SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
Cary	Hendrix	
	
Email:	cary.hendrix@gknsintermetals.com	
Permanent	Address:	1391	South	Jackson	St.,	Salem,	IN		47167	Cell	Phone:	812-620-4419	
	
OBJECTIVE:		Effectively manage a large and complex maintenance department by improving response time on
maintenance issues, creating standard work for maintenance and increasing OEE on equipment. Build a team
environment and continue to create a positive working environment for all maintenance employees.
EDUCATION:		
Purdue	University,	College	Of	Technology,	New	Albany,	IN	
Mechanical	Engineering	Technology	(In	Process):	January	2012-Present	
EXPERIENCE:		
Engineering	Apprentice—GKN	Sinter	Metals	 	 	 	 	 	 January	2012-Present	
• Oversee	and	manage	co-op	employees	and	instruct	them	on	problem	solving;	guiding	and	leading	them	to	grow	in	
their	individual	skills	and	competencies	
• Work	with	multiple	contractors	and	customers	simultaneously	
• Effectively	handle	many	tasks,	prioritizing	their	importance	and	proceeding	accordingly	
• Assist	with	new	product	launches,	working	with	the	majority	of	departments	and	different	levels	of	seniority		
• Assist	heavily	in	set	up	and	troubleshooting	of	Cincinnati	,	Meers,	Dorst	and	Sacmi	presses	working	with	numerous	
contractors	and	customers	to	successfully	fix	all	levels	of	these	machines.	
• Managed	the	process	of	building	and	designing	the	new	density	room	from	beginning	to	completion,	managing	
several	contractors	and	processes	at	once	
Maintenance	Mechanic—GKN	Sinter	Metals		 	 	 	 	 																				May	2004-January	2012	
• Efficiently	performed	maintenance	and	PM	on	all	equipment		
• Completed	MSSC	Training	
• Advanced	knowledge	of	compacting	presses	and	experience	in	successfully	pin-pointing	and	solving	complex	issues	
that	arise	
• Ability	to	read	hydraulic	and	electrical	schematics	
• Working	effectively	and	cooperating	with	outside	vendors	in	high	stress	situations	
Leader—GKN	Sinter	Metals		 	 	 	 	 	 	 															May	2000-May	2004	
• Assigned	jobs	and	adjusted	schedule	as	needed	
• Oversaw	and	managed	15	different	employees,	including	different	personalities	and	seniorities	
• Managed	minor	behavioral	issues	as	needed	
Setup/Operator—GKN	Sinter	Metals	 	 	 	 	 	 	 December	1997-May	2004	
• Set	up	and	operated	Cincinnati	compacting	presses	
• Demonstrated	leadership	qualities	while	in	a	non-leadership	role	
Material	Handler—GKN	Sinter	Metals	 	 	 	 	 	 	 December	1996-December	1997	
	
	
TECHNICAL	/	COMPUTER	SKILLS:	
• Working	knowledge	of	Auto-Cad	
• Proficient	in	Microsoft	Office	Suite

Contenu connexe

Tendances (18)

Indu Resume
Indu ResumeIndu Resume
Indu Resume
 
Ryan McDonald Resume
Ryan McDonald ResumeRyan McDonald Resume
Ryan McDonald Resume
 
Orville Gann (1)
Orville Gann (1)Orville Gann (1)
Orville Gann (1)
 
Update Resume 12-4
Update Resume 12-4Update Resume 12-4
Update Resume 12-4
 
Dale buck jr. resume 2016
Dale buck jr. resume 2016Dale buck jr. resume 2016
Dale buck jr. resume 2016
 
John Thompson Resume 2016
John Thompson Resume 2016John Thompson Resume 2016
John Thompson Resume 2016
 
Donald Stevenson Resume
Donald Stevenson ResumeDonald Stevenson Resume
Donald Stevenson Resume
 
Michael R.3
Michael R.3Michael R.3
Michael R.3
 
Robert Gregorio CV
Robert Gregorio CVRobert Gregorio CV
Robert Gregorio CV
 
Resume
Resume Resume
Resume
 
DougDelebreauResumeUWSTOUT
DougDelebreauResumeUWSTOUTDougDelebreauResumeUWSTOUT
DougDelebreauResumeUWSTOUT
 
Anson Pamela final
Anson Pamela final Anson Pamela final
Anson Pamela final
 
John Adcock - Resume
John Adcock - ResumeJohn Adcock - Resume
John Adcock - Resume
 
zeffiroa Resume Mar 2016
zeffiroa Resume Mar 2016zeffiroa Resume Mar 2016
zeffiroa Resume Mar 2016
 
Becky fessler 2016
Becky fessler 2016Becky fessler 2016
Becky fessler 2016
 
Anand
AnandAnand
Anand
 
JIBY RESUME
JIBY RESUMEJIBY RESUME
JIBY RESUME
 
Important Steps to Improve Quality of Construction
Important Steps to Improve Quality of ConstructionImportant Steps to Improve Quality of Construction
Important Steps to Improve Quality of Construction
 

En vedette (7)

CAK Resume
CAK ResumeCAK Resume
CAK Resume
 
casey new resume
casey new resumecasey new resume
casey new resume
 
CASSIES FINAL RESUME
CASSIES FINAL RESUMECASSIES FINAL RESUME
CASSIES FINAL RESUME
 
Carla Starr Resume
Carla Starr ResumeCarla Starr Resume
Carla Starr Resume
 
Castine Resume 2016
Castine Resume 2016Castine Resume 2016
Castine Resume 2016
 
carl wylde resume
carl wylde resumecarl wylde resume
carl wylde resume
 
Cassie Jacoby Resume 2016
Cassie Jacoby Resume 2016Cassie Jacoby Resume 2016
Cassie Jacoby Resume 2016
 

Similaire à Cary Hendrix Resume 2016

Similaire à Cary Hendrix Resume 2016 (20)

Resume 10-1-15(2)
Resume 10-1-15(2)Resume 10-1-15(2)
Resume 10-1-15(2)
 
Hemamalini
HemamaliniHemamalini
Hemamalini
 
Dave Hunt-CV (1)
Dave Hunt-CV (1)Dave Hunt-CV (1)
Dave Hunt-CV (1)
 
Niels Andersen Resume, October 2015.
Niels Andersen Resume,  October 2015.Niels Andersen Resume,  October 2015.
Niels Andersen Resume, October 2015.
 
Ian Montague resume
Ian Montague resumeIan Montague resume
Ian Montague resume
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
James King CV 2016
James King CV 2016James King CV 2016
James King CV 2016
 
adin cv
adin cvadin cv
adin cv
 
my cv upto 2015 june
my cv upto 2015 junemy cv upto 2015 june
my cv upto 2015 june
 
shino john resume
shino john resume shino john resume
shino john resume
 
AMurray_CV
AMurray_CVAMurray_CV
AMurray_CV
 
MilindPatil
MilindPatilMilindPatil
MilindPatil
 
20150311 Resume
20150311 Resume20150311 Resume
20150311 Resume
 
2022 melvin resume updated
2022 melvin  resume updated2022 melvin  resume updated
2022 melvin resume updated
 
Jason Cherry resume
Jason Cherry resumeJason Cherry resume
Jason Cherry resume
 
My Resume (2)
My Resume (2)My Resume (2)
My Resume (2)
 
Milind Patil- Resume
Milind Patil- ResumeMilind Patil- Resume
Milind Patil- Resume
 
Iain YoungCV
Iain YoungCVIain YoungCV
Iain YoungCV
 
CV NGUYEN DINH VI KHAI
CV NGUYEN DINH VI KHAICV NGUYEN DINH VI KHAI
CV NGUYEN DINH VI KHAI
 

Cary Hendrix Resume 2016

  • 1. Cary Hendrix Email: cary.hendrix@gknsintermetals.com Permanent Address: 1391 South Jackson St., Salem, IN 47167 Cell Phone: 812-620-4419 OBJECTIVE: Effectively manage a large and complex maintenance department by improving response time on maintenance issues, creating standard work for maintenance and increasing OEE on equipment. Build a team environment and continue to create a positive working environment for all maintenance employees. EDUCATION: Purdue University, College Of Technology, New Albany, IN Mechanical Engineering Technology (In Process): January 2012-Present EXPERIENCE: Engineering Apprentice—GKN Sinter Metals January 2012-Present • Oversee and manage co-op employees and instruct them on problem solving; guiding and leading them to grow in their individual skills and competencies • Work with multiple contractors and customers simultaneously • Effectively handle many tasks, prioritizing their importance and proceeding accordingly • Assist with new product launches, working with the majority of departments and different levels of seniority • Assist heavily in set up and troubleshooting of Cincinnati , Meers, Dorst and Sacmi presses working with numerous contractors and customers to successfully fix all levels of these machines. • Managed the process of building and designing the new density room from beginning to completion, managing several contractors and processes at once Maintenance Mechanic—GKN Sinter Metals May 2004-January 2012 • Efficiently performed maintenance and PM on all equipment • Completed MSSC Training • Advanced knowledge of compacting presses and experience in successfully pin-pointing and solving complex issues that arise • Ability to read hydraulic and electrical schematics • Working effectively and cooperating with outside vendors in high stress situations Leader—GKN Sinter Metals May 2000-May 2004 • Assigned jobs and adjusted schedule as needed • Oversaw and managed 15 different employees, including different personalities and seniorities • Managed minor behavioral issues as needed Setup/Operator—GKN Sinter Metals December 1997-May 2004 • Set up and operated Cincinnati compacting presses • Demonstrated leadership qualities while in a non-leadership role Material Handler—GKN Sinter Metals December 1996-December 1997 TECHNICAL / COMPUTER SKILLS: • Working knowledge of Auto-Cad • Proficient in Microsoft Office Suite