1. CURRICULUM VITAE
Name : ALI ROZIKI
Place/Date of Birth : Pemalang, January 04 1971
Martial Status : Married
EDUCATION : Technical High School
Health : Excellence
Address : Jl. A. Yani No. 19 Kraksaan
Probolinggo - Jawa Timur
Religion : Moslem
Nationality : Indonesia
Phone : 081 331 173 573
Email : ali.roziki@yahoo.co.id
RESPONSIBLE DUTIES
As Electrical/Instrument Supervisor
As Electrical/Instrument QA/QC (Inspector)
Job Description
Electrical & Instrument
Fabrication & Installation Electric Instrument Construction, DC Voltage AC Voltage LV-MV-
HV, Grounding System. Termination, installation hook-up instrument, leak test, merger test,
loop test, continuity, calibration of instrument, pressure gauge, transducer, pressure switch,
level switch, control valve, transmitter, temperature switch, thermocouple, control and
analyzers. Electrical Instrument Report, Daily Report, Weekly Report & Commissioning
Dossier.
TRAINING COURSE
Welding Course at BLK Serang – Banten
Electrical Safety Training at Paiton Project
H2S Training, EPF 3 Exxon Mobile Project Bojonegoro East Java
English Course
DCS Operator at Paiton 3 Project
WORK EXPERIENCE
Company : Tri Patra Engineering
Classification : E/I QC Inspector
Period of service : July 2013 to December2014
Location : EPC 1 Banyu urip Project Bojonegoro
Job Responsibility :
Inspection of all electrical, Instrument and material
Incoming as per manufacturing certificate (data sheet)and project specification
Inspection of installed equipment as per approved drawing project specification
And quality specification, inspection of instrument/electrical as per procedure
prepare document
Needed for joint inspection with client ,such as latest revision drawing(Location lay out,
P&ID, Cable schedule & wiring diagram , mark up drawing) ,make the ITR (inspection Test
Report) submit to client to get approved after joint inspection, verify punch list, clear pinch
list Joint inspection with client
2. Company : PT Taiyo Sinar Raya Tecnik
Classification : E/I Quality Control
Period of service : June,2012- July 2013
Location : Cibitung Bekasi
Job Responsibility : Inspection of all electrical, Instrument and material Incoming as per
manufacturing certificate (data sheet) and project specification Inspection of installed
equipment as per approved drawing project specification
And quality specification, inspection of instrument/electrical as per procedur ,prepare
document
Needed for joint inspection with client ,such as latest revision drawing(Location lay out,
P&ID, Cable schedule & wiring diagram , mark up drawing) ,make the ITR (inspection
Test Report) submit to client to get approved after joint inspection, verify punch list, clear
pinch list
Joint inspection with client
Company : PT PAITON ENERGY
Classification : Electrical /Instrument Inspector/Commissioning
Period of service : 02 February 2011 until November 2011 Location
Location : Expansion Project Unit #3 ( 815 MW )East Java
Job Responsibility : Commissioning E/I System, include with Documentation
Dossier, Translate of Drawing Specification as per IEC and Procedure of
Commissioning per System, Review and check Calibration Report & Equipment
Test. Communicated and coordinate with Contractor Consortium with regard to day to day
Inspection activities and other related matter concerning quality control. QC work
Instruction based on contract requirement as per ITP QC procedure
Company : PT. UNITECH
Classification : Electric Supervisor
Period of service : June, 2010 uptoJanuary 2011
Location : Chevron Geotermal Gunung salak Sukabumi West Java
Responsibility : Supervision, Coordination Crews, Setting Panels
Install Partial Discharge for 13,8 Kv Motor include accessory control system
HSE Permit system , and daily report
Company : PT. CITRA PANJI MANUNGGAL
Classification : QC Electric /Instrument
Period of service : April 2009-Desember,25 2009
Location : EPF3-Banyuurip Exxon mobile project Bojonegoro
East Java
Job Responsibility : Reported of actually in site Installation condition as
Following Project Specification, Reported check sheet all E/I equipment, make the
ITR ( Inspection Test Report) submit to client to get approved after joint inspection,
Verify punch list, clear punch list joint inspection with client.
Company : PT. ROTARY ENGINEERING
3. Classification : E & I Technician
Period of Service : November 2008 to Feb, 2009
Location : Oil Tanking Merak Banten
Job Responsibility : Installation of Panels, Cable tray, Pulling Cable, Conduit
setting panels and Install grounding
Company : PT. SINAR MULIA ABADI
Classification : I/E and testing Commissioning
Period of Service : March 2008 up to Sept 2008
Location : Nippon Steel Batam Offshore Service for ConocoPhillips
North Belut WHP-C & WHP-D Development Project
Batam - Kepulauan Riau
Job Responsibility : Inspection, Testing and Reporting, daily report,
Mechanical completion report, ITR all E/I and Punch list report
Company : PT. GRAMA BAZITA ENGINEERING
Classification : Preventive Maintenance Instrument Technician
for PT. RIAU PRIMA ENERGY
Period : February 2007 up to January 2008
Location : Riau Andalan Pulp & Paper
Pangkalan Kerinci, Riau
Job Responsibility : Preventive Maintenance, Trouble Shorting and
Additional work
Company : BABCOCK & WILCOX
Classification : Instrument Commissioning Technician.
Period of Service :April 2005 up to 03 November 2006
Location : PLTU Tanjung Jati B
2 x 660 MW Coal Fired Power Plant Project
Jepara – Central Java
Job Responsibility : As Instrument/ Electrical Technician is responsible for
Monitoring, Checking, and control of instrument calibration Field Testing/Loop and
Commissioning activities work turbine generator, Boiler, Compressor activities.
Performed was Pre-Commissioning, and reporting to E/I Supervisor
Company : PT. TOYO ENGINEERING COORPORATION
Classification : Electrical Commissioning
Period of Service : January 1998 to April 2000
Location : Paiton Private Power Plant Project Phase 1
Paiton – East Java
Job Responsibility : Assist Electrical Commissioning
Company : PT. TECHNO ALPHA PRIMA
Classification : Electrical Commissioning
4. Period of Service : November 1995 to December 1997
Location : Paiton Private Power Plant Project Phase 1
Paiton – East Java
Job Responsibility : Supporting Commissioning activity
Company : PT. TECHNO FRONTIER
Classification : E & I Technician
Period of Service : Aug 1993 to March 1995
Location : Candra Asri Petro Chemical Project
Anyer – Banten
Job Responsibility : Supporting Commissioning activity
DECLARATION
I declare that all above information are valid and based on my knowledge and experience for
many years dealing with those works.
Best Regard,
Ali Roziki