Potential for increasing the role of
renewables in Mekong power supply
(MK14)
Technology Review
Mekong Forum 2013
Tim Suljada
(tim.suljada@icem.com.au)
Outline
•
•
•
•
•
•
•

Suitable renewable energy technologies
Technical potential in the LMB
Costs of renewables
Overcoming technical barriers to deployment
Solar PV status and growth prospects
Wind status and growth prospects
Conclusion
Renewables potential and deployment

Source: Grubb curve in Electric Power Research
Institute (2009)
Assessment of technology suitability to
the Mekong
Renewable energy potential in LMB
• Highest potential is

solar, mostly in Thailand
and Vietnam
– 76GW, currently 0.374 GW

• Wind and biomass
significant

– Wind: 12GW mostly in Viet
Nam (currently 0.134GW)
– Biomass: 5.5GW across
region (currently 1.1GW)

 Current LMB power plans
include 104GW in new
capacity by 2025

Source: ICEM (2013)
Utility-scale

Small-scale / off-grid

Renewables costs

Average generation costs
LMB: 0.103 – 0.137
(ICEM, 2013 – based on Current PDPs to 2025)

Source: IRENA (2013)
How significant is cost as a barrier?
• Biomass and small hydro is competitive with
current generation sources in the region
– Scale? Collectively ~15GW potential

• Wind is nearing competitiveness
– 4-16 c/kWh globally, around 12c/kWh non-OECD Asia
– Potential is ~12GW

• Solar more costly
– 9-40 c/kWh globally, around 30c/kWh non-OECD Asia
– Potential is ~76GW
Ways to overcome the cost barrier?
• Public investment in
feed-in-tariffs

– Thailand has stimulated
renewables deployment
with attractive tariff rates
for all technologies
– Vietnam has a modest
feed in tariff for wind

• Investment is more

financially viable for
consumer and may
bring down capital costs
over time by creating a
larger market

Effect of German FiT
Aside from cost?
• Challenge of intermittent and volatile solar and
wind resources
– Outputs depends on when the sun shines and the
wind blows  low capacity factors & hard to predict
– Baseload power generation sources like hydro and
coal cannot be ‘swapped’ for solar and wind
– Similarly, peaking plants such as gas (CCGT), which
can be turned on to respond to energy use patterns

• Biomass, small hydro and geothermal can meet
these needs, but make a small contribution
Managing intermittency of solar and
wind resources
Once intermittent generation reaches ≈ 20%:
1. Renewable energy output correlation with load
– Peak shaving effect of solar and daytime a/c driven peaks

2. Distributed small-scale generation sources
– Emerging literature on the balancing effect of aggregating
many dispersed generation sources

3. Load shedding
– Utility pays major energy users not to draw from the grid

4. Storage
– Batteries can smooth power output, but expensive

5. Backup generation capacity
– CCGT, hydro dispatch to compensate, but expensive
Solar PV
Bangchak Solar Farm 38MW
Ayutthaya, Thailand

$3,000 / kWp
27.37 c/kWh

 Best performance in direct
sunlight
– Thailand: 5-6.5 kWh/m2/day
– Viet Nam: 3-6.25 kWh/m2/day

 Scattered light on cloudy
days, reduced output
Rooftop (<5 kWp)
• Capital: $2,275 – 5,000 /kWp
• Generation: 16-55 c/kWh
Utility scale (<250 MWp)
• Capital: $1,300 – 2,760 /kWp
• Generation: 9-40 c/kWh
42% (20112012)

Solar growth
60%
p.a.(200
72012)
Source: REN21 (2013)

Solar capacity growth in Thailand

…LMB growth in solar PV driven by
Thailand with 362MW installed
capacity in 2012
(A total of 12MW were installed in
other LMB countries in 2012)
Source: Tongsopit
& Greacen (2013)
Solar development potential in LMB
Solar farm – utility scale

Solar rooftop
By 2025, an
estimated:
464,300 rooftop
solar of 929MW.

By 2025, an estimated:
800 solar farms of total
capacity 16,000MW.

Source: ICEM (2013) SEA
of GMS Power Planning
Solar - levelised cost trends for
good resource (6.5 kWh/m2/day)

Generation costs projected to fall

Source: Hearps, Patrick, and Dylan McConnell. "Renewable Energy Technology
Cost Review." Melbourne Energy Institute (2011): 1-58
Solar module prices - historical

Module prices driving cost reductions

Source: IRENA (2013) Renewable Power Generation Costs in 2012: An
Overview, IRENA: Abu Dhabi
Solar investment cost components
• Module costs
largely correspond
with international
market price
• Balance of system
costs are locally
specific and vary
considerably
between countries

Source: Melbourne Energy Institute (2011)
Renewable Energy Technology Cost Review
Balance of system costs for residential
systems: USA vs Germany
• Similar module costs, but different BOS
– US total costs were double Germany’s in 2011

• Will costs in the US come down with installed capacity
due to learning rates and economies of scale? Possible
accumulation
period also
experienced in
Germany
Source: :
Berkley Lab in
Melbourne
Energy Institute
(2011)
Based on 8,000 residential rooftop solar systems in 2012
Observations in Thailand: solar farms
Thailand solar farms

International experience
Utility scale in USA in 2010 with module
cost $1.90  total cost $3.50

Investment cost components
4
3.5

Investment cost [$/Wp]

3

Total

2.5

2

Module

1.5
1
0.5

Balance of system

55%

Source: Rocky
Mountain
Institute (2010)

73%

Date of planned investment

12/16/11

10/16/11

8/16/11

6/16/11

4/16/11

2/16/11

12/16/10

10/16/10

8/16/10

6/16/10

4/16/10

2/16/10

12/16/09

10/16/09

0

• Improved racking design
Consistent regulations for business
Public information on project development

Source: UNFCCC CDM data on 13
Thailand solar farms and spot prices for •
•
solar modules at time of investment
What we could see in Viet Nam and
others as markets develop
• In Viet Nam, current capital costs ≈ $5 / Wp
– More in Cambodia and Laos where there is no local
manufacturing and smaller markets

• As in Thailand, the module cost is likely to be
similar to international rates
– Above $1 / Wp depending on size of order
– Balance of system costs, including margin for
hardware suppliers likely to be upwards of $4 / Wp

• Likely to remain higher than Thailand until
market develops with installation volume
Similar trends for wind power

Generation costs projected to fall

Source: Hearps, Patrick, and Dylan McConnell. "Renewable Energy Technology
Cost Review." Melbourne Energy Institute (2011): 1-58
Wind investment cost components:
turbine and other costs

Source: Melbourne Energy Institute (2011)
Renewable Energy Technology Cost Review
Wind development potential in LMB
19% (20112012)

By 2025, an estimated:
292 wind farms with total
capacity 8,760MW.

25%
p.a.(200
72012)
Source: ICEM (2013) SEA
of GMS Power Planning
Source: REN21 (2013)
Conclusions
• Biomass and small hydro already financially
viable and meet load characteristics
– But, they are on a small scale

• Wind and solar potential is on a large enough
scale and will soon be financially viable
1. Financial incentives needed in the short-term
2. Intermittency and volatility must be considered once
renewables proportion reaches ≈ 20%

• Thailand offers a good example for the LMB
– Financial incentives have developed the market, which
appears to have brought down local costs
THANK YOU

Tim Suljada, ICEM
(tim.suljada@icem.com.au)

Contenu connexe

Tendances

Grid-Connected Photovoltaic System Requirement-Crimson Publishers
Grid-Connected Photovoltaic System Requirement-Crimson PublishersGrid-Connected Photovoltaic System Requirement-Crimson Publishers
Grid-Connected Photovoltaic System Requirement-Crimson PublishersCrimsonpublishersPRSP
 
S2 solar energy i pv
S2 solar energy i pvS2 solar energy i pv
S2 solar energy i pvCETN
 
Pathways to Decarbonization & Digital Innovation in Energy: Making Better Dec...
Pathways to Decarbonization & Digital Innovation in Energy: Making Better Dec...Pathways to Decarbonization & Digital Innovation in Energy: Making Better Dec...
Pathways to Decarbonization & Digital Innovation in Energy: Making Better Dec...World Bank Infrastructure
 
Final Report - PV Group ANS
Final Report - PV Group ANSFinal Report - PV Group ANS
Final Report - PV Group ANSKyle Runion
 
Design of Hybrid Solar-Wind Power System for a Coaster Area in Lagos State, S...
Design of Hybrid Solar-Wind Power System for a Coaster Area in Lagos State, S...Design of Hybrid Solar-Wind Power System for a Coaster Area in Lagos State, S...
Design of Hybrid Solar-Wind Power System for a Coaster Area in Lagos State, S...paperpublications3
 
Solar Power Based Micro Grid Systems.pptx
Solar Power Based Micro Grid Systems.pptxSolar Power Based Micro Grid Systems.pptx
Solar Power Based Micro Grid Systems.pptxNiuru Ranaweera
 
PV-solar / Wind Hybrid Energy System for GSM/CDMA Type Mobile Telephony Base ...
PV-solar / Wind Hybrid Energy System for GSM/CDMA Type Mobile Telephony Base ...PV-solar / Wind Hybrid Energy System for GSM/CDMA Type Mobile Telephony Base ...
PV-solar / Wind Hybrid Energy System for GSM/CDMA Type Mobile Telephony Base ...IJERA Editor
 
Final 9.09.18 piezo (1)
Final 9.09.18 piezo (1)Final 9.09.18 piezo (1)
Final 9.09.18 piezo (1)rahulyadav1481
 
Pathways to Decarbonization & Digital Innovation in Energy: Prospects for Hyd...
Pathways to Decarbonization & Digital Innovation in Energy: Prospects for Hyd...Pathways to Decarbonization & Digital Innovation in Energy: Prospects for Hyd...
Pathways to Decarbonization & Digital Innovation in Energy: Prospects for Hyd...World Bank Infrastructure
 
Wind Energy Project Analysis
Wind Energy Project AnalysisWind Energy Project Analysis
Wind Energy Project AnalysisLeonardo ENERGY
 
Oxford 28th october (capital costs, storage, experience curves) v2
Oxford 28th october (capital costs, storage, experience curves) v2Oxford 28th october (capital costs, storage, experience curves) v2
Oxford 28th october (capital costs, storage, experience curves) v2Chris Goodall
 
Presentation on management strategy for solar photovoltaic cell
Presentation on management strategy for solar photovoltaic cellPresentation on management strategy for solar photovoltaic cell
Presentation on management strategy for solar photovoltaic cellshujathshu
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesSaurabh Mehta
 
Bangalore | Jul-16 | Solar power as a tool for emissions mitigations and dev...
Bangalore |  Jul-16 | Solar power as a tool for emissions mitigations and dev...Bangalore |  Jul-16 | Solar power as a tool for emissions mitigations and dev...
Bangalore | Jul-16 | Solar power as a tool for emissions mitigations and dev...Smart Villages
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at CheeyapparaIRJET Journal
 
Renewable energy in Japan
Renewable energy in JapanRenewable energy in Japan
Renewable energy in JapanGerhard Fasol
 

Tendances (19)

Grid-Connected Photovoltaic System Requirement-Crimson Publishers
Grid-Connected Photovoltaic System Requirement-Crimson PublishersGrid-Connected Photovoltaic System Requirement-Crimson Publishers
Grid-Connected Photovoltaic System Requirement-Crimson Publishers
 
S2 solar energy i pv
S2 solar energy i pvS2 solar energy i pv
S2 solar energy i pv
 
Pathways to Decarbonization & Digital Innovation in Energy: Making Better Dec...
Pathways to Decarbonization & Digital Innovation in Energy: Making Better Dec...Pathways to Decarbonization & Digital Innovation in Energy: Making Better Dec...
Pathways to Decarbonization & Digital Innovation in Energy: Making Better Dec...
 
NMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
NMRESGI_Optimized Integration of PV with Battery Storage_HawkinsNMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
NMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
 
Final Report - PV Group ANS
Final Report - PV Group ANSFinal Report - PV Group ANS
Final Report - PV Group ANS
 
Hydro
HydroHydro
Hydro
 
Design of Hybrid Solar-Wind Power System for a Coaster Area in Lagos State, S...
Design of Hybrid Solar-Wind Power System for a Coaster Area in Lagos State, S...Design of Hybrid Solar-Wind Power System for a Coaster Area in Lagos State, S...
Design of Hybrid Solar-Wind Power System for a Coaster Area in Lagos State, S...
 
Solar Power Based Micro Grid Systems.pptx
Solar Power Based Micro Grid Systems.pptxSolar Power Based Micro Grid Systems.pptx
Solar Power Based Micro Grid Systems.pptx
 
PV-solar / Wind Hybrid Energy System for GSM/CDMA Type Mobile Telephony Base ...
PV-solar / Wind Hybrid Energy System for GSM/CDMA Type Mobile Telephony Base ...PV-solar / Wind Hybrid Energy System for GSM/CDMA Type Mobile Telephony Base ...
PV-solar / Wind Hybrid Energy System for GSM/CDMA Type Mobile Telephony Base ...
 
Final 9.09.18 piezo (1)
Final 9.09.18 piezo (1)Final 9.09.18 piezo (1)
Final 9.09.18 piezo (1)
 
Pathways to Decarbonization & Digital Innovation in Energy: Prospects for Hyd...
Pathways to Decarbonization & Digital Innovation in Energy: Prospects for Hyd...Pathways to Decarbonization & Digital Innovation in Energy: Prospects for Hyd...
Pathways to Decarbonization & Digital Innovation in Energy: Prospects for Hyd...
 
Wind Energy Project Analysis
Wind Energy Project AnalysisWind Energy Project Analysis
Wind Energy Project Analysis
 
Oxford 28th october (capital costs, storage, experience curves) v2
Oxford 28th october (capital costs, storage, experience curves) v2Oxford 28th october (capital costs, storage, experience curves) v2
Oxford 28th october (capital costs, storage, experience curves) v2
 
Parvez alam israes 2020
Parvez alam israes 2020Parvez alam israes 2020
Parvez alam israes 2020
 
Presentation on management strategy for solar photovoltaic cell
Presentation on management strategy for solar photovoltaic cellPresentation on management strategy for solar photovoltaic cell
Presentation on management strategy for solar photovoltaic cell
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
 
Bangalore | Jul-16 | Solar power as a tool for emissions mitigations and dev...
Bangalore |  Jul-16 | Solar power as a tool for emissions mitigations and dev...Bangalore |  Jul-16 | Solar power as a tool for emissions mitigations and dev...
Bangalore | Jul-16 | Solar power as a tool for emissions mitigations and dev...
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
 
Renewable energy in Japan
Renewable energy in JapanRenewable energy in Japan
Renewable energy in Japan
 

Similaire à Technology review

TOO4TO Module 4 / Sustainable Energy Solutions: Part 1
TOO4TO Module 4 / Sustainable Energy Solutions: Part 1TOO4TO Module 4 / Sustainable Energy Solutions: Part 1
TOO4TO Module 4 / Sustainable Energy Solutions: Part 1TOO4TO
 
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsDesign a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsEklavya Sharma
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solarmacsolar77
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solarmacsolar77
 
Distributed generation &amp; power quality unit 5
Distributed generation &amp; power quality unit 5Distributed generation &amp; power quality unit 5
Distributed generation &amp; power quality unit 5hariyenireddy1
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solarmacsolar77
 
Renewable energy integration and energy storage
Renewable energy integration and energy storage Renewable energy integration and energy storage
Renewable energy integration and energy storage Bushveld Energy
 
Solarcentury Africa Hybrid Brochure 0216
Solarcentury Africa Hybrid Brochure 0216Solarcentury Africa Hybrid Brochure 0216
Solarcentury Africa Hybrid Brochure 0216Daniel Davies
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET Journal
 
Forecasting Solar Power by LSTM & DBN Techniques using ML
Forecasting Solar Power by LSTM & DBN Techniques using MLForecasting Solar Power by LSTM & DBN Techniques using ML
Forecasting Solar Power by LSTM & DBN Techniques using MLIRJET Journal
 
Design and Modeling of Grid Connected Hybrid Renewable Energy Power Generation
Design and Modeling of Grid Connected Hybrid Renewable Energy Power GenerationDesign and Modeling of Grid Connected Hybrid Renewable Energy Power Generation
Design and Modeling of Grid Connected Hybrid Renewable Energy Power GenerationIJERA Editor
 
Emergent Energy Futures
Emergent Energy FuturesEmergent Energy Futures
Emergent Energy Futuresjames_hamilton
 
AI Battery Power Management
AI Battery Power ManagementAI Battery Power Management
AI Battery Power Managementvishnu746522
 
Concentrating Solar Power: Michael Taylor Presentation to CSP EMEA 17 april 2...
Concentrating Solar Power: Michael Taylor Presentation to CSP EMEA 17 april 2...Concentrating Solar Power: Michael Taylor Presentation to CSP EMEA 17 april 2...
Concentrating Solar Power: Michael Taylor Presentation to CSP EMEA 17 april 2...Michael Taylor
 
technical paper
technical papertechnical paper
technical paperJ K Shree
 
REV 2016: Storage Project & Policy Successes: Enhancing Reneweables Integrati...
REV 2016: Storage Project & Policy Successes: Enhancing Reneweables Integrati...REV 2016: Storage Project & Policy Successes: Enhancing Reneweables Integrati...
REV 2016: Storage Project & Policy Successes: Enhancing Reneweables Integrati...Daymark Energy Advisors
 
Tesla Master Plan Part 3
Tesla Master Plan Part 3Tesla Master Plan Part 3
Tesla Master Plan Part 3AdriaanKamp
 

Similaire à Technology review (20)

TOO4TO Module 4 / Sustainable Energy Solutions: Part 1
TOO4TO Module 4 / Sustainable Energy Solutions: Part 1TOO4TO Module 4 / Sustainable Energy Solutions: Part 1
TOO4TO Module 4 / Sustainable Energy Solutions: Part 1
 
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsDesign a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solar
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solar
 
Distributed generation &amp; power quality unit 5
Distributed generation &amp; power quality unit 5Distributed generation &amp; power quality unit 5
Distributed generation &amp; power quality unit 5
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solar
 
Renewable energy integration and energy storage
Renewable energy integration and energy storage Renewable energy integration and energy storage
Renewable energy integration and energy storage
 
Solarcentury Africa Hybrid Brochure 0216
Solarcentury Africa Hybrid Brochure 0216Solarcentury Africa Hybrid Brochure 0216
Solarcentury Africa Hybrid Brochure 0216
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
 
Forecasting Solar Power by LSTM & DBN Techniques using ML
Forecasting Solar Power by LSTM & DBN Techniques using MLForecasting Solar Power by LSTM & DBN Techniques using ML
Forecasting Solar Power by LSTM & DBN Techniques using ML
 
Design and Modeling of Grid Connected Hybrid Renewable Energy Power Generation
Design and Modeling of Grid Connected Hybrid Renewable Energy Power GenerationDesign and Modeling of Grid Connected Hybrid Renewable Energy Power Generation
Design and Modeling of Grid Connected Hybrid Renewable Energy Power Generation
 
Emergent Energy Futures
Emergent Energy FuturesEmergent Energy Futures
Emergent Energy Futures
 
AI Battery Power Management
AI Battery Power ManagementAI Battery Power Management
AI Battery Power Management
 
Concentrating Solar Power: Michael Taylor Presentation to CSP EMEA 17 april 2...
Concentrating Solar Power: Michael Taylor Presentation to CSP EMEA 17 april 2...Concentrating Solar Power: Michael Taylor Presentation to CSP EMEA 17 april 2...
Concentrating Solar Power: Michael Taylor Presentation to CSP EMEA 17 april 2...
 
technical paper
technical papertechnical paper
technical paper
 
REV 2016: Storage Project & Policy Successes: Enhancing Reneweables Integrati...
REV 2016: Storage Project & Policy Successes: Enhancing Reneweables Integrati...REV 2016: Storage Project & Policy Successes: Enhancing Reneweables Integrati...
REV 2016: Storage Project & Policy Successes: Enhancing Reneweables Integrati...
 
ANKITS PRESENTATION.pptx
ANKITS PRESENTATION.pptxANKITS PRESENTATION.pptx
ANKITS PRESENTATION.pptx
 
Tesla Master Plan Part-3
Tesla Master Plan Part-3 Tesla Master Plan Part-3
Tesla Master Plan Part-3
 
Tesla Master Plan Part 3
Tesla Master Plan Part 3Tesla Master Plan Part 3
Tesla Master Plan Part 3
 
Tesla Master Plan Part 3
Tesla Master Plan Part 3Tesla Master Plan Part 3
Tesla Master Plan Part 3
 

Plus de CPWF Mekong

Mekong: The Challenges of Scale
Mekong: The Challenges of ScaleMekong: The Challenges of Scale
Mekong: The Challenges of ScaleCPWF Mekong
 
Closing remarks dr kim geheb
Closing remarks dr kim gehebClosing remarks dr kim geheb
Closing remarks dr kim gehebCPWF Mekong
 
Session 20 comparing the nexus along the mekong ganga
Session 20 comparing the nexus along the mekong  gangaSession 20 comparing the nexus along the mekong  ganga
Session 20 comparing the nexus along the mekong gangaCPWF Mekong
 
Sustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsSustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsCPWF Mekong
 
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...CPWF Mekong
 
Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...CPWF Mekong
 
Draft agenda session 19 for panelists
Draft agenda session 19 for panelistsDraft agenda session 19 for panelists
Draft agenda session 19 for panelistsCPWF Mekong
 
Lessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaLessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaCPWF Mekong
 
Decision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrDecision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrCPWF Mekong
 
Chinese studies on impacts of dams
Chinese studies on impacts of damsChinese studies on impacts of dams
Chinese studies on impacts of damsCPWF Mekong
 
Governance, institutions and decision making
Governance, institutions and decision makingGovernance, institutions and decision making
Governance, institutions and decision makingCPWF Mekong
 
Integrated water resource management
Integrated water resource managementIntegrated water resource management
Integrated water resource managementCPWF Mekong
 
How hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsHow hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsCPWF Mekong
 
Gender, livelihoods & decision making
Gender, livelihoods & decision makingGender, livelihoods & decision making
Gender, livelihoods & decision makingCPWF Mekong
 
Better dams for food and livelihoods overview
Better dams for food and livelihoods overviewBetter dams for food and livelihoods overview
Better dams for food and livelihoods overviewCPWF Mekong
 
Assessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentAssessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentCPWF Mekong
 
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
Day 1 session 5.3  direct vs indirect pes could microcredit be an optionDay 1 session 5.3  direct vs indirect pes could microcredit be an option
Day 1 session 5.3 direct vs indirect pes could microcredit be an optionCPWF Mekong
 
Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...CPWF Mekong
 
Solar pv in vietnam power sector benefits, costs and policy
Solar pv in vietnam power sector  benefits, costs and policySolar pv in vietnam power sector  benefits, costs and policy
Solar pv in vietnam power sector benefits, costs and policyCPWF Mekong
 
Gap analysis of renewable energy generation in the lower mekong basin
Gap analysis of renewable energy generation in the lower mekong basinGap analysis of renewable energy generation in the lower mekong basin
Gap analysis of renewable energy generation in the lower mekong basinCPWF Mekong
 

Plus de CPWF Mekong (20)

Mekong: The Challenges of Scale
Mekong: The Challenges of ScaleMekong: The Challenges of Scale
Mekong: The Challenges of Scale
 
Closing remarks dr kim geheb
Closing remarks dr kim gehebClosing remarks dr kim geheb
Closing remarks dr kim geheb
 
Session 20 comparing the nexus along the mekong ganga
Session 20 comparing the nexus along the mekong  gangaSession 20 comparing the nexus along the mekong  ganga
Session 20 comparing the nexus along the mekong ganga
 
Sustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsSustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operations
 
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
 
Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...
 
Draft agenda session 19 for panelists
Draft agenda session 19 for panelistsDraft agenda session 19 for panelists
Draft agenda session 19 for panelists
 
Lessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaLessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodia
 
Decision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrDecision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdr
 
Chinese studies on impacts of dams
Chinese studies on impacts of damsChinese studies on impacts of dams
Chinese studies on impacts of dams
 
Governance, institutions and decision making
Governance, institutions and decision makingGovernance, institutions and decision making
Governance, institutions and decision making
 
Integrated water resource management
Integrated water resource managementIntegrated water resource management
Integrated water resource management
 
How hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsHow hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoods
 
Gender, livelihoods & decision making
Gender, livelihoods & decision makingGender, livelihoods & decision making
Gender, livelihoods & decision making
 
Better dams for food and livelihoods overview
Better dams for food and livelihoods overviewBetter dams for food and livelihoods overview
Better dams for food and livelihoods overview
 
Assessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentAssessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower development
 
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
Day 1 session 5.3  direct vs indirect pes could microcredit be an optionDay 1 session 5.3  direct vs indirect pes could microcredit be an option
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
 
Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...
 
Solar pv in vietnam power sector benefits, costs and policy
Solar pv in vietnam power sector  benefits, costs and policySolar pv in vietnam power sector  benefits, costs and policy
Solar pv in vietnam power sector benefits, costs and policy
 
Gap analysis of renewable energy generation in the lower mekong basin
Gap analysis of renewable energy generation in the lower mekong basinGap analysis of renewable energy generation in the lower mekong basin
Gap analysis of renewable energy generation in the lower mekong basin
 

Dernier

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 

Dernier (20)

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 

Technology review

  • 1. Potential for increasing the role of renewables in Mekong power supply (MK14) Technology Review Mekong Forum 2013 Tim Suljada (tim.suljada@icem.com.au)
  • 2. Outline • • • • • • • Suitable renewable energy technologies Technical potential in the LMB Costs of renewables Overcoming technical barriers to deployment Solar PV status and growth prospects Wind status and growth prospects Conclusion
  • 3. Renewables potential and deployment Source: Grubb curve in Electric Power Research Institute (2009)
  • 4. Assessment of technology suitability to the Mekong
  • 5. Renewable energy potential in LMB • Highest potential is solar, mostly in Thailand and Vietnam – 76GW, currently 0.374 GW • Wind and biomass significant – Wind: 12GW mostly in Viet Nam (currently 0.134GW) – Biomass: 5.5GW across region (currently 1.1GW)  Current LMB power plans include 104GW in new capacity by 2025 Source: ICEM (2013)
  • 6. Utility-scale Small-scale / off-grid Renewables costs Average generation costs LMB: 0.103 – 0.137 (ICEM, 2013 – based on Current PDPs to 2025) Source: IRENA (2013)
  • 7. How significant is cost as a barrier? • Biomass and small hydro is competitive with current generation sources in the region – Scale? Collectively ~15GW potential • Wind is nearing competitiveness – 4-16 c/kWh globally, around 12c/kWh non-OECD Asia – Potential is ~12GW • Solar more costly – 9-40 c/kWh globally, around 30c/kWh non-OECD Asia – Potential is ~76GW
  • 8. Ways to overcome the cost barrier? • Public investment in feed-in-tariffs – Thailand has stimulated renewables deployment with attractive tariff rates for all technologies – Vietnam has a modest feed in tariff for wind • Investment is more financially viable for consumer and may bring down capital costs over time by creating a larger market Effect of German FiT
  • 9. Aside from cost? • Challenge of intermittent and volatile solar and wind resources – Outputs depends on when the sun shines and the wind blows  low capacity factors & hard to predict – Baseload power generation sources like hydro and coal cannot be ‘swapped’ for solar and wind – Similarly, peaking plants such as gas (CCGT), which can be turned on to respond to energy use patterns • Biomass, small hydro and geothermal can meet these needs, but make a small contribution
  • 10. Managing intermittency of solar and wind resources Once intermittent generation reaches ≈ 20%: 1. Renewable energy output correlation with load – Peak shaving effect of solar and daytime a/c driven peaks 2. Distributed small-scale generation sources – Emerging literature on the balancing effect of aggregating many dispersed generation sources 3. Load shedding – Utility pays major energy users not to draw from the grid 4. Storage – Batteries can smooth power output, but expensive 5. Backup generation capacity – CCGT, hydro dispatch to compensate, but expensive
  • 11. Solar PV Bangchak Solar Farm 38MW Ayutthaya, Thailand $3,000 / kWp 27.37 c/kWh  Best performance in direct sunlight – Thailand: 5-6.5 kWh/m2/day – Viet Nam: 3-6.25 kWh/m2/day  Scattered light on cloudy days, reduced output Rooftop (<5 kWp) • Capital: $2,275 – 5,000 /kWp • Generation: 16-55 c/kWh Utility scale (<250 MWp) • Capital: $1,300 – 2,760 /kWp • Generation: 9-40 c/kWh
  • 12. 42% (20112012) Solar growth 60% p.a.(200 72012) Source: REN21 (2013) Solar capacity growth in Thailand …LMB growth in solar PV driven by Thailand with 362MW installed capacity in 2012 (A total of 12MW were installed in other LMB countries in 2012) Source: Tongsopit & Greacen (2013)
  • 13. Solar development potential in LMB Solar farm – utility scale Solar rooftop By 2025, an estimated: 464,300 rooftop solar of 929MW. By 2025, an estimated: 800 solar farms of total capacity 16,000MW. Source: ICEM (2013) SEA of GMS Power Planning
  • 14. Solar - levelised cost trends for good resource (6.5 kWh/m2/day) Generation costs projected to fall Source: Hearps, Patrick, and Dylan McConnell. "Renewable Energy Technology Cost Review." Melbourne Energy Institute (2011): 1-58
  • 15. Solar module prices - historical Module prices driving cost reductions Source: IRENA (2013) Renewable Power Generation Costs in 2012: An Overview, IRENA: Abu Dhabi
  • 16. Solar investment cost components • Module costs largely correspond with international market price • Balance of system costs are locally specific and vary considerably between countries Source: Melbourne Energy Institute (2011) Renewable Energy Technology Cost Review
  • 17. Balance of system costs for residential systems: USA vs Germany • Similar module costs, but different BOS – US total costs were double Germany’s in 2011 • Will costs in the US come down with installed capacity due to learning rates and economies of scale? Possible accumulation period also experienced in Germany Source: : Berkley Lab in Melbourne Energy Institute (2011) Based on 8,000 residential rooftop solar systems in 2012
  • 18. Observations in Thailand: solar farms Thailand solar farms International experience Utility scale in USA in 2010 with module cost $1.90  total cost $3.50 Investment cost components 4 3.5 Investment cost [$/Wp] 3 Total 2.5 2 Module 1.5 1 0.5 Balance of system 55% Source: Rocky Mountain Institute (2010) 73% Date of planned investment 12/16/11 10/16/11 8/16/11 6/16/11 4/16/11 2/16/11 12/16/10 10/16/10 8/16/10 6/16/10 4/16/10 2/16/10 12/16/09 10/16/09 0 • Improved racking design Consistent regulations for business Public information on project development Source: UNFCCC CDM data on 13 Thailand solar farms and spot prices for • • solar modules at time of investment
  • 19. What we could see in Viet Nam and others as markets develop • In Viet Nam, current capital costs ≈ $5 / Wp – More in Cambodia and Laos where there is no local manufacturing and smaller markets • As in Thailand, the module cost is likely to be similar to international rates – Above $1 / Wp depending on size of order – Balance of system costs, including margin for hardware suppliers likely to be upwards of $4 / Wp • Likely to remain higher than Thailand until market develops with installation volume
  • 20. Similar trends for wind power Generation costs projected to fall Source: Hearps, Patrick, and Dylan McConnell. "Renewable Energy Technology Cost Review." Melbourne Energy Institute (2011): 1-58
  • 21. Wind investment cost components: turbine and other costs Source: Melbourne Energy Institute (2011) Renewable Energy Technology Cost Review
  • 22. Wind development potential in LMB 19% (20112012) By 2025, an estimated: 292 wind farms with total capacity 8,760MW. 25% p.a.(200 72012) Source: ICEM (2013) SEA of GMS Power Planning Source: REN21 (2013)
  • 23. Conclusions • Biomass and small hydro already financially viable and meet load characteristics – But, they are on a small scale • Wind and solar potential is on a large enough scale and will soon be financially viable 1. Financial incentives needed in the short-term 2. Intermittency and volatility must be considered once renewables proportion reaches ≈ 20% • Thailand offers a good example for the LMB – Financial incentives have developed the market, which appears to have brought down local costs
  • 24. THANK YOU Tim Suljada, ICEM (tim.suljada@icem.com.au)

Notes de l'éditeur

  1. Levelised cost (calc of present value of energy generation costs over the full lifetime for comparison)Note range of different costs within technologies and average values in different regionsUtility scale = OECD fossil fuel price + small-scale = dieselgensetIs cost a barrier? Within the range Upfront investment costIn Vietnam:Sub-critical coal = 0.068Combined cycle gas = 0.072
  2. Biomass/biogas estimates could be significantly higher
  3. Public good justification: reduces pollution associated with fossil fuelsThailand – link to Jiab’sAdder rates to existing wholesale price of electricity paid by the utility EGAT over 7 or 10 yearsSolar adder of 8 Baht/kWh or (26.7c/kWh), which came down to 6.5 Baht/ kWh (21.7c/kWh)Biomass/biogas around 0.01 c/kWh and wind around 11-15c/kWh depending on sizeStrong growth in PPAs signed, but some issues have meant slower than hoped installationsVietnam – link to Khanh’s
  4. Link to John’s presentation
  5. Module price should largely flow through to Mekong countries, butWith the exception of Thailand, markets are smaller meaning higher margins required for tech suppliersThere is some local solar panel assembly in Thailand and VietnamMany utility scale plants in Thailand are still importing panels, taking advantage of import tax exemptionsBalance of system costs vary considerably between countriesStructural, engineering, hardware supplier margin and electrical costsCosts reduce as theindustry is established and a greater degree of vertical integration is achieved from module supply to installation
  6. Note Thailand observations are utility scale (cheaper in general than residential rooftop described on previous slide)I understand latest observations this year show module costs comprising approx42% in 2013