Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
General Motors - Workplace Charging: Filling a Critical Infrastructure Gap - July 31, 2012
1. Workplace Charging: Filling a Critical Infrastructure Gap
July 31, 2012
Alex Keros
Mngr, Advanced Vehicle and Infrastructure Policy
2. GM’s Line-up of Plug-in Vehicles:
Chevrolet Volt
EREV (2010)
Cadillac ELR EREV
(Timing to be announced)
Electric Vehicle and Charging| General Motors
Chevrolet Spark
BEV (2013)
GM Workplace Installation Examples
• GM GlobalHeadquarters(RenaissanceCenter, Detroit)
• Detroit-HamtramckAssembly Plant (includesSolar)
• BrownstownBattery AssemblyPlant
• GM Tech Center
o VEC (Solar)
o AEC (Solar)
o Design Studios
o R&D
o Service Operations
o Company Vehicle Operations (Solar)
• BowlingGreenAssembly Plant (Solar)
• LordstownComplex(Solar)
• Parma Metal Center (Solar)
• BaltimoreTransmission Plant (includesSolar)
• MilfordProvingGrounds(includesSolar)
• Customer Care & Aftersales, ServicePartsOrganization
• AdvancedTechnicalCenters
o Palo Alto, CA
o Torrance, CA
o Honolulu, HI
o Honeoye Falls, NY
o Washington DC
Public
Workplace
Residential
120V =
grid-friendly, easy
240V =
faster-charging
3. 3
PEV Charging Installations | GM Workplace
Detroit-Hamtramck (MI) Assembly Plant Company Vehicle Operations (MI) GM Headquarters
Warrant Tech Center (MI) Adv. Vehicle Center (VA) Dealerships
(including CA)