Summary
• A green-field bridge project in Portugal
▫ Why this project?
▫ History
• Risk analysis
▫ Country Risk and Political Risk
▫ Financial risk
▫ Market risk
▫ Technical risk
• Project Financial Structure
▫ Contractual structure
▫ Shareholders
▫ Refinancing
• Project Assessment
▫ Financial Appraisal Of The Project
▫ Project Global Evaluation
• Key Takeaways
2/16
Construction and operation of a new bridge between Sacavem and Montijo, called Vasco de Gama Bridge
In parallel : improvement of the 25 de Abril bridge, but SPV does not include
these works.
Very high estimated cost: EUR 897-910 mn
GATTEL (Portuguese Government Agency) manages the project.
The SPV is called Lusoponte. The Concession associated with a toll (BOT) is awarded to an industrial
consortium of British, French and Portuguese companies
Initial financing entities are the Cohesion Fund,European Investment Bank, 25 de Abril bridge revenues, &
others.
A green-field bridge project in Portugal
3/16
Why this project?
• Initial situation:
▫ only a single bridge between : the 25 de Abril between Lisbon on the
Tagus’s North and South banks
▫ Traffic congestion
Decision to build a new bridge between North bank and South bank
• Objectives of the project:
▫ Improve the traffic between North and South banks, reducing commuting
time
▫ Boost the local economy.
• Constraint:
▫ open the bridge on 29th march 1998 for the world exhibition.
• Chosen road:
▫ Sacavem-Montijo to open new urban develoment fronts.
4/16
History of Project
• January 1991: Creation of GATTEL, a government agency in charge to find a solution to traffic congestions
between Lisbonn and Almada
• 1991: GATTEL decides to create the future Vasco de Gama bridge
• June 1992: Prequalification of 5 competitors to carry out the project
• April 1993: Call for tender is launched
• October 1993: Reception of 3 bidders offers
• 29th April 1994: A consortium called Lusoponte is awarded the contract
• 1995: Construction of the Vasco De Gama bridge starts, Creation of the CAO – The observation committee
for the new bridge (operational in 96)
• 24th March 1995: DBFOM agreement is signed
• 1st of January 1996: DBFOM agreement comes into force
• 29th March 1998: the Vasco de Gama bridge is constructed and inaugurated on time.
• 3rd July 2000: a global settlement agreement (GSA) is signed and loans are renegotiated
5/16
Risk Analysis - Country risk and political risk
• Initial Risks
▫ Risk of population opposition due to expropriation
▫ Risk of NGO opposition
▫ Risk of non honoring of government guarantee
▫ Risk of change of government impacting technical and financial choices
▫ Risk of bad decision-making
• A series of bad political choices occurred, enforced by the pressure of perspective of the Expo ’98. (-)
• Lack of coordination with cities and bad integration in land management plan led to a bad location choice
and the urban development objective is not satisfied (uncontrolled development). (-)
6/16
Risk Analysis - Financial Risk
• Initial Risks:
▫ Risk of population opposition due to expropriation
▫ Risk of NGO opposition
▫ Risk of non honoring of government guarantee
▫ Risk of change of government impacting technical and financial choices
▫ Risk of bad decision-making
▫ Change risk linked to different currencies before the EUR (PTE, FRF, GBP), but limitated
• State at the end of the project: the contract contains dangerous clauses that transfer most of the risks
to the Portuguese Government.
▫ Protestations led to a limitation of toll increase as planned so the Government pays a compensation to
Lusoponte. (-)
▫ Encouraging Public Transportation would lead the Government has to pay compensation fees to
Lusoponte, which is contradictory with his global objective of improving transportation means. (-)
7/16
Risk Analysis - Market Risk
• Initial Risks
▫ Risk that the users do not take the bridge due to bad location choice or high pricing
▫ Risk of general decrease of the traffic (e.g. due to Public Transportation development)
• State at the end of the project: Not a lot of bridge users due to above mentioned reasons: not enough tolls
are perceived. This has had a negative impact on the Business Plan (level of expectations in Free Cash
Flow). (-)
8/16
Risk Analysis - Technical Risk
• Initial Risks
▫ Risk not to avoid traffic congestion
▫ Environmental risk: the road is crossing an SPA (Special Protection Area)
▫ Technical risks: difficult engineering due to 20km large and local seismic activity
▫ Project management risk due to complexity, technical interfaces and multinational workers
(Portuguese, French, British)
▫ Risk of additional construction costs
• State at end of project
▫ A bad location has been chosen for the bridge so the bridge does not divert traffic (-)
▫ The new urban front has developed incontrolably (mobility problems, little recreational areas...). (-)
▫ The SPA has been deeply severed. (-)
9/16
Project Financial Structure - Entities
Lusoponte
GATTELEIB
25 de Abril Bridge
NovaponteGestiponte
Cohesion Fund
Others (shareholders,
gov, support…)
Equity
Concession
agreement
Shareholders (UK-France-
Portugal)
Operation and
maintenance agreementConstruction
agreement
Commercial Banks
(after refinancing)
Debt
Equity &
Subordinated debt
10/16
Project Financial Structure - Shareholders
Kvaerner CI & Macquarie Infrastructure LTD, UK
24,8%
Vinci Group, France 22%
BPC, Portugal 14,84%
Mota & Cia, Portugal 13,83%
Somague, Portugal 13,83%
Teixera Duart, Portugal 7,5%
Vinci Group, Portugal 2,8%
Edifer, Portugal 0,4%
The shareholders of Lusoponte are 53,2% Portuguese
companies, and 46,8% foreign participation.
11/16
Project Financial Structure – Refinancing
Before refinancing
Cohesion fund 35%
EIB 33%
25 de Abril Bridge 6%
Others 26% (Portuguese
gov, equity other loans)
after refinancing
Cohesion fund 30%
EIB 29%
Commercial Banks 11%
25 de Abril 6%
Others 24%
Initial budget reviewed due to
- Additional construction costs and
- Traffic not meeting former expectations for debt recovery.
New EIB loan of EUR 120 mn on 19Y at 9.3% in 2000, backed
by commercial banks.
High impact on grossed-up interests.
80 80
415 415
415 535
Before After
Loans
Subsidies
Equity
In EUR mn
12/16
Financial Appraisal Of The Project 1/2
• At the beginning of the project, equity represents 9% of the total financing (D/E = 11,4). This may be to
optimistic, given the risk profile of the project, based on a toll.
• The revenue is below expectations.
▫ This is due to a bad location choice and an ill-adapted pricing.
• Increase of loan tenor and debt volume during the construction period. Interest rates are high.
▫ The initial loan were negotiated under difficult market conditions.
▫ The debt has risen due to high interest rate new loans.
13/16
Financial Appraisal Of The Project 2/2
• DSCR is just as the acceptable limit.
▫ Decreasing from 1,49 (2002) to 1,4 (2007) due to extra loan.
▫ Just at threshold for EIB loan and senior loan
▫ A good minimum DSCR would be 1,5
• ROE is not satisfactory for shareholders.
▫ 11,43% which is quite low (should be between 15 and 20%),
▫ even if reduction of equity level (8,8% to 7,7%) has mechanically increased ROE.
14/16
Project Global Evaluation
None of the project objectives has been reached:
• No traffic diversion on the 25 Abril Bridge, nor global improvement,
• No development of new economic fronts,
• Negative social, economical and ecological impacts.
The financal rebalancing indicates that the contract was not designed correctly, especially concerning cash
flow previsions.
Although initial market risk had been attributed to the shareholders in the contract, it has been completely
transferred to the government through heavy refinancing and compensations.
This project has been only possible thanks to heavy public financing and a series of bad decision-making.
15/16
Key takeaways
• The CAO succeeded in accomplishing their main goal: to control Lusoponte environmental
performance and avoid further environmental crimes.
• The positive impact of the project is mainly in the improvement of the decision making process for
future projects in Portugal and in Europe.
▫ Give more credibility to environmental NGOs,
▫ Public consultations,
▫ More grounded decisions.
• As highlighted by the CAO, “it takes both political will and technical staff to achieve meaningful post-
work evaluation.”
16/16

Contenu connexe

Tendances

Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case studyAKSHAY CHATURVEDI
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkUnni Krishnan
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls Manvinder Kingra
 
Bandra worli sea link jay
Bandra worli sea link jayBandra worli sea link jay
Bandra worli sea link jayDhruv Seth
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+linkASHOK KUMAR
 
Harbours and docks
Harbours and docksHarbours and docks
Harbours and docksMHarishbabu
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGEAnkit Gautam
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptxDRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptxAmitYadav363360
 
Construction challenge of bridge in hilly areas
 Construction challenge of bridge in hilly areas Construction challenge of bridge in hilly areas
Construction challenge of bridge in hilly areasShashank Naruka
 
Dam construction
Dam constructionDam construction
Dam constructionalizay41
 
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTUVATSAL PATEL
 
Construction of metro station
Construction of metro stationConstruction of metro station
Construction of metro stationAmit Kumar Tiwari
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge constructionMadujith Sagara
 
Breakwater, jetties and groins.
Breakwater, jetties and groins.Breakwater, jetties and groins.
Breakwater, jetties and groins.Latif Hyder Wadho
 
Sea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanSea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanDavid H Moloney
 

Tendances (20)

Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case study
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
Bandra worli sea link jay
Bandra worli sea link jayBandra worli sea link jay
Bandra worli sea link jay
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+link
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Harbours and docks
Harbours and docksHarbours and docks
Harbours and docks
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGE
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptxDRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
 
Construction challenge of bridge in hilly areas
 Construction challenge of bridge in hilly areas Construction challenge of bridge in hilly areas
Construction challenge of bridge in hilly areas
 
Dam construction
Dam constructionDam construction
Dam construction
 
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
 
Construction of metro station
Construction of metro stationConstruction of metro station
Construction of metro station
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge construction
 
Breakwater, jetties and groins.
Breakwater, jetties and groins.Breakwater, jetties and groins.
Breakwater, jetties and groins.
 
Sea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanSea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution Plan
 
Problems in hilly roads
Problems in hilly roadsProblems in hilly roads
Problems in hilly roads
 
Bridges In Pakistan
Bridges In PakistanBridges In Pakistan
Bridges In Pakistan
 

En vedette

The Stinky Bridge, A Commons (Case Study & Call To Action) 2014 06-29 v1 light
The Stinky Bridge, A Commons (Case Study & Call To Action) 2014 06-29 v1 lightThe Stinky Bridge, A Commons (Case Study & Call To Action) 2014 06-29 v1 light
The Stinky Bridge, A Commons (Case Study & Call To Action) 2014 06-29 v1 lightJustine Camacho-Tajonera
 
Project Management
Project ManagementProject Management
Project Managementm g
 
Pultrusion and frp bridge case study
Pultrusion and frp bridge case studyPultrusion and frp bridge case study
Pultrusion and frp bridge case studyVaibhav Srivastava
 
TYPES OF MOVING BRIDGES PPT
TYPES OF MOVING BRIDGES PPTTYPES OF MOVING BRIDGES PPT
TYPES OF MOVING BRIDGES PPTpremkumar0141
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridgemominzaki
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansuKumar Snehansu
 
Short film analysis 1
Short film analysis 1Short film analysis 1
Short film analysis 1SunrajB
 
Brooklyn Bridge
Brooklyn BridgeBrooklyn Bridge
Brooklyn Bridgejexpoz
 
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Daniel X. O'Neil
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge Hakkim Shajahan
 
Brooklyn Bridge: A Case sudy
Brooklyn Bridge: A Case sudyBrooklyn Bridge: A Case sudy
Brooklyn Bridge: A Case sudyBhavik A Shah
 

En vedette (20)

CASE STUDY OF WAKOTA BRIDGE
CASE STUDY OF WAKOTA BRIDGECASE STUDY OF WAKOTA BRIDGE
CASE STUDY OF WAKOTA BRIDGE
 
The Stinky Bridge, A Commons (Case Study & Call To Action) 2014 06-29 v1 light
The Stinky Bridge, A Commons (Case Study & Call To Action) 2014 06-29 v1 lightThe Stinky Bridge, A Commons (Case Study & Call To Action) 2014 06-29 v1 light
The Stinky Bridge, A Commons (Case Study & Call To Action) 2014 06-29 v1 light
 
Project Management
Project ManagementProject Management
Project Management
 
Pultrusion and frp bridge case study
Pultrusion and frp bridge case studyPultrusion and frp bridge case study
Pultrusion and frp bridge case study
 
TYPES OF MOVING BRIDGES PPT
TYPES OF MOVING BRIDGES PPTTYPES OF MOVING BRIDGES PPT
TYPES OF MOVING BRIDGES PPT
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansu
 
King's college
King's collegeKing's college
King's college
 
Bridge
BridgeBridge
Bridge
 
Short film analysis 1
Short film analysis 1Short film analysis 1
Short film analysis 1
 
Brooklyn Bridge
Brooklyn BridgeBrooklyn Bridge
Brooklyn Bridge
 
Bridges case
Bridges caseBridges case
Bridges case
 
Bridges case studies
Bridges case studiesBridges case studies
Bridges case studies
 
Bridges
BridgesBridges
Bridges
 
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
 
San Francisco
San FranciscoSan Francisco
San Francisco
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge
 
Brooklyn Bridge: A Case sudy
Brooklyn Bridge: A Case sudyBrooklyn Bridge: A Case sudy
Brooklyn Bridge: A Case sudy
 
Case study on flipkart
Case study on flipkartCase study on flipkart
Case study on flipkart
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 

Similaire à Vasco de Gama Bridge Project Case Study

Heathrow Expansion Plan.pptx
Heathrow Expansion Plan.pptxHeathrow Expansion Plan.pptx
Heathrow Expansion Plan.pptxNaimaMukhtar2
 
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's RoleCarlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's RoleProColombia
 
Session 3: River Transport Authority
Session 3: River Transport AuthoritySession 3: River Transport Authority
Session 3: River Transport AuthorityOECDGlobalRelations
 
Leaders Study Program, Paris 2019- Great paris
Leaders Study Program, Paris 2019- Great parisLeaders Study Program, Paris 2019- Great paris
Leaders Study Program, Paris 2019- Great pariswww.theurbanvision.com
 
Port Partnership Seminar - Jakarta
Port Partnership Seminar - JakartaPort Partnership Seminar - Jakarta
Port Partnership Seminar - JakartaFitri Indra Wardhono
 
Innovative financing of transport infrastructure j. hensen
Innovative financing of transport infrastructure   j. hensenInnovative financing of transport infrastructure   j. hensen
Innovative financing of transport infrastructure j. hensenEuropean Commission
 
Project management
Project managementProject management
Project managementkingklass
 
P3s for Puerto Rico - 17 May 2023 - Updated.pptx
P3s for Puerto Rico  - 17 May 2023 - Updated.pptxP3s for Puerto Rico  - 17 May 2023 - Updated.pptx
P3s for Puerto Rico - 17 May 2023 - Updated.pptxMarc Joffe
 
Presentación del Presidente de la ANI en comisión New York - Londres - Tel Aviv
Presentación del Presidente de la ANI en comisión New York - Londres - Tel AvivPresentación del Presidente de la ANI en comisión New York - Londres - Tel Aviv
Presentación del Presidente de la ANI en comisión New York - Londres - Tel AvivAgencia Nacional de Infraestructura
 
20130603 presentación nyc
20130603 presentación nyc20130603 presentación nyc
20130603 presentación nycProColombia
 
ISMED Training: Assessing the PPP Option, presentation by IFC
ISMED Training: Assessing the PPP Option, presentation by IFCISMED Training: Assessing the PPP Option, presentation by IFC
ISMED Training: Assessing the PPP Option, presentation by IFCOECDGlobalRelations
 
Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Nhi Nguyen (Katherine)
 
Abengoa project finance
Abengoa project financeAbengoa project finance
Abengoa project financeAbengoa
 
Hans Shoenmakers - Stepping stone for CCS in Europe
Hans Shoenmakers - Stepping stone for CCS in EuropeHans Shoenmakers - Stepping stone for CCS in Europe
Hans Shoenmakers - Stepping stone for CCS in EuropeGlobal CCS Institute
 
Public-Private participation to improve supply chains
Public-Private participation to improve supply chainsPublic-Private participation to improve supply chains
Public-Private participation to improve supply chainsTristan Wiggill
 
May 2009 IAPH WB: state of the port sector
May 2009 IAPH WB: state of the port sector May 2009 IAPH WB: state of the port sector
May 2009 IAPH WB: state of the port sector Michel_Donner
 
ISMED Training: PPPs in Egypt's River Transport_EIB
ISMED Training: PPPs in Egypt's River Transport_EIBISMED Training: PPPs in Egypt's River Transport_EIB
ISMED Training: PPPs in Egypt's River Transport_EIBOECDGlobalRelations
 

Similaire à Vasco de Gama Bridge Project Case Study (20)

Heathrow Expansion Plan.pptx
Heathrow Expansion Plan.pptxHeathrow Expansion Plan.pptx
Heathrow Expansion Plan.pptx
 
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's RoleCarlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
 
Session 3: River Transport Authority
Session 3: River Transport AuthoritySession 3: River Transport Authority
Session 3: River Transport Authority
 
Leaders Study Program, Paris 2019- Great paris
Leaders Study Program, Paris 2019- Great parisLeaders Study Program, Paris 2019- Great paris
Leaders Study Program, Paris 2019- Great paris
 
Port Partnership Seminar - Jakarta
Port Partnership Seminar - JakartaPort Partnership Seminar - Jakarta
Port Partnership Seminar - Jakarta
 
Innovative financing of transport infrastructure j. hensen
Innovative financing of transport infrastructure   j. hensenInnovative financing of transport infrastructure   j. hensen
Innovative financing of transport infrastructure j. hensen
 
Project management
Project managementProject management
Project management
 
P3s for Puerto Rico - 17 May 2023 - Updated.pptx
P3s for Puerto Rico  - 17 May 2023 - Updated.pptxP3s for Puerto Rico  - 17 May 2023 - Updated.pptx
P3s for Puerto Rico - 17 May 2023 - Updated.pptx
 
Presentación del Presidente de la ANI en comisión New York - Londres - Tel Aviv
Presentación del Presidente de la ANI en comisión New York - Londres - Tel AvivPresentación del Presidente de la ANI en comisión New York - Londres - Tel Aviv
Presentación del Presidente de la ANI en comisión New York - Londres - Tel Aviv
 
20130603 presentación nyc
20130603 presentación nyc20130603 presentación nyc
20130603 presentación nyc
 
ISMED Training: Assessing the PPP Option, presentation by IFC
ISMED Training: Assessing the PPP Option, presentation by IFCISMED Training: Assessing the PPP Option, presentation by IFC
ISMED Training: Assessing the PPP Option, presentation by IFC
 
Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends
 
Abengoa project finance
Abengoa project financeAbengoa project finance
Abengoa project finance
 
Presentation “Auditing PPP- Lessons learned from the French experience”. Anka...
Presentation “Auditing PPP- Lessons learned from the French experience”. Anka...Presentation “Auditing PPP- Lessons learned from the French experience”. Anka...
Presentation “Auditing PPP- Lessons learned from the French experience”. Anka...
 
ISMED PPD: Assessment Report
ISMED PPD: Assessment ReportISMED PPD: Assessment Report
ISMED PPD: Assessment Report
 
Hans Shoenmakers - Stepping stone for CCS in Europe
Hans Shoenmakers - Stepping stone for CCS in EuropeHans Shoenmakers - Stepping stone for CCS in Europe
Hans Shoenmakers - Stepping stone for CCS in Europe
 
Public-private-partnerships in Italy – Federico Antellini Russo – June 2014 m...
Public-private-partnerships in Italy – Federico Antellini Russo – June 2014 m...Public-private-partnerships in Italy – Federico Antellini Russo – June 2014 m...
Public-private-partnerships in Italy – Federico Antellini Russo – June 2014 m...
 
Public-Private participation to improve supply chains
Public-Private participation to improve supply chainsPublic-Private participation to improve supply chains
Public-Private participation to improve supply chains
 
May 2009 IAPH WB: state of the port sector
May 2009 IAPH WB: state of the port sector May 2009 IAPH WB: state of the port sector
May 2009 IAPH WB: state of the port sector
 
ISMED Training: PPPs in Egypt's River Transport_EIB
ISMED Training: PPPs in Egypt's River Transport_EIBISMED Training: PPPs in Egypt's River Transport_EIB
ISMED Training: PPPs in Egypt's River Transport_EIB
 

Dernier

Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...shivangimorya083
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfGale Pooley
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free DeliveryPooja Nehwal
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfGale Pooley
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdfFinTech Belgium
 

Dernier (20)

Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 

Vasco de Gama Bridge Project Case Study

  • 1. Vasco de Gama Bridge Project Finance Case Study ESSEC Executive Master Strategy & Management Of International Business 2012-2013 Tarek EL BITAR Kheira KADRI Audrey KIST GASPARD Mariétou SARR 1/16
  • 2. Summary • A green-field bridge project in Portugal ▫ Why this project? ▫ History • Risk analysis ▫ Country Risk and Political Risk ▫ Financial risk ▫ Market risk ▫ Technical risk • Project Financial Structure ▫ Contractual structure ▫ Shareholders ▫ Refinancing • Project Assessment ▫ Financial Appraisal Of The Project ▫ Project Global Evaluation • Key Takeaways 2/16
  • 3. Construction and operation of a new bridge between Sacavem and Montijo, called Vasco de Gama Bridge In parallel : improvement of the 25 de Abril bridge, but SPV does not include these works. Very high estimated cost: EUR 897-910 mn GATTEL (Portuguese Government Agency) manages the project. The SPV is called Lusoponte. The Concession associated with a toll (BOT) is awarded to an industrial consortium of British, French and Portuguese companies Initial financing entities are the Cohesion Fund,European Investment Bank, 25 de Abril bridge revenues, & others. A green-field bridge project in Portugal 3/16
  • 4. Why this project? • Initial situation: ▫ only a single bridge between : the 25 de Abril between Lisbon on the Tagus’s North and South banks ▫ Traffic congestion Decision to build a new bridge between North bank and South bank • Objectives of the project: ▫ Improve the traffic between North and South banks, reducing commuting time ▫ Boost the local economy. • Constraint: ▫ open the bridge on 29th march 1998 for the world exhibition. • Chosen road: ▫ Sacavem-Montijo to open new urban develoment fronts. 4/16
  • 5. History of Project • January 1991: Creation of GATTEL, a government agency in charge to find a solution to traffic congestions between Lisbonn and Almada • 1991: GATTEL decides to create the future Vasco de Gama bridge • June 1992: Prequalification of 5 competitors to carry out the project • April 1993: Call for tender is launched • October 1993: Reception of 3 bidders offers • 29th April 1994: A consortium called Lusoponte is awarded the contract • 1995: Construction of the Vasco De Gama bridge starts, Creation of the CAO – The observation committee for the new bridge (operational in 96) • 24th March 1995: DBFOM agreement is signed • 1st of January 1996: DBFOM agreement comes into force • 29th March 1998: the Vasco de Gama bridge is constructed and inaugurated on time. • 3rd July 2000: a global settlement agreement (GSA) is signed and loans are renegotiated 5/16
  • 6. Risk Analysis - Country risk and political risk • Initial Risks ▫ Risk of population opposition due to expropriation ▫ Risk of NGO opposition ▫ Risk of non honoring of government guarantee ▫ Risk of change of government impacting technical and financial choices ▫ Risk of bad decision-making • A series of bad political choices occurred, enforced by the pressure of perspective of the Expo ’98. (-) • Lack of coordination with cities and bad integration in land management plan led to a bad location choice and the urban development objective is not satisfied (uncontrolled development). (-) 6/16
  • 7. Risk Analysis - Financial Risk • Initial Risks: ▫ Risk of population opposition due to expropriation ▫ Risk of NGO opposition ▫ Risk of non honoring of government guarantee ▫ Risk of change of government impacting technical and financial choices ▫ Risk of bad decision-making ▫ Change risk linked to different currencies before the EUR (PTE, FRF, GBP), but limitated • State at the end of the project: the contract contains dangerous clauses that transfer most of the risks to the Portuguese Government. ▫ Protestations led to a limitation of toll increase as planned so the Government pays a compensation to Lusoponte. (-) ▫ Encouraging Public Transportation would lead the Government has to pay compensation fees to Lusoponte, which is contradictory with his global objective of improving transportation means. (-) 7/16
  • 8. Risk Analysis - Market Risk • Initial Risks ▫ Risk that the users do not take the bridge due to bad location choice or high pricing ▫ Risk of general decrease of the traffic (e.g. due to Public Transportation development) • State at the end of the project: Not a lot of bridge users due to above mentioned reasons: not enough tolls are perceived. This has had a negative impact on the Business Plan (level of expectations in Free Cash Flow). (-) 8/16
  • 9. Risk Analysis - Technical Risk • Initial Risks ▫ Risk not to avoid traffic congestion ▫ Environmental risk: the road is crossing an SPA (Special Protection Area) ▫ Technical risks: difficult engineering due to 20km large and local seismic activity ▫ Project management risk due to complexity, technical interfaces and multinational workers (Portuguese, French, British) ▫ Risk of additional construction costs • State at end of project ▫ A bad location has been chosen for the bridge so the bridge does not divert traffic (-) ▫ The new urban front has developed incontrolably (mobility problems, little recreational areas...). (-) ▫ The SPA has been deeply severed. (-) 9/16
  • 10. Project Financial Structure - Entities Lusoponte GATTELEIB 25 de Abril Bridge NovaponteGestiponte Cohesion Fund Others (shareholders, gov, support…) Equity Concession agreement Shareholders (UK-France- Portugal) Operation and maintenance agreementConstruction agreement Commercial Banks (after refinancing) Debt Equity & Subordinated debt 10/16
  • 11. Project Financial Structure - Shareholders Kvaerner CI & Macquarie Infrastructure LTD, UK 24,8% Vinci Group, France 22% BPC, Portugal 14,84% Mota & Cia, Portugal 13,83% Somague, Portugal 13,83% Teixera Duart, Portugal 7,5% Vinci Group, Portugal 2,8% Edifer, Portugal 0,4% The shareholders of Lusoponte are 53,2% Portuguese companies, and 46,8% foreign participation. 11/16
  • 12. Project Financial Structure – Refinancing Before refinancing Cohesion fund 35% EIB 33% 25 de Abril Bridge 6% Others 26% (Portuguese gov, equity other loans) after refinancing Cohesion fund 30% EIB 29% Commercial Banks 11% 25 de Abril 6% Others 24% Initial budget reviewed due to - Additional construction costs and - Traffic not meeting former expectations for debt recovery. New EIB loan of EUR 120 mn on 19Y at 9.3% in 2000, backed by commercial banks. High impact on grossed-up interests. 80 80 415 415 415 535 Before After Loans Subsidies Equity In EUR mn 12/16
  • 13. Financial Appraisal Of The Project 1/2 • At the beginning of the project, equity represents 9% of the total financing (D/E = 11,4). This may be to optimistic, given the risk profile of the project, based on a toll. • The revenue is below expectations. ▫ This is due to a bad location choice and an ill-adapted pricing. • Increase of loan tenor and debt volume during the construction period. Interest rates are high. ▫ The initial loan were negotiated under difficult market conditions. ▫ The debt has risen due to high interest rate new loans. 13/16
  • 14. Financial Appraisal Of The Project 2/2 • DSCR is just as the acceptable limit. ▫ Decreasing from 1,49 (2002) to 1,4 (2007) due to extra loan. ▫ Just at threshold for EIB loan and senior loan ▫ A good minimum DSCR would be 1,5 • ROE is not satisfactory for shareholders. ▫ 11,43% which is quite low (should be between 15 and 20%), ▫ even if reduction of equity level (8,8% to 7,7%) has mechanically increased ROE. 14/16
  • 15. Project Global Evaluation None of the project objectives has been reached: • No traffic diversion on the 25 Abril Bridge, nor global improvement, • No development of new economic fronts, • Negative social, economical and ecological impacts. The financal rebalancing indicates that the contract was not designed correctly, especially concerning cash flow previsions. Although initial market risk had been attributed to the shareholders in the contract, it has been completely transferred to the government through heavy refinancing and compensations. This project has been only possible thanks to heavy public financing and a series of bad decision-making. 15/16
  • 16. Key takeaways • The CAO succeeded in accomplishing their main goal: to control Lusoponte environmental performance and avoid further environmental crimes. • The positive impact of the project is mainly in the improvement of the decision making process for future projects in Portugal and in Europe. ▫ Give more credibility to environmental NGOs, ▫ Public consultations, ▫ More grounded decisions. • As highlighted by the CAO, “it takes both political will and technical staff to achieve meaningful post- work evaluation.” 16/16