2. • Detailed Drawings
• Carcassing
• Aluminium
• Fixings
• Full Material Schedule
• Full packing & Pallet Schedule
• Product Identification
• PPC to Akzo 30 year standard
• Packing
All in one Delivery
Hidden Values
30 Years of Quality
1986 - 2013
5. How to achieve what you want:
Rainwater flow
Texture and profile of roof
• Roof edge shape
• Location
• Roof area
• Rainfall Intensity
• Number and capacity of outlets
… but data is over 25 years old
Drainage design
11. 1000 hour salt spray test
Results: No Blistering,Softening or detachment
of coating.
Impact test (0.908kg from 0,25m high)
Results: No Cracking or detachment of Coating.
Permeability test (2 hour pressure cooker)
Results: No Blistering or detachment of Coating.
Adhesion test (2mm cross hatch) Results: No
Flaking or removal of the Coating.
Flexibility test (20mm mandrel)
Results: No Cracking or detachment of the
Coating.
MIBK cure test
Results: No Removal of the coating or significant
softening of the film.
Salt testing
Tests
Notes de l'éditeur
Today Contractors and subcontractors need to be assured that they are getting value for their money and this is not solely down cost of material but includes the efficiency of the delivery, scheduling of material( drawings, components and fixings) to the ease of installation.
Eaves ventilation can be accommodated within soffit panels. Particularly NB in cold roof designs or to allow timber structures to breathe. Requirements are typically 10mm or 25mm continuous ventilation. This is achieved using 1 or 2 rows of 25mm x 2mm punched slots.