3. Henley Planning Issues:
• Protected Sites
• Bradgate Brickworks to the
southwest of the site -
Geological importance
• Refer to SOS?
• Development shouldn’t
impede access to the quarry
face or for maintenance of
the RIG
• Drainage of development
shouldn’t negatively impact
on the SSSI
• Known Interests Outside
Protected Sites
BEAM BfL Assessor Network Meeting, 13 October 2010
4. Henley Planning Issues:
• Flora and Fauna
• Vegetation along north and west
boundaries
• Replanting scheme as part of
landscaping condition / topography
helps
• Associated ecology
BEAM BfL Assessor Network Meeting, 13 October 2010
5. Henley Planning Issues:
• Highways / Routes
• Highways needed to be extended to
allow for potential future linkage
(pedestrian, cycle, vehicular, PROW??? )
• Adoptable standards? In part
• Visitor parking in wider carriageway not
bays
• Long and straight = need for traffic
calming
BEAM BfL Assessor Network Meeting, 13 October 2010
6. Henley Planning Issues:
• Additionalities
• Late funding
• Subsequent planning application for
Eco-Park/Zone
- Landscaping or material change of
use of land?
• Further consultation
BEAM BfL Assessor Network Meeting, 13 October 2010