4Q13 Results
CPFL Renováveis
This presentation may contain statements that represent expectations about future events or results according to Brazilian
and international securities regulations. These statements are based on certain assumptions and analyses made by the
Company pursuant to its experience and the economic environment, market conditions and expected future events, many
of which are beyond the Company's control.
Important factors that could lead to significant differences between actual results and the statements on expectations about
future events or results include the Company's business strategy, Brazilian and international economic conditions,
technology, financial strategy, developments in the utilities industry, hydrological conditions, financial market conditions,
uncertainty regarding the results of future operations, plans, objectives, expectations and intentions, among others.
Considering these factors, the Company's actual results may differ materially from those indicated or implied in forward-
looking statements about future events or results.
The information and opinions contained in this presentation should not be construed as a recommendation to potential
investors and no investment decision should be based on the truthfulness, timeliness or completeness of such information
or opinions. None of the advisors of the Company or parties related to them or their representatives shall be liable for any
losses that may result from the use or of this presentation.
This material includes forward-looking statements subject to risks and uncertainties, which are based on current
expectations and projections about future events and trends that may affect the Company's business. These statements
may include projections of economic growth, demand, energy supply, as well as information about its competitive position,
the regulatory environment, potential growth opportunities and other matters. Many factors could adversely affect the
estimates and assumptions on which these statements are based.
Disclaimer
2
Highlights 4Q13
3
Operations’ start Alvorada plant with 50MW of capacity, in
Minas Gerais
Trading at the auction A-5 2013 amounting 51.3 MW of
capacity through two wind farms, starting energy supply from
2018
Operating capacity increased to 1,283 MW distributed in
60 power plants (+11% vs 2012)
Net revenue of R$ 334 million in 4Q13 (+20% vs 4Q12) and R$
1.0 billion in 2013 (+26% vs 2012)
EBITDA of R$ 176 million in 4Q13 (+6% vs 4Q12) and R$ 563
million in 2013 (+12% vs 2012)
Solid liquidity situation: with cash balance of R$ 890 million
Investments amounting R$ 804 million in 2013
Leverage of 6.9x EBITDA, with debt profile and cost suitable with
the Company’s projects
1st APIMEC Meeting held in December, 2013
Joint venture with a DESA. CPFL Renováveis portfolio
will reach 2,131.1 MW in contracted capacity:
1,694.4 MW in operation; and
436.7 MW under construction
Completion of Rosa dos Ventos' acquisition, adding 2
wind farms, with 13.7 MW capacity, to CPFL Renovaveis’
portfolio
Last wind farm forming Atlântica Wind Complex started its
operations, with 120 MW of capacity, in Rio Grande do Sul.
This is the first project in Brazil with 120 meters in height's
turbines and 3 MW of power
Due to Rosa dos Ventos and Atlântica, Company’s operation capacity
achieved 1,416.8 MW, with 66 usinas in the 1Q14
Recents events
4
Portfolio’s capacity
55
#1 in renewable energy in Brazil with 1.4 GW (79%) of capacity in operation1
1.8 GW of capacity in operation until 2018
Regionally diversified portfolio with presence in 4 sources
Long term PPAs, concessions and authorizations
Note: (1) Considers Rosa dos Ventos acquisition and startup of Complex Atlântica, both concluded in the first quarter of 2014
2012 2013 1Q14 2Q14 2016 2018 Total
contracted
1,153.1
1,283.1
, 1,416.8
51.3
.78.2
254.0 1,800.3
Contracted portfolio growth (MW)
11.3% 10.4%
6
Projects concluded in 2013
Campo dos Ventos II Bio Coopcana Bio Alvorada
Start of operations 3Q13 ¹ 3Q13 4Q13
Capacity (MW) 30.0 50.0 50.0
Physical guarantee
(MWavg)
15.0 18.0 18.0
PPA LER 2 / 2010 - 20 years ACL 3 - 21 years ACL3 - 20 years
1) Campo dos Ventos II is already able to generate energy and is entitled to revenue corresponding to the billing contracted in the 2010 Reserve Energy
Auction (LER) as of September 27, 2013 – conclusion of the construction of ICG still pending
2) Reserve Auction
3) Free Market
Operating data
4Q12 4Q13
230.7 284.7
0
0,4
427.0
427.9
243.7
274.9
SHPP
SOL
WIND
BIO901.4
2012 2013
1,007.9 1,195.5
0
1.4
1,187.3
1,269.8
544.5
733.9
Energy generation per source (GWh) (1)
987.9
2,739.7
3,200.7
Generated energy reached 3.201 GWh in 2013 , 16.8% more than that in 2012, mainly due to growth
of portfolio in operation
9.6%
16.8%
7
1) The energy generation data does not consider Santa Clara and Campo dos Ventos II wind farms which are able to generate energy and have
been receiving the revenue from their contracts – conclusion of the construction of ICG still pending
Net revenue (R$ Million)
30.3%
SHPP
19.2%
Bio
50.4%
Wind
4Q12 4Q13
277.7 334.1
2012 2013
806,4
1.018,6
20.3%
26.3%
Per source (2013)1
8(1) The solar source share is of 0.03%. In 2012 there was no solar generation.
Net revenue
R$ Million
• Full year energy sales, in 2013, of the projects Bio Ipê, Bio Pedra, Santa Clara Complex, Tanquinho
Solar and SHPP Santo Góes (started its operation over 2012)
• Acquisition of Bons Ventos (jun/12) and Ester Plant (oct/12)
• Beginning of sales contract fulfillment in 2013 of the projects Bio Coopcana, Bio Alvorada, Campos
dos Ventos II Complex e Atlântica Complex
• Annual adjustment of the contracts (based on IGP-M or IPCA)
• extraordinary costs with energy purchase due to contracts supply amounting R$ 73.1 million in the
4Q13 and R$ 174.7 million in 2013
• Higher expenses in 2013 due to Bons Ventos’s amortization of right to exploit and personnel, partially
offset by non recurring items in 2012
• Recurrent costs and expenses in accordance with the Company’s expansion plan
Costs of energy generation and
general and administrative expenses
R$ Million
Costs–R$mmExpenses–R$mm
4Q12 4Q13
129.9
188.7
45.3%
2012 2013
371.4
573.5
54.4%
4Q12 4Q13
70.7
56.1
-20.6%
2012 2013
219.9 230.3
9
4.8%
Adjusted EBITDA
4Q13
EBITDA
R$ Million
504.3
212.2
174.7
21.3 563.1
EBITDA
4Q12
Net revenue Extraordinary
costs
PMSO e
others
EBITDA
4Q13
11.7%
EBITDA
2012
Net revenue Extraordinary
costs
PMSO e others EBITDA
2013
59.6% 52.5%
62.5% 55.3%
Margem EBITDA
165.4 56.4 175.6
73.1 26.8
EBITDA margin
6.1%
• Net revenue
• Increase in the
operation portfolio
(130MW)
• PMSO e others
• Non-recurrent items in
2012
• Extraordinary
expenses
• 4Q13: R$73.1 MM
• 2013: R$174.7 MM
74.4%
248.7
Ebitda Ajustado
2013
72.4%
737.8
EBITDA
ajustado 2013
10
• Excluding extraordinary costs: net income of R$ 100.9 million in the 4Q13 and R$ 119.6 million in 2013
Net income (Loss)
R$ Million
11
27.8
73.1 100.9
-55.0 174.7
119.6
Net income
4Q13
Extraordinary
expenses
Adjusted net
income 4Q13
Net loss
2013
Adjusted net
income 2013
Extraordinary
expenses
3,809.8 4,001.2 3,772.1 3,874.8
565.3 572.1 553.4 563.1
1Q13 2Q13 3Q13 4Q13
Net debt2 EBITDA LTM³
Caixa 2014 2015 2016 2017 2018+
755.9
316.0
133.9
356.1 351.8 355.1
2,812.1
573.4
889.8
Debt according to index rate (%)Net debt/ebitda (R$ mm)
Debt amortization (R$ mm)
• Average term: 6.7 years
• Average nominal cost: 7.8%
(81.7% of CDI dec/13)
Debt profile
1) Corresponds to funding for projects under construction works that did not yet have pay-outs of long-term debts
2) The cash balance considers the reserve account balance (linked investments)
3) Last twelve months
Debt profile
CDI
27.0%
Fixed
13.9%
TJLP
55.6%
TJ6
1.8%
IGPM
1.7%
12
889.4
CashReserve account Bridge loans(1) Loans and Debentures
6.7x
7.0x 6.8x
6.9x
Leverage 2
13
Start of operation Capacity
(MW)
Physical guarantee
(MWavg)
PPA
1Q14 120 52.7 LFA 2010 - 20 years
Atlântica Complex
Concluded projects in March 2014
14
1) Macacos, Pedra Preta, Costa Branca and Juremas
Start of
operations
Capacity
(MW)
Physical
guarantee
(MWavg)
Financing PPA
2Q14 78.2 37.5
BNDES
(contracted, partially
disbursed)
LFA aug/10 - 20 years
Ongoing projects
Macacos I Complex 1
Start of
operations
1H16 2H16 1H18
Capacity
(MW)
82.0 172.0 51.3
Physical
guarantee
(MWavg)
40.2 89.0 26.1
Financing
BNDES
(structuring)
BNDES
(structuring)
BNDES
(to be structure)
PPA ACL - 20 years ACL - 20 years A-5 2013
1) Campo dos Ventos I, III, V;
2) Ventos de São Benedito, Ventos de Santo Dimas, Santa Mônica, Santa Úrsula São Domingos and Ventos de São Martinho;
3) Pedra Cheirosa I and Pedra Cheirosa II.
Ongoing projects
Campo dos Ventos
Complex1
São Benedito
Complex2
Pedra Cheirosa
Complex3
15
Transaction
• Merger of WF2 into CPFL-R, which will hereinafter hold 100% of
DESA’s shares
• ARROW, managing fund of WF2, will hereinafter hold 12.63%(1) CPFL-
R capital stock, upon fulfillment of prior conditions
Main prior
conditions
• Due diligence by CPFL-R at WF2, and by WF2 at CPFL-R
• Acquisition by WF2 of the remaining DESA shares, in order to hold all
capital stock of DESA prior to the joint venture
• Approval of the transaction by ANEEL, CADE and DESA creditors
Governance
• ARROW will become a party in the CPFL-R Shareholders’ Agreement
currently in force with rights and duties under such agreement
including:
̶ Right to appoint one member for CPFL-R Board of Directors
̶ Right to appoint one member for the Board of Directors’
consulting committees
Lock-up • The new shares will be in lock-up period until February 10, 2015
ARROW
WF2
Other
Shareholders
ARROW
WF2
100%
78.9% 21.1%
100%
100%
DESA shareholding structure
2
1 Current
Pre Joint Venture structure
Note:
1 Shareholding interest may suffer potential adjustments arising from due diligence
DESA
Joint Venture with Dobrevê Energia S.A. ("DESA") adding 331 MW of total contracted installed capacity
to CPFL Renováveis portfolio
16
Composição acionária pós incorporação
17
5.6% 5.5% 7.1% 3.0% 1.9% 1.5%58.8% 9.3%
Prior operation
Market
7.2% 0.00%
4.9% 4.8% 6.2% 2.6% 1.7% 1.3%51.4% 8.1%
After operation
Market
6.3% 12.6%(1)
(ARROW)
(ARROW)
(2)
(2)
After the conclusion of the transaction FIP ARROW will hold 12.63%(1) of the total capital
stock of CPFL Renováveis. CPFL Energia will remain being the holding
Notes:
1 Shareholding interest may suffer potential adjustments arising from due diligence
2 By CPFL Geração
Operation Construction Pipeline Total
1.1 1.1399.0 423.0
370.0 . 370,0
924.4
. 412,7
3,766.7
1,337.1
24.0
3,766.7
Operation Construction Pipeline Total
72.4
205.2
-
24.0
96.4
29.2
234.4
Operation Construction Pipeline Total
1,1 1.1326.6 326.6
370.0 370.0
719.2
383.5
3,766.7
1,102.7
3,766.7
CPFL Renováveis’s portfolio after the joint venture (MW)
CPFL Renováveis (actual)
DESA
(1)
(1) Does not include projects in developing of Desa, in review
SHPP
SOL
WIND
BIO
CPFL Renováveis (after association)
(1)
1,416.8
277.6
5,567.0
330.8
1,694.4
5,897.8
53.2
436.7
18
• Market capitalization of R$ 5.9 million on December 30th, 2013
• Average daily volume of 210 thousand
• Between the IPO and the end of 2013, Company's shares rose 7.1%
Market capital
•
7.1%
8.7%
2.8%
Shares performance (1)
1) Basis 100 in 07/19/2013
19
Contacts
Closing quotation on 03/25/2014:
R$ 12.30
Market cap:
R$ 5.4 billion | US$ 2.3 billion
20
André Dorf
Chief Executive Officer
Marcelo Souza
Chief Financial and Investor Relations Officer
Maria Carolina Gonçalves
Investor Relations Head
Luciana Silvestre Fonseca
Investor Relations Analyst
Priscila de Oliveira
Investor Relations Analyst
E-mail: ri@cpflrenovaveis.com.br
Telephone: 55-11- 3157-9305
Press Office
RP1 Comunicação Empresarial
E-mail: carolinamarcondes@rp1.com.br
Telephone: 55-11- 5501-4655

Contenu connexe

Tendances

2013 Results, 2030 Strategic Plan and 2014-25018 Business Plan
2013 Results, 2030 Strategic Plan and 2014-25018 Business Plan2013 Results, 2030 Strategic Plan and 2014-25018 Business Plan
2013 Results, 2030 Strategic Plan and 2014-25018 Business PlanPetrobras
 
Company Website Presentation - April 2014 (C)
Company Website Presentation - April 2014 (C)Company Website Presentation - April 2014 (C)
Company Website Presentation - April 2014 (C)AnteroResources
 
Company website presentation april 2014
Company website presentation   april 2014Company website presentation   april 2014
Company website presentation april 2014AnteroResources
 
Petrobras at a Glance
Petrobras at a GlancePetrobras at a Glance
Petrobras at a GlancePetrobras
 
2 q12 results presentation
2 q12 results presentation2 q12 results presentation
2 q12 results presentationTriunfoRi
 
Webcast Presentation CPFL Energia_2Q13_final
Webcast Presentation CPFL Energia_2Q13_finalWebcast Presentation CPFL Energia_2Q13_final
Webcast Presentation CPFL Energia_2Q13_finalCPFL RI
 
Company Presentation - October 2014
Company Presentation - October 2014Company Presentation - October 2014
Company Presentation - October 2014AnteroResources
 
Company website presentation january 2015
Company website presentation   january 2015Company website presentation   january 2015
Company website presentation january 2015AnteroResources
 
Company website presentation june 2015
Company website presentation   june 2015Company website presentation   june 2015
Company website presentation june 2015AnteroResources
 
Webcast Presentation CPFL Energia_2Q14
Webcast Presentation CPFL Energia_2Q14Webcast Presentation CPFL Energia_2Q14
Webcast Presentation CPFL Energia_2Q14CPFL RI
 
Company website presentation august 2014
Company website presentation   august 2014Company website presentation   august 2014
Company website presentation august 2014AnteroResources
 
Company Website Presentation - August 2014
Company Website Presentation - August 2014Company Website Presentation - August 2014
Company Website Presentation - August 2014AnteroResources
 
Operational Results - 3rd Quarter 2014
Operational Results - 3rd Quarter 2014Operational Results - 3rd Quarter 2014
Operational Results - 3rd Quarter 2014Petrobras
 
Company website presentation (a) november 2014
Company website presentation (a)   november 2014Company website presentation (a)   november 2014
Company website presentation (a) november 2014AnteroResources
 
Company Website Presentation November 2015
Company Website Presentation November 2015Company Website Presentation November 2015
Company Website Presentation November 2015AnteroResources
 
Company website presentation november 2015
Company website presentation   november 2015Company website presentation   november 2015
Company website presentation november 2015AnteroResources
 
Company website presentation (a) november 2014(2)
Company website presentation (a)   november 2014(2)Company website presentation (a)   november 2014(2)
Company website presentation (a) november 2014(2)AnteroResources
 

Tendances (18)

2013 Results, 2030 Strategic Plan and 2014-25018 Business Plan
2013 Results, 2030 Strategic Plan and 2014-25018 Business Plan2013 Results, 2030 Strategic Plan and 2014-25018 Business Plan
2013 Results, 2030 Strategic Plan and 2014-25018 Business Plan
 
Company Website Presentation - April 2014 (C)
Company Website Presentation - April 2014 (C)Company Website Presentation - April 2014 (C)
Company Website Presentation - April 2014 (C)
 
Company website presentation april 2014
Company website presentation   april 2014Company website presentation   april 2014
Company website presentation april 2014
 
Petrobras at a Glance
Petrobras at a GlancePetrobras at a Glance
Petrobras at a Glance
 
Q2 20 ER Presentation
Q2 20 ER PresentationQ2 20 ER Presentation
Q2 20 ER Presentation
 
2 q12 results presentation
2 q12 results presentation2 q12 results presentation
2 q12 results presentation
 
Webcast Presentation CPFL Energia_2Q13_final
Webcast Presentation CPFL Energia_2Q13_finalWebcast Presentation CPFL Energia_2Q13_final
Webcast Presentation CPFL Energia_2Q13_final
 
Company Presentation - October 2014
Company Presentation - October 2014Company Presentation - October 2014
Company Presentation - October 2014
 
Company website presentation january 2015
Company website presentation   january 2015Company website presentation   january 2015
Company website presentation january 2015
 
Company website presentation june 2015
Company website presentation   june 2015Company website presentation   june 2015
Company website presentation june 2015
 
Webcast Presentation CPFL Energia_2Q14
Webcast Presentation CPFL Energia_2Q14Webcast Presentation CPFL Energia_2Q14
Webcast Presentation CPFL Energia_2Q14
 
Company website presentation august 2014
Company website presentation   august 2014Company website presentation   august 2014
Company website presentation august 2014
 
Company Website Presentation - August 2014
Company Website Presentation - August 2014Company Website Presentation - August 2014
Company Website Presentation - August 2014
 
Operational Results - 3rd Quarter 2014
Operational Results - 3rd Quarter 2014Operational Results - 3rd Quarter 2014
Operational Results - 3rd Quarter 2014
 
Company website presentation (a) november 2014
Company website presentation (a)   november 2014Company website presentation (a)   november 2014
Company website presentation (a) november 2014
 
Company Website Presentation November 2015
Company Website Presentation November 2015Company Website Presentation November 2015
Company Website Presentation November 2015
 
Company website presentation november 2015
Company website presentation   november 2015Company website presentation   november 2015
Company website presentation november 2015
 
Company website presentation (a) november 2014(2)
Company website presentation (a)   november 2014(2)Company website presentation (a)   november 2014(2)
Company website presentation (a) november 2014(2)
 

En vedette

Cpfl energia presentation_final
Cpfl energia presentation_finalCpfl energia presentation_final
Cpfl energia presentation_finalCPFL RI
 
Institutional presentation cpfl energia itaú ny final
Institutional presentation cpfl energia itaú ny finalInstitutional presentation cpfl energia itaú ny final
Institutional presentation cpfl energia itaú ny finalCPFL RI
 
Cpfl energia ndrs citi_impres
Cpfl energia ndrs citi_impresCpfl energia ndrs citi_impres
Cpfl energia ndrs citi_impresCPFL RI
 
Presentation eng cpfl energia_final_print
Presentation eng cpfl energia_final_printPresentation eng cpfl energia_final_print
Presentation eng cpfl energia_final_printCPFL RI
 
Apresentaçao cpfl energia_1_t11_final_11mai_eng
Apresentaçao cpfl energia_1_t11_final_11mai_engApresentaçao cpfl energia_1_t11_final_11mai_eng
Apresentaçao cpfl energia_1_t11_final_11mai_engCPFL RI
 
Apresentação 3 t15_master_inglês_final v2
Apresentação 3 t15_master_inglês_final v2Apresentação 3 t15_master_inglês_final v2
Apresentação 3 t15_master_inglês_final v2CPFL RI
 
Apresentação ri cpfl energia 2 t11_pt
Apresentação ri cpfl energia 2 t11_ptApresentação ri cpfl energia 2 t11_pt
Apresentação ri cpfl energia 2 t11_ptCPFL RI
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCPFL RI
 
Apresentação ri cpfl energia_4_t11_09mar12_pt_final_print
Apresentação ri cpfl energia_4_t11_09mar12_pt_final_printApresentação ri cpfl energia_4_t11_09mar12_pt_final_print
Apresentação ri cpfl energia_4_t11_09mar12_pt_final_printCPFL RI
 

En vedette (9)

Cpfl energia presentation_final
Cpfl energia presentation_finalCpfl energia presentation_final
Cpfl energia presentation_final
 
Institutional presentation cpfl energia itaú ny final
Institutional presentation cpfl energia itaú ny finalInstitutional presentation cpfl energia itaú ny final
Institutional presentation cpfl energia itaú ny final
 
Cpfl energia ndrs citi_impres
Cpfl energia ndrs citi_impresCpfl energia ndrs citi_impres
Cpfl energia ndrs citi_impres
 
Presentation eng cpfl energia_final_print
Presentation eng cpfl energia_final_printPresentation eng cpfl energia_final_print
Presentation eng cpfl energia_final_print
 
Apresentaçao cpfl energia_1_t11_final_11mai_eng
Apresentaçao cpfl energia_1_t11_final_11mai_engApresentaçao cpfl energia_1_t11_final_11mai_eng
Apresentaçao cpfl energia_1_t11_final_11mai_eng
 
Apresentação 3 t15_master_inglês_final v2
Apresentação 3 t15_master_inglês_final v2Apresentação 3 t15_master_inglês_final v2
Apresentação 3 t15_master_inglês_final v2
 
Apresentação ri cpfl energia 2 t11_pt
Apresentação ri cpfl energia 2 t11_ptApresentação ri cpfl energia 2 t11_pt
Apresentação ri cpfl energia 2 t11_pt
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL Energia
 
Apresentação ri cpfl energia_4_t11_09mar12_pt_final_print
Apresentação ri cpfl energia_4_t11_09mar12_pt_final_printApresentação ri cpfl energia_4_t11_09mar12_pt_final_print
Apresentação ri cpfl energia_4_t11_09mar12_pt_final_print
 

Similaire à Eng presentation 4_q13results_vfinal

Earnings release 3 q14_final
Earnings release 3 q14_finalEarnings release 3 q14_final
Earnings release 3 q14_finalCPFL RI
 
Eng apresentação de resultados v.final
Eng apresentação de resultados v.finalEng apresentação de resultados v.final
Eng apresentação de resultados v.finalersa_ri
 
Earnings release 4 q14 vfinal
Earnings release 4 q14 vfinalEarnings release 4 q14 vfinal
Earnings release 4 q14 vfinalCPFL RI
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCPFL RI
 
Corporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCorporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCPFL RI
 
Corporate Presentation - CPFL Energia - May 2015
Corporate Presentation - CPFL Energia - May 2015Corporate Presentation - CPFL Energia - May 2015
Corporate Presentation - CPFL Energia - May 2015CPFL RI
 
Webcast Presentation CPFL Energia_3Q13
Webcast Presentation CPFL Energia_3Q13Webcast Presentation CPFL Energia_3Q13
Webcast Presentation CPFL Energia_3Q13CPFL RI
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCPFL RI
 
Corporate Presentantion CPFL Energia June 2015
Corporate Presentantion CPFL Energia June 2015Corporate Presentantion CPFL Energia June 2015
Corporate Presentantion CPFL Energia June 2015CPFL RI
 
Subsea 7 Q1 2013 results presentation
Subsea 7 Q1 2013 results presentationSubsea 7 Q1 2013 results presentation
Subsea 7 Q1 2013 results presentationTradeWindsnews
 
Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017CPFL RI
 
Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017CPFL RI
 
Webcast Presentation CPFL Energia_3Q14
Webcast Presentation CPFL Energia_3Q14Webcast Presentation CPFL Energia_3Q14
Webcast Presentation CPFL Energia_3Q14CPFL RI
 
MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX_RI
 
Presentation 1Q15 - CPFL Energia
Presentation 1Q15 - CPFL EnergiaPresentation 1Q15 - CPFL Energia
Presentation 1Q15 - CPFL EnergiaCPFL RI
 
Apresentação de resultados 1 t15 master_inglês_v3
Apresentação de resultados 1 t15 master_inglês_v3Apresentação de resultados 1 t15 master_inglês_v3
Apresentação de resultados 1 t15 master_inglês_v3CPFL RI
 
Corporate Presentation CPFL Energia April 2015
Corporate Presentation CPFL Energia   April 2015Corporate Presentation CPFL Energia   April 2015
Corporate Presentation CPFL Energia April 2015CPFL RI
 
4Q13 Results Presentation
4Q13 Results Presentation4Q13 Results Presentation
4Q13 Results PresentationAluparRI
 
Webcast Presentation CPFL Energia_1Q14
Webcast Presentation CPFL Energia_1Q14Webcast Presentation CPFL Energia_1Q14
Webcast Presentation CPFL Energia_1Q14CPFL RI
 
Webcast Presentation CPFL Energia_4Q13
Webcast Presentation CPFL Energia_4Q13Webcast Presentation CPFL Energia_4Q13
Webcast Presentation CPFL Energia_4Q13CPFL RI
 

Similaire à Eng presentation 4_q13results_vfinal (20)

Earnings release 3 q14_final
Earnings release 3 q14_finalEarnings release 3 q14_final
Earnings release 3 q14_final
 
Eng apresentação de resultados v.final
Eng apresentação de resultados v.finalEng apresentação de resultados v.final
Eng apresentação de resultados v.final
 
Earnings release 4 q14 vfinal
Earnings release 4 q14 vfinalEarnings release 4 q14 vfinal
Earnings release 4 q14 vfinal
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL Energia
 
Corporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCorporate Presentation - CPFL Energia
Corporate Presentation - CPFL Energia
 
Corporate Presentation - CPFL Energia - May 2015
Corporate Presentation - CPFL Energia - May 2015Corporate Presentation - CPFL Energia - May 2015
Corporate Presentation - CPFL Energia - May 2015
 
Webcast Presentation CPFL Energia_3Q13
Webcast Presentation CPFL Energia_3Q13Webcast Presentation CPFL Energia_3Q13
Webcast Presentation CPFL Energia_3Q13
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL Energia
 
Corporate Presentantion CPFL Energia June 2015
Corporate Presentantion CPFL Energia June 2015Corporate Presentantion CPFL Energia June 2015
Corporate Presentantion CPFL Energia June 2015
 
Subsea 7 Q1 2013 results presentation
Subsea 7 Q1 2013 results presentationSubsea 7 Q1 2013 results presentation
Subsea 7 Q1 2013 results presentation
 
Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017
 
Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017
 
Webcast Presentation CPFL Energia_3Q14
Webcast Presentation CPFL Energia_3Q14Webcast Presentation CPFL Energia_3Q14
Webcast Presentation CPFL Energia_3Q14
 
MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX Corporate Presentation (July)
MPX Corporate Presentation (July)
 
Presentation 1Q15 - CPFL Energia
Presentation 1Q15 - CPFL EnergiaPresentation 1Q15 - CPFL Energia
Presentation 1Q15 - CPFL Energia
 
Apresentação de resultados 1 t15 master_inglês_v3
Apresentação de resultados 1 t15 master_inglês_v3Apresentação de resultados 1 t15 master_inglês_v3
Apresentação de resultados 1 t15 master_inglês_v3
 
Corporate Presentation CPFL Energia April 2015
Corporate Presentation CPFL Energia   April 2015Corporate Presentation CPFL Energia   April 2015
Corporate Presentation CPFL Energia April 2015
 
4Q13 Results Presentation
4Q13 Results Presentation4Q13 Results Presentation
4Q13 Results Presentation
 
Webcast Presentation CPFL Energia_1Q14
Webcast Presentation CPFL Energia_1Q14Webcast Presentation CPFL Energia_1Q14
Webcast Presentation CPFL Energia_1Q14
 
Webcast Presentation CPFL Energia_4Q13
Webcast Presentation CPFL Energia_4Q13Webcast Presentation CPFL Energia_4Q13
Webcast Presentation CPFL Energia_4Q13
 

Plus de CPFL RI

Corporate Presentation CPFL Energia
Corporate Presentation CPFL Energia  Corporate Presentation CPFL Energia
Corporate Presentation CPFL Energia CPFL RI
 
Corporate Presentation CPFL Energia 2020
Corporate Presentation CPFL Energia 2020Corporate Presentation CPFL Energia 2020
Corporate Presentation CPFL Energia 2020CPFL RI
 
CPFL ENERGIA_INSTITUTIONAL PRESENTATION
CPFL ENERGIA_INSTITUTIONAL PRESENTATIONCPFL ENERGIA_INSTITUTIONAL PRESENTATION
CPFL ENERGIA_INSTITUTIONAL PRESENTATIONCPFL RI
 
CPFL Investor Day 2019
CPFL Investor Day 2019CPFL Investor Day 2019
CPFL Investor Day 2019CPFL RI
 
1Q19 Results Presentation - CPFL Energia
1Q19 Results Presentation - CPFL Energia1Q19 Results Presentation - CPFL Energia
1Q19 Results Presentation - CPFL EnergiaCPFL RI
 
Apresentação de Resultados 1T19 - CPFL Energia
Apresentação de Resultados 1T19 - CPFL EnergiaApresentação de Resultados 1T19 - CPFL Energia
Apresentação de Resultados 1T19 - CPFL EnergiaCPFL RI
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCPFL RI
 
Apresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaApresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaCPFL RI
 
4Q18 Results Presentation - CPFL Energia
4Q18 Results Presentation - CPFL Energia4Q18 Results Presentation - CPFL Energia
4Q18 Results Presentation - CPFL EnergiaCPFL RI
 
Apresentação de Resultados 4T18/2018 - CPFL Energia
Apresentação de Resultados 4T18/2018 - CPFL EnergiaApresentação de Resultados 4T18/2018 - CPFL Energia
Apresentação de Resultados 4T18/2018 - CPFL EnergiaCPFL RI
 
Corporate presentation cpfl energia nov2018 en
Corporate presentation cpfl energia nov2018 enCorporate presentation cpfl energia nov2018 en
Corporate presentation cpfl energia nov2018 enCPFL RI
 
Corporate presentation cpfl energia nov2018 pt
Corporate presentation cpfl energia nov2018 ptCorporate presentation cpfl energia nov2018 pt
Corporate presentation cpfl energia nov2018 ptCPFL RI
 
3Q18 Results Presentation - CPFL Energia
3Q18 Results Presentation - CPFL Energia3Q18 Results Presentation - CPFL Energia
3Q18 Results Presentation - CPFL EnergiaCPFL RI
 
Apresentação de Resultados 3T18 - CPFL Energia
Apresentação de Resultados 3T18 - CPFL EnergiaApresentação de Resultados 3T18 - CPFL Energia
Apresentação de Resultados 3T18 - CPFL EnergiaCPFL RI
 
Corporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCorporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCPFL RI
 
Apresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaApresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaCPFL RI
 
2Q18 Results Presentation - CPFL Energia
2Q18 Results Presentation - CPFL Energia2Q18 Results Presentation - CPFL Energia
2Q18 Results Presentation - CPFL EnergiaCPFL RI
 
Apresentação de Resultados 2T18 - CPFL Energia
Apresentação de Resultados 2T18 - CPFL EnergiaApresentação de Resultados 2T18 - CPFL Energia
Apresentação de Resultados 2T18 - CPFL EnergiaCPFL RI
 
Corporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCorporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCPFL RI
 
Apresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaApresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaCPFL RI
 

Plus de CPFL RI (20)

Corporate Presentation CPFL Energia
Corporate Presentation CPFL Energia  Corporate Presentation CPFL Energia
Corporate Presentation CPFL Energia
 
Corporate Presentation CPFL Energia 2020
Corporate Presentation CPFL Energia 2020Corporate Presentation CPFL Energia 2020
Corporate Presentation CPFL Energia 2020
 
CPFL ENERGIA_INSTITUTIONAL PRESENTATION
CPFL ENERGIA_INSTITUTIONAL PRESENTATIONCPFL ENERGIA_INSTITUTIONAL PRESENTATION
CPFL ENERGIA_INSTITUTIONAL PRESENTATION
 
CPFL Investor Day 2019
CPFL Investor Day 2019CPFL Investor Day 2019
CPFL Investor Day 2019
 
1Q19 Results Presentation - CPFL Energia
1Q19 Results Presentation - CPFL Energia1Q19 Results Presentation - CPFL Energia
1Q19 Results Presentation - CPFL Energia
 
Apresentação de Resultados 1T19 - CPFL Energia
Apresentação de Resultados 1T19 - CPFL EnergiaApresentação de Resultados 1T19 - CPFL Energia
Apresentação de Resultados 1T19 - CPFL Energia
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL Energia
 
Apresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaApresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL Energia
 
4Q18 Results Presentation - CPFL Energia
4Q18 Results Presentation - CPFL Energia4Q18 Results Presentation - CPFL Energia
4Q18 Results Presentation - CPFL Energia
 
Apresentação de Resultados 4T18/2018 - CPFL Energia
Apresentação de Resultados 4T18/2018 - CPFL EnergiaApresentação de Resultados 4T18/2018 - CPFL Energia
Apresentação de Resultados 4T18/2018 - CPFL Energia
 
Corporate presentation cpfl energia nov2018 en
Corporate presentation cpfl energia nov2018 enCorporate presentation cpfl energia nov2018 en
Corporate presentation cpfl energia nov2018 en
 
Corporate presentation cpfl energia nov2018 pt
Corporate presentation cpfl energia nov2018 ptCorporate presentation cpfl energia nov2018 pt
Corporate presentation cpfl energia nov2018 pt
 
3Q18 Results Presentation - CPFL Energia
3Q18 Results Presentation - CPFL Energia3Q18 Results Presentation - CPFL Energia
3Q18 Results Presentation - CPFL Energia
 
Apresentação de Resultados 3T18 - CPFL Energia
Apresentação de Resultados 3T18 - CPFL EnergiaApresentação de Resultados 3T18 - CPFL Energia
Apresentação de Resultados 3T18 - CPFL Energia
 
Corporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCorporate Presentation - CPFL Energia
Corporate Presentation - CPFL Energia
 
Apresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaApresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL Energia
 
2Q18 Results Presentation - CPFL Energia
2Q18 Results Presentation - CPFL Energia2Q18 Results Presentation - CPFL Energia
2Q18 Results Presentation - CPFL Energia
 
Apresentação de Resultados 2T18 - CPFL Energia
Apresentação de Resultados 2T18 - CPFL EnergiaApresentação de Resultados 2T18 - CPFL Energia
Apresentação de Resultados 2T18 - CPFL Energia
 
Corporate Presentation - CPFL Energia
Corporate Presentation - CPFL EnergiaCorporate Presentation - CPFL Energia
Corporate Presentation - CPFL Energia
 
Apresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL EnergiaApresentação Institucional - CPFL Energia
Apresentação Institucional - CPFL Energia
 

Eng presentation 4_q13results_vfinal

  • 2. This presentation may contain statements that represent expectations about future events or results according to Brazilian and international securities regulations. These statements are based on certain assumptions and analyses made by the Company pursuant to its experience and the economic environment, market conditions and expected future events, many of which are beyond the Company's control. Important factors that could lead to significant differences between actual results and the statements on expectations about future events or results include the Company's business strategy, Brazilian and international economic conditions, technology, financial strategy, developments in the utilities industry, hydrological conditions, financial market conditions, uncertainty regarding the results of future operations, plans, objectives, expectations and intentions, among others. Considering these factors, the Company's actual results may differ materially from those indicated or implied in forward- looking statements about future events or results. The information and opinions contained in this presentation should not be construed as a recommendation to potential investors and no investment decision should be based on the truthfulness, timeliness or completeness of such information or opinions. None of the advisors of the Company or parties related to them or their representatives shall be liable for any losses that may result from the use or of this presentation. This material includes forward-looking statements subject to risks and uncertainties, which are based on current expectations and projections about future events and trends that may affect the Company's business. These statements may include projections of economic growth, demand, energy supply, as well as information about its competitive position, the regulatory environment, potential growth opportunities and other matters. Many factors could adversely affect the estimates and assumptions on which these statements are based. Disclaimer 2
  • 3. Highlights 4Q13 3 Operations’ start Alvorada plant with 50MW of capacity, in Minas Gerais Trading at the auction A-5 2013 amounting 51.3 MW of capacity through two wind farms, starting energy supply from 2018 Operating capacity increased to 1,283 MW distributed in 60 power plants (+11% vs 2012) Net revenue of R$ 334 million in 4Q13 (+20% vs 4Q12) and R$ 1.0 billion in 2013 (+26% vs 2012) EBITDA of R$ 176 million in 4Q13 (+6% vs 4Q12) and R$ 563 million in 2013 (+12% vs 2012) Solid liquidity situation: with cash balance of R$ 890 million Investments amounting R$ 804 million in 2013 Leverage of 6.9x EBITDA, with debt profile and cost suitable with the Company’s projects 1st APIMEC Meeting held in December, 2013
  • 4. Joint venture with a DESA. CPFL Renováveis portfolio will reach 2,131.1 MW in contracted capacity: 1,694.4 MW in operation; and 436.7 MW under construction Completion of Rosa dos Ventos' acquisition, adding 2 wind farms, with 13.7 MW capacity, to CPFL Renovaveis’ portfolio Last wind farm forming Atlântica Wind Complex started its operations, with 120 MW of capacity, in Rio Grande do Sul. This is the first project in Brazil with 120 meters in height's turbines and 3 MW of power Due to Rosa dos Ventos and Atlântica, Company’s operation capacity achieved 1,416.8 MW, with 66 usinas in the 1Q14 Recents events 4
  • 5. Portfolio’s capacity 55 #1 in renewable energy in Brazil with 1.4 GW (79%) of capacity in operation1 1.8 GW of capacity in operation until 2018 Regionally diversified portfolio with presence in 4 sources Long term PPAs, concessions and authorizations Note: (1) Considers Rosa dos Ventos acquisition and startup of Complex Atlântica, both concluded in the first quarter of 2014 2012 2013 1Q14 2Q14 2016 2018 Total contracted 1,153.1 1,283.1 , 1,416.8 51.3 .78.2 254.0 1,800.3 Contracted portfolio growth (MW) 11.3% 10.4%
  • 6. 6 Projects concluded in 2013 Campo dos Ventos II Bio Coopcana Bio Alvorada Start of operations 3Q13 ¹ 3Q13 4Q13 Capacity (MW) 30.0 50.0 50.0 Physical guarantee (MWavg) 15.0 18.0 18.0 PPA LER 2 / 2010 - 20 years ACL 3 - 21 years ACL3 - 20 years 1) Campo dos Ventos II is already able to generate energy and is entitled to revenue corresponding to the billing contracted in the 2010 Reserve Energy Auction (LER) as of September 27, 2013 – conclusion of the construction of ICG still pending 2) Reserve Auction 3) Free Market
  • 7. Operating data 4Q12 4Q13 230.7 284.7 0 0,4 427.0 427.9 243.7 274.9 SHPP SOL WIND BIO901.4 2012 2013 1,007.9 1,195.5 0 1.4 1,187.3 1,269.8 544.5 733.9 Energy generation per source (GWh) (1) 987.9 2,739.7 3,200.7 Generated energy reached 3.201 GWh in 2013 , 16.8% more than that in 2012, mainly due to growth of portfolio in operation 9.6% 16.8% 7 1) The energy generation data does not consider Santa Clara and Campo dos Ventos II wind farms which are able to generate energy and have been receiving the revenue from their contracts – conclusion of the construction of ICG still pending
  • 8. Net revenue (R$ Million) 30.3% SHPP 19.2% Bio 50.4% Wind 4Q12 4Q13 277.7 334.1 2012 2013 806,4 1.018,6 20.3% 26.3% Per source (2013)1 8(1) The solar source share is of 0.03%. In 2012 there was no solar generation. Net revenue R$ Million • Full year energy sales, in 2013, of the projects Bio Ipê, Bio Pedra, Santa Clara Complex, Tanquinho Solar and SHPP Santo Góes (started its operation over 2012) • Acquisition of Bons Ventos (jun/12) and Ester Plant (oct/12) • Beginning of sales contract fulfillment in 2013 of the projects Bio Coopcana, Bio Alvorada, Campos dos Ventos II Complex e Atlântica Complex • Annual adjustment of the contracts (based on IGP-M or IPCA)
  • 9. • extraordinary costs with energy purchase due to contracts supply amounting R$ 73.1 million in the 4Q13 and R$ 174.7 million in 2013 • Higher expenses in 2013 due to Bons Ventos’s amortization of right to exploit and personnel, partially offset by non recurring items in 2012 • Recurrent costs and expenses in accordance with the Company’s expansion plan Costs of energy generation and general and administrative expenses R$ Million Costs–R$mmExpenses–R$mm 4Q12 4Q13 129.9 188.7 45.3% 2012 2013 371.4 573.5 54.4% 4Q12 4Q13 70.7 56.1 -20.6% 2012 2013 219.9 230.3 9 4.8%
  • 10. Adjusted EBITDA 4Q13 EBITDA R$ Million 504.3 212.2 174.7 21.3 563.1 EBITDA 4Q12 Net revenue Extraordinary costs PMSO e others EBITDA 4Q13 11.7% EBITDA 2012 Net revenue Extraordinary costs PMSO e others EBITDA 2013 59.6% 52.5% 62.5% 55.3% Margem EBITDA 165.4 56.4 175.6 73.1 26.8 EBITDA margin 6.1% • Net revenue • Increase in the operation portfolio (130MW) • PMSO e others • Non-recurrent items in 2012 • Extraordinary expenses • 4Q13: R$73.1 MM • 2013: R$174.7 MM 74.4% 248.7 Ebitda Ajustado 2013 72.4% 737.8 EBITDA ajustado 2013 10
  • 11. • Excluding extraordinary costs: net income of R$ 100.9 million in the 4Q13 and R$ 119.6 million in 2013 Net income (Loss) R$ Million 11 27.8 73.1 100.9 -55.0 174.7 119.6 Net income 4Q13 Extraordinary expenses Adjusted net income 4Q13 Net loss 2013 Adjusted net income 2013 Extraordinary expenses
  • 12. 3,809.8 4,001.2 3,772.1 3,874.8 565.3 572.1 553.4 563.1 1Q13 2Q13 3Q13 4Q13 Net debt2 EBITDA LTM³ Caixa 2014 2015 2016 2017 2018+ 755.9 316.0 133.9 356.1 351.8 355.1 2,812.1 573.4 889.8 Debt according to index rate (%)Net debt/ebitda (R$ mm) Debt amortization (R$ mm) • Average term: 6.7 years • Average nominal cost: 7.8% (81.7% of CDI dec/13) Debt profile 1) Corresponds to funding for projects under construction works that did not yet have pay-outs of long-term debts 2) The cash balance considers the reserve account balance (linked investments) 3) Last twelve months Debt profile CDI 27.0% Fixed 13.9% TJLP 55.6% TJ6 1.8% IGPM 1.7% 12 889.4 CashReserve account Bridge loans(1) Loans and Debentures 6.7x 7.0x 6.8x 6.9x Leverage 2
  • 13. 13 Start of operation Capacity (MW) Physical guarantee (MWavg) PPA 1Q14 120 52.7 LFA 2010 - 20 years Atlântica Complex Concluded projects in March 2014
  • 14. 14 1) Macacos, Pedra Preta, Costa Branca and Juremas Start of operations Capacity (MW) Physical guarantee (MWavg) Financing PPA 2Q14 78.2 37.5 BNDES (contracted, partially disbursed) LFA aug/10 - 20 years Ongoing projects Macacos I Complex 1
  • 15. Start of operations 1H16 2H16 1H18 Capacity (MW) 82.0 172.0 51.3 Physical guarantee (MWavg) 40.2 89.0 26.1 Financing BNDES (structuring) BNDES (structuring) BNDES (to be structure) PPA ACL - 20 years ACL - 20 years A-5 2013 1) Campo dos Ventos I, III, V; 2) Ventos de São Benedito, Ventos de Santo Dimas, Santa Mônica, Santa Úrsula São Domingos and Ventos de São Martinho; 3) Pedra Cheirosa I and Pedra Cheirosa II. Ongoing projects Campo dos Ventos Complex1 São Benedito Complex2 Pedra Cheirosa Complex3 15
  • 16. Transaction • Merger of WF2 into CPFL-R, which will hereinafter hold 100% of DESA’s shares • ARROW, managing fund of WF2, will hereinafter hold 12.63%(1) CPFL- R capital stock, upon fulfillment of prior conditions Main prior conditions • Due diligence by CPFL-R at WF2, and by WF2 at CPFL-R • Acquisition by WF2 of the remaining DESA shares, in order to hold all capital stock of DESA prior to the joint venture • Approval of the transaction by ANEEL, CADE and DESA creditors Governance • ARROW will become a party in the CPFL-R Shareholders’ Agreement currently in force with rights and duties under such agreement including: ̶ Right to appoint one member for CPFL-R Board of Directors ̶ Right to appoint one member for the Board of Directors’ consulting committees Lock-up • The new shares will be in lock-up period until February 10, 2015 ARROW WF2 Other Shareholders ARROW WF2 100% 78.9% 21.1% 100% 100% DESA shareholding structure 2 1 Current Pre Joint Venture structure Note: 1 Shareholding interest may suffer potential adjustments arising from due diligence DESA Joint Venture with Dobrevê Energia S.A. ("DESA") adding 331 MW of total contracted installed capacity to CPFL Renováveis portfolio 16
  • 17. Composição acionária pós incorporação 17 5.6% 5.5% 7.1% 3.0% 1.9% 1.5%58.8% 9.3% Prior operation Market 7.2% 0.00% 4.9% 4.8% 6.2% 2.6% 1.7% 1.3%51.4% 8.1% After operation Market 6.3% 12.6%(1) (ARROW) (ARROW) (2) (2) After the conclusion of the transaction FIP ARROW will hold 12.63%(1) of the total capital stock of CPFL Renováveis. CPFL Energia will remain being the holding Notes: 1 Shareholding interest may suffer potential adjustments arising from due diligence 2 By CPFL Geração
  • 18. Operation Construction Pipeline Total 1.1 1.1399.0 423.0 370.0 . 370,0 924.4 . 412,7 3,766.7 1,337.1 24.0 3,766.7 Operation Construction Pipeline Total 72.4 205.2 - 24.0 96.4 29.2 234.4 Operation Construction Pipeline Total 1,1 1.1326.6 326.6 370.0 370.0 719.2 383.5 3,766.7 1,102.7 3,766.7 CPFL Renováveis’s portfolio after the joint venture (MW) CPFL Renováveis (actual) DESA (1) (1) Does not include projects in developing of Desa, in review SHPP SOL WIND BIO CPFL Renováveis (after association) (1) 1,416.8 277.6 5,567.0 330.8 1,694.4 5,897.8 53.2 436.7 18
  • 19. • Market capitalization of R$ 5.9 million on December 30th, 2013 • Average daily volume of 210 thousand • Between the IPO and the end of 2013, Company's shares rose 7.1% Market capital • 7.1% 8.7% 2.8% Shares performance (1) 1) Basis 100 in 07/19/2013 19
  • 20. Contacts Closing quotation on 03/25/2014: R$ 12.30 Market cap: R$ 5.4 billion | US$ 2.3 billion 20 André Dorf Chief Executive Officer Marcelo Souza Chief Financial and Investor Relations Officer Maria Carolina Gonçalves Investor Relations Head Luciana Silvestre Fonseca Investor Relations Analyst Priscila de Oliveira Investor Relations Analyst E-mail: ri@cpflrenovaveis.com.br Telephone: 55-11- 3157-9305 Press Office RP1 Comunicação Empresarial E-mail: carolinamarcondes@rp1.com.br Telephone: 55-11- 5501-4655