This document provides an overview of a patented online construction management system. The system aims to create synergy between owners, builders, suppliers, and trades to provide fairness, transparency, and accurate pricing. It allows owners to customize home designs and receive instant pricing. Builders can easily order materials and schedule trades. Suppliers and trades can update pricing and manage documents. The system provides tools to help manage the entire construction process from initial estimates through warranty periods. It streamlines tasks like purchasing, scheduling, and payments for all parties.
2. Architectural ‐ Operations Manual – November 2014 338
“The ARCHITECTURAL systems, methods and products are covered by patent
applications AU2011901536 and AU2011902183, with international rights reserved in
all countries party to the Paris Convention for the Protection of Industrial Property. The
systems, methods and products are also subject to international copyright laws.”
OVERVIEW
The system is a patented online program that has been developed specifically for the
residential construction market. It is based on complete synergy between:
1. The Owner / Architect / Developer (the owner of the property looking to have construction
performed to their requirements and standards).
2. The Builder (the licensed builder or the “owner builder” who will actually build the project and
engage all parties involved in the process).
3. The Supplier (the approved suppliers who generally supply the manufactured goods used to
build the house. This can also include labour to complete their task).
4. The Trade (the works performed by a tradesman or tradesmen that may include labour, supply
and labour or even hire aspects of a construction project).
The main reason that this system works is because of this synergy. If one part of this
interaction does not work, then the whole process becomes less impacting. Each of these roles has been
carefully designed to ensure that each interacts the way they should so that all parties are happy. In
some cases, the way that the works have traditionally been done for years have been changed (not in
practice, but the approach) to give a much better outcome that is more fair for all.
The fundamental outcome that needed to be reached for this system is fairness. Not just for the builder,
or the owner, but the trade and supplier also. Fairness is the foundation for everything, as if things are
not fair, through experience we find that by the end fairness to those who have missed out (often the
builder or the trade), they have evened up the score by charging “extras” or “variations” which we feel is
unfair and not in good business practice.
At a glance this system may be looked at as a form of “Network Building”. To some
degree this is correct as with the combined buying power of all builders going through the one system,
purchase prices are significantly reduced. However, this is only a small part of the value of
. The main value of is found:
An online specifications tool that allows the owner (or architect) to make very specific choices
that not only determine the price of construction instantly, but get saved in the database for
auto ordering by the builder (ie ensuring that what the owner has asked for is what they get).
Instant pricing. The online database is formed from a combination of information, rates and
options provided in real time via their own online pages from the Builder, Supplier and Trade.
As a result, all pricing shown on the system is real, accurate and live. An updated price can be
obtained at any time giving the owner every opportunity to change the inclusions until they are
happy with the resultant price.
Supplier information including:
o Cost (this is calculated automatically based up on the current rate x qty x builders
margin)
o Showroom address
o Image of the product (where appropriate)
o Rep details
o Supplier’s website details for further exploring.
Construction tools throughout the process that aid both the owner and the builder including:
o Gantt Charts with current progress and expected timeframes.
o Online progress payments
o Time extensions / Variations
o Handover tools
3. Architectural ‐ Operations Manual – November 2014 339
o Warranty Period tools
Builder tools including
o Builder’s own online page that allows them to insert previous projects, current
workloads, and general snapshot of them to provide the best chance for an owner or
architect to select them. This page can include their own logo so that it is perceived by an
owner that this is their site. This logo is then also used for the printing of the
specifications and documents.
o List of trades with reviews, comments and ratings from other builders. This aims to
maintain a list of good and reliable trades while eliminating poor performing trades. It is
a good way to expand a trade list. These trades are generally the same as used by major
volume builders due to a similar methodology and pricing.
o Purchase Order system / Calendar that has the stored items selected by the owner and
has formed the contract. All the builder needs to do is select the date, the supplier or
trade and what category of work is to be done, and the rest is done for the builder. No
quotes required by the builder as it is already done for them. Once the builder selects
“send”, the supplier or the trade is automatically sent an email purchase order based on
current rates along with drawings or other documentation they requested.
Supplier tools including:
o Online page to maintain current pricing and keep products up to date.
o Supplier credit applications upload
o Document selector
o Quote upload tool for those suppliers who need to provide a unique quote for each
project.
Trade tools including:
o Online page to maintain current pricing.
o Document selector
The result really is a comprehensive system to ensure that an accurate, efficient and fair process is
maintained while achieving the cheapest prices reasonable. Better yet, this is all completely achievable
from any computer that has access to the internet.
6. Architectural ‐ Operations Manual – November 2014 342
SITE REQUIREMENTS PAGE:
The second tab takes you to the “Site
Requirements” page. This page focuses mainly
on the items that are not traditionally included
in a traditional construction contract such as:
Driveways
Landscaping
Site Cuts / excavation
Common Drainage
Subdivisions
Etc.
The main reason for the inclusion of this is to
have one contract that can cater for all aspects
of the project and enable a bank to fund
everything in the one process. This is an
extremely useful approach to developers and
even owners wanting a full package without
constantly being hit for extra costs that were not
allowed for in the original contract.
The other items that are included in this section
are those that are generally mandatory
requirements and would only get done once (ie
one allowance) for a project whether there was
one house or 10 units. These items may include:
Building Permit Application
Temp Fencing
Temp Toilet
Temp Power Pole
Security Cameras
Insurance(s)
Etc.
The way this section works is the same as the
selections for each of the items of the house(s),
see the following pages for more information on
how this actual process works.
You will notice 2 “buttons” at the bottom of the screen. These allow you to:
1. Save the project and return at any time without notifying anyone.
2. Save and submit the project to the construction administrator for assessment (this is where it is
first checked for accuracy and all required inclusions). It is quite expected that the first version
of this quote / estimate will not be complete and may exclude many items that are simply not
known. This is fine and normal. During this process all these items will be dealt with in due
process.
9. Architectural ‐ Operations Manual – November 2014 345
When you “hover” the mouse over
each option, another “pop‐up” window
will appear individual to each option
that will display:
1. Brief description of the option
2. Sub Options available
3. Price of each item as what will
be allowed for in the contract.
This price you see will be the
sum of:
a. The raw actual cost as
supplied and update
constantly by the
supplier (this is a real
cost with no mark‐ups,
rebates etc).
b. Cost for installation
(generally the trade
component).
c. Builders Margin.
So the cost you see here is the
actual cost you are paying with
everything accounted for.
Please note that this cost is for
the rate (per m2, m3, l/m etc),
so this cost will be multiplied
by the quantity required.
All you are required to do is click onto the item you require based on the information you have viewed.
Once you have selected your item, this will
be displayed in the specifications summary
(ie the page you were on previously).
Now you have the ability to:
1. Enter in the quantity required.
2. Enter in the options to this item
along with quantities required.
3. Enter in comments. These can be
anything – generally instructions to
clarify anything or specific install
requirements the user / owner may
have. This will be passed on to the
builder, supplier and trade
automatically
As each of these items are filled out, the
costs are accumulated in the overall
construction contract price. So you are only
paying for what you ask for – no inflated
costs, extras, etc. You can view an updated
cost on the overview page any time as it is
all calculated in “real time”.
12. Architectural ‐ Operations Manual – November 2014 348
CONTRACTS
At the point where all parties are
happy with the content, contracts
(template by the Construction
Manager) are produced. These are
“Master Builder Association of
Victoria (MBAV)” standard
contracts (generally accepted by all
parties) are what are used. These
contracts look at the interests of
both the builder and the owner and
present the project to the owner
with:
Fixed price
Liquidated Damages (for
compensation to the owner in
the event the builder finishes
the project late).
All standard items normally
included or required to
further clarify the intent of the
project that you would expect
in a building contract.
As the contract stage is quite straight
forward and generally managed by all
parties concerned solicitors, we will
not go into any more detail here as this
manual is more about the system itself
rather than the specifics of contracts
that are general heavily regulated by
law or the building commission.
CONSTRUCTION FEATURES AND BENEFITS
A whole host of features and benefits have been designed within to make sure that the
process is as user friendly as possible, while maintaining the constant theme of being fair throughout
the entire project. The designers of the system are constantly looking for ways to improve the features
and benefits of this system, and they will continually grow and become more extensive. Following is a
list of current features and benefits to help:
DURING CONSTRUCTION
GANTT CHARTS (TIME SCHEDULING)
At the point of when the contracts are
being prepared, the builder is asked
how long each of the nominated stages
will take to complete. To this,
foreseeable rain periods, weekends,
holidays, etc are added (which
calculates the contracted period for
construction) but also supplies a Gantt
Chart (time graph) that is shown within
the system to allow the
owner see if the project is on schedule.
16. Architectural ‐ Operations Manual – November 2014 352
HOW IT WORKS – THE BUILDER
The builder is the centre of all the action. These days most builders do very little “hand‐on” work such
as carpentry and hard labour, but act more like project managers with the key additional roles of
funding the project and taking the responsibility for all that happens on site.
With the system, the builder’s role is significantly reduced in terms of time required
and administration work. Once the system has been quoted as a result of the combined
efforts of the owner, estimator and the builder, all pricing is set, specification are established and all
purchase ordered are ready for a simple “click” to be sent.
Furthermore, the errors with interpretation of specifications, colours and styles are also minimised, as
the builder simply sends the purchase order that the owner has requested during the quote stage,
therefore minimising error and time wastage.
If this is not enough, the builder now has access to bulk buying power through the
networks, so all the builders quotes and pricing has been pre‐determined via the real‐time supplier /
trade to links. Once again reducing the amount of time required to detail the project by
a considerable amount.
So this is not just about making the life of the builder easier and less time consuming while increasing
accuracy, it actually reduces actual direct costs for a builder to complete a house / development.
The Process:
The process for the builder is very similar to the owner / developer / architect in the way that the initial
process is handled, please refer to this section for the main steps in the initial stages. There are
however, some specific differences to these stages:
Approve Quote
Construction Strategy
Standard Legal Requirements
APPROVE QUOTE
At the point where the owner / developer / architect has completed their requirements, the estimator
has fully checked the quote, a few limited quotes are sent off to the suppliers for more accurate quotes
(whereby it is too hard to have fixed rates). These items would include (but not limited to):
1. Roof trusses & prefabricated walls / subfloor.
2. Stairs
3. Metal roofing (including fascia, gutter, capping, flashings etc).
Once these items are uploaded onto the system by the supplier, the builder is then asked to check this
project for the first time. At this point everything has been done for the builder including specifications,
quotes, rates, etc, etc, and all is needed is a thorough checking and approving. This is a very important
stage, as after this step of checking that everything is as to the builders requirements, the builder
hereby takes on responsibility of the build in all areas.
17. Architectural ‐ Operations Manual – November 2014 353
The builder is supplied with an enormous
amount of information in order to make their
final approval. This includes all the
documentation that has been prepared for the
building permit including (but not limited to):
1. Working drawings
2. Soil Test
3. Engineering (structural and civil)
4. Energy Rating reports
5. Sewer details
6. Property Information
7. Legal Point of Discharge
8. Town Planning Permit (where
applicable)
9. Etc, etc
All these documents are stored online for access
at any time via the internet, whether this be in
the office or on the building site.
On top of this documentation, the builder has immediate access to all the pricing. The pricing is broken
up into 3 categories:
1. Quotes
These are the items that had to be sent away for formal quoting due to their complexity (where
are rate is near impossible to apply and maintain accuracy). These would already have been
done for the builder and simply can be accessed via their designated page. This is stored for
future reference. When the purchase order is sent by the builder at a later stage, this quote is
automatically attached as confirmation with no extra effort to the builder at all.
2. Suppliers
The supplier through negotiation
and careful set up all provide the
system with
agreed rates; this is sometimes
for supply only; and sometimes
supply & install depending on the
item and the supplier. There is
only 1 supplier per product, this
ensures that it is the
responsibility of the supplier to
keep the price updated,
competitive and accurate.
The builder has access at any time
to the current rates from the
suppliers through the “Items
Summary” page. Here the builder
can see all the items that are
included in
along with the options, images,
pricing and contact details direct
to the rep.
This section acts like a dashboard and provides pricing and information across the whole
industry.
24. Architectural ‐ Operations Manual – November 2014 360
4. Once the builder has finalised the dates, they
simply need to click onto the “Send Purchase
Order” within the Event box and all the rest of
the important work is done automatically by
the system. Instantly a
purchase order will be produced based on all
the information provided by the designers,
owner, supplier / trade including:
Name of the Supplier / Trade
Address for this project
The builders name and billing address
Brief description of the project
Detailed list of items including any
comments provided by the owner,
options, colours and other relevant
information contained within the
database.
An item summary listing bulk supply
quantities and relevant rates as agreed
for each.
Total contract amount (ie the purchase
order amount)
Date required on site (start date)
Number of days allocated for works
(this is a deadline to ensure that they
do not slow down or delay overall
construction scheduling and timing.
A note that the builder has the right to
charge penalties for delayed works
whereby it is not reasonable or
justifiable.
A comments section whereby the
builder can specify detailed
instructions or customised
specifications.
A list of notes ensuring that good
practise is followed such as cleaning
up after themselves, communication
standards etc. Generally all the factors
or instructions that should be
discussed prior to works or issues
rather than later.
Upon confirmation by the builder that all
information contained within the purchase
order is to their satisfaction, a simple click to
“Approve & Send” will automatically send to
the supplier or trade this purchase order along
with:
1. Copy of working drawings or whatever
documentation the supplier / trade has
prior requested
2. Copy of their applicable specifications.
A copy will also be sent to the builder via
email for their record.
Once this step has been done, the event will turn green showing that it has been created and sent.
25. Architectural ‐ Operations Manual – November 2014 361
FEATURES DURING CONSTRUCTION
During construction, may features have been included within to help preserve the
relationship between the owner and the builder. At the time of creating this booklet there are 7 separate
construction features that should be used consistently throughout.
1. Invoicing
2. Extras / Variations (by builder)
3. Variations (by owner)
4. Time Extension
5. Incident Reports
6. Photo Boards
7. Communication Logs
INVOICING
At the completion of each stage, the builder will issue a stage invoice to the owner to present to the
bank (where applicable) for payment. With the system, the builder will upload this
invoice online. At this point the following things occur:
Invoice is immediately emailed to the owner along with an automatically generated email
stating that the stage is completed and payment is now due and payable. (at the time of
preparing this document, talks are being made with certain banks to allow for direct
submission of invoices along with certain details to make this step much more efficient for
all).
Gantt Chart is updated as being complete.
Next stage is started on the Gantt Chart.
The information is stored online for access by the owner or builder at any time.
EXTRAS / VARIATIONS (BY BUILDER)
A variation to the contract may be done by both the owner and the builder with the permission of
the other party. A formal tool has been added to the system to facilitate this.
In the case of the builder it will generally be a result of:
1. Supplier not having stock of a particular item (whether this be stocking issue or
discontinued line)
2. Site reality that a particular item will not work due to building constraints etc.
3. Etc.
It will be necessary for the builder to change the specifications in order to maintain the legality of
the contract and protect the interests of all concerned.
This step allows the builder to nominate a new product or service, allocate a cost for this and
perhaps make an extension of time request. All of which should be approved by the owner via this
formal process which is recorded in the database and log system.
VARIATIONS (by owner) – see owner section.
TIME EXTENSION
27. Architectural ‐ Operations Manual – November 2014 363
We have discussed in reasonable detail all the features and benefits of the specific features of
. However, is so much more than patented systems, techniques and
features, as this works only as a result of synergy (everyone working together to get a better result than
what you could by your own).
By default, this system only works when both suppliers and trades are happy and tuned in to the
method. All of the suppliers selected as mandatory to the system are generally those who:
1. Are larger companies with their own systems and scheduling that is tried and tested (and
enforced by a hierarchy of management).
You can always find a cheap supplier if you look hard enough, but will you get the
warranties, reliability and the other requirements you need to make sure that the cheaper
rates do not become financial nightmares over the course of time...
2. Are national companies (as is set to be a national system used throughout
Australia and beyond). This means that these companies can see the benefits of being within this
network as a mandatory supplier. Along with the ease of quoting, ordering and scheduling, the
potential to access a vast number of builders through the one system all combines to force very
good pricing that a “stand‐alone” builder simply cannot compare to.
Imaging being able to buy materials for the same price as a builder who builds 300 homes a year
yet you only build 3! Plus getting the service and support to match.
3. Would be very focused on support and good service. As a group or network, the “stand‐alone”
builder will become part of something bigger and be able to play by the same rules and have the
same opportunities as the larger volume builders that are slowing forcing out the smaller
builder.
So... if the patented systems, techniques, features and support don’t excite you as a builder, then surely
the pricing will!
Traditionally the builder cares about the builder (and they should as they need to stay profitable and
liquid). But in the past very little emphasis has been placed on the owner / client. There are heaps of
estimating systems on the market. There are generally 2 issues with these:
1. They are not internet based which means they have to be loaded statically onto a computer and
all the products, information and pricing has to be done manually done by the builder. There are
heaps of issues with this which have been touched on earlier in this document. The biggest issue
(apart from direct access to your suppliers and trades), is that every time there is a price change,
the builder must initially be notified of this, then secondly update manually all the pricing. This
is inefficient and simply too exposed to risk.
2. They do not have the owner / client be involved in the process to get the foundation of trust and
transparency.
Simply put, if the owner / client is not happy, the builder will not get the contract.
This is where stands out as it completely involves the owner / client to the point where
they are completely creating the game plan. They will initially have all the information they need to
make good informed choices while controlling the cost to their budget. They know what they are getting
and know what is or isn’t included. They are then presented with very accurate specifications
documentation which is included in the contract. They also know that whatever they have selected will
be delivered on site as the system only allows for this to happen. So there is
established confidence and clarity (as well as great pricing).
So if a builder has this calmness from the owner to start with, much of the hard work is done (literally –
as they have also done all your hard work in the process; quotes, purchase orders etc).
32. Architectural ‐ Operations Manual – November 2014 368
products.
3. Description – a brief
description of the product
benefits or perhaps even what
is included within a service.
4. Rate extension – here the supplier will nominate what the price refers to (ie m2, m3, l/m, $, etc).
The item rate extension can be different from the option extension (see point 5 below).
5. Options – where a product as options or pricing cannot be determined by one value (for
example the install may include a base rate to cover delivery and admin, plus a m2 rate for the
actual install), this can all be accommodated for in the options section.
6. Category – a category must be determined to separate the stage that the product or service may
be expected to be performed. For example a plumbing supplier may supply both wall mixer taps
as well as basins – these would be quoted in separate areas and delivered at separate times. This
is all determined in this admin page.
7. Price – This price is set by the supplier and is in “real time”. If there are 150 pending quotes /
estimates in the system, and the supplier changes the price of one or more of
their products, it will instantly update all quotes / estimates. What is noted here as a price is
what will be sent back to you in the purchase order, so it is important that these are current and
real pricing.
Note: failure to have real and accurate pricing (ie rates or pricing that different
from what is eventuating on site) will lead for the full extraction of the supplier
from the system altogether and replacement with a more reliable and ethical
supplier.
35. Architectural ‐ Operations Manual – November 2014 371
EXPECTATIONS FOR THE SUPPLIER
As part of the relationship with and remain as the mandatory (sole) supplier, it is
expected:
1. Pricing is best possible with rates that the normal builder could not get access to by themselves.
2. Service / support is uncompromised.
3. Loyalty to the program is uncompromised (builder can only get access to the better pricing if
connected to the system and done ONLY via the online
purchase order system). Any supplier found dealing direct with a builder or client will face the
possibility of being removed from the system in its entirety.
4. Ethical and reliable site conduct.
5. Continued and regular maintenance to the suppliers page in regards to current product
information and pricing.
36. Architectural ‐ Operations Manual – November 2014 372
HOW IT WORKS – THE TRADE
The trade component of the system works very similar to the supplier’s component,
with one main differentiation; the trade is not mandatory. This is for 2 main reasons:
1. It is expected that the trade will concentrate to certain areas and cannot perform their role in
entire regions; this is not to say that some trades will, but the system allows for all situations.
2. It should be the right of the builder to select their preferred trade as a result of many factors.
Often a builder has used the same trade for all their projects over many years with great success.
This cannot be interfered with.
INITIAL SETUP
Initially there will need to be 3 main things created prior to receiving purchase orders and commencing
works contracts :
1. Trade Profile
2. Default Requirements
3. Rates / Pricing
TRADE PROFILE
This is simply entering in the details of the
entity that the trade trades under. In
addition, contact details such as postal
address, phone number and email address
for the purchase orders. Much of these
details will be shown to the builder, so they
need to be accurate.
DEFAULT REQUIREMENTS
In the theme of having great relationships, it
is presented to the trade to nominate:
1. A lead time for time expected to be
available on site for a typical period.
For example a bricklayer may need
30 days to process an order and
schedule for a time that can be
guaranteed. This would be noted as a
default requirement and the builders
purchase order would be determined
around this.
This feature will aid in good
organisation, quicker projects and
less stress for all concerned.
2. Documentation that is required for each project. Here the trade can chose from a list of
documentation already prepared and on the system such as:
Working drawings
Engineering
Materials Schedule
Landscape Plan
Civil drawings
Etc, etc.