ABOUT ARCH CONSULTANCY
 ESTABLISHED IN JAN,1992
 EXPERTISE IN HIGHWAYS, BRIDGES &
FLYOVER’S DESIGNING
 DESIGN OF TEMPORARY STRUCTURES FOR
FLYOVERS & VIADUCTS INCLUDING DESIGN
OF STAGING , LAUNCHING & ERECTION
SCHEMES FOR PRECAST MEMBERS
INTRODUCTION TO WORK
 DESIGN OF SUBSTRUCTURE
COMPONENTS OF ELEVATED VIADUCT
UNDER PHASE II OF DELHI MRTS
PROJECT.
 DESIGN OF S/S OF ROB CROSSING ON
INDORE-KHALGHAT SECTION ON NH-3
DESIGN OF SUBSTRUCTURE
COMPONENTS INCLUDES
 CALCULATION OF BEARING LOADS
 DESIGN OF PORTAL PIER AND FOUNDATION
BEARING LOAD
CALCULATIONS
ELEVATION
2.20m
16t 16t 16t 16t 16t 16t 16t 16t
11.60m 11.60m5.04m
2.20m
2.20m 2.20m
CALCULATION OF LIVE LOAD
REACTION
BEARING LOAD CALCULATIONS
I. CALCULATE REACTIONS DUE TO SELF
WEIGHT,SIDL & LL
II. CALCULATE ECCENTRICITY DUE TO
CURVATURE,IF ANY,BY -
2/3*RADIUS*(1-COSØ)
III. CALCULATE MOMENT DUE TO
ECCENTRICITY
IV. FIND OUT MOMENT DUE TO
ECCENTRICITY DUE TO ONE TRACK
LOADED
BEARING LOAD CALCULATIONS
v. SEISMIC FORCE ( as per IRC 6:2000)
a) SEISMIC TRANSVERSE FORCE
(DL,SIDL,25%LL)
b) SEISMIC VERTICAL FORCE
(DL,SIDL,50%LL)
BEARING LOAD CALCULATIONS
vi. FIND OUT CENTRIFUGAL FORCE(CF) BY:-
LOAD*V2
/(127*R)
vii. CALCULATE MOMENT DUE TO ‘CF’
viii. MAX & MIN BEARING LOAD
= vertical reaction ± moment
no. of bearings bearing spacing
DESIGN OF PORTAL PIER
& OPEN FOUNDATION
PORTAL FRAME
BOX GIRDER
PORTAL PIER
PORTAL BEAM
12.7m 12.7m
8.4m 6.6m
CENTRE LINE ALIGNMENT
ELASTOMERIC BEARING
PORTAL FRAME
BOX GIRDER
PORTAL PIER
PORTAL BEAM
12.7m 12.7m
8.4m 6.6m
CENTRE LINE ALIGNMENT
ELASTOMERIC BEARING
PORTAL FRAME
BOX GIRDER
PORTAL PIER
PORTAL BEAM
12.7m 12.7m
8.4m 6.6m
CENTRE LINE ALIGNMENT
ELASTOMERIC BEARING
PORTAL FRAME
BOX GIRDER
PORTAL PIER
PORTAL BEAM
12.7m 12.7m
8.4m 6.6m
CENTRE LINE ALIGNMENT
ELASTOMERIC BEARING
PORTAL FRAME
BOX GIRDER
PORTAL PIER
PORTAL BEAM
12.7m 12.7m
8.4m 6.6m
CENTRE LINE ALIGNMENT
ELASTOMERIC BEARING
DESIGN OF PORTAL PIER & OPEN
FOUNDATION
i. LOAD
CALCULATIONS
DESIGN OF PORTAL PIER & OPEN
FOUNDATION
ii. FORCES CALCULATED AS EXPLAINED ARE
APPLIED ON THE IDEALISED STRUCTURE
IN STAAD-PRO
iii. FROM STAAD,FORCES ARE CALCULATED
ON FOUNDATION TOP
iv. CRITICAL LOAD CASES ARE MADE FOR
DESIGN OF FOOTING
DESIGN OF PORTAL PIER & OPEN
FOUNDATION
x. SIZE OF FOOTING IS CHECKED WITH THE
HELP OF LABFIL SOFTWARE (house built
software)
DESIGN OF PORTAL PIER & OPEN
FOUNDATION
xi. FOOTING SIZE IS CHECKED FOR BASE
PRESSURE
xii. FOOTING DEPTH IS CHECKED FOR SHEAR
AND REINFORCEMENT IS CALCULATED
CORRESSPONDING TO BENDING MOMENT
DESIGN OF PORTAL PIER & OPEN
FOUNDATION
xiii. PIER SHAFTS ARE ALSO DESIGNED BY
USING LABFIL SOFTWARE
xiv. FORCES ON TOP OF THE PIER ARE
CALCULATED FROM STAAD
xv. IDEALISATION OF PIER IS MADE AND
REINFORCEMENT IS PROVIDED
DESIGN OF PORTAL PIER & OPEN
FOUNDATION
xvi. THEN BY LABFIL , STRESSES ARE WORKED
OUT WHICH SHOULD BE LESS THAN
PERMISSIBLE.
DESIGN OF S/S OF ROB
ON INDORE-KHALGHAT
SECTION ON NH-3
LOAD CALCULATION
 DL
 SIDL
 LL (70R & CLASS A LOADING)
ELEVATION
PRE-TENSIONED
I-GIRDERS
ELEVATION
SECTION AT SUPPORTS (Y-Y)
SECTION AT CENTRE(Z-Z)
AREA -463125mm2
AREA -570069.44mm2
CLASS-A MOST ECCENTRIC
CLASS-A SYMMETRIC TO G2
CLASS-A TWO LANE
CLASS 70R MOST ECCENTRIC
GRID IDEALISATION
DESIGN OF
ELASTOMERIC BEARING
ELASTOMERIC BEARING DETAIL
te
ts
H
a
ti
c
ti = Thickness of individual layer of elastomer
te = Thickness of top/bottom layer of elastomer
ts = Thickness of steel laminate
c = Side cover
H = Total height of bearing
a = Dimension parallel o the beam
DESIGN OF ELASTOMERIC
BEARING (as per UIC: 772-2R)
i. MEAN PRESSURE:- Pmax/A(10 to 12MPa)
ii. NO SLIP CONDITION
• MIN MEAN PRESSURE- Pmin/A > 2MPa
• TANGENTIAL FORCE< f*P
f- FRICTION COEFFICIENT
i. LIMITATION OF DISTORTION
T> (TRANSLATION IN LONG.
DIRECTION)/0.7
DESIGN OF ELASTOMERIC
BEARING (as per UIC: 772-2R)
iv. NO UPLIFT AT THE EDGE WITH THE LEAST
LOAD
v. NO BUCKLING CONDITION (depend upon the
rubber thickness)
a/10≤T≤a/5
vi. SHEAR STRESS
SHEAR STRESS DUE TO TANGENTIAL
FORCE, NORMAL FORCE & ROTATION < 5 *
SHEAR MODULUS
DESIGN OF ELASTOMERIC
BEARING (as per UIC: 772-2R)
vii. STRENGTH OF PLATES :-
PLATES SHOULD BE ABLE TO WITHSTAND
THE TENSILE FORCES TO WHICH THEY ARE
SUBJECTED TO UNDER NORMAL LOADING
THANK YOU

More Related Content

What's hot

Bridge
Bridge Bridge
Bridge
illpa
 

What's hot (20)

Bridge components
Bridge componentsBridge components
Bridge components
 
Che 1 pile foundation
Che 1 pile foundationChe 1 pile foundation
Che 1 pile foundation
 
About Bridge pier.
About Bridge pier.About Bridge pier.
About Bridge pier.
 
Types of Bridges
Types of Bridges Types of Bridges
Types of Bridges
 
Deck slab bridge
Deck slab bridgeDeck slab bridge
Deck slab bridge
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
introduction to a bridge foundation
introduction to a bridge foundationintroduction to a bridge foundation
introduction to a bridge foundation
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Spine and wing method for box girders
Spine and wing method for box girdersSpine and wing method for box girders
Spine and wing method for box girders
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in Tunneling
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
 
Ce8702 railways, airports, docks and harbour engineering mcq
Ce8702 railways, airports, docks and harbour engineering mcqCe8702 railways, airports, docks and harbour engineering mcq
Ce8702 railways, airports, docks and harbour engineering mcq
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of Soil
 
Bridge Construction & Its Types
Bridge Construction & Its TypesBridge Construction & Its Types
Bridge Construction & Its Types
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
 
Bridge
Bridge Bridge
Bridge
 
Pile Foundations
Pile FoundationsPile Foundations
Pile Foundations
 

Viewers also liked (9)

Introduction on Theory of Structures
Introduction on Theory of StructuresIntroduction on Theory of Structures
Introduction on Theory of Structures
 
Reinforced slab bridge design(AASHTO allowable stress design method)
Reinforced slab bridge design(AASHTO allowable stress design method)Reinforced slab bridge design(AASHTO allowable stress design method)
Reinforced slab bridge design(AASHTO allowable stress design method)
 
structural analysis CE engg. solved ex.
structural analysis CE engg. solved ex.structural analysis CE engg. solved ex.
structural analysis CE engg. solved ex.
 
Structural Analysis - Virtual Work Method
Structural Analysis - Virtual Work MethodStructural Analysis - Virtual Work Method
Structural Analysis - Virtual Work Method
 
Theory of structures
Theory of structuresTheory of structures
Theory of structures
 
Principle of Virtual Work in structural analysis
Principle of Virtual Work in structural analysisPrinciple of Virtual Work in structural analysis
Principle of Virtual Work in structural analysis
 
Structural Analysis (Solutions) Chapter 9 by Wajahat
Structural Analysis (Solutions) Chapter 9 by WajahatStructural Analysis (Solutions) Chapter 9 by Wajahat
Structural Analysis (Solutions) Chapter 9 by Wajahat
 
Review of structural analysis
Review of structural analysisReview of structural analysis
Review of structural analysis
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 

Similar to Design of bridge component by vikas dhawan

HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2
Hafiz Waheed
 
Technical memorandum -Senior Capstone Project
Technical memorandum -Senior Capstone ProjectTechnical memorandum -Senior Capstone Project
Technical memorandum -Senior Capstone Project
Manzi Roger Dusabimana
 
Dmped vmp rfqp_160218_final draft (dmped comments 2 25 16) (002)_sam_ed_kathl...
Dmped vmp rfqp_160218_final draft (dmped comments 2 25 16) (002)_sam_ed_kathl...Dmped vmp rfqp_160218_final draft (dmped comments 2 25 16) (002)_sam_ed_kathl...
Dmped vmp rfqp_160218_final draft (dmped comments 2 25 16) (002)_sam_ed_kathl...
wandescrown
 
designage - Profile-1
designage - Profile-1designage - Profile-1
designage - Profile-1
Tushar Patil
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
Aamir Javed
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
Jatin Mandhyan
 
Integrated project
Integrated projectIntegrated project
Integrated project
isyroc
 
Integrated project
Integrated projectIntegrated project
Integrated project
Lee Fong Yen
 

Similar to Design of bridge component by vikas dhawan (20)

HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2
 
Shib
ShibShib
Shib
 
SALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design finalSALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design final
 
Report
ReportReport
Report
 
CV Arushini Padayachee
CV Arushini PadayacheeCV Arushini Padayachee
CV Arushini Padayachee
 
Analysis and Design of RCC Residential Building in StaadPro
Analysis and Design of RCC Residential Building in StaadProAnalysis and Design of RCC Residential Building in StaadPro
Analysis and Design of RCC Residential Building in StaadPro
 
Technical memorandum -Senior Capstone Project
Technical memorandum -Senior Capstone ProjectTechnical memorandum -Senior Capstone Project
Technical memorandum -Senior Capstone Project
 
Dmped vmp rfqp_160218_final draft (dmped comments 2 25 16) (002)_sam_ed_kathl...
Dmped vmp rfqp_160218_final draft (dmped comments 2 25 16) (002)_sam_ed_kathl...Dmped vmp rfqp_160218_final draft (dmped comments 2 25 16) (002)_sam_ed_kathl...
Dmped vmp rfqp_160218_final draft (dmped comments 2 25 16) (002)_sam_ed_kathl...
 
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PROPLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
 
designage - Profile-1
designage - Profile-1designage - Profile-1
designage - Profile-1
 
Legazpi City, Philippines
Legazpi City, PhilippinesLegazpi City, Philippines
Legazpi City, Philippines
 
Olmsted SAME Article
Olmsted SAME ArticleOlmsted SAME Article
Olmsted SAME Article
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
full report
full reportfull report
full report
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
LinkedIN_24-07-15
LinkedIN_24-07-15LinkedIN_24-07-15
LinkedIN_24-07-15
 
Integrated project
Integrated projectIntegrated project
Integrated project
 
Integrated project
Integrated projectIntegrated project
Integrated project
 
Wacker Drive Viaduct Reconstruction
Wacker Drive Viaduct ReconstructionWacker Drive Viaduct Reconstruction
Wacker Drive Viaduct Reconstruction
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...
 

More from Ali Ishaqi (9)

مصحف الأصحاب من الشاطبية والدرة
مصحف الأصحاب من الشاطبية والدرة مصحف الأصحاب من الشاطبية والدرة
مصحف الأصحاب من الشاطبية والدرة
 
Tanks foundations
Tanks foundationsTanks foundations
Tanks foundations
 
Advanced project management ppts
Advanced project management pptsAdvanced project management ppts
Advanced project management ppts
 
Sap 2000 شرح تصميم سقف باستخدام برنامج
Sap 2000 شرح تصميم سقف باستخدام برنامجSap 2000 شرح تصميم سقف باستخدام برنامج
Sap 2000 شرح تصميم سقف باستخدام برنامج
 
Reinforcement detailing
Reinforcement  detailingReinforcement  detailing
Reinforcement detailing
 
نوطة تعليمية لبرنامج Sap2000
نوطة تعليمية لبرنامج Sap2000نوطة تعليمية لبرنامج Sap2000
نوطة تعليمية لبرنامج Sap2000
 
مكونات الحاسوب
مكونات الحاسوبمكونات الحاسوب
مكونات الحاسوب
 
ساب 2000
ساب 2000ساب 2000
ساب 2000
 
Islands
IslandsIslands
Islands
 

Recently uploaded

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 

Design of bridge component by vikas dhawan

  • 1. DESIGN OF BRIDGE COMPONENT BY: VIKAS KUMAR 1055204 UNDER GUIDANCE OF DR. MANEEK KUMAR MR. SANJAY JAIN HEAD OF CIVIL DEPTT. DIRECTOR ARCH CONSULTANCY FACULTY COORDINATER INDUSTRY COORDINATOR
  • 2. ABOUT ARCH CONSULTANCY  ESTABLISHED IN JAN,1992  EXPERTISE IN HIGHWAYS, BRIDGES & FLYOVER’S DESIGNING  DESIGN OF TEMPORARY STRUCTURES FOR FLYOVERS & VIADUCTS INCLUDING DESIGN OF STAGING , LAUNCHING & ERECTION SCHEMES FOR PRECAST MEMBERS
  • 3. INTRODUCTION TO WORK  DESIGN OF SUBSTRUCTURE COMPONENTS OF ELEVATED VIADUCT UNDER PHASE II OF DELHI MRTS PROJECT.  DESIGN OF S/S OF ROB CROSSING ON INDORE-KHALGHAT SECTION ON NH-3
  • 4. DESIGN OF SUBSTRUCTURE COMPONENTS INCLUDES  CALCULATION OF BEARING LOADS  DESIGN OF PORTAL PIER AND FOUNDATION
  • 7. 2.20m 16t 16t 16t 16t 16t 16t 16t 16t 11.60m 11.60m5.04m 2.20m 2.20m 2.20m CALCULATION OF LIVE LOAD REACTION
  • 8. BEARING LOAD CALCULATIONS I. CALCULATE REACTIONS DUE TO SELF WEIGHT,SIDL & LL II. CALCULATE ECCENTRICITY DUE TO CURVATURE,IF ANY,BY - 2/3*RADIUS*(1-COSØ) III. CALCULATE MOMENT DUE TO ECCENTRICITY IV. FIND OUT MOMENT DUE TO ECCENTRICITY DUE TO ONE TRACK LOADED
  • 9. BEARING LOAD CALCULATIONS v. SEISMIC FORCE ( as per IRC 6:2000) a) SEISMIC TRANSVERSE FORCE (DL,SIDL,25%LL) b) SEISMIC VERTICAL FORCE (DL,SIDL,50%LL)
  • 10. BEARING LOAD CALCULATIONS vi. FIND OUT CENTRIFUGAL FORCE(CF) BY:- LOAD*V2 /(127*R) vii. CALCULATE MOMENT DUE TO ‘CF’ viii. MAX & MIN BEARING LOAD = vertical reaction ± moment no. of bearings bearing spacing
  • 11. DESIGN OF PORTAL PIER & OPEN FOUNDATION
  • 12.
  • 13.
  • 14.
  • 15. PORTAL FRAME BOX GIRDER PORTAL PIER PORTAL BEAM 12.7m 12.7m 8.4m 6.6m CENTRE LINE ALIGNMENT ELASTOMERIC BEARING
  • 16. PORTAL FRAME BOX GIRDER PORTAL PIER PORTAL BEAM 12.7m 12.7m 8.4m 6.6m CENTRE LINE ALIGNMENT ELASTOMERIC BEARING
  • 17. PORTAL FRAME BOX GIRDER PORTAL PIER PORTAL BEAM 12.7m 12.7m 8.4m 6.6m CENTRE LINE ALIGNMENT ELASTOMERIC BEARING
  • 18. PORTAL FRAME BOX GIRDER PORTAL PIER PORTAL BEAM 12.7m 12.7m 8.4m 6.6m CENTRE LINE ALIGNMENT ELASTOMERIC BEARING
  • 19. PORTAL FRAME BOX GIRDER PORTAL PIER PORTAL BEAM 12.7m 12.7m 8.4m 6.6m CENTRE LINE ALIGNMENT ELASTOMERIC BEARING
  • 20. DESIGN OF PORTAL PIER & OPEN FOUNDATION i. LOAD CALCULATIONS
  • 21.
  • 22.
  • 23. DESIGN OF PORTAL PIER & OPEN FOUNDATION ii. FORCES CALCULATED AS EXPLAINED ARE APPLIED ON THE IDEALISED STRUCTURE IN STAAD-PRO iii. FROM STAAD,FORCES ARE CALCULATED ON FOUNDATION TOP iv. CRITICAL LOAD CASES ARE MADE FOR DESIGN OF FOOTING
  • 24. DESIGN OF PORTAL PIER & OPEN FOUNDATION x. SIZE OF FOOTING IS CHECKED WITH THE HELP OF LABFIL SOFTWARE (house built software)
  • 25. DESIGN OF PORTAL PIER & OPEN FOUNDATION xi. FOOTING SIZE IS CHECKED FOR BASE PRESSURE xii. FOOTING DEPTH IS CHECKED FOR SHEAR AND REINFORCEMENT IS CALCULATED CORRESSPONDING TO BENDING MOMENT
  • 26. DESIGN OF PORTAL PIER & OPEN FOUNDATION xiii. PIER SHAFTS ARE ALSO DESIGNED BY USING LABFIL SOFTWARE xiv. FORCES ON TOP OF THE PIER ARE CALCULATED FROM STAAD xv. IDEALISATION OF PIER IS MADE AND REINFORCEMENT IS PROVIDED
  • 27. DESIGN OF PORTAL PIER & OPEN FOUNDATION xvi. THEN BY LABFIL , STRESSES ARE WORKED OUT WHICH SHOULD BE LESS THAN PERMISSIBLE.
  • 28.
  • 29.
  • 30.
  • 31. DESIGN OF S/S OF ROB ON INDORE-KHALGHAT SECTION ON NH-3
  • 32. LOAD CALCULATION  DL  SIDL  LL (70R & CLASS A LOADING)
  • 38. CLASS-A MOST ECCENTRIC CLASS-A SYMMETRIC TO G2 CLASS-A TWO LANE CLASS 70R MOST ECCENTRIC
  • 40.
  • 42. ELASTOMERIC BEARING DETAIL te ts H a ti c ti = Thickness of individual layer of elastomer te = Thickness of top/bottom layer of elastomer ts = Thickness of steel laminate c = Side cover H = Total height of bearing a = Dimension parallel o the beam
  • 43. DESIGN OF ELASTOMERIC BEARING (as per UIC: 772-2R) i. MEAN PRESSURE:- Pmax/A(10 to 12MPa) ii. NO SLIP CONDITION • MIN MEAN PRESSURE- Pmin/A > 2MPa • TANGENTIAL FORCE< f*P f- FRICTION COEFFICIENT i. LIMITATION OF DISTORTION T> (TRANSLATION IN LONG. DIRECTION)/0.7
  • 44. DESIGN OF ELASTOMERIC BEARING (as per UIC: 772-2R) iv. NO UPLIFT AT THE EDGE WITH THE LEAST LOAD v. NO BUCKLING CONDITION (depend upon the rubber thickness) a/10≤T≤a/5 vi. SHEAR STRESS SHEAR STRESS DUE TO TANGENTIAL FORCE, NORMAL FORCE & ROTATION < 5 * SHEAR MODULUS
  • 45. DESIGN OF ELASTOMERIC BEARING (as per UIC: 772-2R) vii. STRENGTH OF PLATES :- PLATES SHOULD BE ABLE TO WITHSTAND THE TENSILE FORCES TO WHICH THEY ARE SUBJECTED TO UNDER NORMAL LOADING