SlideShare une entreprise Scribd logo
1  sur  5
Télécharger pour lire hors ligne
September 15, 2008

Protect the Project

Conceptual estimating technology helps the Texas Army National Guard stay in budget.

                      The federal government can be one of the most unforgiving of owners when it comes to
                      project budgets. Projects that fall within its jurisdiction are monitored with a scrupulous
                      eye, and those that don’t stay within the allocated resources run the risk of being
                      terminated.

                      Of course the key to keeping an eye on the budget is properly managing the estimating
                      phases. The problem with the traditional estimating methods, however, is they do not
                      provide the level of detail needed to keep all parties involved on the project—particularly,
                      the owner—on the same page.

                     This was precisely the case regarding a government-funded project in El Paso, Texas.
                     Just when it looked like this project was in jeopardy of getting off schedule and
exceeding the budget, the project team called in the reserves in the form of a new method of gathering cost-
estimation data through detailed data-rich models.

Early Warnings
Earlier this year, The Texas Army National Guard, www.agd.state.tx.us/army, Austin, Texas, commissioned a
project for a new reserve center and vehicle maintenance facility in El Paso, Texas.

The project encompasses a main facility area that includes general office and personnel support areas, while
ancillary facilities include maintenance work bays, military vehicle parking, site security measures, and access
roads.

A project of such magnitude requires tight coordination of multiple contractors, engineers, architects, and
estimators. This specific project is a state-owned facility funded by a cooperative agreement by the
government.

As a government-funded project, the 243,000-sq.ft. facility was required to continually meet the federal
funding requirements. The project falls under the BRAC (Base Realignment and Closure) from the DoD (U.S.
Dept. of Defense), www.defenselink.mil, Washington, D.C., which is used for organizing the installation
infrastructure of facilities and ships that are in the jurisdiction of the DoD, namely any infrastructure in the
United States.

The program examines the quality of infrastructure and aims to save billions of dollars on facilities annually.
The legally mandated selection criteria determine which installations should be closed or realigned.

Within BRAC, AFRCs (Armed Forces Reserve Centers) need to be closed or realigned when the missions of the
installation have ceased or been relocated.

In El Paso, Texas, the plan under BRAC is to relocate all units from five closed or realigned AFRCs to a new
AFRC with a Consolidated Equipment Concentration Site and Maintenance Facility.

This new project will provide a training facility with administrative, education, assembly, library, and a
learning center. The facility will also have a vault, weapons simulator, barracks areas, and physical fitness
areas for units. In addition, a maintenance shop will have work bays and maintenance administrative support.
Construction is just beginning on this facility. However, getting to the start date of construction was a bumpy
process. In particular was the challenge of getting the upfront design and estimate to continually meet the
government’s budget.

Jacobs Engineering Group, www.jacobs.com, Pasadena, Calif., which is the design firm on this project, began
working with estimators at Apex Cost Consultants, www.apexcost.com, Dallas, Texas, to develop and prepare
the conceptual estimate.

Claude Eudaric, president, Apex Cost Consultants, says the normal procedure for the cost estimator is to first
examine the type of building it is, and then develop a historical database.

“The historical database has all of the project types that we have done and we go in and we pick a similar
project type that we have done within the last six months to a year and what we do is we extrapolate what
the cost of this project would be based on the historical data that we have,” says Eudaric.

According to Eudaric, since it is a government project, the government sets the budget. And to set the
budget, the government uses the Form 1391, which is a government form used to estimate the cost of the
project. Still, Apex had to do conceptual budgets for the 10% and 35% phases of the estimate to verify the
predicted estimate from the government.

It didn’t take long before problems arose. Just 10% into the conceptual budget phase Apex Cost Consultants
found its numbers had exceeded the government’s budget and the project was in danger of getting off
schedule.

“Initially we turned in the estimate and (it) said that the project was 30% over budget, based on the 1391,”
says Eudaric. “So the first thing they did was they shot the messenger. They felt like we hadn’t provided them
enough backup data. How could we make such a determination without details and analysis of the project?”

Apex was positive, based on current market conditions, that the 30% overage was indeed correct.

“If you give a client the number they think it should be and then the project is off the bid and it blows up,
then the liability is on us because we gave them a number that was inaccurate,” says Eudaric.

At this point all parties were upset the project had exceeded the government’s budget. It reached a turning
point where the project had to be reevaluated with a new method of conceptual estimating.

Mission Recall
A few months later, Eudaric received an email from Jacobs Engineering asking for a new way to reevaluate the
project. Going into the 35% design, the team needed to convince the owners that the cost estimates were
accurate and help with creating the budget for this project.

Apex knew this required getting everyone involved—from the architect to the contractor to the government—
on the same page. To do so it needed to provide detailed information on the project’s estimate in a way
everyone could understand.

Apex decided to shift its processes from traditional methods of cost estimation to a new way of gathering
information through data-rich models. There began the search for a new technology solution to give all project
members a more detailed, macro view of cost estimation through modeling.

For the 35% phase, Apex approached Jacobs with the idea to use a new piece of technology that would help
bring the team within budget and essentially get the project back on schedule.

“I had gone to a demonstration and saw this three-dimensional software working,” says Eudaric. “And what
was so unique about it is it was creating an estimate in realtime. So as (it) was modeling this hypothetical
building, on the right hand side were all the costs.

“And what the software does is it allows you to build a cost model, but to also build it based on a virtual
building where you have dimensions (and) you have parameters. In other words, you are building this building
in virtual space and then putting a price to it.”

The software was DProfiler from Beck Technology, www.beck-technology.com, a technology division within
The Beck Group, www.beckgroup.com, Dallas, Texas, which addresses the macro view of the project.

According to Stewart Carroll, chief operating officer, Beck Technology, BIM (building information modeling)
can be categorized in two ways—a macro view and a micro view.

Much has been said in the industry regarding the value of BIM. At its core, BIM is a process in which multiple
members of a project gather the same detailed information from intelligent models. More specifically, the
macro view represents the big-picture view of the early phases of a project while the micro view comes a bit
later, answering the detailed questions of how to design, document, and build a project.

Products on the market that address the micro view include Revit from Autodesk, www.autodesk.com, San
Rafael, Calif. Bentley Architecture from Bentley Systems, www.bentley.com, Exton, Pa. and ArchiCAD from
Graphisoft, www.graphisoft.com, Budapest, Hungary. All of these technologies help contractors design,
document, and build the project.

Less common and newer to the construction industry are technologies for the macro view. According to
Carroll, contractors looking at the earliest phase of a project will likely ask themselves the ‘if’ and ‘what’
questions including:

      If I build this building, what are the ramifications?
      What are operating costs from an energy perspective?
      What are the lifecycle costs?
      What is the first cost of construction?
      What are all the assumptions we are going to plug in based on our history?

In conceptual estimating, estimators must make these key and critical assumptions in order to create a
complete estimate of design, according to Carroll.

DProfiler can help contractors create an accurate cost estimate in the planning and conception cost estimate
phases of a project and answer the key questions of ‘if’ and ‘what’ early on in the project.

“We focus on the early phases of getting teams together, clarifying assumptions, building a graphical
representation,” says Carroll. “Not to design, but to get everybody on the same page in terms of description of
scope, and out of (that) scope comes cost.”

In addition to providing improved team collaboration and communication, the technology also provides greater
accuracy of project data. DProfiler provides a graphical representation of all the estimate information so if
something doesn’t line up or was miscalculated, DProfiler can easily recognize the mistake. The product also
gives contractors the ability to perform quantity takeoff tasks in a significantly reduced amount of time.

One specific feature includes an integrated energy analysis, which studies energy cost impact of change,
analyzes LEED (Leadership in Energy and Environmental Design) qualifications, and determines HVAC
(heating, ventilation, and air conditioning) initial cost. DProfiler also includes RSMeans Data, which means the
construction estimate can reflect the average U.S. cost of any major city’s indexes.

The macro view of BIM is becoming more important because being able to look at 3D (three-dimensional)
models of detailed information on the estimate—as opposed to basic cost estimates in spreadsheets—gives a
visual element to the estimate. This helps any project member, regardless of experience using estimates, to
see and understand the scope of the estimate.

This was an important element in the Texas Army National Guard project, providing all project members with
the scope so everyone could understand where the project was in the conceptual estimate process.

Saving the Project
With the help of the technology, Apex and Beck did the MEP (mechanical, electrical, and plumbing) scope and
the architectural, structural, and site scope for the reserve center in El Paso, Texas.

Brent Pilgrim, project cost manager, The Beck Group, worked closely with Eudaric to help develop the
documents with models and graphical elements used to show the MEP and architectural, structural, and site
scope.

“What DProfiler does and the value that it brings is it provided such a level of detailed information that
everyone was able to comprehend it and digest it and understand why the project was over budget
understand where different costs were allocated,” says Pilgrim. “So we did the design criteria, the images, the
cost estimate, and we provided the deliverable to the team.”

Through DProfiler, the team still found the conceptual estimate to be 20% above the government’s budget,
compared to the 30% Apex originally presented.

To help explain why the project still exceeded the budget, this deliverable was brought into a full-day meeting
where everyone involved in the project was able to review cost, design, and scope.

“We brought in the stakeholder, the owners, the Texas Army National Guard, people as far as Washington,
D.C., were in here to look at the project,” says Eudaric.

By displaying the detailed project information from DProfiler, everyone involved with the project was able to
see where the project had exceeded the budget and the group could begin to take the necessary steps to
bring the project back into budget.

Apex needed to value engineer the project, making changes to the building’s scope in terms of materials,
functions, and components. This is a process that Eudaric says would normally take weeks to complete.

“With DProfiler (the) time factor goes away because now that you have this three-dimensional model, you can
actually run what (are) called what-if scenarios on the model in realtime in front of the client as you are
discussing the various changes,” says Eudaric.

Since the budget number on this project was $45 million, the team was able to add components back into the
building until the team reached the allotted amount. From there, the team turned the other components into
add alternates, which are components of the project that are not needed for the building to function.

Full Speed Ahead
By the end of the day, the team was able to get the project down to a base bid and create add-alternate items
that allowed them to add scope back in as cost was reallocated or the budget changed.

Based solely on this full-day meeting the government approved the project and allowed it to move forward,
according to Pilgrim.

From that point the project began to move smoothly through the remainder of the estimating phases. The
team continued using DProfiler for the 65% phase of the estimate. Yet since the estimate move passed the
conceptual environment and into a more detailed environment, the project team also applied traditional
estimating to this phase.
For traditional cost estimating Apex uses Sage Timberline Office, www.sagetimberlineoffice.com, Beaverton,
Ore., and integrates it with DProfiler.

“We did a final review of the 95% drawings,” says Eudaric. “The client was very happy with the results, and
the project (was) issued to go for bid (near the end of July). So everything was completely pulled together.”

Comparing the original cost-estimating methods with the BIM method, the visual elements of the model
helped the team understand information more thoroughly, according to Pilgrim.

“Traditionally, I don’t think people take the time or have the capacity to understand a very dry, traditional
cost estimate,” continues Pilgrim. “(DProfiler) gives a value to the project that allows the team members to
make decisions and understand it and comprehend it and digest it.”

Contenu connexe

En vedette

Union Budget 2017-18
Union Budget 2017-18Union Budget 2017-18
Union Budget 2017-18
EdelmanIndiaPA
 

En vedette (11)

Keynote slides: Platform Strategy Creating Exponential Value in a Connected ...
Keynote slides: Platform Strategy Creating Exponential Value  in a Connected ...Keynote slides: Platform Strategy Creating Exponential Value  in a Connected ...
Keynote slides: Platform Strategy Creating Exponential Value in a Connected ...
 
Analysis of Union Budget 2017
Analysis of Union Budget 2017Analysis of Union Budget 2017
Analysis of Union Budget 2017
 
Union budget 2017 impact analysis
Union budget 2017   impact analysisUnion budget 2017   impact analysis
Union budget 2017 impact analysis
 
MIS 13 Customer Relationship Management
MIS 13 Customer Relationship ManagementMIS 13 Customer Relationship Management
MIS 13 Customer Relationship Management
 
India union budget 2017 2018
India union budget 2017 2018 India union budget 2017 2018
India union budget 2017 2018
 
PwC: New IT Platform From Strategy Through Execution
PwC: New IT Platform From Strategy Through ExecutionPwC: New IT Platform From Strategy Through Execution
PwC: New IT Platform From Strategy Through Execution
 
Budget 2017 Highlights
Budget 2017 HighlightsBudget 2017 Highlights
Budget 2017 Highlights
 
Union Budget 2017 India
Union Budget 2017 IndiaUnion Budget 2017 India
Union Budget 2017 India
 
Union Budget 2017-18
Union Budget 2017-18Union Budget 2017-18
Union Budget 2017-18
 
Technology Budgeting for SMB
Technology Budgeting for SMBTechnology Budgeting for SMB
Technology Budgeting for SMB
 
March 2017 Budget Seminar
March 2017 Budget Seminar March 2017 Budget Seminar
March 2017 Budget Seminar
 

Similaire à Conceptual Estimating Technology helps the Texas Army National Guard Stay in Budget

6Project Management Terms and ConceptsPost Universit.docx
6Project Management Terms and ConceptsPost Universit.docx6Project Management Terms and ConceptsPost Universit.docx
6Project Management Terms and ConceptsPost Universit.docx
standfordabbot
 
Projects in Contemporary Organizations The past several decades ha.docx
Projects in Contemporary Organizations The past several decades ha.docxProjects in Contemporary Organizations The past several decades ha.docx
Projects in Contemporary Organizations The past several decades ha.docx
briancrawford30935
 
Integrated Project Delivery For Construction
Integrated Project Delivery For ConstructionIntegrated Project Delivery For Construction
Integrated Project Delivery For Construction
Kim Moore
 
SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)
Peter Mello
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
Tim McManus
 
CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docx
walterl4
 
Control and Risk Mitigation Whitepaper
Control and Risk Mitigation WhitepaperControl and Risk Mitigation Whitepaper
Control and Risk Mitigation Whitepaper
Greg Fry
 
Running head PROJECT CHARTER ABOUT CREATING A WEBSITE FOR HR .docx
Running head PROJECT CHARTER ABOUT CREATING A WEBSITE FOR HR   .docxRunning head PROJECT CHARTER ABOUT CREATING A WEBSITE FOR HR   .docx
Running head PROJECT CHARTER ABOUT CREATING A WEBSITE FOR HR .docx
toltonkendal
 
Wedding Case StudyArie McQuarleyCSUWedding.docx
Wedding Case StudyArie McQuarleyCSUWedding.docxWedding Case StudyArie McQuarleyCSUWedding.docx
Wedding Case StudyArie McQuarleyCSUWedding.docx
jessiehampson
 
Running head pROJECT DELIVERABLE 21pROJECT DELIVERABLE 28.docx
Running head pROJECT DELIVERABLE 21pROJECT DELIVERABLE 28.docxRunning head pROJECT DELIVERABLE 21pROJECT DELIVERABLE 28.docx
Running head pROJECT DELIVERABLE 21pROJECT DELIVERABLE 28.docx
jeanettehully
 

Similaire à Conceptual Estimating Technology helps the Texas Army National Guard Stay in Budget (20)

Infrastructure Project Management: Building Bridges to Success
Infrastructure Project Management: Building Bridges to SuccessInfrastructure Project Management: Building Bridges to Success
Infrastructure Project Management: Building Bridges to Success
 
2014 DeltaV life sciences booth at emerson exchange
2014 DeltaV life sciences booth at emerson exchange2014 DeltaV life sciences booth at emerson exchange
2014 DeltaV life sciences booth at emerson exchange
 
6Project Management Terms and ConceptsPost Universit.docx
6Project Management Terms and ConceptsPost Universit.docx6Project Management Terms and ConceptsPost Universit.docx
6Project Management Terms and ConceptsPost Universit.docx
 
Projects in Contemporary Organizations The past several decades ha.docx
Projects in Contemporary Organizations The past several decades ha.docxProjects in Contemporary Organizations The past several decades ha.docx
Projects in Contemporary Organizations The past several decades ha.docx
 
Integrated Project Delivery For Construction
Integrated Project Delivery For ConstructionIntegrated Project Delivery For Construction
Integrated Project Delivery For Construction
 
SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)SDPM (Success Driven Project Management)
SDPM (Success Driven Project Management)
 
How To Develop A Project Management Plan
How To Develop A Project Management PlanHow To Develop A Project Management Plan
How To Develop A Project Management Plan
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
 
CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docx
 
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
 
Control and Risk Mitigation Whitepaper
Control and Risk Mitigation WhitepaperControl and Risk Mitigation Whitepaper
Control and Risk Mitigation Whitepaper
 
Maximizing Project Value with Construction Management Platforms..pdf
Maximizing Project Value with Construction Management Platforms..pdfMaximizing Project Value with Construction Management Platforms..pdf
Maximizing Project Value with Construction Management Platforms..pdf
 
An Engineering Technology Capstone Project The Snow Load Network.pdf
An Engineering Technology Capstone Project  The Snow Load Network.pdfAn Engineering Technology Capstone Project  The Snow Load Network.pdf
An Engineering Technology Capstone Project The Snow Load Network.pdf
 
Denver_County_Jail
Denver_County_JailDenver_County_Jail
Denver_County_Jail
 
Budgeting & cost control
Budgeting & cost controlBudgeting & cost control
Budgeting & cost control
 
Gunnar Hellekson - Open Source: A Platform for Government Innovation
Gunnar Hellekson - Open Source: A Platform for Government InnovationGunnar Hellekson - Open Source: A Platform for Government Innovation
Gunnar Hellekson - Open Source: A Platform for Government Innovation
 
Running head PROJECT CHARTER ABOUT CREATING A WEBSITE FOR HR .docx
Running head PROJECT CHARTER ABOUT CREATING A WEBSITE FOR HR   .docxRunning head PROJECT CHARTER ABOUT CREATING A WEBSITE FOR HR   .docx
Running head PROJECT CHARTER ABOUT CREATING A WEBSITE FOR HR .docx
 
How to harness big data to drive performance across your project portfolio
How to harness big data to drive performance across your project portfolioHow to harness big data to drive performance across your project portfolio
How to harness big data to drive performance across your project portfolio
 
Wedding Case StudyArie McQuarleyCSUWedding.docx
Wedding Case StudyArie McQuarleyCSUWedding.docxWedding Case StudyArie McQuarleyCSUWedding.docx
Wedding Case StudyArie McQuarleyCSUWedding.docx
 
Running head pROJECT DELIVERABLE 21pROJECT DELIVERABLE 28.docx
Running head pROJECT DELIVERABLE 21pROJECT DELIVERABLE 28.docxRunning head pROJECT DELIVERABLE 21pROJECT DELIVERABLE 28.docx
Running head pROJECT DELIVERABLE 21pROJECT DELIVERABLE 28.docx
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Dernier (20)

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

Conceptual Estimating Technology helps the Texas Army National Guard Stay in Budget

  • 1. September 15, 2008 Protect the Project Conceptual estimating technology helps the Texas Army National Guard stay in budget. The federal government can be one of the most unforgiving of owners when it comes to project budgets. Projects that fall within its jurisdiction are monitored with a scrupulous eye, and those that don’t stay within the allocated resources run the risk of being terminated. Of course the key to keeping an eye on the budget is properly managing the estimating phases. The problem with the traditional estimating methods, however, is they do not provide the level of detail needed to keep all parties involved on the project—particularly, the owner—on the same page. This was precisely the case regarding a government-funded project in El Paso, Texas. Just when it looked like this project was in jeopardy of getting off schedule and exceeding the budget, the project team called in the reserves in the form of a new method of gathering cost- estimation data through detailed data-rich models. Early Warnings Earlier this year, The Texas Army National Guard, www.agd.state.tx.us/army, Austin, Texas, commissioned a project for a new reserve center and vehicle maintenance facility in El Paso, Texas. The project encompasses a main facility area that includes general office and personnel support areas, while ancillary facilities include maintenance work bays, military vehicle parking, site security measures, and access roads. A project of such magnitude requires tight coordination of multiple contractors, engineers, architects, and estimators. This specific project is a state-owned facility funded by a cooperative agreement by the government. As a government-funded project, the 243,000-sq.ft. facility was required to continually meet the federal funding requirements. The project falls under the BRAC (Base Realignment and Closure) from the DoD (U.S. Dept. of Defense), www.defenselink.mil, Washington, D.C., which is used for organizing the installation infrastructure of facilities and ships that are in the jurisdiction of the DoD, namely any infrastructure in the United States. The program examines the quality of infrastructure and aims to save billions of dollars on facilities annually. The legally mandated selection criteria determine which installations should be closed or realigned. Within BRAC, AFRCs (Armed Forces Reserve Centers) need to be closed or realigned when the missions of the installation have ceased or been relocated. In El Paso, Texas, the plan under BRAC is to relocate all units from five closed or realigned AFRCs to a new AFRC with a Consolidated Equipment Concentration Site and Maintenance Facility. This new project will provide a training facility with administrative, education, assembly, library, and a learning center. The facility will also have a vault, weapons simulator, barracks areas, and physical fitness areas for units. In addition, a maintenance shop will have work bays and maintenance administrative support.
  • 2. Construction is just beginning on this facility. However, getting to the start date of construction was a bumpy process. In particular was the challenge of getting the upfront design and estimate to continually meet the government’s budget. Jacobs Engineering Group, www.jacobs.com, Pasadena, Calif., which is the design firm on this project, began working with estimators at Apex Cost Consultants, www.apexcost.com, Dallas, Texas, to develop and prepare the conceptual estimate. Claude Eudaric, president, Apex Cost Consultants, says the normal procedure for the cost estimator is to first examine the type of building it is, and then develop a historical database. “The historical database has all of the project types that we have done and we go in and we pick a similar project type that we have done within the last six months to a year and what we do is we extrapolate what the cost of this project would be based on the historical data that we have,” says Eudaric. According to Eudaric, since it is a government project, the government sets the budget. And to set the budget, the government uses the Form 1391, which is a government form used to estimate the cost of the project. Still, Apex had to do conceptual budgets for the 10% and 35% phases of the estimate to verify the predicted estimate from the government. It didn’t take long before problems arose. Just 10% into the conceptual budget phase Apex Cost Consultants found its numbers had exceeded the government’s budget and the project was in danger of getting off schedule. “Initially we turned in the estimate and (it) said that the project was 30% over budget, based on the 1391,” says Eudaric. “So the first thing they did was they shot the messenger. They felt like we hadn’t provided them enough backup data. How could we make such a determination without details and analysis of the project?” Apex was positive, based on current market conditions, that the 30% overage was indeed correct. “If you give a client the number they think it should be and then the project is off the bid and it blows up, then the liability is on us because we gave them a number that was inaccurate,” says Eudaric. At this point all parties were upset the project had exceeded the government’s budget. It reached a turning point where the project had to be reevaluated with a new method of conceptual estimating. Mission Recall A few months later, Eudaric received an email from Jacobs Engineering asking for a new way to reevaluate the project. Going into the 35% design, the team needed to convince the owners that the cost estimates were accurate and help with creating the budget for this project. Apex knew this required getting everyone involved—from the architect to the contractor to the government— on the same page. To do so it needed to provide detailed information on the project’s estimate in a way everyone could understand. Apex decided to shift its processes from traditional methods of cost estimation to a new way of gathering information through data-rich models. There began the search for a new technology solution to give all project members a more detailed, macro view of cost estimation through modeling. For the 35% phase, Apex approached Jacobs with the idea to use a new piece of technology that would help bring the team within budget and essentially get the project back on schedule. “I had gone to a demonstration and saw this three-dimensional software working,” says Eudaric. “And what was so unique about it is it was creating an estimate in realtime. So as (it) was modeling this hypothetical
  • 3. building, on the right hand side were all the costs. “And what the software does is it allows you to build a cost model, but to also build it based on a virtual building where you have dimensions (and) you have parameters. In other words, you are building this building in virtual space and then putting a price to it.” The software was DProfiler from Beck Technology, www.beck-technology.com, a technology division within The Beck Group, www.beckgroup.com, Dallas, Texas, which addresses the macro view of the project. According to Stewart Carroll, chief operating officer, Beck Technology, BIM (building information modeling) can be categorized in two ways—a macro view and a micro view. Much has been said in the industry regarding the value of BIM. At its core, BIM is a process in which multiple members of a project gather the same detailed information from intelligent models. More specifically, the macro view represents the big-picture view of the early phases of a project while the micro view comes a bit later, answering the detailed questions of how to design, document, and build a project. Products on the market that address the micro view include Revit from Autodesk, www.autodesk.com, San Rafael, Calif. Bentley Architecture from Bentley Systems, www.bentley.com, Exton, Pa. and ArchiCAD from Graphisoft, www.graphisoft.com, Budapest, Hungary. All of these technologies help contractors design, document, and build the project. Less common and newer to the construction industry are technologies for the macro view. According to Carroll, contractors looking at the earliest phase of a project will likely ask themselves the ‘if’ and ‘what’ questions including: If I build this building, what are the ramifications? What are operating costs from an energy perspective? What are the lifecycle costs? What is the first cost of construction? What are all the assumptions we are going to plug in based on our history? In conceptual estimating, estimators must make these key and critical assumptions in order to create a complete estimate of design, according to Carroll. DProfiler can help contractors create an accurate cost estimate in the planning and conception cost estimate phases of a project and answer the key questions of ‘if’ and ‘what’ early on in the project. “We focus on the early phases of getting teams together, clarifying assumptions, building a graphical representation,” says Carroll. “Not to design, but to get everybody on the same page in terms of description of scope, and out of (that) scope comes cost.” In addition to providing improved team collaboration and communication, the technology also provides greater accuracy of project data. DProfiler provides a graphical representation of all the estimate information so if something doesn’t line up or was miscalculated, DProfiler can easily recognize the mistake. The product also gives contractors the ability to perform quantity takeoff tasks in a significantly reduced amount of time. One specific feature includes an integrated energy analysis, which studies energy cost impact of change, analyzes LEED (Leadership in Energy and Environmental Design) qualifications, and determines HVAC (heating, ventilation, and air conditioning) initial cost. DProfiler also includes RSMeans Data, which means the construction estimate can reflect the average U.S. cost of any major city’s indexes. The macro view of BIM is becoming more important because being able to look at 3D (three-dimensional) models of detailed information on the estimate—as opposed to basic cost estimates in spreadsheets—gives a
  • 4. visual element to the estimate. This helps any project member, regardless of experience using estimates, to see and understand the scope of the estimate. This was an important element in the Texas Army National Guard project, providing all project members with the scope so everyone could understand where the project was in the conceptual estimate process. Saving the Project With the help of the technology, Apex and Beck did the MEP (mechanical, electrical, and plumbing) scope and the architectural, structural, and site scope for the reserve center in El Paso, Texas. Brent Pilgrim, project cost manager, The Beck Group, worked closely with Eudaric to help develop the documents with models and graphical elements used to show the MEP and architectural, structural, and site scope. “What DProfiler does and the value that it brings is it provided such a level of detailed information that everyone was able to comprehend it and digest it and understand why the project was over budget understand where different costs were allocated,” says Pilgrim. “So we did the design criteria, the images, the cost estimate, and we provided the deliverable to the team.” Through DProfiler, the team still found the conceptual estimate to be 20% above the government’s budget, compared to the 30% Apex originally presented. To help explain why the project still exceeded the budget, this deliverable was brought into a full-day meeting where everyone involved in the project was able to review cost, design, and scope. “We brought in the stakeholder, the owners, the Texas Army National Guard, people as far as Washington, D.C., were in here to look at the project,” says Eudaric. By displaying the detailed project information from DProfiler, everyone involved with the project was able to see where the project had exceeded the budget and the group could begin to take the necessary steps to bring the project back into budget. Apex needed to value engineer the project, making changes to the building’s scope in terms of materials, functions, and components. This is a process that Eudaric says would normally take weeks to complete. “With DProfiler (the) time factor goes away because now that you have this three-dimensional model, you can actually run what (are) called what-if scenarios on the model in realtime in front of the client as you are discussing the various changes,” says Eudaric. Since the budget number on this project was $45 million, the team was able to add components back into the building until the team reached the allotted amount. From there, the team turned the other components into add alternates, which are components of the project that are not needed for the building to function. Full Speed Ahead By the end of the day, the team was able to get the project down to a base bid and create add-alternate items that allowed them to add scope back in as cost was reallocated or the budget changed. Based solely on this full-day meeting the government approved the project and allowed it to move forward, according to Pilgrim. From that point the project began to move smoothly through the remainder of the estimating phases. The team continued using DProfiler for the 65% phase of the estimate. Yet since the estimate move passed the conceptual environment and into a more detailed environment, the project team also applied traditional estimating to this phase.
  • 5. For traditional cost estimating Apex uses Sage Timberline Office, www.sagetimberlineoffice.com, Beaverton, Ore., and integrates it with DProfiler. “We did a final review of the 95% drawings,” says Eudaric. “The client was very happy with the results, and the project (was) issued to go for bid (near the end of July). So everything was completely pulled together.” Comparing the original cost-estimating methods with the BIM method, the visual elements of the model helped the team understand information more thoroughly, according to Pilgrim. “Traditionally, I don’t think people take the time or have the capacity to understand a very dry, traditional cost estimate,” continues Pilgrim. “(DProfiler) gives a value to the project that allows the team members to make decisions and understand it and comprehend it and digest it.”