2. North Bill Disposal Capabilities
• 11 evaporative ponds totaling nearly 6 million
barrels
• Our state-of-the-art offload facility will drastically
reduce your trucking costs by unloading at an
expedited rate of 8 minutes per 130 barrels, cutting
your costs in half
• 4 unloading stations with the ability to quickly
acquire 2 additional stations
• Accepts oilfield produced and flowback water on
a per barrel basis
• Competitively priced with even further reduced rates
at higher volumes
• Fresh water available in large capacity through
6 meter stations that are simple and accurate
• 100% compliant with the strict standards
and regulations of Wyoming Department of
Environmental Quality, United States Environmental
Protection Agency, and Wyoming Game and Fish
Department
North Bill Disposal, family owned and operated, is an expansive oilfield waste water
disposal plant serving the Powder River Basin of Wyoming.
Services
• Oilfield waste water disposal plant
• Fresh water
• Oilfield produced and flowback water on a per
barrel basis
Offload Facility
Evaporation Ponds
Fresh
Water
Storage
3. Call to Make Arrangements
for Disposal
Manager/Plant (307) 359-0341
Office (307) 358-1885
Hours of Operation
7:00am to 7:00pm 7 days a week
24 hours upon request
Location
Conveniently located on Hwy 59 at
mile marker 41 just north of Bill,
Wyoming
Steckley Road
Powder River Basin