more values to staff and paying attention to their family problems. The role of the CEO is so significant to inject a positive energy among project managers and project team members, also to initiate a fair appraisal system by identifying proper key performance indicators (KPIs) in order to motivate different departments to collaborate with project managers and create more values for the company. This close cooperation can lower the level of stress among project managers, keep the company away from several internal conflicts, and facilitate the conditions for a better organizational performance and more profitability. References Allen, M.W., Armstrong, D.J., Reid, M.F. and Riemenschneider, C.K. (2008), “Factors impacting the perceived organizational support of IT employees”, Information & Management, Vol. 45, pp. 556-563. American Psychological Association. (2009). Stress in America 2009. Retrieved from http://www.apa.org/news/press/releases/stress-exec-summary.pdf Baars, W. (2006). Project Management Handbook: version 1.1, Data Archiving and Networking Services, San Francisco, USA 99
  • 7. Research on Humanities and Social Sciences ISSN 2222-1719 (Paper) ISSN 2222-2863 (Online) Vol.3, No.16, 2013 www.iiste.org Barczak, G., & Wilemon, D. (2003). Team member experiences in new product development: views from the trenches. R&D Management, 33(5), 463-479. Berrie M.(2008) , Project Manager Responsibilities, PM Hut.( http://www.pmhut.com/project-managerresponsibilities) Campbell, M., Baltes, J. I., Martin, A., & Meddings, K. (2007). The Stress of Leadership. Center for Creative Leadership. htt p://www. ccl. org/leadership/pdf/research/StressofLeadership. pdf. Chiocchio, F., Beaulieu, G., Boudrias, J. S., Rousseau, V., Aubé, C., & Morin, E. M. (2010). The Project Involvement Index, psychological distress, and psychological well-being: Comparing workers from projectized and non-projectized organizations. International Journal of Project Management, 28(3), 201-211. Coetzee, M., & De Villiers, M. (2010). Sources of job stress, work engagement and career orientations of employees in a South African fi nancial institution.Southern African Business Review, 14(1). DARREL, C. S. F. (2008). Investigating the effects of time pressure on new product development teams. Greiner, L. E., & Schein, V. E. (1981). The paradox of managing a project-oriented matrix: Establishing coherence Hackman JR, Wageman R, Ruddy TM, Ray CL.(2000), Team eff ectiveness in theory and practice. Linking theory with practice. Cooper CL, Locke EA, editors. Industrial and organizational psychology. USA: Blackwell; p. 110–29.) Haynes,N. S., & Love, P. E. (2004). Psychological adjustment and coping among construction project managers. Construction management and economics, 22(2), 129-140. Houtman, I., Jettinghof, K., & Cedillo, L. (2007). Raising awareness of stress at work in developing countries: a modern hazard in a traditional working environment: advice to employers and worker representatives. Jacques, P. H., Garger, J., & Thomas, M. (2007). Assessing leader behaviors in project managers. Management Research News, 31(1), 4-11. Kuprenas, J. A. (2003). Implementation and performance of a matrix organization structure. International Journal of Project Management, 21(1), 51-62. Larson, E. W., & Gobeli, D. H. (1987). Matrix management: contradictions and insights. California Management Review, 29(4), 126-138. Leung, M. Y., Sham, J., & Chan, Y. S. (2007). Adjusting Stressors–Job-Demand Stress in Preventing Rustout/Burnout in Estimators. Surveying and Built Environment, 18(1), 17-26.. Nordqvist, S., Hovmark, S., & Zika-Viktorsson, A. (2004). Perceived time pressure and social processes in project teams. International Journal of Project Management, 22(6), 463-468. Pathak, D. (2012). Role of perceived organizational support on stress-satisfaction relationship: An empirical study. Asian Journal of Management Research, 3(1), 153-177. Posner, B. Z. (1986). What's all the fighting about? Conflicts in project management. Engineering Management, IEEE Transactions on, (4), 207-211. Schrader E. and Matheson A.(2009), A deeper look into stress and workloadin the BC public service, work environment survey. Sedström, O. (2007). Stress and conflict in project management. A mixed research study of a Swedish energy company. Singh, C. (2003) An Assessment Of Sources And Moderators Of Stress For Project Managers. Sommerville, J., & Langford, V. (1994). Multivariate influences on the people side of projects: stress and conflict. International Journal of Project Management, 12(4), 234-243. Sutherland, V. J. & Cooper, C. L. 2000, Strategic stress management: an organisational approach Tukel, O. I., & Rom, W. O. (1995)., Analysis of the Characteristics of Projects in Diverse Industries Working paper, Cleveland State University, Cleveland, Ohio Tukel, O. I., & Rom, W. O. (1998). Analysis of the characteristics of projects in diverse industries. Journal of Operations Management, 16(1), 43-61. Van Eerde, W. (2000). Procrastination: Self-regulation in initiating aversive goals. Applied Psychology , 49, 372–389. Verma V. K. (1998), conflict management, PMI project management handbook within chaos. Sloan Management Review, 22(2), 17-22. Zika-Viktorsson, A., Hovmark, S., & Nordqvist, S. (2003). Psychosocial aspects of project work: a comparison between product development and construction projects. International Journal of Project Management, 21(8), 563-569. Zika-Viktorsson, A., Sundström, P., & Engwall, M. (2006). Project overload: An exploratory study of work and management in multi-project settings.International Journal of Project Management, 24(5), 385-394. 100
  • 8. This academic article was published by The International Institute for Science, Technology and Education (IISTE). The IISTE is a pioneer in the Open Access Publishing service based in the U.S. and Europe. The aim of the institute is Accelerating Global Knowledge Sharing. More information about the publisher can be found in the IISTE’s homepage: http://www.iiste.org CALL FOR JOURNAL PAPERS The IISTE is currently hosting more than 30 peer-reviewed academic journals and collaborating with academic institutions around the world. There’s no deadline for submission. Prospective authors of IISTE journals can find the submission instruction on the following page: http://www.iiste.org/journals/ The IISTE editorial team promises to the review and publish all the qualified submissions in a fast manner. All the journals articles are available online to the readers all over the world without financial, legal, or technical barriers other than those inseparable from gaining access to the internet itself. Printed version of the journals is also available upon request of readers and authors. MORE RESOURCES Book publication information: http://www.iiste.org/book/ Recent conferences: http://www.iiste.org/conference/ IISTE Knowledge Sharing Partners EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open Archives Harvester, Bielefeld Academic Search Engine, Elektronische Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial Library , NewJour, Google Scholar