SlideShare a Scribd company logo
1 of 2
Download to read offline
This state-of-the-art strategic pipelay and heavy lift vessel is ideally
suited to meeting the exacting requirements of today’s ultra-deep
and deepwater projects, in the world’s harshest environments.
•	 Length 182m x breadth 46m
•	 600t tension S-lay up to 46-inch pipe diameter
•	 937t top tension J-lay system up to 24-inch pipe diameter
•	 2,800t onboard pipe storage
•	 Mast crane: capacity main hoist 5,000t; 1,200t heave
compensated aux hoist
•	 Accommodation for 399 persons
•	 2 x work-class 3,000 rated ROVs
seabed-to-surface
Seven
Borealis
Pipelay /
Heavy Lift
General Information
Type	 Pipelay / Heavy Lift
DnV Class Notation	 +1A1 Crane Vessel HELDK-SH OPP-F E0
DYNPOS-AUTRO NAUT-AW CLEAN DESIGN
DK BIS
Call Sign	 C6YG8	
Flag	 Bahamas		
Year Built	 Delivery 2012
Principal Dimensions
Length Overall (m)	 182.2m		
Breadth (m)	 46.2m		
Depth Main Deck (m)	 16.1m		
Operating Draft (m)	 8.5m to 11.35m		
Transit Speed (knots)	 12 knots		
Endurance (days)	 45 days in transit with 220 persons
	 45 days on DP with 399 persons
DP System
DP Classification	 K-POS DP Class III	
Reference Systems	 3 x Gyros, 3 x MRU, 4 x wind sensors,
3 x DGPS, 2 x HiPAP, 1 x Radius, 1 x Taut
Wire + interfaces for extra Taut Wire, 1 x
Fanbeam, 2 x Seapath 320
Power and Propulsion
Main Engines/Generators	
Number	6	
Type	 Rolls-Royce B32:40 V12A 720 rpm diesel
engines	
Power (kW)	 5,760kW each		
			
Emergency/Harbour Generator	
Number	1	
Type	 MTU, V12 4000 Series	
Power (kW)	 1,600kW	
			
Thrusters for Propulsion and DP	
Number	 2 x azimuth thrusters	
Type	 Rolls-Royce UUC 455 FP, underwater
demountable	
Power (kW)	 5,500kW each	
Location	Stern	
			
Thrusters for DP	
Number	 4 x azimuth thrusters, vertically retractable
Type	 Rolls-Royce UL 305 FP 	
Power (kW)	 3,200kW	
Location	 3 at bow, 1 at stern	
Number	 1 x tunnel thruster	
Type	 Rolls-Royce TT 3,000 CP 	
Power (kW)	 2,500kW	
Location	Bow
Main Deck
Clear Deck Area (m²)	 730m² 	
Deck Strength (t/m²)	 10t/m²
Pipe Deck Storage Capacity 	 2,800t
Seven Borealis
Capacities
Fuel Oil	 HFO/MDO: 3080m³, MDO: 3360m³	
Lubricating Oil (m³)	 64m³		
Fresh Water (m³)	 1,123m³		
Ballast Water (m³)	 20,600m³
Technical Water (m³)	 700m³
Accommodation
Berths (No.)	 231 in single or double cabins
or 405 in single / double / 4 x man cabins
Cabins (No.)	 127
Helideck
Type	 Aluminium - Suitable for S-92
	 NMD compliant
Pipelaying Systems
Rigid S-lay:	
Max Tension (t)	 600t dynamic	
Tensioners (No. and type)	 3 x Huisman BV vertical two track tensioners
	 Variable speed electric drive motors
Pipe Range (inches)	 4.5 - 46 inches with coating
Storage Capacity of Pipe (t)	 4 x 700t SJs on starboard side deck
Total 2,800t
Work Stations (No.)	 11 single joint stations or 6 double joint
stations
Stinger (m)	 3 section stinger
Stinger length 92.5m, radius 70 to 300m
Operating Water Depth (m)	 20m - 3,000m	
A&R Capacity (t)	 600t traction winch, 200t CT drum winch
S-lay Comments	 Steep S-lay system, up to 90 deg departure	
			
Rigid J-lay: 	
Max Tension (t)	 937t dynamic	
Pipe Range (inches)	 4-inch minimum, 24-inch maximum with
coating (Friction Clamp), 36-inch with
coating (Collar), 72-inch clearance for
passing through inline tees, etc	
Work Stations (No.)	 2 work stations
WS1 for welding/NDT, WS2 for NDT/coating
Joint Type	 Double joint nominal length 24.6m, range
19.0m to 26.0m, 40t maximum weight	
Operating Water Depth (m)	 3,000m	
A&R Capacity (t)	 600t dynamic outside J-lay tower
360t dynamic insider J-lay tower
PLET Handling capacity	 100t 	
J-lay Comments	 Active gimballing mode - gimbal max angle
15°. Tower can handle pipe catenary using
either friction clamps or collar clamps
Outriggers	 Portside provision for 1,000t hangoff
	 Starboard side provision for 1,225t hangoff	
		
Flexible lay:	 Provision for future system installation
Cranes
Main Crane Capacity (mt)	 5,000t (stability permitting)	
Location	 Main deck centreline aft	
Manufacturer	 Huisman Equipment BV	
Dual Main Hoist, Revolving 	 4,000t at 40m radius
	 1,500t at 78m radius	
Auxiliary Hoist
(Subsea Hook)	 1,200t at 70m radius, 4 falls
	 600t at 103m radius, 2 falls	
Operating Water Depth (m)	 6,000m - single fall	
Active Heave Compensation	 Auxiliary hoist only	
Whip Line	 Single fall: 55t at all radii
	 Double fall: 110t at all radii 	
Main Crane Tugger Winches	 4 x 45t pull. Constant tension up to 22t each
Main Crane Comments	 Main block is splitable into two blocks/hooks
to allow jacket upending
Three point lifts can be achieved using the
two main blocks and the auxiliary block
Auxiliary Cranes				
Number	 3		
Capacity and Location	 40t Dreggen knuckle boom on starboard side
	 40t Dreggen knuckle boom on port side Aft
	 36t Huisman PMOC on port side Fwd
ROV System
ROVs (No. and type)	 2 x work-class ROVs, ACV type by Schilling
Operating Depth Rating (m)	 3,000m with 1,500m long tether	
ROV Comments	 LARS: Techmal HF 135 using an electric
Active Heave Compensation winch
	 Umbilical winch: MacArtney
	 MASH 34.4-3400
www.subsea7.com
© Subsea 7, 2015
Information correct at time of going to press
M
arch
2015

More Related Content

What's hot

in-pit crushing and conveing system (IPCC)
in-pit crushing and conveing system (IPCC)in-pit crushing and conveing system (IPCC)
in-pit crushing and conveing system (IPCC)NileshSingh206
 
Highwall Mining System
Highwall Mining SystemHighwall Mining System
Highwall Mining Systemibrahim şenol
 
Astec Australia Hydraulic Breakers & Boom Systems
Astec Australia Hydraulic Breakers & Boom SystemsAstec Australia Hydraulic Breakers & Boom Systems
Astec Australia Hydraulic Breakers & Boom SystemsAstec Australia
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder pptAMIT SAHU
 
Dragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliDragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliTauhid Mohammad
 
Designing a shaft system
Designing a shaft systemDesigning a shaft system
Designing a shaft systemSafdar Ali
 
Design of Auger highwall mining
Design of Auger highwall miningDesign of Auger highwall mining
Design of Auger highwall miningBoeut Sophea
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning MaterialBhaskar Naidu
 
Semimechanization sdls&lh ds
Semimechanization sdls&lh dsSemimechanization sdls&lh ds
Semimechanization sdls&lh dsSATYANARAYANA I
 
Astec Australia - Mobile Underground Mining
Astec Australia - Mobile Underground MiningAstec Australia - Mobile Underground Mining
Astec Australia - Mobile Underground MiningAstec Australia
 
Design and Performance of Highwall Mining
Design and Performance of Highwall MiningDesign and Performance of Highwall Mining
Design and Performance of Highwall MiningShantanu kumar
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface minesSafdar Ali
 

What's hot (19)

Continuous miner
Continuous minerContinuous miner
Continuous miner
 
in-pit crushing and conveing system (IPCC)
in-pit crushing and conveing system (IPCC)in-pit crushing and conveing system (IPCC)
in-pit crushing and conveing system (IPCC)
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Highwall Mining System
Highwall Mining SystemHighwall Mining System
Highwall Mining System
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Astec Australia Hydraulic Breakers & Boom Systems
Astec Australia Hydraulic Breakers & Boom SystemsAstec Australia Hydraulic Breakers & Boom Systems
Astec Australia Hydraulic Breakers & Boom Systems
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
 
Dragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliDragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauli
 
Designing a shaft system
Designing a shaft systemDesigning a shaft system
Designing a shaft system
 
In-Pit Crushing and Conveying Systems
In-Pit Crushing and Conveying SystemsIn-Pit Crushing and Conveying Systems
In-Pit Crushing and Conveying Systems
 
Design of Auger highwall mining
Design of Auger highwall miningDesign of Auger highwall mining
Design of Auger highwall mining
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Auxiliary equipment
Auxiliary equipmentAuxiliary equipment
Auxiliary equipment
 
Semimechanization sdls&lh ds
Semimechanization sdls&lh dsSemimechanization sdls&lh ds
Semimechanization sdls&lh ds
 
Astec Australia - Mobile Underground Mining
Astec Australia - Mobile Underground MiningAstec Australia - Mobile Underground Mining
Astec Australia - Mobile Underground Mining
 
High Wall Mining
High Wall MiningHigh Wall Mining
High Wall Mining
 
Design and Performance of Highwall Mining
Design and Performance of Highwall MiningDesign and Performance of Highwall Mining
Design and Performance of Highwall Mining
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface mines
 

Viewers also liked

7 Herramientas de Productividad
7 Herramientas de Productividad7 Herramientas de Productividad
7 Herramientas de Productividadcomovivirdelarte
 
ELIXIR-UK and the ELIXIR Interoperability Platform
ELIXIR-UK and the ELIXIR Interoperability PlatformELIXIR-UK and the ELIXIR Interoperability Platform
ELIXIR-UK and the ELIXIR Interoperability PlatformELIXIR UK
 
20151231法務部:「第14任總統副總統及第9屆立法委員選舉查察工作執行」報告
20151231法務部:「第14任總統副總統及第9屆立法委員選舉查察工作執行」報告20151231法務部:「第14任總統副總統及第9屆立法委員選舉查察工作執行」報告
20151231法務部:「第14任總統副總統及第9屆立法委員選舉查察工作執行」報告R.O.C.Executive Yuan
 
Reshoots
ReshootsReshoots
ReshootsWood95
 
20160310交通部:「提升氣象及地震測報能力相關計畫執行成效」報告
20160310交通部:「提升氣象及地震測報能力相關計畫執行成效」報告20160310交通部:「提升氣象及地震測報能力相關計畫執行成效」報告
20160310交通部:「提升氣象及地震測報能力相關計畫執行成效」報告R.O.C.Executive Yuan
 
Taller practico de oratoria
Taller practico de oratoriaTaller practico de oratoria
Taller practico de oratoriacomovivirdelarte
 
20160616經濟部:「節電推動進展與檢討」
20160616經濟部:「節電推動進展與檢討」 20160616經濟部:「節電推動進展與檢討」
20160616經濟部:「節電推動進展與檢討」 R.O.C.Executive Yuan
 
Our North, whose future: What is the scope for Aboriginal workforce development?
Our North, whose future: What is the scope for Aboriginal workforce development?Our North, whose future: What is the scope for Aboriginal workforce development?
Our North, whose future: What is the scope for Aboriginal workforce development?Ninti_One
 
Global shipping
Global shipping Global shipping
Global shipping ProColombia
 
MBa project HRM
MBa project HRMMBa project HRM
MBa project HRMGobi Nath
 

Viewers also liked (13)

Cps Bud
Cps BudCps Bud
Cps Bud
 
7 Herramientas de Productividad
7 Herramientas de Productividad7 Herramientas de Productividad
7 Herramientas de Productividad
 
ELIXIR-UK and the ELIXIR Interoperability Platform
ELIXIR-UK and the ELIXIR Interoperability PlatformELIXIR-UK and the ELIXIR Interoperability Platform
ELIXIR-UK and the ELIXIR Interoperability Platform
 
20151231法務部:「第14任總統副總統及第9屆立法委員選舉查察工作執行」報告
20151231法務部:「第14任總統副總統及第9屆立法委員選舉查察工作執行」報告20151231法務部:「第14任總統副總統及第9屆立法委員選舉查察工作執行」報告
20151231法務部:「第14任總統副總統及第9屆立法委員選舉查察工作執行」報告
 
Reshoots
ReshootsReshoots
Reshoots
 
20160310交通部:「提升氣象及地震測報能力相關計畫執行成效」報告
20160310交通部:「提升氣象及地震測報能力相關計畫執行成效」報告20160310交通部:「提升氣象及地震測報能力相關計畫執行成效」報告
20160310交通部:「提升氣象及地震測報能力相關計畫執行成效」報告
 
Rajan Sinha
Rajan SinhaRajan Sinha
Rajan Sinha
 
Suryanarayana Resume_2
Suryanarayana Resume_2Suryanarayana Resume_2
Suryanarayana Resume_2
 
Taller practico de oratoria
Taller practico de oratoriaTaller practico de oratoria
Taller practico de oratoria
 
20160616經濟部:「節電推動進展與檢討」
20160616經濟部:「節電推動進展與檢討」 20160616經濟部:「節電推動進展與檢討」
20160616經濟部:「節電推動進展與檢討」
 
Our North, whose future: What is the scope for Aboriginal workforce development?
Our North, whose future: What is the scope for Aboriginal workforce development?Our North, whose future: What is the scope for Aboriginal workforce development?
Our North, whose future: What is the scope for Aboriginal workforce development?
 
Global shipping
Global shipping Global shipping
Global shipping
 
MBa project HRM
MBa project HRMMBa project HRM
MBa project HRM
 

Similar to Seven Borealis

Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfsalem123gmaal
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specificationPrabhakar Tiwari
 
Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Anatolijs Krjucenkovs
 
Nordica_Spec_2016-esite pieni versio
Nordica_Spec_2016-esite pieni versioNordica_Spec_2016-esite pieni versio
Nordica_Spec_2016-esite pieni versioMatti Westerlund
 
ZDY6000LD(B) In-seam Directional Drill Rig
ZDY6000LD(B) In-seam Directional Drill RigZDY6000LD(B) In-seam Directional Drill Rig
ZDY6000LD(B) In-seam Directional Drill RigOwen Ji
 
PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)Zorareh Nouri
 
Deepwater rig improvement ops
Deepwater rig improvement opsDeepwater rig improvement ops
Deepwater rig improvement opsamrhaggag
 
Редукторы серии U Power Jacks
Редукторы серии U Power JacksРедукторы серии U Power Jacks
Редукторы серии U Power JacksArve
 
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSFugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSErik-André Albrecht
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's FleetBOURBON
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 

Similar to Seven Borealis (20)

Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdf
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specification
 
S3000
S3000S3000
S3000
 
Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014
 
2848spm_norMAXIMUS
2848spm_norMAXIMUS2848spm_norMAXIMUS
2848spm_norMAXIMUS
 
Skandi Acergy
Skandi AcergySkandi Acergy
Skandi Acergy
 
Nordica_Spec_2016-esite pieni versio
Nordica_Spec_2016-esite pieni versioNordica_Spec_2016-esite pieni versio
Nordica_Spec_2016-esite pieni versio
 
Archer Modular Rigs
Archer Modular RigsArcher Modular Rigs
Archer Modular Rigs
 
ZDY6000LD(B) In-seam Directional Drill Rig
ZDY6000LD(B) In-seam Directional Drill RigZDY6000LD(B) In-seam Directional Drill Rig
ZDY6000LD(B) In-seam Directional Drill Rig
 
PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)
 
Deepwater rig improvement ops
Deepwater rig improvement opsDeepwater rig improvement ops
Deepwater rig improvement ops
 
Normand Cutter
Normand CutterNormand Cutter
Normand Cutter
 
Редукторы серии U Power Jacks
Редукторы серии U Power JacksРедукторы серии U Power Jacks
Редукторы серии U Power Jacks
 
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSFugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's Fleet
 
wellservicer_wbb
wellservicer_wbbwellservicer_wbb
wellservicer_wbb
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Seven Falcon
Seven FalconSeven Falcon
Seven Falcon
 
Norshore Atlantic specifications
Norshore Atlantic specificationsNorshore Atlantic specifications
Norshore Atlantic specifications
 
AW3000
AW3000AW3000
AW3000
 

Seven Borealis

  • 1. This state-of-the-art strategic pipelay and heavy lift vessel is ideally suited to meeting the exacting requirements of today’s ultra-deep and deepwater projects, in the world’s harshest environments. • Length 182m x breadth 46m • 600t tension S-lay up to 46-inch pipe diameter • 937t top tension J-lay system up to 24-inch pipe diameter • 2,800t onboard pipe storage • Mast crane: capacity main hoist 5,000t; 1,200t heave compensated aux hoist • Accommodation for 399 persons • 2 x work-class 3,000 rated ROVs seabed-to-surface Seven Borealis Pipelay / Heavy Lift
  • 2. General Information Type Pipelay / Heavy Lift DnV Class Notation +1A1 Crane Vessel HELDK-SH OPP-F E0 DYNPOS-AUTRO NAUT-AW CLEAN DESIGN DK BIS Call Sign C6YG8 Flag Bahamas Year Built Delivery 2012 Principal Dimensions Length Overall (m) 182.2m Breadth (m) 46.2m Depth Main Deck (m) 16.1m Operating Draft (m) 8.5m to 11.35m Transit Speed (knots) 12 knots Endurance (days) 45 days in transit with 220 persons 45 days on DP with 399 persons DP System DP Classification K-POS DP Class III Reference Systems 3 x Gyros, 3 x MRU, 4 x wind sensors, 3 x DGPS, 2 x HiPAP, 1 x Radius, 1 x Taut Wire + interfaces for extra Taut Wire, 1 x Fanbeam, 2 x Seapath 320 Power and Propulsion Main Engines/Generators Number 6 Type Rolls-Royce B32:40 V12A 720 rpm diesel engines Power (kW) 5,760kW each Emergency/Harbour Generator Number 1 Type MTU, V12 4000 Series Power (kW) 1,600kW Thrusters for Propulsion and DP Number 2 x azimuth thrusters Type Rolls-Royce UUC 455 FP, underwater demountable Power (kW) 5,500kW each Location Stern Thrusters for DP Number 4 x azimuth thrusters, vertically retractable Type Rolls-Royce UL 305 FP Power (kW) 3,200kW Location 3 at bow, 1 at stern Number 1 x tunnel thruster Type Rolls-Royce TT 3,000 CP Power (kW) 2,500kW Location Bow Main Deck Clear Deck Area (m²) 730m² Deck Strength (t/m²) 10t/m² Pipe Deck Storage Capacity 2,800t Seven Borealis Capacities Fuel Oil HFO/MDO: 3080m³, MDO: 3360m³ Lubricating Oil (m³) 64m³ Fresh Water (m³) 1,123m³ Ballast Water (m³) 20,600m³ Technical Water (m³) 700m³ Accommodation Berths (No.) 231 in single or double cabins or 405 in single / double / 4 x man cabins Cabins (No.) 127 Helideck Type Aluminium - Suitable for S-92 NMD compliant Pipelaying Systems Rigid S-lay: Max Tension (t) 600t dynamic Tensioners (No. and type) 3 x Huisman BV vertical two track tensioners Variable speed electric drive motors Pipe Range (inches) 4.5 - 46 inches with coating Storage Capacity of Pipe (t) 4 x 700t SJs on starboard side deck Total 2,800t Work Stations (No.) 11 single joint stations or 6 double joint stations Stinger (m) 3 section stinger Stinger length 92.5m, radius 70 to 300m Operating Water Depth (m) 20m - 3,000m A&R Capacity (t) 600t traction winch, 200t CT drum winch S-lay Comments Steep S-lay system, up to 90 deg departure Rigid J-lay: Max Tension (t) 937t dynamic Pipe Range (inches) 4-inch minimum, 24-inch maximum with coating (Friction Clamp), 36-inch with coating (Collar), 72-inch clearance for passing through inline tees, etc Work Stations (No.) 2 work stations WS1 for welding/NDT, WS2 for NDT/coating Joint Type Double joint nominal length 24.6m, range 19.0m to 26.0m, 40t maximum weight Operating Water Depth (m) 3,000m A&R Capacity (t) 600t dynamic outside J-lay tower 360t dynamic insider J-lay tower PLET Handling capacity 100t J-lay Comments Active gimballing mode - gimbal max angle 15°. Tower can handle pipe catenary using either friction clamps or collar clamps Outriggers Portside provision for 1,000t hangoff Starboard side provision for 1,225t hangoff Flexible lay: Provision for future system installation Cranes Main Crane Capacity (mt) 5,000t (stability permitting) Location Main deck centreline aft Manufacturer Huisman Equipment BV Dual Main Hoist, Revolving 4,000t at 40m radius 1,500t at 78m radius Auxiliary Hoist (Subsea Hook) 1,200t at 70m radius, 4 falls 600t at 103m radius, 2 falls Operating Water Depth (m) 6,000m - single fall Active Heave Compensation Auxiliary hoist only Whip Line Single fall: 55t at all radii Double fall: 110t at all radii Main Crane Tugger Winches 4 x 45t pull. Constant tension up to 22t each Main Crane Comments Main block is splitable into two blocks/hooks to allow jacket upending Three point lifts can be achieved using the two main blocks and the auxiliary block Auxiliary Cranes Number 3 Capacity and Location 40t Dreggen knuckle boom on starboard side 40t Dreggen knuckle boom on port side Aft 36t Huisman PMOC on port side Fwd ROV System ROVs (No. and type) 2 x work-class ROVs, ACV type by Schilling Operating Depth Rating (m) 3,000m with 1,500m long tether ROV Comments LARS: Techmal HF 135 using an electric Active Heave Compensation winch Umbilical winch: MacArtney MASH 34.4-3400 www.subsea7.com © Subsea 7, 2015 Information correct at time of going to press M arch 2015