PROJECT ROLL-OUT – 15 to 20 year plan Figure . Phased implementation of the IRT
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],PILOT PHASE – PHASE 1A
TRUNKS & FEEDER VEHICLES Trunk vehicles 18m articulated 12m standard
TRUNKS & FEEDER VEHICLES Feeder vehicles Less than 10m buses (Specs still to be finalised)
5.1 PILOT PHASE – PHASE 1A: INNER CITY ROUTINGS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],INNER CITY ROUTINGS
MyCiTi Routes PHASE 1A FEEDER DIRECTORY (as on 7 July 2010) ID Route identification Route details F00 Hout Bay - Camps Bay Forward Direction:  Marlin Cr - Karbonkel Rd - Atlantic Skipper Rd - Harbour Rd - Princess St - Main Rd - Imizamo Yethu - Victoria Rd - Llandudno - Victoria Rd  –  The Meadway - Park Rd - Argyle St - Victoria Rd Reverse Direction : The Meadway - Park Rd - Argyle St - Victoria Rd  –  Llandudno - Victoria Rd - Imizamo Yethu - Main Rd - Princess St - Harbour Rd - Atlantic Skipper Rd - Karbonkel Rd - Marlin Cr. F01 Camps Bay - CBD - Waterfront Forward Direction:  Victoria Rd northbound - Argyle St - Tree Rd - Geneva Dr - Camps Bay Dr - Kloof Nek Rd - Kloof St - Loop St - Wale St - Adderley St - Heerengracht - Hertzog Blvd eastbound - Hertzog Blvd westbound - D F Malan St - Table Bay Blvd - Hereengracht - Coen Steytler Ave - Dock Rd - South Arm Rd - V & A Waterfront Clock Tower Reverse Direction:  V&A Waterfront Clock Tower - South Arm Rd - Dock Rd - Coen Steytler Ave  –  Hereengracht - Table Bay Blvd - D F Malan St - Hertzog Blvd eastbound - Hertzog Blvd westbound  –  Heerengracht - Adderley St - Wale St  –  Long St - Kloof St - Kloof Nek Rd - Camps Bay Dr  –  Prima Ave - Platteklip Plein - Ravensteyn Ave - Camps Bay Dr - Fiskaal Rd - Chas Booth Ave - Rontree Ave - Camps Bay Dr - Victoria Rd northbound - Argyle St - Tree Rd - Geneva Dr - Camps Bay Dr - Victoria Rd northbound. F02 Sea Point (via Beach Rd) - CBD - Garden Centre Forward Direction:  Beach Rd (At Queens Rd Circle) - Breakwater Lane - Port Rd - Dock Rd circle - Dock Rd - Coen Steytler Ave - Heerengracht - Table Bay Blvd - D F Malan St - Hertzog Blvd Eastbound - Hertzog Boulevard Westbound - Heerengracht - Adderley St - Wale St - Long St - Orange St - Annandale Rd - Mill St - Mill St off ramp eastbound - Maynard Southbound - Mill St on ramp Westbound  Reverse Direction:  Mill St on ramp Westbound - Mill St - Annandale Rd - Orange St - Buitensingel St - Loop St - Wale St - Adderley St - Heerengracht - Hertzog Blvd Eastbound - Hertzog Blvd Westbound - D F Malan St - Table Bay Blvd - Heerengracht - Coen Steyter Ave - Dock Rd - Dock Rd circle - Port Rd - Breakwater Lane - Beach Rd - Turn around at Queens Rd circle.
F03 Camps Bay - Sea Point - CBD Forward Direction:  Victoria Rd southbound - Camps Bay Dr - Geneva Dr - Camps Bay Dr westbound - Victoria Rd northbound - Queens Rd - Regent Rd - St Andrews Rd - Beach Rd - Queens Rd - Regent Rd - Main Rd - Somerset Rd - Riebeek St  –  Long St - Strand St  –  Adderley St - Heerengracht - Hertzog Blvd eastbound F04 Fresnaye - CBD Forward Direction:  Beach Rd - Queens Rd - Kloof Rd - Ave Fresnaye - High Level Rd - Strand St - Adderley St - Heerengracht - Hertzog Blvd Eastbound F05 Vredehoek - CBD Forward Direction:  Deer Park Dr West - Highlands Ave - Upper Buitenkant St - Mill St eastbound - Maynard St - Mill St westbound  –  Buitenkant St - Darling St - Adderley St - Heerengracht - Hertzog Blvd. F06 Bo-Kaap - CBD - District 6 - Salt River  Forward Direction:  Bantam St - Yusuf Dr - Wale St - Adderley St - Darling St - Keizersgracht - Chester Rd - Coronation Rd - Upper Mountain Rd - Rhodes Ave - Upper Roodebloem Rd - Roodebloem Rd - Victoria Rd - Salt River Rd - Salt River Rd Circle - Albert Rd eastbound - Spencer Rd northbound - Foundry Rd westbound F07 City Bowl Circle Line Forward Direction:  Kloof St - Hof St - Rayden St - Molteno Rd - Montrose Ave - Upper Orange St - Lincoln Rd - Sidmouth Ave - Homeleigh Ave - Fitzherbert Rd - Deer Park Dr - Highlands Ave - Florida Rd - Davenport Rd - St James St - Derry St - Noordelik Ave - Barnham Ave - Windburg Ave - Crassula Ave - Roeland St - de Villiers Rd - Tennant St - Keizergracht - Darling St - Adderley St - Heerengracht - Hertzog Blvd Eastbound - Hertzog Boulevard Westbound - D F Malan St - Table Bay Blvd - Heerengracht - Coen Steytler Ave - Lower Long St - Long St - Kloof St. F65 Tamboerskloof - CBD Forward Direction:  Warren St - Albert Rd - Woodside Rd - Brownlow Rd - Burnside Rd - Kloof Nek Rd - Kloof St (southbound) - Camp St - Upper Orange St - Hatfield St - St Johns Rd - Plein St - Darling St - Adderley St - Heerengracht - Hertzog Blvd.
5.1 PILOT PHASE – PHASE 1A: INNER CITY ROUTINGS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],INNER CITY ROUTINGS
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],STATION CONFIGURATION
Civic station will provide seamless and comfortable transfer
Trunk services R 5 + R0.30 per km (max. R16) (R 4 – R 15 in off-peak) Feeder services R 5 per trip (R 4 in off-peak ) Free Trunk – Feeder transfer at selected stations FARE STRUCTURE
Phase 1a Rollout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],0
Phase 1a Rollout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],1
Phase 1a Rollout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],2
Phase 1a Rollout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],3
Phase 1a Rollout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],4
Phase 1a Rollout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],5
Inner City Interim Service World Cup IRT Vehicles used to assist 2010 event operations June/ July 2010 Inner City interim service (commence end of Sept.) Airport Shuttle Service (N2) Milestone 0 Airport & Bayside Trunk Feb. 2011 Milestone 1 PLUS Inner City Feeders Oct. 2011
Inner City Interim Route  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Inner City Route Transport Products Number of Trips Fare Valid for 1 trip  R5 3 months 10 trips (clip card) R40 1 month Unlimited R40 1 week Unlimited R15 1day Bundle of 50 or more R4  per trip 3 months
6. Progress as at July 2010 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Progress to date
Stadium Station
Stadium Station
Stadium Station
Stadium Station
Stadium Station
Civic Station
Cape Town   Integrated Rapid Transit System Civic Station
Airport Station
Cape Town   Integrated Rapid Transit System West Coast Corridor
Cape Town   Integrated Rapid Transit System West Coast Corridor
Cape Town   Integrated Rapid Transit System West Coast Corridor
Cape Town   Integrated Rapid Transit System West Coast Corridor
CONCLUSION : Projected system operational benefits Operational parameter Benefits Regular & Frequent service Peak Period: Phase 1a (Trunks) – 3 to 6 min headways Full phase (Trunks) – 1 minute headways Travel time benefit ,[object Object],[object Object],[object Object],Projected Modal shift Modelled at 10% for Phase 1a area Rapid boarding & alighting Current station design and ticketing will allow for minimal dwell times. 18m bus can empty between 20 – 30 seconds. ‘ Door to door’ service (Walking distance) Feeders are designed (at least 80% of residents) to be within 500m of residents and desired destinations. Total journey cost of R16 (Trunk + Feeder).
 
www.capetown.gov.za/irt For any further information, feel free to contact: Gershwin Fortune  BSc (Civil) Eng, MEng Cum laude. Acting Manager: IRT System Planning & Modelling E-mail: gershwin.fortune@capetown.gov.za Tel: +27214009130
Business & Contract structure Existing Model Operating the buses Ticketing Fare collection System Information Marketing the service Bus stop maintenance Termini management Depot management Depot owner Contract Monitoring CURRENT BUS OPERATOR  (GABS) CITY OF CAPE TOWN PGWC
Business & contract structure IRT Model Operating the buses Ticketing Fare collection System Information Marketing the service Bus stop maintenance Station management Depot management Depot owner Contract Monitoring IRT VEHICLE OPERATOR COMPANY  CITY OF CAPE TOWN
Business & Contract Structure MUNICIPAL IRT ENTITY SERVICE DELIVERY AGREEMENT WITH NEGOTIATE Fare collection monitoring System Information Contract Monitoring Control Centre Contractor Fare System Contractor Ticketing system & equipment Fare collection Station Services Contractor Ticket sales Access control System Information Station management Cleaning Security Vehicle Operator Contractor Operating the buses Depot management TENDER TENDER TENDER
Phase 1a Corridor Vehicle Operator Contracts 2 Contracts 2 Companies NORTHERN West Coast SOUTHERN Inner City

Contenu connexe

En vedette

Herder Gymnasium presentation
Herder Gymnasium presentationHerder Gymnasium presentation
Herder Gymnasium presentationfjoseph
 
Low carbon development in global cities by Peter Erickson
Low carbon development in global cities by Peter EricksonLow carbon development in global cities by Peter Erickson
Low carbon development in global cities by Peter EricksonCape Town Partnership
 
AsoposSOS speech in Europarliament
AsoposSOS speech in EuroparliamentAsoposSOS speech in Europarliament
AsoposSOS speech in Europarliamentdpurpler
 
Placemaking for Equity: How to Bridge Historic Divides
Placemaking for Equity: How to Bridge Historic DividesPlacemaking for Equity: How to Bridge Historic Divides
Placemaking for Equity: How to Bridge Historic DividesCape Town Partnership
 
Asopos-Minamata
Asopos-MinamataAsopos-Minamata
Asopos-Minamatadpurpler
 
Endgültige präsentation servus! hgf presents their comenius students final
Endgültige präsentation servus! hgf presents their comenius students finalEndgültige präsentation servus! hgf presents their comenius students final
Endgültige präsentation servus! hgf presents their comenius students finalfjoseph
 
Οι επιπτώσεις της ρύπανσης του Ασωπού ποταμού σε τρόφιμα - βολβούς
Οι επιπτώσεις της ρύπανσης του Ασωπού ποταμού σε τρόφιμα - βολβούςΟι επιπτώσεις της ρύπανσης του Ασωπού ποταμού σε τρόφιμα - βολβούς
Οι επιπτώσεις της ρύπανσης του Ασωπού ποταμού σε τρόφιμα - βολβούςdpurpler
 
Chatzinikolaou Asopos&Koronia Eu 2009
Chatzinikolaou Asopos&Koronia Eu 2009Chatzinikolaou Asopos&Koronia Eu 2009
Chatzinikolaou Asopos&Koronia Eu 2009dpurpler
 
iZimvo Zase Kasi: Your city; your views; your future. Co-creating the 24-hour...
iZimvo Zase Kasi: Your city; your views; your future. Co-creating the 24-hour...iZimvo Zase Kasi: Your city; your views; your future. Co-creating the 24-hour...
iZimvo Zase Kasi: Your city; your views; your future. Co-creating the 24-hour...Cape Town Partnership
 
Andrew Boraine: Presentation to CEO's forum 20th November 2011
Andrew Boraine: Presentation to CEO's forum 20th November 2011Andrew Boraine: Presentation to CEO's forum 20th November 2011
Andrew Boraine: Presentation to CEO's forum 20th November 2011Cape Town Partnership
 
Abdullah Cerachia CEOs_Forum 21 November 2011
Abdullah Cerachia CEOs_Forum 21 November 2011Abdullah Cerachia CEOs_Forum 21 November 2011
Abdullah Cerachia CEOs_Forum 21 November 2011Cape Town Partnership
 
Inner City Regeneration - Robin Carlisle
Inner City Regeneration - Robin CarlisleInner City Regeneration - Robin Carlisle
Inner City Regeneration - Robin CarlisleCape Town Partnership
 
Integrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike MarsdenIntegrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike MarsdenCape Town Partnership
 
Cape Town Activia Project - Mansoor Mohammed
Cape Town Activia Project - Mansoor MohammedCape Town Activia Project - Mansoor Mohammed
Cape Town Activia Project - Mansoor MohammedCape Town Partnership
 
Future Cape for CEOs Forum 22 Feb 2012
Future Cape for CEOs Forum 22 Feb 2012Future Cape for CEOs Forum 22 Feb 2012
Future Cape for CEOs Forum 22 Feb 2012Cape Town Partnership
 

En vedette (20)

Herder Gymnasium presentation
Herder Gymnasium presentationHerder Gymnasium presentation
Herder Gymnasium presentation
 
Low carbon development in global cities by Peter Erickson
Low carbon development in global cities by Peter EricksonLow carbon development in global cities by Peter Erickson
Low carbon development in global cities by Peter Erickson
 
AsoposSOS speech in Europarliament
AsoposSOS speech in EuroparliamentAsoposSOS speech in Europarliament
AsoposSOS speech in Europarliament
 
Placemaking for Equity: How to Bridge Historic Divides
Placemaking for Equity: How to Bridge Historic DividesPlacemaking for Equity: How to Bridge Historic Divides
Placemaking for Equity: How to Bridge Historic Divides
 
EDP_One_Cape_2040
EDP_One_Cape_2040EDP_One_Cape_2040
EDP_One_Cape_2040
 
Asopos-Minamata
Asopos-MinamataAsopos-Minamata
Asopos-Minamata
 
Endgültige präsentation servus! hgf presents their comenius students final
Endgültige präsentation servus! hgf presents their comenius students finalEndgültige präsentation servus! hgf presents their comenius students final
Endgültige präsentation servus! hgf presents their comenius students final
 
Bcs 20080228 Ku
Bcs 20080228 KuBcs 20080228 Ku
Bcs 20080228 Ku
 
Οι επιπτώσεις της ρύπανσης του Ασωπού ποταμού σε τρόφιμα - βολβούς
Οι επιπτώσεις της ρύπανσης του Ασωπού ποταμού σε τρόφιμα - βολβούςΟι επιπτώσεις της ρύπανσης του Ασωπού ποταμού σε τρόφιμα - βολβούς
Οι επιπτώσεις της ρύπανσης του Ασωπού ποταμού σε τρόφιμα - βολβούς
 
Chatzinikolaou Asopos&Koronia Eu 2009
Chatzinikolaou Asopos&Koronia Eu 2009Chatzinikolaou Asopos&Koronia Eu 2009
Chatzinikolaou Asopos&Koronia Eu 2009
 
Cape Town Partnership 2009 Feedback
Cape Town Partnership 2009 FeedbackCape Town Partnership 2009 Feedback
Cape Town Partnership 2009 Feedback
 
iZimvo Zase Kasi: Your city; your views; your future. Co-creating the 24-hour...
iZimvo Zase Kasi: Your city; your views; your future. Co-creating the 24-hour...iZimvo Zase Kasi: Your city; your views; your future. Co-creating the 24-hour...
iZimvo Zase Kasi: Your city; your views; your future. Co-creating the 24-hour...
 
Andrew Boraine: Presentation to CEO's forum 20th November 2011
Andrew Boraine: Presentation to CEO's forum 20th November 2011Andrew Boraine: Presentation to CEO's forum 20th November 2011
Andrew Boraine: Presentation to CEO's forum 20th November 2011
 
Silicon Cape Initiative
Silicon Cape InitiativeSilicon Cape Initiative
Silicon Cape Initiative
 
Abdullah Cerachia CEOs_Forum 21 November 2011
Abdullah Cerachia CEOs_Forum 21 November 2011Abdullah Cerachia CEOs_Forum 21 November 2011
Abdullah Cerachia CEOs_Forum 21 November 2011
 
Inner City Regeneration - Robin Carlisle
Inner City Regeneration - Robin CarlisleInner City Regeneration - Robin Carlisle
Inner City Regeneration - Robin Carlisle
 
Integrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike MarsdenIntegrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike Marsden
 
EDP Establishment and activities
EDP Establishment and activitiesEDP Establishment and activities
EDP Establishment and activities
 
Cape Town Activia Project - Mansoor Mohammed
Cape Town Activia Project - Mansoor MohammedCape Town Activia Project - Mansoor Mohammed
Cape Town Activia Project - Mansoor Mohammed
 
Future Cape for CEOs Forum 22 Feb 2012
Future Cape for CEOs Forum 22 Feb 2012Future Cape for CEOs Forum 22 Feb 2012
Future Cape for CEOs Forum 22 Feb 2012
 

Similaire à Part 2 MyCiTi Cape Town IRT System

Keynote Part 2 - Alternative Funding of Road Projects
Keynote Part 2 - Alternative Funding of Road ProjectsKeynote Part 2 - Alternative Funding of Road Projects
Keynote Part 2 - Alternative Funding of Road ProjectsCharlotte Chamber
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureMobility Lab
 
pt 3: The Quickway Proposal: Central Zone
pt 3: The Quickway Proposal: Central Zonept 3: The Quickway Proposal: Central Zone
pt 3: The Quickway Proposal: Central ZoneAlan Hoffman
 
Hunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian ImprovementsHunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian ImprovementsFairfax County
 
Ocean City's 2015 capital plan presentation
Ocean City's 2015 capital plan presentationOcean City's 2015 capital plan presentation
Ocean City's 2015 capital plan presentationOceanCityGazette
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)GardinerEast
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forumpublicinvolvement
 
Fall 2011 South County and BRAC-related Fairfax Connector Service Changes
Fall 2011 South County and BRAC-related Fairfax Connector Service ChangesFall 2011 South County and BRAC-related Fairfax Connector Service Changes
Fall 2011 South County and BRAC-related Fairfax Connector Service ChangesFairfax County
 
Queenstown
QueenstownQueenstown
QueenstownCamy333
 
9900800-050-061-PPT-01-Rev0 (Deep Cove)
9900800-050-061-PPT-01-Rev0 (Deep Cove)9900800-050-061-PPT-01-Rev0 (Deep Cove)
9900800-050-061-PPT-01-Rev0 (Deep Cove)Floris van Weelderen
 
Bryan Townley Portfolio
Bryan Townley PortfolioBryan Townley Portfolio
Bryan Townley PortfolioBryan Townley
 
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Fairfax County
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Fairfax County
 
M60 Towns: Lindsay Humblet, Planit-IE
M60 Towns: Lindsay Humblet, Planit-IEM60 Towns: Lindsay Humblet, Planit-IE
M60 Towns: Lindsay Humblet, Planit-IEPlace North West
 
Rm 3 Assembly transportation committee project list
Rm 3 Assembly transportation committee project list Rm 3 Assembly transportation committee project list
Rm 3 Assembly transportation committee project list Adina Levin
 

Similaire à Part 2 MyCiTi Cape Town IRT System (20)

July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
 
Keynote Part 2 - Alternative Funding of Road Projects
Keynote Part 2 - Alternative Funding of Road ProjectsKeynote Part 2 - Alternative Funding of Road Projects
Keynote Part 2 - Alternative Funding of Road Projects
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 
pt 3: The Quickway Proposal: Central Zone
pt 3: The Quickway Proposal: Central Zonept 3: The Quickway Proposal: Central Zone
pt 3: The Quickway Proposal: Central Zone
 
Hunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian ImprovementsHunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
 
Ocean City's 2015 capital plan presentation
Ocean City's 2015 capital plan presentationOcean City's 2015 capital plan presentation
Ocean City's 2015 capital plan presentation
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
 
Fall 2011 South County and BRAC-related Fairfax Connector Service Changes
Fall 2011 South County and BRAC-related Fairfax Connector Service ChangesFall 2011 South County and BRAC-related Fairfax Connector Service Changes
Fall 2011 South County and BRAC-related Fairfax Connector Service Changes
 
Queenstown
QueenstownQueenstown
Queenstown
 
R-3307_vicinity
R-3307_vicinityR-3307_vicinity
R-3307_vicinity
 
9900800-050-061-PPT-01-Rev0 (Deep Cove)
9900800-050-061-PPT-01-Rev0 (Deep Cove)9900800-050-061-PPT-01-Rev0 (Deep Cove)
9900800-050-061-PPT-01-Rev0 (Deep Cove)
 
Busway Extension to Florida City
Busway Extension to Florida CityBusway Extension to Florida City
Busway Extension to Florida City
 
Bryan Townley Portfolio
Bryan Townley PortfolioBryan Townley Portfolio
Bryan Townley Portfolio
 
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
 
Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
M60 Towns: Lindsay Humblet, Planit-IE
M60 Towns: Lindsay Humblet, Planit-IEM60 Towns: Lindsay Humblet, Planit-IE
M60 Towns: Lindsay Humblet, Planit-IE
 
July 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual WorkshopJuly 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual Workshop
 
Rm 3 Assembly transportation committee project list
Rm 3 Assembly transportation committee project list Rm 3 Assembly transportation committee project list
Rm 3 Assembly transportation committee project list
 

Plus de Cape Town Partnership

Cape Town Partnership 2014 AGM presentation
Cape Town Partnership 2014 AGM presentationCape Town Partnership 2014 AGM presentation
Cape Town Partnership 2014 AGM presentationCape Town Partnership
 
Growing solutions out of wicked challenges: Lessons on urban grown from Cape ...
Growing solutions out of wicked challenges: Lessons on urban grown from Cape ...Growing solutions out of wicked challenges: Lessons on urban grown from Cape ...
Growing solutions out of wicked challenges: Lessons on urban grown from Cape ...Cape Town Partnership
 
Low carbon central city strategy presentation 20140204
Low carbon central city strategy presentation 20140204Low carbon central city strategy presentation 20140204
Low carbon central city strategy presentation 20140204Cape Town Partnership
 
Cape Town International Conference Centre's sustainability journey
Cape Town International Conference Centre's sustainability journeyCape Town International Conference Centre's sustainability journey
Cape Town International Conference Centre's sustainability journeyCape Town Partnership
 
A business case for carbon reduction by Valerie Green of the National Busines...
A business case for carbon reduction by Valerie Green of the National Busines...A business case for carbon reduction by Valerie Green of the National Busines...
A business case for carbon reduction by Valerie Green of the National Busines...Cape Town Partnership
 
Public Workshop Presentation: Maintain a quality and sustainable urban enviro...
Public Workshop Presentation: Maintain a quality and sustainable urban enviro...Public Workshop Presentation: Maintain a quality and sustainable urban enviro...
Public Workshop Presentation: Maintain a quality and sustainable urban enviro...Cape Town Partnership
 
EDP_Provincial Competitiveness Index
EDP_Provincial Competitiveness IndexEDP_Provincial Competitiveness Index
EDP_Provincial Competitiveness IndexCape Town Partnership
 
Towards 2040 unlocking our potential
Towards 2040   unlocking our potentialTowards 2040   unlocking our potential
Towards 2040 unlocking our potentialCape Town Partnership
 
Jay Pather presents on Cape Town public art festival Infecting the City
Jay Pather presents on Cape Town public art festival Infecting the CityJay Pather presents on Cape Town public art festival Infecting the City
Jay Pather presents on Cape Town public art festival Infecting the CityCape Town Partnership
 
The Fringe: Reimagining our public spaces through design
The Fringe: Reimagining our public spaces through designThe Fringe: Reimagining our public spaces through design
The Fringe: Reimagining our public spaces through designCape Town Partnership
 
Tim Tompkins presents on Times Square and Times Square Alliance during a tour...
Tim Tompkins presents on Times Square and Times Square Alliance during a tour...Tim Tompkins presents on Times Square and Times Square Alliance during a tour...
Tim Tompkins presents on Times Square and Times Square Alliance during a tour...Cape Town Partnership
 
Tim Tompkins on Times Square and Cape Town
Tim Tompkins on Times Square and Cape TownTim Tompkins on Times Square and Cape Town
Tim Tompkins on Times Square and Cape TownCape Town Partnership
 
One Cape 2040 Process to finalise the vision
One Cape 2040 Process to finalise the visionOne Cape 2040 Process to finalise the vision
One Cape 2040 Process to finalise the visionCape Town Partnership
 
One Cape 2040 The long-term vision and plan for Western Cape Draft 1
One Cape 2040 The long-term vision and plan for Western Cape Draft 1One Cape 2040 The long-term vision and plan for Western Cape Draft 1
One Cape 2040 The long-term vision and plan for Western Cape Draft 1Cape Town Partnership
 
Western Cape's business and investment climate
Western Cape's business and investment climateWestern Cape's business and investment climate
Western Cape's business and investment climateCape Town Partnership
 
Cape Town is World Design Capital 2014
Cape Town is World Design Capital 2014Cape Town is World Design Capital 2014
Cape Town is World Design Capital 2014Cape Town Partnership
 

Plus de Cape Town Partnership (20)

Cape Town Partnership 2014 AGM presentation
Cape Town Partnership 2014 AGM presentationCape Town Partnership 2014 AGM presentation
Cape Town Partnership 2014 AGM presentation
 
Growing solutions out of wicked challenges: Lessons on urban grown from Cape ...
Growing solutions out of wicked challenges: Lessons on urban grown from Cape ...Growing solutions out of wicked challenges: Lessons on urban grown from Cape ...
Growing solutions out of wicked challenges: Lessons on urban grown from Cape ...
 
Low carbon central city strategy presentation 20140204
Low carbon central city strategy presentation 20140204Low carbon central city strategy presentation 20140204
Low carbon central city strategy presentation 20140204
 
Cape Town International Conference Centre's sustainability journey
Cape Town International Conference Centre's sustainability journeyCape Town International Conference Centre's sustainability journey
Cape Town International Conference Centre's sustainability journey
 
A business case for carbon reduction by Valerie Green of the National Busines...
A business case for carbon reduction by Valerie Green of the National Busines...A business case for carbon reduction by Valerie Green of the National Busines...
A business case for carbon reduction by Valerie Green of the National Busines...
 
Public Workshop Presentation: Maintain a quality and sustainable urban enviro...
Public Workshop Presentation: Maintain a quality and sustainable urban enviro...Public Workshop Presentation: Maintain a quality and sustainable urban enviro...
Public Workshop Presentation: Maintain a quality and sustainable urban enviro...
 
EDP_Provincial Competitiveness Index
EDP_Provincial Competitiveness IndexEDP_Provincial Competitiveness Index
EDP_Provincial Competitiveness Index
 
Towards 2040 unlocking our potential
Towards 2040   unlocking our potentialTowards 2040   unlocking our potential
Towards 2040 unlocking our potential
 
Jay Pather presents on Cape Town public art festival Infecting the City
Jay Pather presents on Cape Town public art festival Infecting the CityJay Pather presents on Cape Town public art festival Infecting the City
Jay Pather presents on Cape Town public art festival Infecting the City
 
The Fringe: Reimagining our public spaces through design
The Fringe: Reimagining our public spaces through designThe Fringe: Reimagining our public spaces through design
The Fringe: Reimagining our public spaces through design
 
Tim Tompkins presents on Times Square and Times Square Alliance during a tour...
Tim Tompkins presents on Times Square and Times Square Alliance during a tour...Tim Tompkins presents on Times Square and Times Square Alliance during a tour...
Tim Tompkins presents on Times Square and Times Square Alliance during a tour...
 
Tim Tompkins on Times Square and Cape Town
Tim Tompkins on Times Square and Cape TownTim Tompkins on Times Square and Cape Town
Tim Tompkins on Times Square and Cape Town
 
One Cape 2040 Process to finalise the vision
One Cape 2040 Process to finalise the visionOne Cape 2040 Process to finalise the vision
One Cape 2040 Process to finalise the vision
 
One Cape 2040 The long-term vision and plan for Western Cape Draft 1
One Cape 2040 The long-term vision and plan for Western Cape Draft 1One Cape 2040 The long-term vision and plan for Western Cape Draft 1
One Cape 2040 The long-term vision and plan for Western Cape Draft 1
 
Western Cape's business and investment climate
Western Cape's business and investment climateWestern Cape's business and investment climate
Western Cape's business and investment climate
 
Cape Town is World Design Capital 2014
Cape Town is World Design Capital 2014Cape Town is World Design Capital 2014
Cape Town is World Design Capital 2014
 
CTICC Expansion - Rashid Toefy
CTICC Expansion - Rashid ToefyCTICC Expansion - Rashid Toefy
CTICC Expansion - Rashid Toefy
 
Waterfront redevelopment
Waterfront redevelopmentWaterfront redevelopment
Waterfront redevelopment
 
NMT City Wide
NMT City Wide NMT City Wide
NMT City Wide
 
New 7 Wonders of Nature
New 7 Wonders of NatureNew 7 Wonders of Nature
New 7 Wonders of Nature
 

Part 2 MyCiTi Cape Town IRT System

  • 1.
  • 2. PROJECT ROLL-OUT – 15 to 20 year plan Figure . Phased implementation of the IRT
  • 3.
  • 4. TRUNKS & FEEDER VEHICLES Trunk vehicles 18m articulated 12m standard
  • 5. TRUNKS & FEEDER VEHICLES Feeder vehicles Less than 10m buses (Specs still to be finalised)
  • 6.
  • 7. MyCiTi Routes PHASE 1A FEEDER DIRECTORY (as on 7 July 2010) ID Route identification Route details F00 Hout Bay - Camps Bay Forward Direction: Marlin Cr - Karbonkel Rd - Atlantic Skipper Rd - Harbour Rd - Princess St - Main Rd - Imizamo Yethu - Victoria Rd - Llandudno - Victoria Rd – The Meadway - Park Rd - Argyle St - Victoria Rd Reverse Direction : The Meadway - Park Rd - Argyle St - Victoria Rd – Llandudno - Victoria Rd - Imizamo Yethu - Main Rd - Princess St - Harbour Rd - Atlantic Skipper Rd - Karbonkel Rd - Marlin Cr. F01 Camps Bay - CBD - Waterfront Forward Direction: Victoria Rd northbound - Argyle St - Tree Rd - Geneva Dr - Camps Bay Dr - Kloof Nek Rd - Kloof St - Loop St - Wale St - Adderley St - Heerengracht - Hertzog Blvd eastbound - Hertzog Blvd westbound - D F Malan St - Table Bay Blvd - Hereengracht - Coen Steytler Ave - Dock Rd - South Arm Rd - V & A Waterfront Clock Tower Reverse Direction: V&A Waterfront Clock Tower - South Arm Rd - Dock Rd - Coen Steytler Ave – Hereengracht - Table Bay Blvd - D F Malan St - Hertzog Blvd eastbound - Hertzog Blvd westbound – Heerengracht - Adderley St - Wale St – Long St - Kloof St - Kloof Nek Rd - Camps Bay Dr – Prima Ave - Platteklip Plein - Ravensteyn Ave - Camps Bay Dr - Fiskaal Rd - Chas Booth Ave - Rontree Ave - Camps Bay Dr - Victoria Rd northbound - Argyle St - Tree Rd - Geneva Dr - Camps Bay Dr - Victoria Rd northbound. F02 Sea Point (via Beach Rd) - CBD - Garden Centre Forward Direction: Beach Rd (At Queens Rd Circle) - Breakwater Lane - Port Rd - Dock Rd circle - Dock Rd - Coen Steytler Ave - Heerengracht - Table Bay Blvd - D F Malan St - Hertzog Blvd Eastbound - Hertzog Boulevard Westbound - Heerengracht - Adderley St - Wale St - Long St - Orange St - Annandale Rd - Mill St - Mill St off ramp eastbound - Maynard Southbound - Mill St on ramp Westbound Reverse Direction: Mill St on ramp Westbound - Mill St - Annandale Rd - Orange St - Buitensingel St - Loop St - Wale St - Adderley St - Heerengracht - Hertzog Blvd Eastbound - Hertzog Blvd Westbound - D F Malan St - Table Bay Blvd - Heerengracht - Coen Steyter Ave - Dock Rd - Dock Rd circle - Port Rd - Breakwater Lane - Beach Rd - Turn around at Queens Rd circle.
  • 8. F03 Camps Bay - Sea Point - CBD Forward Direction: Victoria Rd southbound - Camps Bay Dr - Geneva Dr - Camps Bay Dr westbound - Victoria Rd northbound - Queens Rd - Regent Rd - St Andrews Rd - Beach Rd - Queens Rd - Regent Rd - Main Rd - Somerset Rd - Riebeek St – Long St - Strand St – Adderley St - Heerengracht - Hertzog Blvd eastbound F04 Fresnaye - CBD Forward Direction: Beach Rd - Queens Rd - Kloof Rd - Ave Fresnaye - High Level Rd - Strand St - Adderley St - Heerengracht - Hertzog Blvd Eastbound F05 Vredehoek - CBD Forward Direction: Deer Park Dr West - Highlands Ave - Upper Buitenkant St - Mill St eastbound - Maynard St - Mill St westbound – Buitenkant St - Darling St - Adderley St - Heerengracht - Hertzog Blvd. F06 Bo-Kaap - CBD - District 6 - Salt River Forward Direction: Bantam St - Yusuf Dr - Wale St - Adderley St - Darling St - Keizersgracht - Chester Rd - Coronation Rd - Upper Mountain Rd - Rhodes Ave - Upper Roodebloem Rd - Roodebloem Rd - Victoria Rd - Salt River Rd - Salt River Rd Circle - Albert Rd eastbound - Spencer Rd northbound - Foundry Rd westbound F07 City Bowl Circle Line Forward Direction: Kloof St - Hof St - Rayden St - Molteno Rd - Montrose Ave - Upper Orange St - Lincoln Rd - Sidmouth Ave - Homeleigh Ave - Fitzherbert Rd - Deer Park Dr - Highlands Ave - Florida Rd - Davenport Rd - St James St - Derry St - Noordelik Ave - Barnham Ave - Windburg Ave - Crassula Ave - Roeland St - de Villiers Rd - Tennant St - Keizergracht - Darling St - Adderley St - Heerengracht - Hertzog Blvd Eastbound - Hertzog Boulevard Westbound - D F Malan St - Table Bay Blvd - Heerengracht - Coen Steytler Ave - Lower Long St - Long St - Kloof St. F65 Tamboerskloof - CBD Forward Direction: Warren St - Albert Rd - Woodside Rd - Brownlow Rd - Burnside Rd - Kloof Nek Rd - Kloof St (southbound) - Camp St - Upper Orange St - Hatfield St - St Johns Rd - Plein St - Darling St - Adderley St - Heerengracht - Hertzog Blvd.
  • 9.
  • 10.
  • 11. Civic station will provide seamless and comfortable transfer
  • 12. Trunk services R 5 + R0.30 per km (max. R16) (R 4 – R 15 in off-peak) Feeder services R 5 per trip (R 4 in off-peak ) Free Trunk – Feeder transfer at selected stations FARE STRUCTURE
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. Inner City Interim Service World Cup IRT Vehicles used to assist 2010 event operations June/ July 2010 Inner City interim service (commence end of Sept.) Airport Shuttle Service (N2) Milestone 0 Airport & Bayside Trunk Feb. 2011 Milestone 1 PLUS Inner City Feeders Oct. 2011
  • 20.
  • 21. Inner City Route Transport Products Number of Trips Fare Valid for 1 trip R5 3 months 10 trips (clip card) R40 1 month Unlimited R40 1 week Unlimited R15 1day Bundle of 50 or more R4 per trip 3 months
  • 22.
  • 29. Cape Town Integrated Rapid Transit System Civic Station
  • 31. Cape Town Integrated Rapid Transit System West Coast Corridor
  • 32. Cape Town Integrated Rapid Transit System West Coast Corridor
  • 33. Cape Town Integrated Rapid Transit System West Coast Corridor
  • 34. Cape Town Integrated Rapid Transit System West Coast Corridor
  • 35.
  • 36.  
  • 37. www.capetown.gov.za/irt For any further information, feel free to contact: Gershwin Fortune BSc (Civil) Eng, MEng Cum laude. Acting Manager: IRT System Planning & Modelling E-mail: gershwin.fortune@capetown.gov.za Tel: +27214009130
  • 38. Business & Contract structure Existing Model Operating the buses Ticketing Fare collection System Information Marketing the service Bus stop maintenance Termini management Depot management Depot owner Contract Monitoring CURRENT BUS OPERATOR (GABS) CITY OF CAPE TOWN PGWC
  • 39. Business & contract structure IRT Model Operating the buses Ticketing Fare collection System Information Marketing the service Bus stop maintenance Station management Depot management Depot owner Contract Monitoring IRT VEHICLE OPERATOR COMPANY CITY OF CAPE TOWN
  • 40. Business & Contract Structure MUNICIPAL IRT ENTITY SERVICE DELIVERY AGREEMENT WITH NEGOTIATE Fare collection monitoring System Information Contract Monitoring Control Centre Contractor Fare System Contractor Ticketing system & equipment Fare collection Station Services Contractor Ticket sales Access control System Information Station management Cleaning Security Vehicle Operator Contractor Operating the buses Depot management TENDER TENDER TENDER
  • 41. Phase 1a Corridor Vehicle Operator Contracts 2 Contracts 2 Companies NORTHERN West Coast SOUTHERN Inner City