Test Report
报告编号: 141113
Report No.
报告日期:
Report Date: 2014-11-13
To:
审核批准:
Approval Signatory: 伍贵书
************************************************************************
-
测试目的: Sample Test
Test Purpose:
产品型号: OC-K68
Model No.
样品描述:
Sample Description: OK!
供应商 : ORCCO
Supplier:
订单号:
PO No. N/A
测试开始日期:
Test Start Date: 2014-11-10
测试完成日期:
Test Completed Date: 2014-11-13
测试标准: ANSI/BIFMA X5.1-2011
Test Standard:
Test Summary:
Section
No.
Description
Sample
#1
BIFMA X5,12011
Picture#1
-
1
Backrest
Strength
Test-Static
–
(UNLOCK
ED)
Pass
1 minute with 200ib,1 minute
with 300ib.
2
Base Test
-Static
PASS
1 minute with 2500ib,1 minute
with 2500ib.
-
3
Drop Test
-Dynamic
PASS
6inch drop
1)225ib drop at highest &lowest
seat position
2) 300ib drop at highest &lowest
seat position
4
Stability
Tests
PASS
Load the chair with 13 disks
(See Appendix B). Place the
first disk on the seat so it
touches the support fixture.
As each disk is added to the
stack slide it along the lower
disk until
it contacts the support fixture
as shown in Figure 12b. As
each disk is added, the
backrest may
move such that the lower
disks do not remain against
the support fixture; this is
acceptable, do
not reposition the disks.
If the chair does not tip over
and the tilt mechanism does
not tilt to its most rearward
position
(i.e., at its tilt stop) when the
disks are placed in the chair,
the chair shall also be tested
according to 12.3.1 with the
chair in the unlocked position
-
5
Stability
Tests-
FRONT Sec
12.4
PASS
Apply a vertical load of 600 N
(135 lbf.), by means of the
front stability loading fixture
shown in Figure 12g at a point
60 mm (2.4 in.) from the front
center edge of the
loadbearing
surface of the chair.
6 Arm
Strength
Test-
Horizontal -
Static
PASS 1 minute with 100ib,1 minute
with 150ib.
-
7
Arm
Strength
Test-
Vertical-
Static
PASS
1 minute with 169ib,1 minute
with 253ib.
/
Compressio
n Test
-
Notice:
Disposition of Testing Product: The Test Lab will keep these samples for one week after testing,
and then the samples will be disposed without further notice.
The test report cannot be copied except in full and the test results apply only to item(s) tested.
*************************** End of Report *******************************

More Related Content

What's hot

Setco Spindle Service of Synergy's product
Setco Spindle Service of Synergy's productSetco Spindle Service of Synergy's product
Setco Spindle Service of Synergy's productVittal Kulkarni
 
Testing/Manufacture/Automobile & Paint Testing Equipments
Testing/Manufacture/Automobile & Paint Testing EquipmentsTesting/Manufacture/Automobile & Paint Testing Equipments
Testing/Manufacture/Automobile & Paint Testing Equipmentsfec2020
 
12 weeks industrial training ppt
12 weeks industrial training ppt12 weeks industrial training ppt
12 weeks industrial training pptGurjant Singh
 
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)KHUSHI9999
 
Studer CNC Universal Grinders - Grinding Errors Detection and Repair
Studer CNC Universal Grinders - Grinding Errors Detection and RepairStuder CNC Universal Grinders - Grinding Errors Detection and Repair
Studer CNC Universal Grinders - Grinding Errors Detection and RepairMachine Tool Systems Inc.
 
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hose
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hoseEagle Composite Hose - Petroleum Hose - Fluid Transfer hose
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hoseJGB Enterprises, Inc.
 
TorqMaster Friction Hinge - Zc 250-zc-101-friction-hinge-data-sheet
TorqMaster Friction Hinge - Zc 250-zc-101-friction-hinge-data-sheetTorqMaster Friction Hinge - Zc 250-zc-101-friction-hinge-data-sheet
TorqMaster Friction Hinge - Zc 250-zc-101-friction-hinge-data-sheetfrictionhinges
 
samsung-fdbm-refrigerators-service-bulletin-ice-makers-freezing-over
 samsung-fdbm-refrigerators-service-bulletin-ice-makers-freezing-over samsung-fdbm-refrigerators-service-bulletin-ice-makers-freezing-over
samsung-fdbm-refrigerators-service-bulletin-ice-makers-freezing-overDarlin Collado
 
Extruder 20 brochure by ATI Viet Nam
Extruder 20 brochure by ATI Viet NamExtruder 20 brochure by ATI Viet Nam
Extruder 20 brochure by ATI Viet NamATI Việt Nam
 
Kesavulu_summer intern project ppt
Kesavulu_summer intern project pptKesavulu_summer intern project ppt
Kesavulu_summer intern project pptKesava S
 

What's hot (13)

Setco Spindle Service of Synergy's product
Setco Spindle Service of Synergy's productSetco Spindle Service of Synergy's product
Setco Spindle Service of Synergy's product
 
Testing/Manufacture/Automobile & Paint Testing Equipments
Testing/Manufacture/Automobile & Paint Testing EquipmentsTesting/Manufacture/Automobile & Paint Testing Equipments
Testing/Manufacture/Automobile & Paint Testing Equipments
 
Xtreme engineering-equipment-pvt-ltd
Xtreme engineering-equipment-pvt-ltdXtreme engineering-equipment-pvt-ltd
Xtreme engineering-equipment-pvt-ltd
 
12 weeks industrial training ppt
12 weeks industrial training ppt12 weeks industrial training ppt
12 weeks industrial training ppt
 
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
 
Automobile, pint & plating testing equipments
Automobile, pint & plating testing equipmentsAutomobile, pint & plating testing equipments
Automobile, pint & plating testing equipments
 
Studer CNC Universal Grinders - Grinding Errors Detection and Repair
Studer CNC Universal Grinders - Grinding Errors Detection and RepairStuder CNC Universal Grinders - Grinding Errors Detection and Repair
Studer CNC Universal Grinders - Grinding Errors Detection and Repair
 
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hose
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hoseEagle Composite Hose - Petroleum Hose - Fluid Transfer hose
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hose
 
TorqMaster Friction Hinge - Zc 250-zc-101-friction-hinge-data-sheet
TorqMaster Friction Hinge - Zc 250-zc-101-friction-hinge-data-sheetTorqMaster Friction Hinge - Zc 250-zc-101-friction-hinge-data-sheet
TorqMaster Friction Hinge - Zc 250-zc-101-friction-hinge-data-sheet
 
samsung-fdbm-refrigerators-service-bulletin-ice-makers-freezing-over
 samsung-fdbm-refrigerators-service-bulletin-ice-makers-freezing-over samsung-fdbm-refrigerators-service-bulletin-ice-makers-freezing-over
samsung-fdbm-refrigerators-service-bulletin-ice-makers-freezing-over
 
Universal abrasion resistant tester
Universal abrasion resistant testerUniversal abrasion resistant tester
Universal abrasion resistant tester
 
Extruder 20 brochure by ATI Viet Nam
Extruder 20 brochure by ATI Viet NamExtruder 20 brochure by ATI Viet Nam
Extruder 20 brochure by ATI Viet Nam
 
Kesavulu_summer intern project ppt
Kesavulu_summer intern project pptKesavulu_summer intern project ppt
Kesavulu_summer intern project ppt
 

Viewers also liked

Pengurusan bahan buangan
Pengurusan bahan buanganPengurusan bahan buangan
Pengurusan bahan buangankhaliskhalili
 
Biología 1
Biología 1Biología 1
Biología 1M4RrT1n
 
GSOM SPbU Master Programs
GSOM SPbU Master ProgramsGSOM SPbU Master Programs
GSOM SPbU Master ProgramsDaria Nosova
 
Director's notes for Ep117B enormo henry (Henry Hugglemonster)
Director's notes for Ep117B  enormo henry (Henry Hugglemonster) Director's notes for Ep117B  enormo henry (Henry Hugglemonster)
Director's notes for Ep117B enormo henry (Henry Hugglemonster) shafirov
 
Ens visita la Dolors Garcia i Cornellà
Ens visita la Dolors Garcia i CornellàEns visita la Dolors Garcia i Cornellà
Ens visita la Dolors Garcia i Cornellàescolamitjadms
 
Побудова діаграм в ЕТ EXCEL
Побудова діаграм в ЕТ EXCELПобудова діаграм в ЕТ EXCEL
Побудова діаграм в ЕТ EXCELtanya-m
 
Internet of things
Internet of things Internet of things
Internet of things gigaboxs
 
ΣΕΒ για την Ελληνική Οικονομία - 061016
ΣΕΒ για την Ελληνική Οικονομία - 061016ΣΕΒ για την Ελληνική Οικονομία - 061016
ΣΕΒ για την Ελληνική Οικονομία - 061016Panayotis Sofianopoulos
 
Upstart Sports Spring Catalog
Upstart Sports Spring CatalogUpstart Sports Spring Catalog
Upstart Sports Spring CatalogBryan Teasdale
 
agencies | BusinessWired - Business Wire Blog
agencies | BusinessWired - Business Wire Blogagencies | BusinessWired - Business Wire Blog
agencies | BusinessWired - Business Wire Bloggreedycabin1256
 
Revised Comaprison Chapter 33.pdf
Revised Comaprison Chapter 33.pdfRevised Comaprison Chapter 33.pdf
Revised Comaprison Chapter 33.pdfIsai Serrano
 
Boost conversions by localizing your marketing
Boost conversions by localizing your marketingBoost conversions by localizing your marketing
Boost conversions by localizing your marketingMatchCraft
 
T5 Resume Peer Edit
T5 Resume Peer Edit T5 Resume Peer Edit
T5 Resume Peer Edit Sarah Moug
 
Ampliamento discarica, appalti ed incarichi pubblici, bilancio preventivo 2015
Ampliamento discarica, appalti ed incarichi pubblici, bilancio preventivo 2015Ampliamento discarica, appalti ed incarichi pubblici, bilancio preventivo 2015
Ampliamento discarica, appalti ed incarichi pubblici, bilancio preventivo 2015Gruppo_Innovazione_Responsabilita
 

Viewers also liked (20)

Pengurusan bahan buangan
Pengurusan bahan buanganPengurusan bahan buangan
Pengurusan bahan buangan
 
Biología 1
Biología 1Biología 1
Biología 1
 
My life proyect
My life proyectMy life proyect
My life proyect
 
GSOM SPbU Master Programs
GSOM SPbU Master ProgramsGSOM SPbU Master Programs
GSOM SPbU Master Programs
 
Director's notes for Ep117B enormo henry (Henry Hugglemonster)
Director's notes for Ep117B  enormo henry (Henry Hugglemonster) Director's notes for Ep117B  enormo henry (Henry Hugglemonster)
Director's notes for Ep117B enormo henry (Henry Hugglemonster)
 
Ens visita la Dolors Garcia i Cornellà
Ens visita la Dolors Garcia i CornellàEns visita la Dolors Garcia i Cornellà
Ens visita la Dolors Garcia i Cornellà
 
Побудова діаграм в ЕТ EXCEL
Побудова діаграм в ЕТ EXCELПобудова діаграм в ЕТ EXCEL
Побудова діаграм в ЕТ EXCEL
 
dynaTrace
dynaTracedynaTrace
dynaTrace
 
Internet of things
Internet of things Internet of things
Internet of things
 
Ali Ahmed CV Finance Cell 059 686 22 79
Ali Ahmed CV Finance Cell 059 686 22 79Ali Ahmed CV Finance Cell 059 686 22 79
Ali Ahmed CV Finance Cell 059 686 22 79
 
ΣΕΒ για την Ελληνική Οικονομία - 061016
ΣΕΒ για την Ελληνική Οικονομία - 061016ΣΕΒ για την Ελληνική Οικονομία - 061016
ΣΕΒ για την Ελληνική Οικονομία - 061016
 
Upstart Sports Spring Catalog
Upstart Sports Spring CatalogUpstart Sports Spring Catalog
Upstart Sports Spring Catalog
 
agencies | BusinessWired - Business Wire Blog
agencies | BusinessWired - Business Wire Blogagencies | BusinessWired - Business Wire Blog
agencies | BusinessWired - Business Wire Blog
 
Social id
Social idSocial id
Social id
 
Revised Comaprison Chapter 33.pdf
Revised Comaprison Chapter 33.pdfRevised Comaprison Chapter 33.pdf
Revised Comaprison Chapter 33.pdf
 
PreventionWorks![2008]
PreventionWorks![2008]PreventionWorks![2008]
PreventionWorks![2008]
 
Bab 1 ea
Bab 1 eaBab 1 ea
Bab 1 ea
 
Boost conversions by localizing your marketing
Boost conversions by localizing your marketingBoost conversions by localizing your marketing
Boost conversions by localizing your marketing
 
T5 Resume Peer Edit
T5 Resume Peer Edit T5 Resume Peer Edit
T5 Resume Peer Edit
 
Ampliamento discarica, appalti ed incarichi pubblici, bilancio preventivo 2015
Ampliamento discarica, appalti ed incarichi pubblici, bilancio preventivo 2015Ampliamento discarica, appalti ed incarichi pubblici, bilancio preventivo 2015
Ampliamento discarica, appalti ed incarichi pubblici, bilancio preventivo 2015
 

Orcco K68 Test report(1)

  • 1. 測試單位:佛山市讴歌家具有限公司測試中心 Fo Shan Rocco Furniture Co., Ltd. Product Testing Center 地址:佛山市南海区九江镇沙咀工业区园南二路园区三街 add.:No.3st,2rd,Shazui industrial park,jiujiang town,Nanhai district,Foshan City, CHINA Test Report 报告编号: 141113 Report No. 报告日期: Report Date: 2014-11-13 To: 审核批准: Approval Signatory: 伍贵书 ************************************************************************
  • 2. - 测试目的: Sample Test Test Purpose: 产品型号: OC-K68 Model No. 样品描述: Sample Description: OK! 供应商 : ORCCO Supplier: 订单号: PO No. N/A 测试开始日期: Test Start Date: 2014-11-10 测试完成日期: Test Completed Date: 2014-11-13 测试标准: ANSI/BIFMA X5.1-2011 Test Standard: Test Summary: Section No. Description Sample #1 BIFMA X5,12011 Picture#1
  • 3. - 1 Backrest Strength Test-Static – (UNLOCK ED) Pass 1 minute with 200ib,1 minute with 300ib. 2 Base Test -Static PASS 1 minute with 2500ib,1 minute with 2500ib.
  • 4. - 3 Drop Test -Dynamic PASS 6inch drop 1)225ib drop at highest &lowest seat position 2) 300ib drop at highest &lowest seat position 4 Stability Tests PASS Load the chair with 13 disks (See Appendix B). Place the first disk on the seat so it touches the support fixture. As each disk is added to the stack slide it along the lower disk until it contacts the support fixture as shown in Figure 12b. As each disk is added, the backrest may move such that the lower disks do not remain against the support fixture; this is acceptable, do not reposition the disks. If the chair does not tip over and the tilt mechanism does not tilt to its most rearward position (i.e., at its tilt stop) when the disks are placed in the chair, the chair shall also be tested according to 12.3.1 with the chair in the unlocked position
  • 5. - 5 Stability Tests- FRONT Sec 12.4 PASS Apply a vertical load of 600 N (135 lbf.), by means of the front stability loading fixture shown in Figure 12g at a point 60 mm (2.4 in.) from the front center edge of the loadbearing surface of the chair. 6 Arm Strength Test- Horizontal - Static PASS 1 minute with 100ib,1 minute with 150ib.
  • 6. - 7 Arm Strength Test- Vertical- Static PASS 1 minute with 169ib,1 minute with 253ib. / Compressio n Test
  • 7. - Notice: Disposition of Testing Product: The Test Lab will keep these samples for one week after testing, and then the samples will be disposed without further notice. The test report cannot be copied except in full and the test results apply only to item(s) tested. *************************** End of Report *******************************