Week one 9th February: In this first week we came together in our group and we started to build the foundations of our thriller opening to allow us to get everything sorted out in time for the opening. We decided upon the actors, who would film, the story of it and settings. We also listened to a variety of different music and watched different thrillers to get an idea of what a thriller opening should be like.
Week two 16th February: In this week we discussed many things such as the narratives for our film idea. We were able to choose the opening we were going to go with out of 3 from our narrative planning sheet and we also discussed the generic conventions of a thriller e.g. what kind of thriller, is it meant to have suspense and tension etc? In addition we also planned the date for completing our research and planning- Would involve audience research, location shots etc.
Week three 23rd February: During this week we met up as a group and took still shots of our settings which were places like a church, random streets and a park. We then completed the designs and drawings of our 3 film logos and came to a decision as which one is best appealing. We completed a picture of what we thought our audience members would look like and described them and we also finished our storyboard.
Week four 2nd March: During the course of this week we completed music for our film and completed our storyboard animatic (we ended up changing the music we in the final opening from this one as we believes it fitted the opening better).  We also filmed 5 interviews getting general feedback from our classmates about thrillers. Also on this day we received our equipment from our teachers (cameras, tripods and lights) to be ready to film. One more time we went over our final idea for our filming and we got permission from the school take the equipment outside of school.  
Week four continued 8th March: We filmed our chase scenes in the early evenings. We took advantage of the lights to make the film look better and we filmed the same shots from lots of different angles so when it came to the editing we had more to play round with.
Week five 9th March: We looked back over what we filmed last night and analysed what went wrong and then re-filmed them specific scenes
Week five continued 15th March:   When it got dark again we came back together and filmed the church scenes (last week we done the outside scenes) Again we took advantage of the lights and Christy’s wheelchair to do an effective tracking shot.  We were able to finish off all our filming this day.
Week six 16th March: We uploaded our openings to the Mac’s and started editing.
  Week eight 30th March: We had finally finished editing on this day. In the editing process we done a number of things such as add transitions, titles and music to make our thriller look like a proper thriller opening. In this tie we also got audience feedback on our thriller rough cut. We uploaded our work to our blogs and then our filming and editing process was complete.
Week nine 6th April to 4th May: From here on out all we had to do now was finishing our evaluations (as you will see in our coming blogs) and finish blogging our work.  This included finishing any little bits and pieces that needed to be done and just doing our separate parts of the evaluation.  

Contenu connexe

En vedette (7)

Evaluation 2
Evaluation 2Evaluation 2
Evaluation 2
 
Opening to a thriller
Opening to a thrillerOpening to a thriller
Opening to a thriller
 
Media evaluation
Media evaluationMedia evaluation
Media evaluation
 
Activity 1
Activity 1Activity 1
Activity 1
 
The Near Future of CSS
The Near Future of CSSThe Near Future of CSS
The Near Future of CSS
 
Classroom Management Tips for Kids and Adolescents
Classroom Management Tips for Kids and AdolescentsClassroom Management Tips for Kids and Adolescents
Classroom Management Tips for Kids and Adolescents
 
The Buyer's Journey - by Chris Lema
The Buyer's Journey - by Chris LemaThe Buyer's Journey - by Chris Lema
The Buyer's Journey - by Chris Lema
 

Similaire à Timeline final (20)

Production Diary
Production DiaryProduction Diary
Production Diary
 
Production Diary
Production DiaryProduction Diary
Production Diary
 
Production Diary
Production DiaryProduction Diary
Production Diary
 
Parallel production diary
Parallel production diaryParallel production diary
Parallel production diary
 
5. production reflection sf 2017
5. production reflection sf 20175. production reflection sf 2017
5. production reflection sf 2017
 
A2 advanced portfolio_production_diary
A2 advanced portfolio_production_diaryA2 advanced portfolio_production_diary
A2 advanced portfolio_production_diary
 
Production diary
Production diaryProduction diary
Production diary
 
Production Reflection
Production ReflectionProduction Reflection
Production Reflection
 
Production diary.pptx...................
Production diary.pptx...................Production diary.pptx...................
Production diary.pptx...................
 
Production Diary
Production DiaryProduction Diary
Production Diary
 
Production diary
Production diaryProduction diary
Production diary
 
76658451 meeting-minutes
76658451 meeting-minutes76658451 meeting-minutes
76658451 meeting-minutes
 
The making of our film poster
The making of our film posterThe making of our film poster
The making of our film poster
 
Schedule kayla
Schedule   kaylaSchedule   kayla
Schedule kayla
 
Making of our film poster
Making of our film posterMaking of our film poster
Making of our film poster
 
Matts a2 media evaluation slides 22-38
Matts a2 media evaluation slides 22-38Matts a2 media evaluation slides 22-38
Matts a2 media evaluation slides 22-38
 
Production Reflection 2.0
Production Reflection 2.0Production Reflection 2.0
Production Reflection 2.0
 
Productiion log
Productiion logProductiion log
Productiion log
 
AS re evaluation
AS re evaluationAS re evaluation
AS re evaluation
 
Project for Digital Media Foundations
Project for Digital Media FoundationsProject for Digital Media Foundations
Project for Digital Media Foundations
 

Dernier

Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
mriyagarg453
 
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
rajveermohali2022
 

Dernier (20)

𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
 
❤Personal Whatsapp Number Keylong Call Girls 8617697112 💦✅.
❤Personal Whatsapp Number Keylong Call Girls 8617697112 💦✅.❤Personal Whatsapp Number Keylong Call Girls 8617697112 💦✅.
❤Personal Whatsapp Number Keylong Call Girls 8617697112 💦✅.
 
Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034 Independent Chenna...
Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034  Independent Chenna...Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034  Independent Chenna...
Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034 Independent Chenna...
 
Hotel And Home Service Available Kolkata Call Girls Howrah ✔ 6297143586 ✔Call...
Hotel And Home Service Available Kolkata Call Girls Howrah ✔ 6297143586 ✔Call...Hotel And Home Service Available Kolkata Call Girls Howrah ✔ 6297143586 ✔Call...
Hotel And Home Service Available Kolkata Call Girls Howrah ✔ 6297143586 ✔Call...
 
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
 
(TOP CLASS) Call Girls In Chengalpattu Phone 7427069034 Call Girls Model With...
(TOP CLASS) Call Girls In Chengalpattu Phone 7427069034 Call Girls Model With...(TOP CLASS) Call Girls In Chengalpattu Phone 7427069034 Call Girls Model With...
(TOP CLASS) Call Girls In Chengalpattu Phone 7427069034 Call Girls Model With...
 
𓀤Call On 6297143586 𓀤 Ultadanga Call Girls In All Kolkata 24/7 Provide Call W...
𓀤Call On 6297143586 𓀤 Ultadanga Call Girls In All Kolkata 24/7 Provide Call W...𓀤Call On 6297143586 𓀤 Ultadanga Call Girls In All Kolkata 24/7 Provide Call W...
𓀤Call On 6297143586 𓀤 Ultadanga Call Girls In All Kolkata 24/7 Provide Call W...
 
2k Shot Call girls Laxmi Nagar Delhi 9205541914
2k Shot Call girls Laxmi Nagar Delhi 92055419142k Shot Call girls Laxmi Nagar Delhi 9205541914
2k Shot Call girls Laxmi Nagar Delhi 9205541914
 
Almora call girls 📞 8617697112 At Low Cost Cash Payment Booking
Almora call girls 📞 8617697112 At Low Cost Cash Payment BookingAlmora call girls 📞 8617697112 At Low Cost Cash Payment Booking
Almora call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment Booking
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment BookingKanpur call girls 📞 8617697112 At Low Cost Cash Payment Booking
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
📞 Contact Number 8617697112 VIP East Sikkim Call Girls
📞 Contact Number 8617697112 VIP East Sikkim Call Girls📞 Contact Number 8617697112 VIP East Sikkim Call Girls
📞 Contact Number 8617697112 VIP East Sikkim Call Girls
 
Hotel And Home Service Available Kolkata Call Girls Dum Dum ✔ 6297143586 ✔Cal...
Hotel And Home Service Available Kolkata Call Girls Dum Dum ✔ 6297143586 ✔Cal...Hotel And Home Service Available Kolkata Call Girls Dum Dum ✔ 6297143586 ✔Cal...
Hotel And Home Service Available Kolkata Call Girls Dum Dum ✔ 6297143586 ✔Cal...
 
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034 Independent Chenna...
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034  Independent Chenna...Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034  Independent Chenna...
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034 Independent Chenna...
 
𓀤Call On 6297143586 𓀤 Sonagachi Call Girls In All Kolkata 24/7 Provide Call W...
𓀤Call On 6297143586 𓀤 Sonagachi Call Girls In All Kolkata 24/7 Provide Call W...𓀤Call On 6297143586 𓀤 Sonagachi Call Girls In All Kolkata 24/7 Provide Call W...
𓀤Call On 6297143586 𓀤 Sonagachi Call Girls In All Kolkata 24/7 Provide Call W...
 
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
 
Hotel And Home Service Available Kolkata Call Girls Park Street ✔ 6297143586 ...
Hotel And Home Service Available Kolkata Call Girls Park Street ✔ 6297143586 ...Hotel And Home Service Available Kolkata Call Girls Park Street ✔ 6297143586 ...
Hotel And Home Service Available Kolkata Call Girls Park Street ✔ 6297143586 ...
 
Model Call Girls In Ariyalur WhatsApp Booking 7427069034 call girl service 24...
Model Call Girls In Ariyalur WhatsApp Booking 7427069034 call girl service 24...Model Call Girls In Ariyalur WhatsApp Booking 7427069034 call girl service 24...
Model Call Girls In Ariyalur WhatsApp Booking 7427069034 call girl service 24...
 
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service AvailableCall Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
 

Timeline final

  • 2. Week one 9th February: In this first week we came together in our group and we started to build the foundations of our thriller opening to allow us to get everything sorted out in time for the opening. We decided upon the actors, who would film, the story of it and settings. We also listened to a variety of different music and watched different thrillers to get an idea of what a thriller opening should be like.
  • 3. Week two 16th February: In this week we discussed many things such as the narratives for our film idea. We were able to choose the opening we were going to go with out of 3 from our narrative planning sheet and we also discussed the generic conventions of a thriller e.g. what kind of thriller, is it meant to have suspense and tension etc? In addition we also planned the date for completing our research and planning- Would involve audience research, location shots etc.
  • 4. Week three 23rd February: During this week we met up as a group and took still shots of our settings which were places like a church, random streets and a park. We then completed the designs and drawings of our 3 film logos and came to a decision as which one is best appealing. We completed a picture of what we thought our audience members would look like and described them and we also finished our storyboard.
  • 5. Week four 2nd March: During the course of this week we completed music for our film and completed our storyboard animatic (we ended up changing the music we in the final opening from this one as we believes it fitted the opening better). We also filmed 5 interviews getting general feedback from our classmates about thrillers. Also on this day we received our equipment from our teachers (cameras, tripods and lights) to be ready to film. One more time we went over our final idea for our filming and we got permission from the school take the equipment outside of school.  
  • 6. Week four continued 8th March: We filmed our chase scenes in the early evenings. We took advantage of the lights to make the film look better and we filmed the same shots from lots of different angles so when it came to the editing we had more to play round with.
  • 7. Week five 9th March: We looked back over what we filmed last night and analysed what went wrong and then re-filmed them specific scenes
  • 8. Week five continued 15th March:   When it got dark again we came back together and filmed the church scenes (last week we done the outside scenes) Again we took advantage of the lights and Christy’s wheelchair to do an effective tracking shot. We were able to finish off all our filming this day.
  • 9. Week six 16th March: We uploaded our openings to the Mac’s and started editing.
  • 10.   Week eight 30th March: We had finally finished editing on this day. In the editing process we done a number of things such as add transitions, titles and music to make our thriller look like a proper thriller opening. In this tie we also got audience feedback on our thriller rough cut. We uploaded our work to our blogs and then our filming and editing process was complete.
  • 11. Week nine 6th April to 4th May: From here on out all we had to do now was finishing our evaluations (as you will see in our coming blogs) and finish blogging our work. This included finishing any little bits and pieces that needed to be done and just doing our separate parts of the evaluation.