SlideShare une entreprise Scribd logo
1  sur  24
Télécharger pour lire hors ligne
1Andrew Snowball
Defining the Role of the BIM Manager
Andrew Snowball | BSc, EngTech, TIStructE
BIM Lead at Cundall
2Andrew Snowball
Introduction
• Andrew Snowball
– BIM Lead at Cundall
– Over 8 years' experience (6 involving BIM)
– Civil & Structural
– BSc Civil Engineering
– Technician Member of The Institute of
Structural Engineers (TIstructE)
– Engineering Council Registered (EngTech)
– Autodesk Certified Professional
3Andrew Snowball
Content
• Introduction
• Defining the role of the BIM Manager
– Why appoint a BIM Manager
– Defining BIM Management
• The different types of BIM Manager
• Summary
4Andrew Snowball
Project BIM Manager
BIM Coordinator
Information
Manager
Common Data Environment
Technical BIM Managers
Internal BIM Manager Technicians
Models Design Drawings
Construction BIM Manager
Internal BIM Manager Technicians
Fabrication Installation Sequencing Costing
BIM Management Structure
5Andrew Snowball
Why appoint a BIM Manager?
• Issues arising from not appointing a BIM Manager
– Poor coordination
– Increased project costs
– Delays to programme
– Code & Standards conflicts
– Biased solutions to project obstacles
• When to appoint a BIM Manager?
– Before appointing technical design teams
• Benefits to appointing a BIM Manager?
– Key to unlocking a projects potential
6Andrew Snowball
Defining the Roles
• 4 Key areas of Management
– Model & Drawing Management
– Information Management
– Design & Construction Management
– Stakeholder Management
• Effective BIM Management
– It’s everyone's responsibility
– More than one BIM Manger is needed
7Andrew Snowball
Types of BIM Manager
• Typically there are 6 types of BIM Manager
– 5 are project related roles
– The other is an internal role within an organisation
• Project BIM Managers
• BIM Coordinators
• Information Manager
• Technical BIM Manager
• Construction BIM Manager
• Internal BIM Managers
8Andrew Snowball
Project BIM Manager
BIM Coordinator
Information
Manager
Common Data Environment
Technical BIM Managers
Internal BIM Manager Technicians
Models Design Drawings
Construction BIM Manager
Internal BIM Manager Technicians
Fabrication Installation Sequencing Costing
BIM Management Structure
9Andrew Snowball
The Project BIM Manager
Prerequisites
• Appointed early in the projects life cycle
• Should form part of the Clients Team
• Should be suitably experienced with similar projects
in size and complexity
• Do not produce Design & Construction BIMs
10Andrew Snowball
The Project BIM Manager
Roles & Responsibilities
• Overall coordination responsibility for Design & Construction BIM’s
• Clash Detection & Reports
• Produce the Employers Information Requirements (EIR’s), Project
BIM Execution Plans (BEP) including any Project BIM Templates
• Set the Geospatial Location of the Project
11Andrew Snowball
The Project BIM Manager
Continued…
• Implement & Manage the Common Data Environment
• Audits deliverables to ensure they meet the BEP & EIR’s
• Coordinate COBie data and asset information between the Design &
Construction teams for integration of Facilities Management
Systems
12Andrew Snowball
Project BIM Manager
BIM Coordinator
Information
Manager
Common Data Environment
Technical BIM Managers
Internal BIM Manager Technicians
Models Design Drawings
Construction BIM Manager
Internal BIM Manager Technicians
Fabrication Installation Sequencing Costing
BIM Management Structure
13Andrew Snowball
BIM Coordinator Information Manager
• BIM coordinators fulfil some or
all of the duties of the Project
BIM Manager
• Report directly to the Project
BIM Manager
• Implement & Manage the CDE
while ensuring all deliverables
are uploaded to the CDE
• Audit deliverables to ensure they
meet the BEP & EIR’s
• Coordinate COBie data and asset
information between the Design
& Construction teams for
integration of Facilities
Management Systems
14Andrew Snowball
Project BIM Manager
BIM Coordinator
Information
Manager
Common Data Environment
Technical BIM Managers
Internal BIM Manager Technicians
Models Design Drawings
Construction BIM Manager
Internal BIM Manager Technicians
Fabrication Installation Sequencing Costing
BIM Management Structure
15Andrew Snowball
The Technical BIM Manager
Prerequisites
• Should be represented by each design team
• Should have relevant experience in managing
projects of similar size and complexity
• Should be empowered to manage;
– Technicians
– Building Information Model
• Primary role is to Manage & Coordinate the BIMs
not the production of model and deliverables
16Andrew Snowball
The Technical BIM Manager
Roles & Responsibilities
• Overall responsibility of their organisations BIMs
• Key contact for all aspects relating to the BIMs & their deliverables
• Attend BIM Coordination Meetings & Design Team meetings
• Provide assistance to the Project BIM Manager in creating the BEP
17Andrew Snowball
The Technical BIM Manager
Continued…
• Review & Coordinate all information that is to be issued externally
or uploaded to the CDE
• Prepare BIM Progress Reports (BPR’s)
• Ensure all internal team members are suitably trained and have the
correct hardware and software
18Andrew Snowball
Project BIM Manager
BIM Coordinator
Information
Manager
Common Data Environment
Technical BIM Managers
Internal BIM Manager Technicians
Models Design Drawings
Construction BIM Manager
Internal BIM Manager Technicians
Fabrication Installation Sequencing Costing
BIM Management Structure
19Andrew Snowball
The Construction BIM Manager
Prerequisites
• Should have relevant experience in managing projects of similar size
and complexity
• Should be in a position to manage sub-contractors BIM deliverables,
technicians and the BIMs
20Andrew Snowball
The Construction BIM Manager
Roles & Responsibilities
• Overall responsibility for all construction BIMs
• Ensure construction BIMs meet the design intent
• Key contact for BIMs & their deliverables
• Coordinate the sequencing and scheduling of resources to arrive on
site at predetermined times.
• Prepare BIM Progress Reports (BPR’s)
21Andrew Snowball
The Construction BIM Manager
Continued…
• Coordinate all changes during construction with the design teams
for inclusion in the final federated BIM
• Produce and coordinate the ‘As Built’ information through continual
surveying during construction
• Ensure all construction teams are suitably trained and have the
correct hardware and software
• Coordinate with the other BIM Managers to ensure COBie data &
asset information is complete
22Andrew Snowball
Project BIM Manager
BIM Coordinator
Information
Manager
Common Data Environment
Technical BIM Managers
Internal BIM Manager Technicians
Models Design Drawings
Construction BIM Manager
Internal BIM Manager Technicians
Fabrication Installation Sequencing Costing
BIM Management Structure
23Andrew Snowball
The Internal BIM Manager
• Historical roles are being redefined
– BIM roles are still being defined
• Internal BIM Managers
– What do they do?
– Why are they important?
– Clearing the confusion with Internal BIM Managers
• BIM Administrator
• BIM Executive
• Digital Design Manager
24Andrew Snowball
Summary
• More than one type of BIM Manager is needed for the
success of the project
• Early appointment of Project BIM Managers
• Project BIM Managers present for the whole project
lifecycle
• BIM Managers manage the BIMs not model them
• BIM Management is the responsibility of all project team
members

Contenu connexe

Tendances

New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
Revit presentation
Revit presentationRevit presentation
Revit presentationNeha Somani
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionGalala University
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)Sandip Kumar Verma
 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Trainingpinoy cadplus
 
An Introduction to BIM
An Introduction to BIM An Introduction to BIM
An Introduction to BIM BSRIA
 
Revit introduction class
Revit  introduction classRevit  introduction class
Revit introduction classKARIKALAN E
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentationryanabarton
 
Favorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIFavorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIChris Carson
 
Building information modelling
Building information modellingBuilding information modelling
Building information modellingKiran Birdi
 
Revit Basic Introduction
Revit Basic IntroductionRevit Basic Introduction
Revit Basic IntroductionNI BT
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIMCCT International
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling PresentationMotasem Albanna
 

Tendances (20)

What is BIM?
What is BIM?What is BIM?
What is BIM?
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 
Information Delivery Manual
Information Delivery ManualInformation Delivery Manual
Information Delivery Manual
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
Revit presentation
Revit presentationRevit presentation
Revit presentation
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)
 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Training
 
Virtual Design and Construction
Virtual Design and ConstructionVirtual Design and Construction
Virtual Design and Construction
 
An Introduction to BIM
An Introduction to BIM An Introduction to BIM
An Introduction to BIM
 
Revit introduction class
Revit  introduction classRevit  introduction class
Revit introduction class
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
Favorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIFavorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEI
 
Primavera P6
Primavera P6Primavera P6
Primavera P6
 
Industry Foundation Classes
Industry Foundation ClassesIndustry Foundation Classes
Industry Foundation Classes
 
Building information modelling
Building information modellingBuilding information modelling
Building information modelling
 
Revit Basic Introduction
Revit Basic IntroductionRevit Basic Introduction
Revit Basic Introduction
 
Bim
BimBim
Bim
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling Presentation
 

En vedette

5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual RealityBIM User Day
 
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...BIM User Day
 
5th Qatar BIM User Day, RICS – Decision making, training and BIM
5th Qatar BIM User Day, RICS – Decision making, training and BIM5th Qatar BIM User Day, RICS – Decision making, training and BIM
5th Qatar BIM User Day, RICS – Decision making, training and BIMBIM User Day
 
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLMBIM User Day
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIMBIM User Day
 
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoptionBIM User Day
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single projectBIM User Day
 
5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM IntroductionBIM User Day
 
RIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + ApplicationRIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + ApplicationElrond Burrell
 
Lecture 03 - The Data Warehouse and Design
Lecture 03 - The Data Warehouse and Design Lecture 03 - The Data Warehouse and Design
Lecture 03 - The Data Warehouse and Design phanleson
 
Laser Scan to BIM Case Study - Qasr Al Hosn Fort Council Chamber
Laser Scan to BIM Case Study - Qasr Al Hosn Fort Council ChamberLaser Scan to BIM Case Study - Qasr Al Hosn Fort Council Chamber
Laser Scan to BIM Case Study - Qasr Al Hosn Fort Council ChamberCoastway
 
Lecture 02 - The Data Warehouse Environment
Lecture 02 - The Data Warehouse Environment Lecture 02 - The Data Warehouse Environment
Lecture 02 - The Data Warehouse Environment phanleson
 
The Future of BIM
The Future of BIMThe Future of BIM
The Future of BIMThe NBS
 
How education estates can benefit from better information management
How education estates can benefit from better information managementHow education estates can benefit from better information management
How education estates can benefit from better information managementBSRIA
 

En vedette (16)

5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
 
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
 
5th Qatar BIM User Day, RICS – Decision making, training and BIM
5th Qatar BIM User Day, RICS – Decision making, training and BIM5th Qatar BIM User Day, RICS – Decision making, training and BIM
5th Qatar BIM User Day, RICS – Decision making, training and BIM
 
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
 
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project
 
5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction
 
RIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + ApplicationRIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + Application
 
Tekla Global BIM Awards 2012
Tekla Global BIM Awards 2012Tekla Global BIM Awards 2012
Tekla Global BIM Awards 2012
 
Lecture 03 - The Data Warehouse and Design
Lecture 03 - The Data Warehouse and Design Lecture 03 - The Data Warehouse and Design
Lecture 03 - The Data Warehouse and Design
 
BIM Case Study
BIM Case StudyBIM Case Study
BIM Case Study
 
Laser Scan to BIM Case Study - Qasr Al Hosn Fort Council Chamber
Laser Scan to BIM Case Study - Qasr Al Hosn Fort Council ChamberLaser Scan to BIM Case Study - Qasr Al Hosn Fort Council Chamber
Laser Scan to BIM Case Study - Qasr Al Hosn Fort Council Chamber
 
Lecture 02 - The Data Warehouse Environment
Lecture 02 - The Data Warehouse Environment Lecture 02 - The Data Warehouse Environment
Lecture 02 - The Data Warehouse Environment
 
The Future of BIM
The Future of BIMThe Future of BIM
The Future of BIM
 
How education estates can benefit from better information management
How education estates can benefit from better information managementHow education estates can benefit from better information management
How education estates can benefit from better information management
 

Similaire à 5th Qatar BIM User Day, Defining the role of the BIM Manager

Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Sewell Construction
 
Barriers to bim implementation in gcc
Barriers to bim implementation in gccBarriers to bim implementation in gcc
Barriers to bim implementation in gccHamzeh Nawar, MCIOB
 
Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...
Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...
Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...Jad DELLEL
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th JanMartin Brown
 
PLS 2016: How does the BIM process fit with street lighting design and mainte...
PLS 2016: How does the BIM process fit with street lighting design and mainte...PLS 2016: How does the BIM process fit with street lighting design and mainte...
PLS 2016: How does the BIM process fit with street lighting design and mainte...Institution of Lighting Professionals
 
Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212AlistairGardner
 
BIM Bringing A Real Change in Construction
BIM Bringing A Real Change in ConstructionBIM Bringing A Real Change in Construction
BIM Bringing A Real Change in ConstructionSukh Singh, MBA
 
Foundation works norwich - 15th october 2012
Foundation works   norwich - 15th october 2012Foundation works   norwich - 15th october 2012
Foundation works norwich - 15th october 2012carolmcnulty
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionReshma Philip
 
Mapping Building Design & Construction with BIM Coordination​​
Mapping Building Design & Construction with BIM Coordination​​Mapping Building Design & Construction with BIM Coordination​​
Mapping Building Design & Construction with BIM Coordination​​Top BIM Company
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 

Similaire à 5th Qatar BIM User Day, Defining the role of the BIM Manager (20)

Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
 
Barriers to bim implementation in gcc
Barriers to bim implementation in gccBarriers to bim implementation in gcc
Barriers to bim implementation in gcc
 
Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...
Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...
Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
 
PLS 2016: How does the BIM process fit with street lighting design and mainte...
PLS 2016: How does the BIM process fit with street lighting design and mainte...PLS 2016: How does the BIM process fit with street lighting design and mainte...
PLS 2016: How does the BIM process fit with street lighting design and mainte...
 
Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
BIM Bringing A Real Change in Construction
BIM Bringing A Real Change in ConstructionBIM Bringing A Real Change in Construction
BIM Bringing A Real Change in Construction
 
Foundation works norwich - 15th october 2012
Foundation works   norwich - 15th october 2012Foundation works   norwich - 15th october 2012
Foundation works norwich - 15th october 2012
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
Mapping Building Design & Construction with BIM Coordination​​
Mapping Building Design & Construction with BIM Coordination​​Mapping Building Design & Construction with BIM Coordination​​
Mapping Building Design & Construction with BIM Coordination​​
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
Spar2010murphy
Spar2010murphySpar2010murphy
Spar2010murphy
 
Make BIM work for you
Make BIM work for youMake BIM work for you
Make BIM work for you
 
Bim
BimBim
Bim
 
Bim
BimBim
Bim
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
RICS perspective on project managers and BIM - Matthew Saunders
RICS perspective on project managers and BIM - Matthew SaundersRICS perspective on project managers and BIM - Matthew Saunders
RICS perspective on project managers and BIM - Matthew Saunders
 

Plus de BIM User Day

4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case StudyBIM User Day
 
4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market OutlookBIM User Day
 
4th Qatar BIM User Day, Collaboration or Co-Operation
4th Qatar BIM User Day, Collaboration or Co-Operation4th Qatar BIM User Day, Collaboration or Co-Operation
4th Qatar BIM User Day, Collaboration or Co-OperationBIM User Day
 
4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and StrategiesBIM User Day
 
4th Qatar BIM User Day, BIM Protocols for Qatar
4th Qatar BIM User Day, BIM Protocols for Qatar4th Qatar BIM User Day, BIM Protocols for Qatar
4th Qatar BIM User Day, BIM Protocols for QatarBIM User Day
 
4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in ContractsBIM User Day
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and StandardsBIM User Day
 
4th Qatar BIM User Day, BIM and the Law
4th Qatar BIM User Day, BIM and the Law4th Qatar BIM User Day, BIM and the Law
4th Qatar BIM User Day, BIM and the LawBIM User Day
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FMBIM User Day
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating TechnologyBIM User Day
 
2nd Qatar BIM User Day BIM Technology Outlook
2nd Qatar BIM User Day  BIM Technology Outlook2nd Qatar BIM User Day  BIM Technology Outlook
2nd Qatar BIM User Day BIM Technology OutlookBIM User Day
 
2nd Qatar BIM User Day Document Control and Collaboration Technologies
2nd Qatar BIM User Day  Document Control and Collaboration Technologies2nd Qatar BIM User Day  Document Control and Collaboration Technologies
2nd Qatar BIM User Day Document Control and Collaboration TechnologiesBIM User Day
 
2nd Qatar BIM User Day BIM Technology Market Demand
2nd Qatar BIM User Day  BIM Technology  Market Demand2nd Qatar BIM User Day  BIM Technology  Market Demand
2nd Qatar BIM User Day BIM Technology Market DemandBIM User Day
 
2nd Qatar BIM User Day Design Technology
2nd Qatar BIM User Day  Design Technology2nd Qatar BIM User Day  Design Technology
2nd Qatar BIM User Day Design TechnologyBIM User Day
 
2nd Qatar BIM User Day Doha 3D – Award Ceremony
2nd Qatar BIM User Day  Doha 3D – Award Ceremony2nd Qatar BIM User Day  Doha 3D – Award Ceremony
2nd Qatar BIM User Day Doha 3D – Award CeremonyBIM User Day
 
1st Qatar BIM User DAY Market demand/requirements
1st Qatar BIM User DAY  Market demand/requirements1st Qatar BIM User DAY  Market demand/requirements
1st Qatar BIM User DAY Market demand/requirementsBIM User Day
 
1st Qatar BIM User DAY BIM processes Case Study #2
1st Qatar BIM User DAY  BIM processes Case Study #21st Qatar BIM User DAY  BIM processes Case Study #2
1st Qatar BIM User DAY BIM processes Case Study #2BIM User Day
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2
1st Qatar BIM User Day Business processes supported by BIM methodology, part 21st Qatar BIM User Day Business processes supported by BIM methodology, part 2
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2BIM User Day
 
1st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #11st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #1BIM User Day
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 3
1st Qatar BIM User Day Business processes supported by BIM methodology, part 31st Qatar BIM User Day Business processes supported by BIM methodology, part 3
1st Qatar BIM User Day Business processes supported by BIM methodology, part 3BIM User Day
 

Plus de BIM User Day (20)

4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study
 
4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook
 
4th Qatar BIM User Day, Collaboration or Co-Operation
4th Qatar BIM User Day, Collaboration or Co-Operation4th Qatar BIM User Day, Collaboration or Co-Operation
4th Qatar BIM User Day, Collaboration or Co-Operation
 
4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies
 
4th Qatar BIM User Day, BIM Protocols for Qatar
4th Qatar BIM User Day, BIM Protocols for Qatar4th Qatar BIM User Day, BIM Protocols for Qatar
4th Qatar BIM User Day, BIM Protocols for Qatar
 
4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards
 
4th Qatar BIM User Day, BIM and the Law
4th Qatar BIM User Day, BIM and the Law4th Qatar BIM User Day, BIM and the Law
4th Qatar BIM User Day, BIM and the Law
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
 
2nd Qatar BIM User Day BIM Technology Outlook
2nd Qatar BIM User Day  BIM Technology Outlook2nd Qatar BIM User Day  BIM Technology Outlook
2nd Qatar BIM User Day BIM Technology Outlook
 
2nd Qatar BIM User Day Document Control and Collaboration Technologies
2nd Qatar BIM User Day  Document Control and Collaboration Technologies2nd Qatar BIM User Day  Document Control and Collaboration Technologies
2nd Qatar BIM User Day Document Control and Collaboration Technologies
 
2nd Qatar BIM User Day BIM Technology Market Demand
2nd Qatar BIM User Day  BIM Technology  Market Demand2nd Qatar BIM User Day  BIM Technology  Market Demand
2nd Qatar BIM User Day BIM Technology Market Demand
 
2nd Qatar BIM User Day Design Technology
2nd Qatar BIM User Day  Design Technology2nd Qatar BIM User Day  Design Technology
2nd Qatar BIM User Day Design Technology
 
2nd Qatar BIM User Day Doha 3D – Award Ceremony
2nd Qatar BIM User Day  Doha 3D – Award Ceremony2nd Qatar BIM User Day  Doha 3D – Award Ceremony
2nd Qatar BIM User Day Doha 3D – Award Ceremony
 
1st Qatar BIM User DAY Market demand/requirements
1st Qatar BIM User DAY  Market demand/requirements1st Qatar BIM User DAY  Market demand/requirements
1st Qatar BIM User DAY Market demand/requirements
 
1st Qatar BIM User DAY BIM processes Case Study #2
1st Qatar BIM User DAY  BIM processes Case Study #21st Qatar BIM User DAY  BIM processes Case Study #2
1st Qatar BIM User DAY BIM processes Case Study #2
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2
1st Qatar BIM User Day Business processes supported by BIM methodology, part 21st Qatar BIM User Day Business processes supported by BIM methodology, part 2
1st Qatar BIM User Day Business processes supported by BIM methodology, part 2
 
1st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #11st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #1
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 3
1st Qatar BIM User Day Business processes supported by BIM methodology, part 31st Qatar BIM User Day Business processes supported by BIM methodology, part 3
1st Qatar BIM User Day Business processes supported by BIM methodology, part 3
 

Dernier

The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Conny Dethloff
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfcoolsnoopy1
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Designshakkardaddy
 
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...dsnow9802
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teamsshakkardaddy
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Managementshakkardaddy
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesMassimo Canducci
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Nagarjuna Reddy Aturi
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONHOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONsivani14565220
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationPMIUKChapter
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 

Dernier (20)

The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdf
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
 
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teams
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Management
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human Resources
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONHOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentation
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 

5th Qatar BIM User Day, Defining the role of the BIM Manager

  • 1. 1Andrew Snowball Defining the Role of the BIM Manager Andrew Snowball | BSc, EngTech, TIStructE BIM Lead at Cundall
  • 2. 2Andrew Snowball Introduction • Andrew Snowball – BIM Lead at Cundall – Over 8 years' experience (6 involving BIM) – Civil & Structural – BSc Civil Engineering – Technician Member of The Institute of Structural Engineers (TIstructE) – Engineering Council Registered (EngTech) – Autodesk Certified Professional
  • 3. 3Andrew Snowball Content • Introduction • Defining the role of the BIM Manager – Why appoint a BIM Manager – Defining BIM Management • The different types of BIM Manager • Summary
  • 4. 4Andrew Snowball Project BIM Manager BIM Coordinator Information Manager Common Data Environment Technical BIM Managers Internal BIM Manager Technicians Models Design Drawings Construction BIM Manager Internal BIM Manager Technicians Fabrication Installation Sequencing Costing BIM Management Structure
  • 5. 5Andrew Snowball Why appoint a BIM Manager? • Issues arising from not appointing a BIM Manager – Poor coordination – Increased project costs – Delays to programme – Code & Standards conflicts – Biased solutions to project obstacles • When to appoint a BIM Manager? – Before appointing technical design teams • Benefits to appointing a BIM Manager? – Key to unlocking a projects potential
  • 6. 6Andrew Snowball Defining the Roles • 4 Key areas of Management – Model & Drawing Management – Information Management – Design & Construction Management – Stakeholder Management • Effective BIM Management – It’s everyone's responsibility – More than one BIM Manger is needed
  • 7. 7Andrew Snowball Types of BIM Manager • Typically there are 6 types of BIM Manager – 5 are project related roles – The other is an internal role within an organisation • Project BIM Managers • BIM Coordinators • Information Manager • Technical BIM Manager • Construction BIM Manager • Internal BIM Managers
  • 8. 8Andrew Snowball Project BIM Manager BIM Coordinator Information Manager Common Data Environment Technical BIM Managers Internal BIM Manager Technicians Models Design Drawings Construction BIM Manager Internal BIM Manager Technicians Fabrication Installation Sequencing Costing BIM Management Structure
  • 9. 9Andrew Snowball The Project BIM Manager Prerequisites • Appointed early in the projects life cycle • Should form part of the Clients Team • Should be suitably experienced with similar projects in size and complexity • Do not produce Design & Construction BIMs
  • 10. 10Andrew Snowball The Project BIM Manager Roles & Responsibilities • Overall coordination responsibility for Design & Construction BIM’s • Clash Detection & Reports • Produce the Employers Information Requirements (EIR’s), Project BIM Execution Plans (BEP) including any Project BIM Templates • Set the Geospatial Location of the Project
  • 11. 11Andrew Snowball The Project BIM Manager Continued… • Implement & Manage the Common Data Environment • Audits deliverables to ensure they meet the BEP & EIR’s • Coordinate COBie data and asset information between the Design & Construction teams for integration of Facilities Management Systems
  • 12. 12Andrew Snowball Project BIM Manager BIM Coordinator Information Manager Common Data Environment Technical BIM Managers Internal BIM Manager Technicians Models Design Drawings Construction BIM Manager Internal BIM Manager Technicians Fabrication Installation Sequencing Costing BIM Management Structure
  • 13. 13Andrew Snowball BIM Coordinator Information Manager • BIM coordinators fulfil some or all of the duties of the Project BIM Manager • Report directly to the Project BIM Manager • Implement & Manage the CDE while ensuring all deliverables are uploaded to the CDE • Audit deliverables to ensure they meet the BEP & EIR’s • Coordinate COBie data and asset information between the Design & Construction teams for integration of Facilities Management Systems
  • 14. 14Andrew Snowball Project BIM Manager BIM Coordinator Information Manager Common Data Environment Technical BIM Managers Internal BIM Manager Technicians Models Design Drawings Construction BIM Manager Internal BIM Manager Technicians Fabrication Installation Sequencing Costing BIM Management Structure
  • 15. 15Andrew Snowball The Technical BIM Manager Prerequisites • Should be represented by each design team • Should have relevant experience in managing projects of similar size and complexity • Should be empowered to manage; – Technicians – Building Information Model • Primary role is to Manage & Coordinate the BIMs not the production of model and deliverables
  • 16. 16Andrew Snowball The Technical BIM Manager Roles & Responsibilities • Overall responsibility of their organisations BIMs • Key contact for all aspects relating to the BIMs & their deliverables • Attend BIM Coordination Meetings & Design Team meetings • Provide assistance to the Project BIM Manager in creating the BEP
  • 17. 17Andrew Snowball The Technical BIM Manager Continued… • Review & Coordinate all information that is to be issued externally or uploaded to the CDE • Prepare BIM Progress Reports (BPR’s) • Ensure all internal team members are suitably trained and have the correct hardware and software
  • 18. 18Andrew Snowball Project BIM Manager BIM Coordinator Information Manager Common Data Environment Technical BIM Managers Internal BIM Manager Technicians Models Design Drawings Construction BIM Manager Internal BIM Manager Technicians Fabrication Installation Sequencing Costing BIM Management Structure
  • 19. 19Andrew Snowball The Construction BIM Manager Prerequisites • Should have relevant experience in managing projects of similar size and complexity • Should be in a position to manage sub-contractors BIM deliverables, technicians and the BIMs
  • 20. 20Andrew Snowball The Construction BIM Manager Roles & Responsibilities • Overall responsibility for all construction BIMs • Ensure construction BIMs meet the design intent • Key contact for BIMs & their deliverables • Coordinate the sequencing and scheduling of resources to arrive on site at predetermined times. • Prepare BIM Progress Reports (BPR’s)
  • 21. 21Andrew Snowball The Construction BIM Manager Continued… • Coordinate all changes during construction with the design teams for inclusion in the final federated BIM • Produce and coordinate the ‘As Built’ information through continual surveying during construction • Ensure all construction teams are suitably trained and have the correct hardware and software • Coordinate with the other BIM Managers to ensure COBie data & asset information is complete
  • 22. 22Andrew Snowball Project BIM Manager BIM Coordinator Information Manager Common Data Environment Technical BIM Managers Internal BIM Manager Technicians Models Design Drawings Construction BIM Manager Internal BIM Manager Technicians Fabrication Installation Sequencing Costing BIM Management Structure
  • 23. 23Andrew Snowball The Internal BIM Manager • Historical roles are being redefined – BIM roles are still being defined • Internal BIM Managers – What do they do? – Why are they important? – Clearing the confusion with Internal BIM Managers • BIM Administrator • BIM Executive • Digital Design Manager
  • 24. 24Andrew Snowball Summary • More than one type of BIM Manager is needed for the success of the project • Early appointment of Project BIM Managers • Project BIM Managers present for the whole project lifecycle • BIM Managers manage the BIMs not model them • BIM Management is the responsibility of all project team members