Occupational Safety and Health Act
1994 (OSHA)
The Occupational Safety and
Health Act 1994 (Act 514) is a
piece of Malaysian legislation
which has been gazetted on the
25 February 1994 by the
Malaysian Parliament.
The Occupational Safety andThe Occupational Safety and
Health Act 1994Health Act 1994
 PART I PRELIMINARY
 PART II APPOINTMENT OF OFFICERS
 PART III NATIONAL COUNCIL FOR OCCUPATIONAL
SAFETY AND HEALTH
 PART IV GENERAL DUTIES OF EMPLOYERS AND SELF-
EMPLOYED PERSONS
 PART V GENERAL DUTIES OF DESIGNERS,
MANUFACTURER AND SUPLIERS
 PART VI GENERAL DUTIES OF EMPLOYERS
 PART VII SAFETY AND HEALTH ORGANISATIONS
 PART VIII NOTIFICATION OF ACCIDENTS, DANGEROUS
OCCURRENCE, OCCUPATIONAL POISONING AND
OCCUPATIONAL DISEASES AND INQUIRY
OSHA 1994 (ACT 514)
- Contents (Continued)
 PART IX PROHIBITION AGAINST USE OF PLANT OR
SUBSTANCE
 PART X INDUSTRY CODES OF PRACTICE
 PART XI EFORCEMENT AND INVESTIGATION
 PART XII LIABILITY FOR OFFENCES
 PART XIII APPEALS
 PART XVI REGULATIONS
 PART XV MICELLANEOUS
First Schedule (OSHA)
 Manufacturing
 Mining and Quarrying
 Construction
 Agriculture, Forestry and Fishing
 Utilities:
 Electricity;
 Gas;
 Water; and
 Sanitary Services
First Schedule (OSHA)-contd.
 Transport, Storage and Communication
 Wholesale and Retail Trades
 Hotel and Restaurants
 Finance, Insurance, Real Estate and
Business Services
 Public Services and Statutory Authorities
The Factory and Machinery Act
1967 (Act 139) is a piece of
Malaysian legislation which was
enacted in 1967 as Act No. 64 of
1967 and revised on April 1, 1974 as
Laws of Malaysia Act 139. The Act
was gazette on February 1, 1970.
TheThe Factory and MachineryFactory and Machinery
Act 1967Act 1967
The Factory and Machinery
Act 1967
The principle of the act is "An Act to
provide for the control of factories
with respect to matters relating to
the safety, health and welfare of
person therein, the registration and
inspection of the machinery and for
matters connected therewith".
The Factory and Machinery
Act 1967
The jurisdiction of the Act only
covers less than 20 percent of all
working areas in Malaysia, the
Malaysia government has enacted
the
Occupational Safety and Health Act 1994
which covers almost all areas of
work within Malaysia.
The list of regulations under this Act are:
 1. Occupational Safety and Health (Employers'
Safety and Health General Policy Statements)
(Exception) Regulations 1995
 2. Occupational Safety and Health (Control of
Industry Major Accident Hazards) Regulations 1996
 3. Occupational Safety and Health (Safety and Health
Committee) Regulations 1996
 4. Occupational Safety and Health (Classification,
Packaging and Labelling of Hazardous Chemicals)
Regulations 1997
The list of regulations under this Act are:
 5. Occupational Safety and Heath (Safety and Health
Officer) Regulations 1997
 6. Occupational Safety and Health (Prohibition of Use
of Substance) Order 1999
 7. Occupational Safety and Health (Use and
Standards of Exposure of Chemicals Hazardous to
Health) Regulations 2000
 8. Occupational Safety and Health (Notification of
Accident, Dangerous Occurrence, Occupational
Poisoning and Occupational Disease) Regulation
2004
The Occupational Safety and
Health Act 1994
The principle of the Act is "An Act to
make further provision for securing that
safety, health and welfare of persons at
work, for protecting others against risks
to safety or health in connection with the
activities of persons at work, to establish
the
National Council for Occupational Safety and H
and for matters connected therewith"
Part I - Interpretation.
Section 3
“Contract of service” – any agreement whether in oral or in writing and
whether express or implied, whereby one person agrees to employ another
as an employee and that other agrees to serve his employer as an
employee and includes an apprenticeship contract.
“Council” – the National Council for Occupational Safety and Health
established under Section 8.
“Industry” – the public services, statutory authorities or any of the
economic activities listed in the First Schedule.
“Employer” – means the immediate employer or the principal employer
or both.
“Occupier” – in relation to a place of work, means a person who has the
management or control the place of work.
“Place of work” – means premises where persons work or premises
used for the storage of plant or substance.
Part I - Interpretation - continued
Section 3
“Premises” – includes any land, building or part of any building; any
vehicle, vessel or aircraft; any installation on land, offshore installation or
other installation whether on the bed of or floating on any water and any
tent or moveable structure.
“Self-employed person” –an individual who works for gain or reward
otherwise than under a contract of employment or not he himself employs
others.
“Plant” – includes any machinery, equipment, appliance, implement or
tool, any component thereof and anything fitted, connected or appurtenant .
“Substance” –any natural or artificial subtance whether in solid or liquid
form or in the form of a gas and vapour or any combination.
“Trade union” – any association or combination of workmen or
employers within the meaning of the Trade Unions Act 1959.
Part I - Objectives of the Act.
Section 4 – Objects of the Act:-
To ensure the safety, health and welfare of persons
at work.
To protect person at a place of work other than
persons at work.
To promote an occupational environment for persons
at work which is adapted to their physiological and
psychological needs.
To provide the means towards a system of
regulations and approved industry codes of practice.
Part IV: General Duties of Employers and
Self-Employed Persons
 Section 15 – As far as practicable
 (1) Ensure the safety, health and welfare of all workers while at
work
 (2) This includes:
 a) Making arrangements and maintenance of plants and
work system
 b) Making arrangements for the use, handling, storage
and transportation of the plant and substances (materials).
 c) Provision of information, instruction, training and
supervision.
 d) Provide and maintain workplace / access routes to and
from work areas.
 e) Provide and maintain work environment with adequate
welfare facilities.
Part IV - Worker Interpretation
 Section 15 – Additional Provision.
 Includes: Independent contractor engaged by an
employer or a self employed person and any
employees of the independent contractor.
Part IV: General Duties of Employers and
Self-Employed Persons
 Other duties
 Section 16 - Formulate a written Safety and Health Policy
 Section 17(1) - Conduct operations without endangering
the safety of others – non-workers and public.
 Section 17(2) - Provide information to others on business
operations.
 Section 18 - An occupier of non-domestic premises shall
take measures to ensure that the place of work is/are safe
and without risks to health to the persons other than his
employees.
 Section 19 – A person who contravenes the above section
shall be guilty of an offence and shall on conviction be
liable to fine not exceeding RM 50K or imprisonment for a
term not exceeding 2 years or to both.
Part IV: General Duties of Employers and
Self-Employed Persons
 Importance of a Safety and Health Policy
 Long term objective
 Continuous commitment at all levels of management.
 Delegation of task at lower management levels.
Part IV: General Duties of Employers and
Self-Employed Persons
 Safety and Health Policy - Statement of intent
 Safety must be given priority in all daily work activities.
 Safety is to be integrated into all daily work activities.
 Safety of workers and others (visitors, guests, outsiders)
are of utmost priority.
 The company will do anything in its power to avoid and
prevent accidents.
Part VI: General Duties of Employees
 Section 24
 Ensure personal safety and that of others.
 Cooperate with employer and others.
 Properly wear and /or use personal protective
equipments that are provided.
 Comply to any safety instructions.
Part VI: General Duties of Employees
 Section 25
 An Employee:
 Who intentionally, recklessly or negligently interfere
of misuse anything provided or done in the interest of
safety, health and welfare in pursuance of the Act
shall be guilty of an offence.
Part VI: General Duties of Employees
 Section 26
 The employer may not charge employees for things done
or provided in pursuance of this Act.
 Section 27
 Employer /Trade Union may not discriminate – dismiss,
injure or change position of any employee who makes
complaint that he is not safe or is risk to health and also
exercises his functions as a member of the Safety and
Health Committee.
Part VII - Safety and Health Officer
 Section 29
 Specific industries gazzetted.
 Employ a competent person to act as a safety and
health officer.
 Specific responsibilities to ensure compliance to the
Act and promotion of safe work.
 Qualification and training requirements.
Part VII - Safety and Health Committee
 Section 30
 To be established if:
 There are 40 or more workers.
 Instructed by Director General
 Membership, selection and appointment as prescribed.
 Consultation with employer
Safety and Health Committee Functions
 Section 31
 To review all safety and health measures that have
been taken.
 Investigate issues concerning occupational safety and
health and bring to attention of employer.
 Other functions may be determined.
Part VIII: Notification of accidents, dangerous
occurrence, occupational poisoning
& diseases & inquiry.
 Section 32
 Employers to inform the nearest Department of
Safety and Health office (DOSH).
 Registered Medical Practitioners should report to the
Director General.
DURING YOUR PRACTICE
29
OUTLINE OF PRESENTATIONOUTLINE OF PRESENTATION
CIDB
30
CIDB
31
1. Excavation is man-made cut, cavity, trench or
depression in the earth’s surface formed by earth
removal.
2. A trench is a narrow underground excavation that
is deeper than it is width.
3. Excavations present a range of particular –
stability of the soil, the proximity of underground
services or the presence of water.
INTRODUCTION :INTRODUCTION :
CIDB
32
INTRODUCTION :INTRODUCTION :
4. Factor affecting stability:-
 Large load
 Insufficient shoring
 Vibration
 High water table.
CIDB
33
1. Collapse of side – lack of or inadequate or weak
shoring.
2. Workers falling into excavation – lack of barriers
or inadequate fencing.
3. Asphyxiation – exhaust gases from plant,
machinery and other work process collected at
the bottom of excavation.
4. Falling of spoil placed at the edge of excavation.
5. Failure to maintain shoring/support system.
POTENTIAL HAZARDS :POTENTIAL HAZARDS :
CIDB
34
1.1. Prior to commencing work:-Prior to commencing work:-
a.a. All the underground services have been located andAll the underground services have been located and
marked.marked.
b.b. Arrangements for sloping/benching.Arrangements for sloping/benching.
c.c. An adequate supply of suitable.An adequate supply of suitable.
d.d. Safe method is used for putting in and taking outSafe method is used for putting in and taking out
support system.support system.
CONTROL MEASURES:CONTROL MEASURES:
CIDB
35
Sloping & Benching
CONTROL MEASURES:CONTROL MEASURES:
Shoring
Box shoring
CIDB
36
2. The excavation should be inspected daily2. The excavation should be inspected daily
3.Thoroughly examined after explosives haveThoroughly examined after explosives have
been used, after unexpected falls of materials orbeen used, after unexpected falls of materials or
adverse weather condition .adverse weather condition .
CONTROL MEASURES:CONTROL MEASURES:
CIDB
37
Safe access/igressSafe access/igress
CONTROL MEASURES:CONTROL MEASURES:
Edge protectionEdge protection
Stability of adjacentStability of adjacent
structurestructure
Underground waterUnderground water
Protection against floodProtection against flood
Location of imposedLocation of imposed
loadsloads
CIDB
38
CIDB
39
INTRODUCTION:INTRODUCTION:
 To achieve proper
support of structures
are distribution of
structural loads to
foundations.
 The intensity of the
loads transferred will
not cause shear
failure or settlement.
CIDB
40
HAZARDS:HAZARDS:
 Collapse of pile
driving equipment.
 Loss of loads- pile
being hoisted.
 Workers being
crushed by loads.
 Collapse of
kentledge during load
test.
 Noise.
CIDB
41
CONTROL MEASURES:CONTROL MEASURES:
 Pile driver/rig – operated by
competent operator (well
trained and experienced
personnel.
 All equipment to be inspected
daily prior to commencement
of work.
 Thoroughly examined by
approved person at least
once in 12 months.
 Safety clothing including hard
hats, safety shoes, safety
glasses and hearing
protection.
CIDB
42
CONTROL MEASURES:CONTROL MEASURES:
 Designated person – in-
charge of the work and
personally direct and give
the operating signals.
 If any operating
abnormalities are observed,
the hammer should be
stopped immediately.
 All personnel should stay
clear of the work area
during operations.
CIDB
43
CONTROL MEASURES:CONTROL MEASURES:
 Designated person should check stability of
kentledge or load before commencing the test.
 Restricted area.
 Only authorized personnel to enter for taking
test readings.
 Move out as soon as possible after taking the
readings.
 Fire extinguishers & first aid box must be kept
available at all times.
CIDB
44
CIDB
45
INTRODUCTION:INTRODUCTION:
 The term “service” means all
underground electricity, gas,
water, sewer pipes,
telecommunications plant and
liquid petroleum services and
oil pipelines.
 If does not include
underground structures such
as brick sewers, railway
tunnels, etc.
CIDB
46
HAZARDS:HAZARDS:
1. Electrical Cables
 Damage to live
electricity cables.
 Fatal burns to the
hands, face and
body.
 Direct electric shock
is rare but not
impossible.
CIDB
47
HAZARDS:HAZARDS:
2. Gas Lines
 Damage which causes
an immediate escape of
toxic gas.
 Damage which causes
an escape some time
later.
CIDB
48
HAZARDS:HAZARDS:
3. Water Pipes & Sewer
Lines
 Damage to water pipes
could wash away subsoil
and reduce the support for
adjacent services, highways
and structures.
 Further dangers-risks of
flooding.
 The main danger from
damage to a sewer is the
possibility of contamination.
CIDB
49
CONTROL MEASURES:CONTROL MEASURES:
1. Planning
 Obtained pertinent information
before excavation work starts.
 Indications that buried services
exist such as the presence of
street lights, illuminated traffic
signs, valve pit covers etc.
 However the absence of such
indications does not
necessarily mean that there are
no buried services.
CIDB
50
CONTROL MEASURES:CONTROL MEASURES:
2. Cables & Pipe Locating
Devices
 Use suitable cable and pipe
locating devices.
 Location plan- to determine
as accurately as possible the
position of traceable
underground services in or
near the proposed work
area.
CIDB
51
CONTROL MEASURES:CONTROL MEASURES:
3. Safe Digging
Practices
 Start with trial holes.
 Start digging by using
hang tools as necessary
to confirm the position of
any buried services.
 If any service is found, it
should be assumed to
be live until proved
otherwise.
CIDB
52
CONTROL MEASURES:CONTROL MEASURES:
 Obtain written confirmation of disconnection from the service
owner before removing a redundant service.
 Services uncovered in an excavation may need to be
supported.
 If the underground services have been found to be too
shallow/the plans or other information have proved to be
inaccurate, informed owners before backfilled.
 If a underground service suffers damage, informed the owner
should immediately.
 In the case of electrical cables, gas pipes or high pressure
water mains, arrangements made to keep people well clear of
the area until it has been repaired or otherwise made safe by
the owner.
CIDB
53
CIDB
CIDB
54
Collapses of formwork has the potential for
severe injury and death.
INTRODUCTIONINTRODUCTION
CIDB
55
1. Erection of Falsework
Collapse due to poor design or poor erection (not
complying with approved design and drawings.
Poor access – slips and falls, abrasions, strains and
sprains.
Fall from the edge of floor/opening.
Manual handling- Strains and sprains; injuries such
as back damage while handling and fixing falsework.
HAZARDSHAZARDS
CIDB
56
2. Fixing Steel Reinforcement.
 Poor access – slips and falls,
abrasions, strains and sprains.
 Inadequate edge/opening - fall from
the edge of floor/opening.
 Manual handling- Strains and
sprains; injuries such as back
damage while handling and fixing
reinforcement bars.
 Sharp edges- Cuts from
reinforcement bar ends or tie wire.
HAZARDSHAZARDS
CIDB
57
3. Pouring/Placing of Concrete.
 Poor access – slips and falls,
abrasions, strains and sprains.
 Inadequate opening/opening
protection – fall from the edge of
floor/opening.
 Violent ejection of concrete from
bucket/hose at first moment of
delivery-falls onto the floor or off the
edge of the floor.
 Walking on wet floor-Slip on wet
formwork or reinforcement and fall;
trip or twist ankle.
HAZARDSHAZARDS
CIDB
58
 Wet concrete-splashes into the eyes.
 Noise from operating machineries-
hearing damage from continuous
noise over a long period.
 Vibration-muscoskeletal
disorder/white fingers from using of
concrete vibrator for a long period.
 Skin/eye contact with concrete-skin
rash or allergy/dermatitis; concrete
splashed in eye.
HAZARDSHAZARDS
CIDB
59
4. Striking-off
Falsework.
 Poor communication-
collapse of structure due
to premature dismantling
of falsework.
 Dismantling not done in
sequence-hit or struck
by falling falsework
components.
 Poor housekeeping-slip,
trip or twist ankle.
HAZARDSHAZARDS
CIDB
60
1. Planning.
 What needs to be supported and how it should be done?
 How long the falsework will be in use?
 Appointment of competent designated person.
 Competent and adequately trained machine operators.
2. Design.
 Significant falsework structures should be designed by a
competent person to ensure adequate stability, strength
and stiffness.
CONTROL MEASURESCONTROL MEASURES
CIDB
61
3. Materials – Falsework should be constructed or adapted
so as to be suitable for the purpose for which it is used.
 It should be strong enough and stable in use.
 Damaged components should not be used.
4. Erection of Falsework.
 Before erection-risk assessment should be carried out and a
safe system of work developed.
 Approved method statement-read and understand by those
doing the work.
 Falsework should be stable at all stages of erection and be
regularly checked.
 Only “Approved working drawings” should be used.
CONTROL MEASURESCONTROL MEASURES
CIDB
62
5. Pouring/Placing Concrete
 Safe access must be provided.
 Falsework and formwork have
been inspected and approved
for concreting work.
 Concrete should not be poured
too rapidly or from such a height
as to overload the
formwork/falsework.
 When using crane-competent
operator and trained signalman.
CONTROL MEASURESCONTROL MEASURES
CIDB
63
5. Pouring/Placing Concrete
 Concrete spillage should not be
allowed to accumulate on
falsework.
 All workers handling cement and
concrete should wear suitable
eye protection, gloves and
rubber boots.
 In the use of vibrators care must
be taken that form ties are not
broken.
 Vibrator motors on elevated
platform should be firmly
secured.
CONTROL MEASURESCONTROL MEASURES
CIDB
64
6. Striking-off Falsework
 The designated person should agree
the time of striking.
 A written permit-to-strike procedure is
strongly recommended.
 A striking sequence should be
established and followed.
 Suitable temporary platforms must be
provided for workers carrying out
dismantling works.
 Loose fittings and materials should
be removed before dismantling
begins.
CONTROL MEASURESCONTROL MEASURES
CIDB
65
6. Striking-off Falsework
 Dismantled materials should be
placed directly into storage areas.
 Materials sticking into concrete and
liable to fall should be removed as
work proceeds.
 Projecting nails must be removed or
hammered down .
 Suitable nets should be fixed where
necessary to prevent or control the
fall of materials.
 Openings must be securely covered
or guarded.
 Debris should be cleared as work
proceeds.
CONTROL MEASURESCONTROL MEASURES
66
CIDB
67
INTRODUCTION:INTRODUCTION:
 Factories & Machinery (Safety, Health &
Welfare) Regulations 1970 defined working
at height as……
“any work platform at a place from
which the worker will be liable to fall a
distant of more than 3.0m”
CIDB
68
HAZARDS:HAZARDS:
 1. Collapse of temporary structures.
 2. Fall of workers.
 3. Fall of materials/objects.
CIDB
69
CONTROL MEASURES:CONTROL MEASURES:
1. Temporary work platforms.
a. Scaffolding.
 Designed, erected, altered and dismantled in
accordance to Part X, Factories & Machinery
(Building Operations & Works of Engineering
Construction) (Safety), Regulation 1986.
 Inspected scaffolds by competent person at every
7 days interval upon completion of erection and
after every bad weather.
CIDB
70
CONTROL MEASURES:CONTROL MEASURES:
1. Temporary work platforms.
a. Scaffolding (continued).
 Stable-If necessary should be secured to the
building/structure.
 Checked for clearances from nearby power-lines prior to
its erection.
 Mobile scaffold-castor wheel locked.
 Mobile scaffold-traveling path of clear off electrical and
other hazards.
b. Working platform and access platform must have full
edge protection comprising handrail, mid-rail and toe-
board.
CIDB
71
CONTROL MEASURES:CONTROL MEASURES:
2. Elevated Working Platform (EWPs)
 Risk assessment-identify EWP is
appropriate for the intended work.
 EWPs must be operated by properly
trained operator.
 Self-propelled EWPs-firm level
surfaces.
 Person working on EWP-wear fall
arrest device connected anchor point
in basket.
 The EWP should be left in a properly
stowed safe configuration whether it is
unattended.
CIDB
72
CONTROL MEASURES:CONTROL MEASURES:
3. Guardrails.
 Adequate strength to withstand the impact of
a person falling against them.
 In place prior to any work commencing and
should not be removed until all work is
complete.
4. Falling Materials/Objects
 Provide a safe means of raising and lowering
plant, materials and debris in the place of
work.
 Personal protective equipment to minimize
the risk associated with falling objects.
 Secure physical barrier to prevent objects
falling freely from buildings.
CIDB
73
CIDB
74
INTRODUCTION:INTRODUCTION:
1. “Confined space” is a space which:-
 is not intended as a regular workplace.
 Has restricted means of entry or exit.
 Is large enough and so configured that an
employee can bodily enter and perform
assigned work.
 Is at atmospheric pressure during occupancy.
CIDB
75
INTRODUCTION:INTRODUCTION:
2. In addition this space has at least one of these
characteristics:-
 It contains or has a potential to contain a hazardous
atmosphere.
 It contains material (solid or fluid) that has potential
engulfing an entrant.
 It has internal configuration such that an entrant could
be trapped or asphyxiated by inwardly converging
walls or by a floor which slopes downward and taper to
a smaller cross-section.
 It contains any other recognised serious safety or
health hazards for example rotors.
CIDB
76
INTRODUCTION:INTRODUCTION:
3. Examples:-
 Septic tanks, manholes and sumps.
 Basement.
 Trenches, pipes, ducts and tunnels.
CIDB
77
HAZARDS:HAZARDS:
 Manholes, tunnels, trenches set in chalk soil – party fill
with carbon dioxide gas, displacing breathable air.
 Manholes in contaminated ground – poisonous or
flammable gases (e.g. near underground petrol tanks).
 Manholes, pits or trenches connected to sewer –
flammable and/or poisonous gases and/or insufficient
oxygen in the air.
CIDB
78
CONTROL MEASURES:CONTROL MEASURES:
 Test shows presence of
dangerous air- NO ENTRY.
 Before entry – test to
determine levels of oxygen
present, and NO dangerous
amounts of flammable and/or
poisonous gases.
 Unsafe atmosphere –
appropriate RPE to be
provided.
CIDB
79
CONTROL MEASURES:CONTROL MEASURES:
 Entrants – training and instruction in the precautions to be
taken inside the area.
 Adopt permit-to-work system.
 Stand-by person-stationed outside the space to keep watch
and communicate with anyone inside.
 Rescue harnesses should be worn by all those inside the
confined space.
 Rescue procedures should be included in the training of
workers.
 Rescue equipment including emergency breathing apparatus
should be available near the entrance at all times.
 No attempt should ever be made to clear fumes or gases with
pure oxygen.
CIDB
80
CIDB
81
INTRODUCTION:INTRODUCTION:
1. Hand Tools.
 Hand tools are non-powered.
 They include anything from
axes to wrenches.
2. Power Tools
 They are several types of
power tools based on the
power source they use; electric
pneumatic, liquid fuel, hydraulic
and power-actuated.
CIDB
82
HAZARDS:HAZARDS:
1. Hand Tools – Some Examples.
 Using a screwdriver as a chisel-tip of the screwdriver to
break and fly, hitting the user or other employees.
 If a wooden handle on a tool such as a hammer or an axe is
loose, splintered or cracked-head of tool-fly off and strike the
user or another worker.
Sledge
hammer
CIDB
83
HAZARDS:HAZARDS:
2. Power Tools – Some
Examples:
 Electric-powered tools-burns and
slight shocks-lead to injuries or
even heart failure.
 Powered abrasive grinding,
cutting, polishing and wire buffing
wheels – may throw off flying
fragments.
 Pneumatic tools – hit by one of
the tool’s attachments.
CIDB
84
CONTROL MEASURES:CONTROL MEASURES:
1. Hand Tools.
 Select the right tools for the right jobs.
 Examine every tool before each use – equipment so worn or
damaged should be repaired or removed from service.
 Caution employees that saw blades, knives or other tools be
directed away from aisle areas and other employees working in
close proximity.
 Cutting tools must be sharp.
 Appropriate PPE e.g. safety goggles, gloves etc. should be worn
due to hazards that may be encountered while using hand tools.
 Floors be kept as clean and dry as possible to prevent
accidental slips with or around dangerous hand tools.
CIDB
85
CONTROL MEASURES:CONTROL MEASURES:
2. Power Tools.
 Never carry a tool by cord or hose.
 Never yank the cord or the hose to disconnect it from the
receptacle.
 Keep cords and hoses away from heat, oil and sharp edges.
 Disconnect tools when not in use, before servicing and when
changing accessories such as blades, bits and cutters.
 Secure work with clamps or a vice freeing both hands to operate
the tool.
 Avoid accidental starting. The worker should not hold a finger on
the switch button while carrying a plugged-in tool.
CIDB
86
CONTROL MEASURES:CONTROL MEASURES:
2. Power Tools - continued.
 Tools should be maintained with care.
 Tools should be kept sharp and clean for the best
performance.
 Follow instructions in the user’s manual for lubricating
and changing accessories.
 Be sure to keep good footing and maintain good
balance.
 The proper apparel should be worn – loose clothing,
ties or jewellery can become caught in moving parts.
CIDB
87
CONTROL MEASURES:CONTROL MEASURES:
2. Power Tools - continued.
 All portable electric tools that are
damaged shall be removed from
use and tagged “Do not use”.
 Hazardous moving parts of a
power tool need to be
safeguarded.
 Adopt ‘lock-out tag-out’ system
for maintenance of tools.
CIDB

Contenu connexe

Tendances

Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...Ahmad Nazib
 
Mobile crane legal requirements
Mobile crane  legal requirementsMobile crane  legal requirements
Mobile crane legal requirementsHamat, Mohd Kudzi
 
DUW chapter 1. ppt
DUW chapter 1. pptDUW chapter 1. ppt
DUW chapter 1. pptnamasakina
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Abirami V Veeramani
 
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia BerbahayaKeselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia BerbahayaAhmad Aidil Nasir
 
Occupational Safety and Health Act (OSHA)
Occupational Safety and Health Act (OSHA)Occupational Safety and Health Act (OSHA)
Occupational Safety and Health Act (OSHA)Chuckle Chubb
 
02. occupational safety and health act 1994 (act 514) osha
02. occupational safety and health act 1994 (act 514) osha02. occupational safety and health act 1994 (act 514) osha
02. occupational safety and health act 1994 (act 514) oshaahmadexsan
 
Introduction to osha
Introduction to oshaIntroduction to osha
Introduction to oshafarihahmansor
 
Part i introduction to osh sss duties & tasks (day 1)
Part i   introduction to osh sss duties & tasks (day 1) Part i   introduction to osh sss duties & tasks (day 1)
Part i introduction to osh sss duties & tasks (day 1) mohd shukri
 
Enhancement module lecture 4-fma and regulations
Enhancement module lecture 4-fma and regulationsEnhancement module lecture 4-fma and regulations
Enhancement module lecture 4-fma and regulationsRidzwan Hj Hussain
 
AKTA KESELAMATAN DAN KESIHATAN PEKERJAAN 1994 - AKTA 514
AKTA KESELAMATAN DAN KESIHATAN PEKERJAAN 1994 - AKTA 514AKTA KESELAMATAN DAN KESIHATAN PEKERJAAN 1994 - AKTA 514
AKTA KESELAMATAN DAN KESIHATAN PEKERJAAN 1994 - AKTA 514Muhammad Nasrullah
 
Introduction to occupational safety and health
Introduction to occupational safety and healthIntroduction to occupational safety and health
Introduction to occupational safety and healthPoliteknik Kuching Sarawak
 
OSHA ACT 1994
OSHA ACT 1994 OSHA ACT 1994
OSHA ACT 1994 ppuuthm
 

Tendances (20)

Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
 
Mobile crane legal requirements
Mobile crane  legal requirementsMobile crane  legal requirements
Mobile crane legal requirements
 
DUW chapter 1. ppt
DUW chapter 1. pptDUW chapter 1. ppt
DUW chapter 1. ppt
 
Fma 1967 & the regulations
Fma 1967 & the regulationsFma 1967 & the regulations
Fma 1967 & the regulations
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)
 
NIOSH WPA SHO Paper 4
NIOSH WPA SHO Paper 4 NIOSH WPA SHO Paper 4
NIOSH WPA SHO Paper 4
 
Factories And Machinery Act 1967 Revised 1974 Malaysia
Factories And Machinery Act 1967 Revised 1974 MalaysiaFactories And Machinery Act 1967 Revised 1974 Malaysia
Factories And Machinery Act 1967 Revised 1974 Malaysia
 
Class 4-osha-1994-cdm
Class 4-osha-1994-cdmClass 4-osha-1994-cdm
Class 4-osha-1994-cdm
 
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia BerbahayaKeselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
 
OSH Legislation in Malaysia
OSH Legislation in MalaysiaOSH Legislation in Malaysia
OSH Legislation in Malaysia
 
Osha94
Osha94Osha94
Osha94
 
Occupational Safety and Health Act (OSHA)
Occupational Safety and Health Act (OSHA)Occupational Safety and Health Act (OSHA)
Occupational Safety and Health Act (OSHA)
 
02. occupational safety and health act 1994 (act 514) osha
02. occupational safety and health act 1994 (act 514) osha02. occupational safety and health act 1994 (act 514) osha
02. occupational safety and health act 1994 (act 514) osha
 
Introduction to osha
Introduction to oshaIntroduction to osha
Introduction to osha
 
Part i introduction to osh sss duties & tasks (day 1)
Part i   introduction to osh sss duties & tasks (day 1) Part i   introduction to osh sss duties & tasks (day 1)
Part i introduction to osh sss duties & tasks (day 1)
 
Enhancement module lecture 4-fma and regulations
Enhancement module lecture 4-fma and regulationsEnhancement module lecture 4-fma and regulations
Enhancement module lecture 4-fma and regulations
 
Nadopod
NadopodNadopod
Nadopod
 
AKTA KESELAMATAN DAN KESIHATAN PEKERJAAN 1994 - AKTA 514
AKTA KESELAMATAN DAN KESIHATAN PEKERJAAN 1994 - AKTA 514AKTA KESELAMATAN DAN KESIHATAN PEKERJAAN 1994 - AKTA 514
AKTA KESELAMATAN DAN KESIHATAN PEKERJAAN 1994 - AKTA 514
 
Introduction to occupational safety and health
Introduction to occupational safety and healthIntroduction to occupational safety and health
Introduction to occupational safety and health
 
OSHA ACT 1994
OSHA ACT 1994 OSHA ACT 1994
OSHA ACT 1994
 

En vedette

Clinical management of heat related illness, moh
Clinical management of heat related illness, mohClinical management of heat related illness, moh
Clinical management of heat related illness, mohLee Oi Wah
 
Ceramah 1 pek kpk bil 2 thn 2009
Ceramah 1 pek kpk bil 2 thn 2009Ceramah 1 pek kpk bil 2 thn 2009
Ceramah 1 pek kpk bil 2 thn 2009Lee Oi Wah
 
Basic principle of medicolegal management in emergency department
Basic principle of medicolegal management in emergency departmentBasic principle of medicolegal management in emergency department
Basic principle of medicolegal management in emergency departmentLee Oi Wah
 
Good medical practice 29 mac 2016
Good medical practice 29 mac 2016Good medical practice 29 mac 2016
Good medical practice 29 mac 2016Lee Oi Wah
 
Health and Safety cartoons slideshow!
Health and Safety cartoons slideshow!Health and Safety cartoons slideshow!
Health and Safety cartoons slideshow!Richard Duszczak
 
Slips, Trips, and Falls - Workplace Safety
Slips, Trips, and Falls - Workplace SafetySlips, Trips, and Falls - Workplace Safety
Slips, Trips, and Falls - Workplace Safetycarrollcenter
 
Overview of trauma care team
Overview of trauma care teamOverview of trauma care team
Overview of trauma care teamLee Oi Wah
 
Kepimpinan & penyeliaan berkesan
Kepimpinan & penyeliaan berkesanKepimpinan & penyeliaan berkesan
Kepimpinan & penyeliaan berkesanLee Oi Wah
 
Polisi perkhidmatan rawatan harian
Polisi perkhidmatan rawatan harianPolisi perkhidmatan rawatan harian
Polisi perkhidmatan rawatan harianLee Oi Wah
 
Niosh[1]
Niosh[1]Niosh[1]
Niosh[1]zahrim
 
Hospital fire prevention & evacuation –who guideline
Hospital fire prevention & evacuation –who guidelineHospital fire prevention & evacuation –who guideline
Hospital fire prevention & evacuation –who guidelineLee Oi Wah
 
Amalan hijau dalam eksa
Amalan hijau dalam eksaAmalan hijau dalam eksa
Amalan hijau dalam eksaLee Oi Wah
 
Akta keselamatan dan kesihatan perkerjaan 1994
Akta keselamatan dan kesihatan perkerjaan 1994Akta keselamatan dan kesihatan perkerjaan 1994
Akta keselamatan dan kesihatan perkerjaan 1994Tengkurex
 
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy settingSenarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy settingLee Oi Wah
 
Keselamatan & kesihatan pekerjaan
Keselamatan & kesihatan pekerjaanKeselamatan & kesihatan pekerjaan
Keselamatan & kesihatan pekerjaanHukaida Hamzah
 
Borang pemantauan
Borang pemantauanBorang pemantauan
Borang pemantauanTING Hua
 

En vedette (20)

Clinical management of heat related illness, moh
Clinical management of heat related illness, mohClinical management of heat related illness, moh
Clinical management of heat related illness, moh
 
Ceramah 1 pek kpk bil 2 thn 2009
Ceramah 1 pek kpk bil 2 thn 2009Ceramah 1 pek kpk bil 2 thn 2009
Ceramah 1 pek kpk bil 2 thn 2009
 
Basic principle of medicolegal management in emergency department
Basic principle of medicolegal management in emergency departmentBasic principle of medicolegal management in emergency department
Basic principle of medicolegal management in emergency department
 
Ppt for ohca
Ppt for ohcaPpt for ohca
Ppt for ohca
 
Good medical practice 29 mac 2016
Good medical practice 29 mac 2016Good medical practice 29 mac 2016
Good medical practice 29 mac 2016
 
Health and Safety cartoons slideshow!
Health and Safety cartoons slideshow!Health and Safety cartoons slideshow!
Health and Safety cartoons slideshow!
 
Arahan mkn 18
Arahan mkn 18Arahan mkn 18
Arahan mkn 18
 
Slips, Trips, and Falls - Workplace Safety
Slips, Trips, and Falls - Workplace SafetySlips, Trips, and Falls - Workplace Safety
Slips, Trips, and Falls - Workplace Safety
 
Overview of trauma care team
Overview of trauma care teamOverview of trauma care team
Overview of trauma care team
 
Arahan mkn 20
Arahan mkn 20Arahan mkn 20
Arahan mkn 20
 
Kepimpinan & penyeliaan berkesan
Kepimpinan & penyeliaan berkesanKepimpinan & penyeliaan berkesan
Kepimpinan & penyeliaan berkesan
 
Polisi perkhidmatan rawatan harian
Polisi perkhidmatan rawatan harianPolisi perkhidmatan rawatan harian
Polisi perkhidmatan rawatan harian
 
Niosh[1]
Niosh[1]Niosh[1]
Niosh[1]
 
Hospital fire prevention & evacuation –who guideline
Hospital fire prevention & evacuation –who guidelineHospital fire prevention & evacuation –who guideline
Hospital fire prevention & evacuation –who guideline
 
Amalan hijau dalam eksa
Amalan hijau dalam eksaAmalan hijau dalam eksa
Amalan hijau dalam eksa
 
Akta keselamatan dan kesihatan perkerjaan 1994
Akta keselamatan dan kesihatan perkerjaan 1994Akta keselamatan dan kesihatan perkerjaan 1994
Akta keselamatan dan kesihatan perkerjaan 1994
 
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy settingSenarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
 
Keselamatan & kesihatan pekerjaan
Keselamatan & kesihatan pekerjaanKeselamatan & kesihatan pekerjaan
Keselamatan & kesihatan pekerjaan
 
Borang pemantauan
Borang pemantauanBorang pemantauan
Borang pemantauan
 
Contoh senarai semak
Contoh senarai semakContoh senarai semak
Contoh senarai semak
 

Similaire à Topic 1 continue osha acts_need to bring

P.s.menon health & safety
P.s.menon health & safetyP.s.menon health & safety
P.s.menon health & safetyspoonthottam
 
Health & Safety at Work Etc. Act 1974.ppt
Health & Safety at Work Etc. Act 1974.pptHealth & Safety at Work Etc. Act 1974.ppt
Health & Safety at Work Etc. Act 1974.ppthammad295273
 
D Part 9 H & S Regs Revision By J Mc Cann
D  Part 9 H & S Regs Revision By J Mc CannD  Part 9 H & S Regs Revision By J Mc Cann
D Part 9 H & S Regs Revision By J Mc CannJames McCann
 
D Part 9 H & S Regs By J Mc Cann
D  Part 9 H & S Regs  By J Mc CannD  Part 9 H & S Regs  By J Mc Cann
D Part 9 H & S Regs By J Mc CannJames McCann
 
D Part 9 H & S Regs By J Mc Cann
D  Part 9 H & S Regs  By J Mc CannD  Part 9 H & S Regs  By J Mc Cann
D Part 9 H & S Regs By J Mc Cannguest2dac56
 
Act-514-Occupational-Safety-and-Health-OSHA-1994.pdf
Act-514-Occupational-Safety-and-Health-OSHA-1994.pdfAct-514-Occupational-Safety-and-Health-OSHA-1994.pdf
Act-514-Occupational-Safety-and-Health-OSHA-1994.pdfjohnisbbrich
 
Working Safely in an Engineering Environment
Working Safely in an Engineering EnvironmentWorking Safely in an Engineering Environment
Working Safely in an Engineering EnvironmentReece Hancock
 
Operationalization of the Worker's right to work in a safe and Healthy enviro...
Operationalization of the Worker's right to work in a safe and Healthy enviro...Operationalization of the Worker's right to work in a safe and Healthy enviro...
Operationalization of the Worker's right to work in a safe and Healthy enviro...Muhumuza2014
 
Guideline dosh garispanduan2006bi
Guideline dosh garispanduan2006biGuideline dosh garispanduan2006bi
Guideline dosh garispanduan2006biAli_kamal
 
Health, Safety and Welfare for Construction and the built Enviro.docx
Health, Safety and Welfare for Construction and the built Enviro.docxHealth, Safety and Welfare for Construction and the built Enviro.docx
Health, Safety and Welfare for Construction and the built Enviro.docxpooleavelina
 
Safety individual final
Safety individual finalSafety individual final
Safety individual finalKailyn Lee
 
Overview OSH Act-1 of 2004.pptx
Overview OSH Act-1 of 2004.pptxOverview OSH Act-1 of 2004.pptx
Overview OSH Act-1 of 2004.pptxKaylaCox14
 
Safety Management in the Hospitality Sector.pptx
Safety Management in the Hospitality Sector.pptxSafety Management in the Hospitality Sector.pptx
Safety Management in the Hospitality Sector.pptxSivasubramaniam Subramanian
 
Factories act, 1948
Factories act, 1948Factories act, 1948
Factories act, 1948Humsi Singh
 

Similaire à Topic 1 continue osha acts_need to bring (20)

Occupational Safety And Health Act 1994 Malaysia
Occupational Safety And Health Act 1994 MalaysiaOccupational Safety And Health Act 1994 Malaysia
Occupational Safety And Health Act 1994 Malaysia
 
P.s.menon health & safety
P.s.menon health & safetyP.s.menon health & safety
P.s.menon health & safety
 
Health & Safety at Work Etc. Act 1974.ppt
Health & Safety at Work Etc. Act 1974.pptHealth & Safety at Work Etc. Act 1974.ppt
Health & Safety at Work Etc. Act 1974.ppt
 
D Part 9 H & S Regs Revision By J Mc Cann
D  Part 9 H & S Regs Revision By J Mc CannD  Part 9 H & S Regs Revision By J Mc Cann
D Part 9 H & S Regs Revision By J Mc Cann
 
D Part 9 H & S Regs By J Mc Cann
D  Part 9 H & S Regs  By J Mc CannD  Part 9 H & S Regs  By J Mc Cann
D Part 9 H & S Regs By J Mc Cann
 
D Part 9 H & S Regs By J Mc Cann
D  Part 9 H & S Regs  By J Mc CannD  Part 9 H & S Regs  By J Mc Cann
D Part 9 H & S Regs By J Mc Cann
 
Occupational Safety And Health Act 1994.ppt
Occupational Safety And Health Act 1994.pptOccupational Safety And Health Act 1994.ppt
Occupational Safety And Health Act 1994.ppt
 
LAWS OF MALAYSIA
LAWS OF MALAYSIALAWS OF MALAYSIA
LAWS OF MALAYSIA
 
Act-514-Occupational-Safety-and-Health-OSHA-1994.pdf
Act-514-Occupational-Safety-and-Health-OSHA-1994.pdfAct-514-Occupational-Safety-and-Health-OSHA-1994.pdf
Act-514-Occupational-Safety-and-Health-OSHA-1994.pdf
 
Working Safely in an Engineering Environment
Working Safely in an Engineering EnvironmentWorking Safely in an Engineering Environment
Working Safely in an Engineering Environment
 
OSHA 1994
OSHA 1994OSHA 1994
OSHA 1994
 
Operationalization of the Worker's right to work in a safe and Healthy enviro...
Operationalization of the Worker's right to work in a safe and Healthy enviro...Operationalization of the Worker's right to work in a safe and Healthy enviro...
Operationalization of the Worker's right to work in a safe and Healthy enviro...
 
Guideline dosh garispanduan2006bi
Guideline dosh garispanduan2006biGuideline dosh garispanduan2006bi
Guideline dosh garispanduan2006bi
 
Health, Safety and Welfare for Construction and the built Enviro.docx
Health, Safety and Welfare for Construction and the built Enviro.docxHealth, Safety and Welfare for Construction and the built Enviro.docx
Health, Safety and Welfare for Construction and the built Enviro.docx
 
Safety individual final
Safety individual finalSafety individual final
Safety individual final
 
Overview OSH Act-1 of 2004.pptx
Overview OSH Act-1 of 2004.pptxOverview OSH Act-1 of 2004.pptx
Overview OSH Act-1 of 2004.pptx
 
intro to OSHA
intro to OSHAintro to OSHA
intro to OSHA
 
Safety Management in the Hospitality Sector.pptx
Safety Management in the Hospitality Sector.pptxSafety Management in the Hospitality Sector.pptx
Safety Management in the Hospitality Sector.pptx
 
factories act 1948
factories act 1948factories act 1948
factories act 1948
 
Factories act, 1948
Factories act, 1948Factories act, 1948
Factories act, 1948
 

Plus de Ali_kamal

Class notes topic 5
Class notes topic 5Class notes topic 5
Class notes topic 5Ali_kamal
 
Routes of exposure of hazards caused by open dumping
Routes of exposure of hazards caused by open dumpingRoutes of exposure of hazards caused by open dumping
Routes of exposure of hazards caused by open dumpingAli_kamal
 
General safe work practices
General safe work practicesGeneral safe work practices
General safe work practicesAli_kamal
 
Class notes topic 5
Class notes topic 5Class notes topic 5
Class notes topic 5Ali_kamal
 
Technical paper chapter 2
Technical paper chapter 2Technical paper chapter 2
Technical paper chapter 2Ali_kamal
 
Powerpoint topic 1 need to bring
Powerpoint topic 1 need to bringPowerpoint topic 1 need to bring
Powerpoint topic 1 need to bringAli_kamal
 
Class notes topic 3
Class notes topic 3 Class notes topic 3
Class notes topic 3 Ali_kamal
 
Class notes topic 2
Class notes topic 2Class notes topic 2
Class notes topic 2Ali_kamal
 
Causes of air pollutant
Causes of air pollutantCauses of air pollutant
Causes of air pollutantAli_kamal
 

Plus de Ali_kamal (16)

Topic 8
Topic 8Topic 8
Topic 8
 
Topic 7
Topic 7Topic 7
Topic 7
 
Topic 7
Topic 7Topic 7
Topic 7
 
Topic 6
Topic 6  Topic 6
Topic 6
 
Class notes topic 5
Class notes topic 5Class notes topic 5
Class notes topic 5
 
Topic 4 3
Topic 4 3Topic 4 3
Topic 4 3
 
Topic 4 2
Topic 4 2Topic 4 2
Topic 4 2
 
Topic 4 1
Topic 4 1Topic 4 1
Topic 4 1
 
Routes of exposure of hazards caused by open dumping
Routes of exposure of hazards caused by open dumpingRoutes of exposure of hazards caused by open dumping
Routes of exposure of hazards caused by open dumping
 
General safe work practices
General safe work practicesGeneral safe work practices
General safe work practices
 
Class notes topic 5
Class notes topic 5Class notes topic 5
Class notes topic 5
 
Technical paper chapter 2
Technical paper chapter 2Technical paper chapter 2
Technical paper chapter 2
 
Powerpoint topic 1 need to bring
Powerpoint topic 1 need to bringPowerpoint topic 1 need to bring
Powerpoint topic 1 need to bring
 
Class notes topic 3
Class notes topic 3 Class notes topic 3
Class notes topic 3
 
Class notes topic 2
Class notes topic 2Class notes topic 2
Class notes topic 2
 
Causes of air pollutant
Causes of air pollutantCauses of air pollutant
Causes of air pollutant
 

Dernier

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 

Dernier (20)

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 

Topic 1 continue osha acts_need to bring

  • 1. Occupational Safety and Health Act 1994 (OSHA)
  • 2. The Occupational Safety and Health Act 1994 (Act 514) is a piece of Malaysian legislation which has been gazetted on the 25 February 1994 by the Malaysian Parliament. The Occupational Safety andThe Occupational Safety and Health Act 1994Health Act 1994
  • 3.  PART I PRELIMINARY  PART II APPOINTMENT OF OFFICERS  PART III NATIONAL COUNCIL FOR OCCUPATIONAL SAFETY AND HEALTH  PART IV GENERAL DUTIES OF EMPLOYERS AND SELF- EMPLOYED PERSONS  PART V GENERAL DUTIES OF DESIGNERS, MANUFACTURER AND SUPLIERS  PART VI GENERAL DUTIES OF EMPLOYERS  PART VII SAFETY AND HEALTH ORGANISATIONS  PART VIII NOTIFICATION OF ACCIDENTS, DANGEROUS OCCURRENCE, OCCUPATIONAL POISONING AND OCCUPATIONAL DISEASES AND INQUIRY
  • 4. OSHA 1994 (ACT 514) - Contents (Continued)  PART IX PROHIBITION AGAINST USE OF PLANT OR SUBSTANCE  PART X INDUSTRY CODES OF PRACTICE  PART XI EFORCEMENT AND INVESTIGATION  PART XII LIABILITY FOR OFFENCES  PART XIII APPEALS  PART XVI REGULATIONS  PART XV MICELLANEOUS
  • 5. First Schedule (OSHA)  Manufacturing  Mining and Quarrying  Construction  Agriculture, Forestry and Fishing  Utilities:  Electricity;  Gas;  Water; and  Sanitary Services
  • 6. First Schedule (OSHA)-contd.  Transport, Storage and Communication  Wholesale and Retail Trades  Hotel and Restaurants  Finance, Insurance, Real Estate and Business Services  Public Services and Statutory Authorities
  • 7. The Factory and Machinery Act 1967 (Act 139) is a piece of Malaysian legislation which was enacted in 1967 as Act No. 64 of 1967 and revised on April 1, 1974 as Laws of Malaysia Act 139. The Act was gazette on February 1, 1970. TheThe Factory and MachineryFactory and Machinery Act 1967Act 1967
  • 8. The Factory and Machinery Act 1967 The principle of the act is "An Act to provide for the control of factories with respect to matters relating to the safety, health and welfare of person therein, the registration and inspection of the machinery and for matters connected therewith".
  • 9. The Factory and Machinery Act 1967 The jurisdiction of the Act only covers less than 20 percent of all working areas in Malaysia, the Malaysia government has enacted the Occupational Safety and Health Act 1994 which covers almost all areas of work within Malaysia.
  • 10. The list of regulations under this Act are:  1. Occupational Safety and Health (Employers' Safety and Health General Policy Statements) (Exception) Regulations 1995  2. Occupational Safety and Health (Control of Industry Major Accident Hazards) Regulations 1996  3. Occupational Safety and Health (Safety and Health Committee) Regulations 1996  4. Occupational Safety and Health (Classification, Packaging and Labelling of Hazardous Chemicals) Regulations 1997
  • 11. The list of regulations under this Act are:  5. Occupational Safety and Heath (Safety and Health Officer) Regulations 1997  6. Occupational Safety and Health (Prohibition of Use of Substance) Order 1999  7. Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000  8. Occupational Safety and Health (Notification of Accident, Dangerous Occurrence, Occupational Poisoning and Occupational Disease) Regulation 2004
  • 12. The Occupational Safety and Health Act 1994 The principle of the Act is "An Act to make further provision for securing that safety, health and welfare of persons at work, for protecting others against risks to safety or health in connection with the activities of persons at work, to establish the National Council for Occupational Safety and H and for matters connected therewith"
  • 13. Part I - Interpretation. Section 3 “Contract of service” – any agreement whether in oral or in writing and whether express or implied, whereby one person agrees to employ another as an employee and that other agrees to serve his employer as an employee and includes an apprenticeship contract. “Council” – the National Council for Occupational Safety and Health established under Section 8. “Industry” – the public services, statutory authorities or any of the economic activities listed in the First Schedule. “Employer” – means the immediate employer or the principal employer or both. “Occupier” – in relation to a place of work, means a person who has the management or control the place of work. “Place of work” – means premises where persons work or premises used for the storage of plant or substance.
  • 14. Part I - Interpretation - continued Section 3 “Premises” – includes any land, building or part of any building; any vehicle, vessel or aircraft; any installation on land, offshore installation or other installation whether on the bed of or floating on any water and any tent or moveable structure. “Self-employed person” –an individual who works for gain or reward otherwise than under a contract of employment or not he himself employs others. “Plant” – includes any machinery, equipment, appliance, implement or tool, any component thereof and anything fitted, connected or appurtenant . “Substance” –any natural or artificial subtance whether in solid or liquid form or in the form of a gas and vapour or any combination. “Trade union” – any association or combination of workmen or employers within the meaning of the Trade Unions Act 1959.
  • 15. Part I - Objectives of the Act. Section 4 – Objects of the Act:- To ensure the safety, health and welfare of persons at work. To protect person at a place of work other than persons at work. To promote an occupational environment for persons at work which is adapted to their physiological and psychological needs. To provide the means towards a system of regulations and approved industry codes of practice.
  • 16. Part IV: General Duties of Employers and Self-Employed Persons  Section 15 – As far as practicable  (1) Ensure the safety, health and welfare of all workers while at work  (2) This includes:  a) Making arrangements and maintenance of plants and work system  b) Making arrangements for the use, handling, storage and transportation of the plant and substances (materials).  c) Provision of information, instruction, training and supervision.  d) Provide and maintain workplace / access routes to and from work areas.  e) Provide and maintain work environment with adequate welfare facilities.
  • 17. Part IV - Worker Interpretation  Section 15 – Additional Provision.  Includes: Independent contractor engaged by an employer or a self employed person and any employees of the independent contractor.
  • 18. Part IV: General Duties of Employers and Self-Employed Persons  Other duties  Section 16 - Formulate a written Safety and Health Policy  Section 17(1) - Conduct operations without endangering the safety of others – non-workers and public.  Section 17(2) - Provide information to others on business operations.  Section 18 - An occupier of non-domestic premises shall take measures to ensure that the place of work is/are safe and without risks to health to the persons other than his employees.  Section 19 – A person who contravenes the above section shall be guilty of an offence and shall on conviction be liable to fine not exceeding RM 50K or imprisonment for a term not exceeding 2 years or to both.
  • 19. Part IV: General Duties of Employers and Self-Employed Persons  Importance of a Safety and Health Policy  Long term objective  Continuous commitment at all levels of management.  Delegation of task at lower management levels.
  • 20. Part IV: General Duties of Employers and Self-Employed Persons  Safety and Health Policy - Statement of intent  Safety must be given priority in all daily work activities.  Safety is to be integrated into all daily work activities.  Safety of workers and others (visitors, guests, outsiders) are of utmost priority.  The company will do anything in its power to avoid and prevent accidents.
  • 21. Part VI: General Duties of Employees  Section 24  Ensure personal safety and that of others.  Cooperate with employer and others.  Properly wear and /or use personal protective equipments that are provided.  Comply to any safety instructions.
  • 22. Part VI: General Duties of Employees  Section 25  An Employee:  Who intentionally, recklessly or negligently interfere of misuse anything provided or done in the interest of safety, health and welfare in pursuance of the Act shall be guilty of an offence.
  • 23. Part VI: General Duties of Employees  Section 26  The employer may not charge employees for things done or provided in pursuance of this Act.  Section 27  Employer /Trade Union may not discriminate – dismiss, injure or change position of any employee who makes complaint that he is not safe or is risk to health and also exercises his functions as a member of the Safety and Health Committee.
  • 24. Part VII - Safety and Health Officer  Section 29  Specific industries gazzetted.  Employ a competent person to act as a safety and health officer.  Specific responsibilities to ensure compliance to the Act and promotion of safe work.  Qualification and training requirements.
  • 25. Part VII - Safety and Health Committee  Section 30  To be established if:  There are 40 or more workers.  Instructed by Director General  Membership, selection and appointment as prescribed.  Consultation with employer
  • 26. Safety and Health Committee Functions  Section 31  To review all safety and health measures that have been taken.  Investigate issues concerning occupational safety and health and bring to attention of employer.  Other functions may be determined.
  • 27. Part VIII: Notification of accidents, dangerous occurrence, occupational poisoning & diseases & inquiry.  Section 32  Employers to inform the nearest Department of Safety and Health office (DOSH).  Registered Medical Practitioners should report to the Director General.
  • 29. 29 OUTLINE OF PRESENTATIONOUTLINE OF PRESENTATION CIDB
  • 31. 31 1. Excavation is man-made cut, cavity, trench or depression in the earth’s surface formed by earth removal. 2. A trench is a narrow underground excavation that is deeper than it is width. 3. Excavations present a range of particular – stability of the soil, the proximity of underground services or the presence of water. INTRODUCTION :INTRODUCTION : CIDB
  • 32. 32 INTRODUCTION :INTRODUCTION : 4. Factor affecting stability:-  Large load  Insufficient shoring  Vibration  High water table. CIDB
  • 33. 33 1. Collapse of side – lack of or inadequate or weak shoring. 2. Workers falling into excavation – lack of barriers or inadequate fencing. 3. Asphyxiation – exhaust gases from plant, machinery and other work process collected at the bottom of excavation. 4. Falling of spoil placed at the edge of excavation. 5. Failure to maintain shoring/support system. POTENTIAL HAZARDS :POTENTIAL HAZARDS : CIDB
  • 34. 34 1.1. Prior to commencing work:-Prior to commencing work:- a.a. All the underground services have been located andAll the underground services have been located and marked.marked. b.b. Arrangements for sloping/benching.Arrangements for sloping/benching. c.c. An adequate supply of suitable.An adequate supply of suitable. d.d. Safe method is used for putting in and taking outSafe method is used for putting in and taking out support system.support system. CONTROL MEASURES:CONTROL MEASURES: CIDB
  • 35. 35 Sloping & Benching CONTROL MEASURES:CONTROL MEASURES: Shoring Box shoring CIDB
  • 36. 36 2. The excavation should be inspected daily2. The excavation should be inspected daily 3.Thoroughly examined after explosives haveThoroughly examined after explosives have been used, after unexpected falls of materials orbeen used, after unexpected falls of materials or adverse weather condition .adverse weather condition . CONTROL MEASURES:CONTROL MEASURES: CIDB
  • 37. 37 Safe access/igressSafe access/igress CONTROL MEASURES:CONTROL MEASURES: Edge protectionEdge protection Stability of adjacentStability of adjacent structurestructure Underground waterUnderground water Protection against floodProtection against flood Location of imposedLocation of imposed loadsloads CIDB
  • 39. 39 INTRODUCTION:INTRODUCTION:  To achieve proper support of structures are distribution of structural loads to foundations.  The intensity of the loads transferred will not cause shear failure or settlement. CIDB
  • 40. 40 HAZARDS:HAZARDS:  Collapse of pile driving equipment.  Loss of loads- pile being hoisted.  Workers being crushed by loads.  Collapse of kentledge during load test.  Noise. CIDB
  • 41. 41 CONTROL MEASURES:CONTROL MEASURES:  Pile driver/rig – operated by competent operator (well trained and experienced personnel.  All equipment to be inspected daily prior to commencement of work.  Thoroughly examined by approved person at least once in 12 months.  Safety clothing including hard hats, safety shoes, safety glasses and hearing protection. CIDB
  • 42. 42 CONTROL MEASURES:CONTROL MEASURES:  Designated person – in- charge of the work and personally direct and give the operating signals.  If any operating abnormalities are observed, the hammer should be stopped immediately.  All personnel should stay clear of the work area during operations. CIDB
  • 43. 43 CONTROL MEASURES:CONTROL MEASURES:  Designated person should check stability of kentledge or load before commencing the test.  Restricted area.  Only authorized personnel to enter for taking test readings.  Move out as soon as possible after taking the readings.  Fire extinguishers & first aid box must be kept available at all times. CIDB
  • 45. 45 INTRODUCTION:INTRODUCTION:  The term “service” means all underground electricity, gas, water, sewer pipes, telecommunications plant and liquid petroleum services and oil pipelines.  If does not include underground structures such as brick sewers, railway tunnels, etc. CIDB
  • 46. 46 HAZARDS:HAZARDS: 1. Electrical Cables  Damage to live electricity cables.  Fatal burns to the hands, face and body.  Direct electric shock is rare but not impossible. CIDB
  • 47. 47 HAZARDS:HAZARDS: 2. Gas Lines  Damage which causes an immediate escape of toxic gas.  Damage which causes an escape some time later. CIDB
  • 48. 48 HAZARDS:HAZARDS: 3. Water Pipes & Sewer Lines  Damage to water pipes could wash away subsoil and reduce the support for adjacent services, highways and structures.  Further dangers-risks of flooding.  The main danger from damage to a sewer is the possibility of contamination. CIDB
  • 49. 49 CONTROL MEASURES:CONTROL MEASURES: 1. Planning  Obtained pertinent information before excavation work starts.  Indications that buried services exist such as the presence of street lights, illuminated traffic signs, valve pit covers etc.  However the absence of such indications does not necessarily mean that there are no buried services. CIDB
  • 50. 50 CONTROL MEASURES:CONTROL MEASURES: 2. Cables & Pipe Locating Devices  Use suitable cable and pipe locating devices.  Location plan- to determine as accurately as possible the position of traceable underground services in or near the proposed work area. CIDB
  • 51. 51 CONTROL MEASURES:CONTROL MEASURES: 3. Safe Digging Practices  Start with trial holes.  Start digging by using hang tools as necessary to confirm the position of any buried services.  If any service is found, it should be assumed to be live until proved otherwise. CIDB
  • 52. 52 CONTROL MEASURES:CONTROL MEASURES:  Obtain written confirmation of disconnection from the service owner before removing a redundant service.  Services uncovered in an excavation may need to be supported.  If the underground services have been found to be too shallow/the plans or other information have proved to be inaccurate, informed owners before backfilled.  If a underground service suffers damage, informed the owner should immediately.  In the case of electrical cables, gas pipes or high pressure water mains, arrangements made to keep people well clear of the area until it has been repaired or otherwise made safe by the owner. CIDB
  • 54. CIDB 54 Collapses of formwork has the potential for severe injury and death. INTRODUCTIONINTRODUCTION
  • 55. CIDB 55 1. Erection of Falsework Collapse due to poor design or poor erection (not complying with approved design and drawings. Poor access – slips and falls, abrasions, strains and sprains. Fall from the edge of floor/opening. Manual handling- Strains and sprains; injuries such as back damage while handling and fixing falsework. HAZARDSHAZARDS
  • 56. CIDB 56 2. Fixing Steel Reinforcement.  Poor access – slips and falls, abrasions, strains and sprains.  Inadequate edge/opening - fall from the edge of floor/opening.  Manual handling- Strains and sprains; injuries such as back damage while handling and fixing reinforcement bars.  Sharp edges- Cuts from reinforcement bar ends or tie wire. HAZARDSHAZARDS
  • 57. CIDB 57 3. Pouring/Placing of Concrete.  Poor access – slips and falls, abrasions, strains and sprains.  Inadequate opening/opening protection – fall from the edge of floor/opening.  Violent ejection of concrete from bucket/hose at first moment of delivery-falls onto the floor or off the edge of the floor.  Walking on wet floor-Slip on wet formwork or reinforcement and fall; trip or twist ankle. HAZARDSHAZARDS
  • 58. CIDB 58  Wet concrete-splashes into the eyes.  Noise from operating machineries- hearing damage from continuous noise over a long period.  Vibration-muscoskeletal disorder/white fingers from using of concrete vibrator for a long period.  Skin/eye contact with concrete-skin rash or allergy/dermatitis; concrete splashed in eye. HAZARDSHAZARDS
  • 59. CIDB 59 4. Striking-off Falsework.  Poor communication- collapse of structure due to premature dismantling of falsework.  Dismantling not done in sequence-hit or struck by falling falsework components.  Poor housekeeping-slip, trip or twist ankle. HAZARDSHAZARDS
  • 60. CIDB 60 1. Planning.  What needs to be supported and how it should be done?  How long the falsework will be in use?  Appointment of competent designated person.  Competent and adequately trained machine operators. 2. Design.  Significant falsework structures should be designed by a competent person to ensure adequate stability, strength and stiffness. CONTROL MEASURESCONTROL MEASURES
  • 61. CIDB 61 3. Materials – Falsework should be constructed or adapted so as to be suitable for the purpose for which it is used.  It should be strong enough and stable in use.  Damaged components should not be used. 4. Erection of Falsework.  Before erection-risk assessment should be carried out and a safe system of work developed.  Approved method statement-read and understand by those doing the work.  Falsework should be stable at all stages of erection and be regularly checked.  Only “Approved working drawings” should be used. CONTROL MEASURESCONTROL MEASURES
  • 62. CIDB 62 5. Pouring/Placing Concrete  Safe access must be provided.  Falsework and formwork have been inspected and approved for concreting work.  Concrete should not be poured too rapidly or from such a height as to overload the formwork/falsework.  When using crane-competent operator and trained signalman. CONTROL MEASURESCONTROL MEASURES
  • 63. CIDB 63 5. Pouring/Placing Concrete  Concrete spillage should not be allowed to accumulate on falsework.  All workers handling cement and concrete should wear suitable eye protection, gloves and rubber boots.  In the use of vibrators care must be taken that form ties are not broken.  Vibrator motors on elevated platform should be firmly secured. CONTROL MEASURESCONTROL MEASURES
  • 64. CIDB 64 6. Striking-off Falsework  The designated person should agree the time of striking.  A written permit-to-strike procedure is strongly recommended.  A striking sequence should be established and followed.  Suitable temporary platforms must be provided for workers carrying out dismantling works.  Loose fittings and materials should be removed before dismantling begins. CONTROL MEASURESCONTROL MEASURES
  • 65. CIDB 65 6. Striking-off Falsework  Dismantled materials should be placed directly into storage areas.  Materials sticking into concrete and liable to fall should be removed as work proceeds.  Projecting nails must be removed or hammered down .  Suitable nets should be fixed where necessary to prevent or control the fall of materials.  Openings must be securely covered or guarded.  Debris should be cleared as work proceeds. CONTROL MEASURESCONTROL MEASURES
  • 67. 67 INTRODUCTION:INTRODUCTION:  Factories & Machinery (Safety, Health & Welfare) Regulations 1970 defined working at height as…… “any work platform at a place from which the worker will be liable to fall a distant of more than 3.0m” CIDB
  • 68. 68 HAZARDS:HAZARDS:  1. Collapse of temporary structures.  2. Fall of workers.  3. Fall of materials/objects. CIDB
  • 69. 69 CONTROL MEASURES:CONTROL MEASURES: 1. Temporary work platforms. a. Scaffolding.  Designed, erected, altered and dismantled in accordance to Part X, Factories & Machinery (Building Operations & Works of Engineering Construction) (Safety), Regulation 1986.  Inspected scaffolds by competent person at every 7 days interval upon completion of erection and after every bad weather. CIDB
  • 70. 70 CONTROL MEASURES:CONTROL MEASURES: 1. Temporary work platforms. a. Scaffolding (continued).  Stable-If necessary should be secured to the building/structure.  Checked for clearances from nearby power-lines prior to its erection.  Mobile scaffold-castor wheel locked.  Mobile scaffold-traveling path of clear off electrical and other hazards. b. Working platform and access platform must have full edge protection comprising handrail, mid-rail and toe- board. CIDB
  • 71. 71 CONTROL MEASURES:CONTROL MEASURES: 2. Elevated Working Platform (EWPs)  Risk assessment-identify EWP is appropriate for the intended work.  EWPs must be operated by properly trained operator.  Self-propelled EWPs-firm level surfaces.  Person working on EWP-wear fall arrest device connected anchor point in basket.  The EWP should be left in a properly stowed safe configuration whether it is unattended. CIDB
  • 72. 72 CONTROL MEASURES:CONTROL MEASURES: 3. Guardrails.  Adequate strength to withstand the impact of a person falling against them.  In place prior to any work commencing and should not be removed until all work is complete. 4. Falling Materials/Objects  Provide a safe means of raising and lowering plant, materials and debris in the place of work.  Personal protective equipment to minimize the risk associated with falling objects.  Secure physical barrier to prevent objects falling freely from buildings. CIDB
  • 74. 74 INTRODUCTION:INTRODUCTION: 1. “Confined space” is a space which:-  is not intended as a regular workplace.  Has restricted means of entry or exit.  Is large enough and so configured that an employee can bodily enter and perform assigned work.  Is at atmospheric pressure during occupancy. CIDB
  • 75. 75 INTRODUCTION:INTRODUCTION: 2. In addition this space has at least one of these characteristics:-  It contains or has a potential to contain a hazardous atmosphere.  It contains material (solid or fluid) that has potential engulfing an entrant.  It has internal configuration such that an entrant could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and taper to a smaller cross-section.  It contains any other recognised serious safety or health hazards for example rotors. CIDB
  • 76. 76 INTRODUCTION:INTRODUCTION: 3. Examples:-  Septic tanks, manholes and sumps.  Basement.  Trenches, pipes, ducts and tunnels. CIDB
  • 77. 77 HAZARDS:HAZARDS:  Manholes, tunnels, trenches set in chalk soil – party fill with carbon dioxide gas, displacing breathable air.  Manholes in contaminated ground – poisonous or flammable gases (e.g. near underground petrol tanks).  Manholes, pits or trenches connected to sewer – flammable and/or poisonous gases and/or insufficient oxygen in the air. CIDB
  • 78. 78 CONTROL MEASURES:CONTROL MEASURES:  Test shows presence of dangerous air- NO ENTRY.  Before entry – test to determine levels of oxygen present, and NO dangerous amounts of flammable and/or poisonous gases.  Unsafe atmosphere – appropriate RPE to be provided. CIDB
  • 79. 79 CONTROL MEASURES:CONTROL MEASURES:  Entrants – training and instruction in the precautions to be taken inside the area.  Adopt permit-to-work system.  Stand-by person-stationed outside the space to keep watch and communicate with anyone inside.  Rescue harnesses should be worn by all those inside the confined space.  Rescue procedures should be included in the training of workers.  Rescue equipment including emergency breathing apparatus should be available near the entrance at all times.  No attempt should ever be made to clear fumes or gases with pure oxygen. CIDB
  • 81. 81 INTRODUCTION:INTRODUCTION: 1. Hand Tools.  Hand tools are non-powered.  They include anything from axes to wrenches. 2. Power Tools  They are several types of power tools based on the power source they use; electric pneumatic, liquid fuel, hydraulic and power-actuated. CIDB
  • 82. 82 HAZARDS:HAZARDS: 1. Hand Tools – Some Examples.  Using a screwdriver as a chisel-tip of the screwdriver to break and fly, hitting the user or other employees.  If a wooden handle on a tool such as a hammer or an axe is loose, splintered or cracked-head of tool-fly off and strike the user or another worker. Sledge hammer CIDB
  • 83. 83 HAZARDS:HAZARDS: 2. Power Tools – Some Examples:  Electric-powered tools-burns and slight shocks-lead to injuries or even heart failure.  Powered abrasive grinding, cutting, polishing and wire buffing wheels – may throw off flying fragments.  Pneumatic tools – hit by one of the tool’s attachments. CIDB
  • 84. 84 CONTROL MEASURES:CONTROL MEASURES: 1. Hand Tools.  Select the right tools for the right jobs.  Examine every tool before each use – equipment so worn or damaged should be repaired or removed from service.  Caution employees that saw blades, knives or other tools be directed away from aisle areas and other employees working in close proximity.  Cutting tools must be sharp.  Appropriate PPE e.g. safety goggles, gloves etc. should be worn due to hazards that may be encountered while using hand tools.  Floors be kept as clean and dry as possible to prevent accidental slips with or around dangerous hand tools. CIDB
  • 85. 85 CONTROL MEASURES:CONTROL MEASURES: 2. Power Tools.  Never carry a tool by cord or hose.  Never yank the cord or the hose to disconnect it from the receptacle.  Keep cords and hoses away from heat, oil and sharp edges.  Disconnect tools when not in use, before servicing and when changing accessories such as blades, bits and cutters.  Secure work with clamps or a vice freeing both hands to operate the tool.  Avoid accidental starting. The worker should not hold a finger on the switch button while carrying a plugged-in tool. CIDB
  • 86. 86 CONTROL MEASURES:CONTROL MEASURES: 2. Power Tools - continued.  Tools should be maintained with care.  Tools should be kept sharp and clean for the best performance.  Follow instructions in the user’s manual for lubricating and changing accessories.  Be sure to keep good footing and maintain good balance.  The proper apparel should be worn – loose clothing, ties or jewellery can become caught in moving parts. CIDB
  • 87. 87 CONTROL MEASURES:CONTROL MEASURES: 2. Power Tools - continued.  All portable electric tools that are damaged shall be removed from use and tagged “Do not use”.  Hazardous moving parts of a power tool need to be safeguarded.  Adopt ‘lock-out tag-out’ system for maintenance of tools. CIDB