SlideShare une entreprise Scribd logo
1  sur  30
Télécharger pour lire hors ligne
Utah Point Multi-User Bulk Export Facility
Port Hedland
Servicing Australia’s future trade growth




2011 WA Engineering Excellence Awards
Resource Development Category
Contents



Contents

Project Overview	             1


Categorisation Statement 	    4


Mandatory Criteria		          6


Optional Criteria	           21


AppendiCES 	                 30


Acknowledgements	46
Project Overview


Project Overview   Project Overview

                   The Utah Point Multi-User Bulk Export Facility        A number of sustainable technology initiatives
                   (Utah Facility) addresses the resource industry’s     and innovative engineering practices were
                   need for expanded port facilities to meet current     adopted and significant studies and consultation
                   and future growth in global demand for Western        undertaken as part of a full Public Environmental
                   Australian mineral resources and to facilitate        Review. This process addressed the complexities
                   export for emerging mineral producers in the          associated with designing and constructing
                   Port Hedland region.                                  a port facility to transport, store and export a
                                                                         multitude of minerals with potentially adverse
                   The Utah Facility was constructed on Finucane
                                                                         environmental and community impacts.
                   Island opposite the existing public berths and
                   within the narrow neck of the Port Hedland            Innovations were introduced to achieve
                   harbour. The Utah Facility development concept        operation efficiency and to mitigate health risks
                   consisted of a new dredged berth pocket and           and other community concerns including: a
                   270 metre long concrete wharf, travelling ship        45,000m3 water recirculation and stormwater
                   loader, 24 hectare stockyard and associated           harvesting system; bentonite geosynthetic lined
                   materials handling infrastructure, administration     stockyard floor with plastic reinforced seawall
                   and controls facility, and a 10 kilometre dedicated   embankments; custom designed automatic
                   access road.                                          vessel mooring system; real time vibration
                                                                         monitoring of the BHPBIO tunnel; quad road train
                   Originally designed for a maximum export
                                                                         wash facilities; unique mobile hopper train ore
                   capacity of 12 to 15 million tonnes per annum,
                                                                         reclaim system and a commitment to a mangrove
                   increased industry demand resulted in design
                                                                         propagation farm.
                   modifications to accommodate an export volume
                   of up to 21 million tonnes per annum. Expanded        The Utah Facility performed beyond expectation
                   capacity was achieved by increasing the dredged       in achieving nameplate capacity within 6 months
                   depth of the berth pocket, introduction of an         of operation and has proved capable of delivering
                   innovative new automatic mooring system to            9 million tonnes of trucked ore per annum
                   berth larger vessels and increasing the materials     throughout representing estimated export sales
                   handling system peak loading rate from 5,000          of $1.5 billion per annum.
                   to 7,500 tonnes per hour. These innovations
                                                                         Future increases in industry demand can
                   allow the current facility and stage one of the
                                                                         be accommodated within the Utah Facility
                   stockyards to reach up to 14Mtpa prior to the
                                                                         with provision made for receiving product via
                   construction of future stockpiling.
                                                                         alternative ore transport modes such as rail
                   Using an integrated client team approach, the         or slurry pipeline. Additional land has been
                   Port Hedland Port Authority (PHPA) worked             allocated adjacent to Utah Point to increase
                   collaboratively with project management               opportunities for new and emerging mining
                   consultants, Pinc Group Pty Ltd (Pinc) to deliver     companies that would otherwise be denied
                   the project. Project planning commenced in            access to export markets.
                   September 2006 and first ore on ship was
                   achieved within 4 years on 17 September 2010
                   after a 20 month construction phase.

                                                                                                                             2
Utah Point Multi-User Bulk Export Facility Port Hedland
         Servicing Australia’s future trade growth




    About Port Hedland Port Authority
                                                                                                                  Categorisation StatemenT
                     The Port Hedland Port Authority        PHPA’s major functions are the control of all
                     (PHPA) is a statutory authority        shipping, and maximising the loaded capacity
                     owned by the Western Australian        of ships through the use of world leading
                     Government. The Port Authority         technology that allows the Authority to maintain
                     has a charter to operate along         minimum safe under keel clearances. The Port
                     commercial lines with a primary        Authority also has a responsibility to plan for and
                     purpose to facilitate trade            manage new developments whilst protecting the
                     through the port.                      environment of the port.




    About Pinc Group Pty LtD
                                   Established in 2005, Pinc is an emerging provider of choice for specialist
                                   project management and project services to the resource sector. Pinc’s
                                   unique PMC management processes and integrated software and systems
                                   are designed to support clients to successfully develop major capital works.

    Previous clients of Pinc include:                        • Boddington Gold Mine
                                                             • Fortescue Metals Group Ltd.
    •   Abesque Engineering Ltd.
                                                             • Karara Mining Ltd.
    •   Extension Hill Pty. Ltd.
    •   Atlantic Ltd.                                        • Midwest Vanadium Pty Ltd.
    •   Atlas Iron Ltd.                                      • Newcrest Mining Ltd.
    •   Ausenco Ltd.                                         • Rio Tinto Ltd.
    •   BHPB Petroleum                                       • Worley Parsons Ltd.




3
Utah Point Multi-User Bulk Export Facility Port Hedland
        Servicing Australia’s future trade growth




    CATegorisation statement
                                                                                                               Mandatory Criteria
    The Utah Facility addresses the resource industry    Implementation of sustainability initiatives
    need for expanded port facilities to meet current    and innovative engineering practices and
    and future growth in global demand for Western       technologies have not only improved operational
    Australian mineral resources.                        efficiency across the port, but reduced
                                                         environmental and health risks to Port Hedland
    Construction of a new multi-user bulk export
                                                         residents, whilst improving amenity for all.
    facility on the west side of the harbour at Utah
    Point, with a capacity to receive small cape         Within the 2010/11 financial year, the Utah
    size ships up to 120,000 tonnes deadweight,          Facility is expected to increase export tonnage
    resolves current pressure placed on existing port    over the PHPA operated berths by 360% from
    facilities within Port Hedland, and allows Western   the previous year achieving the facility’s designed
    Australia’s junior mining companies to export        nameplate capacity of nine million tonnes per
    their products to a resource hungry                  annum with an estimated total export value of
    global market.                                       $1.5 billion.




5
Utah Point Multi-User Bulk Export Facility Port Hedland
        Servicing Australia’s future trade growth                                                                                                                                      Mandatory criteria



    Mandatory Criterion 1 - Occupational Health & Safety

    As the first major construction project undertaken   “The Utah Facility is committed to
    by PHPA, the Utah Facility presented a number        ensuring the highest possible standards
    of occupational health and safety (OH&S)             of occupational health and safety, the
    challenges for the project management team and       minimisation and control of all risks, and
    contractors given the absence of established         to zero harm.”
    safety management policies and procedures,           Excerpt from the Utah Facility’s Safety
    and minimum safety standards for construction.       Management Plan.

    This situation was further complicated by            Safety management initiatives targeted
    a contracting strategy that required the             training, risk assessment and problem solving in
    construction management team to control              high risk areas. It was recognised early that the                                                         Seawall construction using concrete impregnated miracell
    the interfaces between multiple independent          most impact could be achieved by focusing on
    contractors occupying the same work spaces,          improving behaviour and attitudes of front line
    along with Port Hedland’s difficult environmental    workers and supervision to improve the overall      An example of an effective safety initiative is
    working conditions where dust exposure and           safety awareness and culture.                       evident in the implementation of safety controls            Key OH&S initiatives employed across the
    high ambient temperatures and humidity pose                                                              over the dredging and piling operations over the            project included:
                                                         Backed by a high visibility, supportive and         BHPBIO tunnel as detailed in Appendix A.
    significant health and safety risk.                                                                                                                                  •  igh weighting to safety performance and
                                                                                                                                                                           H
                                                         positive leadership culture in which the entire     Real-time vibration monitoring with direct
                                                                                                                                                                           systems in the evaluation of tenders.
    A carefully crafted project management strategy      project management team and contractor              contractor communication was established to
    was established to ensure safe design and            personnel were genuinely engaged in                 predict when dredging and piling operations                 •  azard Identification Analysis (HAZID) and
                                                                                                                                                                           H
    construction outcomes. The project’s OHS            decisions affecting workforce safety, the           might exceed pre-determined safe vibration                    formal risk assessments undertaken regularly.
    Plan set minimum standards and procedures            project management team led work planning           limits. This allowed the extent of further work to          • Early identification of unacceptable risks that
    based on industry standards and statutory            and communication through daily Tool Box            be forecast and quickly agreed upon to ensure                 could lead to unsafe outcomes.
    requirements. Outlining site specific requirements   meetings and weekly contract meetings with the      work undertaken by third parties within the tunnel          • Empowering all personnel to stop work where
    for entering and working on site, the Plan relied    Construction Manager that focused primarily         could continue safely and without disruption.                 unsafe practices or risks were observed.
    heavily on the contractors own quality and safety    on safety and environmental issues.
                                                                                                             Despite the difficult environmental conditions,             • Daily, unobtrusive observation of work
    management systems and procedures. The need
                                                                                                             relative remoteness of the site and high risk                 practices with positive feedback for safe work.
    for cooperation, trust, individual responsibility                                                        nature of the construction work, the safety                 •  voidance of safety clichés or rules for which
                                                                                                                                                                           A
    and accountability were adopted as a basic                                                               management strategy delivered a Lost Time                     the rationale could not be justified.
    undertaking by all parties.                                                                              Injury Frequency Rate (LTI FR) of 1.4 resulting
                                                                                                                                                                         • Elimination of unnecessary paper work,
                                                                                                             from one lost day through injury from a total
                                                                                                                                                                           especially for workers and supervisors.
                                                                                                             850,000 site manhours.
                                                                                                                                                                         •  genuine no blame system and no penalties
                                                                                                                                                                           A
                                                                                                             This LTI FR represents only 10% of the WA                     for lapses or mistakes.
                                                                                                             construction industry’s average of 13.9 and
                                                                                                                                                                         • Early and comprehensive incident/near
                                                                                                             only surpassed by the best performing
                                                                                                                                                                           miss reporting.
                                                                                                             industry sector, that of the finance and
                                                                                                             insurance industry1.
                                                                                                             1
                                                                                                              Work Related Lost Time Injuries and Diseases in WA
                                                                                                             2006-07 to 2008-09,Worksafe WA.




7                                                                                                                                                                                                                             8
Utah Point Multi-User Bulk Export Facility Port Hedland
        Servicing Australia’s future trade growth                                                                                                                                       Mandatory criteria



    Mandatory Criterion 2 – Sound Engineering Practices  Principles

    A fresh approach to project management                the award of construction contracts in line with
                                                          the availability of funds.
    Successful delivery of the Utah Facility can
    be attributed to the selection of contract and        The financial benefit of adopting a fresh approach
    procurement strategies matched to project and         to contracting was evident in the supply and
    commercial risks and the implementation of an         installation of the site’s high voltage electrical
    effective client integrated team.                     feeder. A risk loaded fixed price offer presented
                                                          by the service authority was renegotiated to a
    Flexible contracting strategy matched to risk
                                                          reimbursable contract (cost plus fixed fee) that
    A significant element of the project’s success        netted a 57% cost saving for the augmentation of
    lay in the careful selection of contract strategies   power to the site.
    to minimise scope, cost and time risks. When
                                                          An integrated team approach to project and
    the project was assessed as requiring a full
                                                          construction management
    Public Environmental Review (PER), the planned
    fixed lump sum design and construction model          Following completion of the concept
    had unacceptable prolongation risk and was            development phase, PHPA commissioned the
    therefore replaced with a client integrated project   services of Pinc Group Pty. Ltd. (Pinc) to work
    and construction management team.                     collaboratively as project manager in a genuine
                                                          integrated team approach where Pinc was
    This allowed close management of project
                                                          empowered to think and behave like the client
    approvals and funding requirements, with
                                                                                                                                                             Sample of 3D Computer Model Used in Designing the Utah Facility
    preliminary engineering and procurement               During design and procurement, Pinc provided
    undertaken whilst the scope continued to be           the flexibility required, with part-time and full-time
    developed during the PER process. This strategy       multi-disciplined staff allocated according to the
    led to PHPA taking responsibility for long lead       changing needs of project implementation
                                                                                                                    Pinc was able to provide PHPA with the                 approach provided a more efficient and cost
    item procurement, managing engineering at a
                                                          Refer Appendix B for Utah Facility                        resources, procedures and systems required to          effective project management solution.
    pace consistent with PER outcomes and to stage
                                                          Organisational Chart.                                     effectively manage project planning, scheduling,
                                                                                                                                                                           Total engineering, procurement and construction
                                                                                                                    procurement, contract management, project
                                                                                                                                                                           management (EPMC) services from concept
                                                                                                                    controls and reporting. This service was
                                                                                                                                                                           development (excluding the PER and associated
                                                                                                                    simplified by the adoption of Pinc’s innovative
                                                                                                                                                                           studies) through to commission and handover
                                                                                                                    proprietary Integrated Project Management
                                                                                                                                                                           were delivered for a minimal 10.2% of total
                                                                                                                    Software (PincSys) which continues to be utilised
                                                                                                                                                                           project capital (as summarised below) in an
                                                                                                                    by PHPA in its ongoing operations.
                                                                                                                                                                           industry where the costs of EPMC services are
                                                                                                                    The client integrated team approach                    typically in the range of 15-25%.
                                                                                                                    required a high degree of trust to foster close
                                                                                                                                                                           •  roject Management
                                                                                                                                                                              P
                                                                                                                    communication, eliminate duplication of
                                                                                                                                                                              and Procurement 	                    1.76 %
                                                                                                                    management and encourage fast decision
                                                                                                                    making. With PHPA’s limited experience in              • Engineering 	                         4.30 %
                                                                                                                    the development of major capital assets, this          • Construction Management 	             4.11 %
                                                                            Utah Facility Construction team Photo


9                                                                                                                                                                                                                              10
Utah Point Multi-User Bulk Export Facility Port Hedland
          Servicing Australia’s future trade growth                                                                                                                                           Mandatory criteria



     Mandatory Criterion 3 - Originality  Ingenuity

     Utah Facility Stockyard                                   Design Flexibility

     The Utah Facility has a 24 hectare (1030m                 As selection of facility clients and their products
     x 235m) multi-user bulk materials stockyard               were indeterminate during the design phase and
     designed to receive nine million tonnes per               expected to change over time, the stockyard
     annum of ore delivered by road train. This facility       layout, loading and stacking infrastructure,
     is the first of its size and purpose in the world         materials handling and electrical systems were
     and is truly unique in the design and construction        designed to manage a range of minerals, loading
     methods used in its creation.                             rates, material properties and ore sizes ranging
                                                               from 120mm abrasive chromite lump to superfine
     Size
                                                               mineral concentrate.
     Designed for 20 hour operation (allowing a 4 hour
     traffic curfew for evening peak hour), this facility is
     the only one in the world capable of receiving one
     quad road train transporting up to 106 tonnes
     of multiple ore products every 5 minutes in a
     continuous operation.


                                                                                                                                                                     Workers rolling out Geogrid layer to marine mud stockyard floor



                                                                                                                        Construction                                            selected as the preferred lining material given
                                                                                                                                                                                its chemical stability, self-sealing properties and
                                                                                                                        The stockyard was constructed over potential
                                                                                                                                                                                ability to adjust to differential movement in the
                                                                                                                        acid sulphate marine mud to depths up to 2.5
                                                                                                                                                                                stockyard floor.
                                                                                                                        metres. Too environmentally unstable to expose
                                                                                                                        to oxygen and expensive to treat, the stockyard         Each of the 13 stockpiles housed in the
                                                                                                                        was designed to “float” on the mud. To minimise         stockyard are capable of exerting a pressure
                                                                                                                        earthwork haulage costs, the stockyard floor was        equivalent to a 30 storey building. Two Securgrid
                                                                                                                        restricted to a depth of 2 metres, which required       400/40 geogrid layers with tensile strength of
                                                                                                                        strengthening of the fill to avoid overturning slip     400KN were chosen as the preferred method
                                                                                                                        failure from the weight of stockpiled ores.             of reinforcing the stockyard base given their
                                                                                                                                                                                superior strength and environmental stability.
                                                                                                                        The stockyard base contains a bentonite barrier
                                                                                                                                                                                Stockpile height restrictions were imposed on
                                                                                                                        layer and groundwater collection system installed
                                                                                                                                                                                initial stacking operations to allow consolidated
                                                                                                                        0.9 metres below the stockyard surface to
                                                                                                                                                                                marine mud to develop strength. Fill settlement
                                                                                                                        prevent ore residues and dissolved solids from
                                                                                                                                                                                of up to 20cm was forecast and the stockyard
                                                                                                                        contaminating the groundwater. Bentonite was
                                                                                                                                                                                design accommodated this predicted movement.
                                                                               Preparing marine mud for geogrid layer


11                                                                                                                                                                                                                                    12
Utah Point Multi-User Bulk Export Facility Port Hedland
         Servicing Australia’s future trade growth                                                                            Mandatory criteria



                                                                                                                A safer, more efficient way to moor vessels

                                                                                                                Catovec’s MoorMaster Automatic Mooring
                                                                                                                System uses new technology to improve safety,
                                                                                                                time and operational costs associated with
                                                                                                                berthing large ships and significantly increase the
                                                                                                                port’s throughput.

                                                                                                                Innovative 200MM units designed to withstand
                                                                                                                Port Hedland’s extreme tidal, heat and dust
                                                                                                                conditions have not only improved safety
                                                         Quad Road Train Adjacent to Stockyard Dump Pocket      compared to traditional rope mooring, but
                                                                                                                reduced vessel capture, moor and release times
                                                                                                                by approximately 2.5 hours per vessel.
     Operations                                          Refer Appendix C - Utah Facility General               More information on the innovative application
                                                         Arrangement Plan and Process Flowsheet for             of Cavotec technology is found in Mandatory
     Given the volume of trucks and variety of
                                                         more further information.                              Criteria 8.
     ores being transported to multiple stockpiles
     within the facility, customised transport, truck    Significant cost savings were achieved by
     management and communications systems were          replacing the traditional fixed hoppers with two
     designed to manage stockyard efficiency.            originally designed hopper trains. These rail
                                                         trains were designed to operate over the central
     A two lane elevated perimeter road allows trucks
                                                         reclaim load-out conveyor with trailing power and
     to circulate, pull out safely and right side dump
                                                         water cables. The six hoppers and two motor
     into hoppers capable of automatically identifying
                                                         control centres required for this solution achieved
     the truck and its contents before unloading. A
                                                         considerable capital cost and operating savings.
     CCTV system linked to a central control room
     at the entrance was also constructed to ensure      Refer Appendix D - Mobile Hopper Train General
     efficient facility management and security.         Arrangements 1 and 2 for further information.




                                                                                                                                         3D model view of stockyard
                                                                                Mobile Hopper Train Schematic

13                                                                                                                                                                    14
Utah Point Multi-User Bulk Export Facility Port Hedland
         Servicing Australia’s future trade growth                                                                                                                  Mandatory criteria



     Mandatory Criterion 4 - Economic Contribution

                                                                                                                                                      Provision was also made for ship loading rates
                                                                                                                                                      of up to 7,500 tonnes per hour, well in excess of
                                                                                                                                                      the rate required to service the stockyard. When
                                                             “This was a development that needed                                                      coupled with the increased operating efficiency
                                                             to happen… it is necessary to meet the                                                   provided by the Cavotec Automatic Mooring
                                                             significant growth that has come through                                                 system, the Utah Facility can increase throughput
                                                             the port but also facilitate iron ore juniors to                                         capacity well beyond the current 9 million tonnes
                                                             get their products out.”1                                                                per annum.

                                                             	      Andre Bush, CEO,                                                                  Future expansion of the facility has also been
                                                             	      Port Hedland Port Authority.                                                      considered in its establishment. Additional
                                                                                                                                                      land has been assigned for the construction
                                                                                                                                                      of a second stockyard capable of receiving
                                                                                                                                                      mineral products through a variety of alternative
                                                                                                                                                      transport modes such as rail, overland conveyor
                                                                                                                                                      or slurry pipeline. Existing facility capability and
     Increasing Port Hedland’s export capacity            existing public berth infrastructure to increase                                            access road design will permit these options to
                                                          inner harbour capacity without reducing the                                                 be pursued without modification to the current
     The development of the Utah Facility has had a
                                                          export capacity of other port users. The BHPBIO                                             materials handling system.
     fundamental impact on Western Australia’s future
                                                          under harbour tunnel that crosses at shallow
     export potential and economic activity.
                                                          depth under the Utah Wharf constrained the
     The Utah Facility signals a vital opportunity        depth of the Facility berth pocket such that it
     for new and emerging miners to export their          was only suitable for Panamax and Small Cape
     products to international markets. Commencing        vessels with low drafts capable of accessing the
     the export chain through affordable trucking         harbour during low tide when larger ore carriers
     options is expected to provide a starting point      cannot operate.
     for the generation of valuable cash-flow to new
                                                          Custom built to manage between 85,000 and
     market entrants, which will in turn provide future
                                                          100,000 road trains per year, the Utah Facility
     opportunities for expansion through capital
                                                          stockyard delivers a diverse range of ores from
     development and encourage investment in
                                                          mines within a 550 kilometre radius of Port
     minerals mining well into the future.
                                                          Hedland. Within the first year of operation, the
     PHPA’s strategic plan to expand the Port’s inner     Utah Facility has achieved nameplate export
     harbour capacity from 200 million tonnes to 495      capacity of 9 million tonnes of trucked ore per
     million tonnes per annum cannot be achieved          annum worth an estimated $1.5 billion in export
     without the Utah Facility. Through clever design     sales and facilitated a 360% increase in annual
     and use of technology, the facility accommodates     export tonnage for PHPA public berths.




                                                                                                                Ore being conveyed onto ore carrier
                                                                                                                docked at Utah Point berth

15                                                                                                                                                                                                           16
Utah Point Multi-User Bulk Export Facility Port Hedland
     Servicing Australia’s future trade growth                                                                                                               Mandatory criteria



                                                                                         Mandatory Criterion 5 – Community Benefit

                                                                                         Development of the Utah Facility and                   Strengthening community links
                                                                                         relocation of chromite and manganese exports
                                                                                                                                                The Utah Facility initiated the establishment of
                                                                                         from Port Hedland’s west end to Utah Point
                                                                                                                                                the Port Collaboration and Heritage Agreement
                                                                                         has resolved a number of significant
                                                                                                                                                between PHPA and the local Marapikurrinya
                                                                                         environmental issues affecting the local
                                                                                                                                                community, the original custodians of the land
                                                                                         community. In addition to the significant
                                                                                                                                                occupied by the Utah Facility. This agreement
                                                                                         environmental and health improvements outlined
                                                                                                                                                initiated a number of benefits for the community
                                                                                         in Optional Criteria 16, the following have also
                                                                                                                                                that were not in place prior to the project,
                                                                                         contributed to a significantly improved amenity
                                                                                                                                                including a commitment to the provision of
                                                                                         for the Port Hedland community.
                                                                                                                                                employment, ongoing business development
                                                                                         Increasing employment opportunities in                 assistance, development of a Cultural Heritage
                                                                                         the region                                             Masterplan and provision of assistance with
                                                                                                                                                cultural heritage training and awareness by
                                                                                         The number of employees working for the PHPA
                                                                                                                                                the PHPA.
                                                                                         increased from 25 to 90 with a diverse range
                                                                                         of skill sets, following completion of the project.    Traditional land owners also secured JV
                                                                                         These personnel were either sourced from the           partnerships with three of the major contractors
                                                                                         local community or new residents following             during construction which resulted in direct
                                                                                         a commitment made from staff to live in Port           employment, traineeships and dry-hire of
                                                                                         Hedland. Given Port Hedland’s typically transient      equipment. The project also employed a heritage
                                                                                         population, PHPA has made a significant                monitor to oversee all construction activities.
                                                                                         contribution to strengthening Port Hedland’s
                                                                                                                                                Improved traffic flow and road safety
                                                                                         permanent employment base.
                                                                                                                                                The project improved traffic safety by removing
                                                                                         Many local contractors and services were utilised
                                                                                                                                                road train traffic from Port Hedland’s suburban
                                                                                         during the construction phase. Upon completion
                                                                                                                                                and feeder roads. Trucks now enter the Utah site
                                                                                         of the facility, three of the four major contractors
                                                                                                                                                via a new dedicated 10 kilometre sealed access
                                                                                         employed have made long term commitments
                                                                                                                                                road, and significant improvements have been
                                                                                         to working in the local community and have
                                                                                                                                                made to address safety issues associated with
                                                                                         set up local offices and established permanent
                                                                                                                                                road train and light vehicle interaction on the
                                                                                         accommodation arrangements.
                                                                                                                                                Great Northern Highway network.

                                                                                                                                                Further benefits included the mandated
                                                                                                                                                requirement to cover all truck loads to prevent
                                                                                                                                                dust and contaminants affecting suburban areas.




                                                               Utah wharf construction


17                                                                                                                                                                                                 18
Utah Point Multi-User Bulk Export Facility Port Hedland
         Servicing Australia’s future trade growth                                                                                                                                      Mandatory criteria



     Mandatory Criterion 6 - Sustainable Development

     Water conservation and mangrove preservation          metre high perimeter seawalls. This allowed the
     were significant drivers for the development          embankment to be steepened and prevented the
     of sustainable engineering solutions for the          loss of 1.2 hectares of mangroves at the seawall
     Utah Facility.                                        toe at a cost of $0.63m (investment of $52 per
                                                           square metre of mangroves preserved).
     Preserving Port Hedland mangroves
                                                           Refer Appendix E for Stockyard Embankment
     Twenty four hectares were required to establish
                                                           Road Details.
     a stockyard capable of stockpiling trucked                                                                                                                     Seawall construction using concrete impregnated miracell
     ores with a nine million tonne per annum              Care was also taken to ensure that
     export potential.                                     mangroves outside of the construction footprint
                                                           were not disturbed. At the conclusion of             Water Quality and Conservation                            A 45,000m3 lined recirculation water pond and
     Consistent with the requirements of EPA
                                                           construction activities, mangroves were thriving                                                               controlled discharge pipe system and three
     Guidance Statements No. 1 (Tropical Arid Zone                                                              The potential adverse eco-toxicological effect of
                                                           at the toe of the seawall as a result of careful                                                               1,000m3 storage tanks were installed to enable
     Mangroves; EPA 2001) and No. 29 (BPPH                                                                      chromite and manganese on mangrove
                                                           construction practices.                                                                                        fire and dust suppression, and management
     protection; EPA 2004c) to minimise mangrove                                                                and marine systems was studied by PHPA
     loss and in particular, to protect valuable closed    In total, 18 hectares of mangroves were                                                                        of potable water across the site to deliver the
                                                                                                                during the PER and led to a requirement to
     canopy mangroves, the stockyard footprint was         removed during construction of the stockyard                                                                   abovementioned water conservation outcomes.
                                                                                                                prevent ores containing chromite and manganese
     minimised and re-oriented.                            and access road. A commitment has been               from contaminating groundwater systems and                Contaminated stockyard stormwater harvested
                                                           given by PHPA to the Environmental Protection        the harbour.                                              through a ring main pipe system to the
     A partially disturbed calcarenite (limestone)
                                                           Authority and local community to meet the                                                                      recirculation water pond will provide an estimated
     outcrop at Stanley Point was selected as the                                                               The project team developed the following
                                                           Guidance Statement target of 10% historic                                                                      6 weeks reprieve per year from the need
     most appropriate stockyard location given its                                                              initiatives to prevent mineral contamination of
                                                           loss of mangrove environments since European                                                                   for expensive scheme water representing a
     low ecological value as a result of being                                                                  ground and harbour waters:
                                                           settlement through the establishment of a                                                                      considerable cost saving.
     previously disturbed and consisting mostly of
                                                           mangrove offset project. This work will further      •  hysical separation of iron ore from other
                                                                                                                  P
     sandy saline flats with low open shrubs.
                                                           generate local jobs in its construction and will       contaminating ores in the stockyard.
     Multiple layers of plastic geogrid (Securgrid         support ongoing eco-tourism and aboriginal           • Installation of a bentonite barrier layer with
     120/20) were also installed within the six to eight   heritage opportunities.                                sub-surface drainage collection system.
                                                                                                                • Installation of sealed internal roads.
                                                                                                                •  onstruction of an automatically operated
                                                                                                                  C
                                                                                                                  quad road train truck wash station installed
                                                                                                                  with water recirculation system.
                                                                                                                • Materials handling system designed for wash
                                                                                                                  down and collection of contaminants between
                                                                                                                  shipments for treatment and recirculation.
                                                                                                                • On site collection and treatment of stormwater
                                                                                                                  that is harvested for dust suppression.
                                                                                                                • Installation of two Stormceptor units to operate
                                                                                                                  in conjunction with the wharf wash down                             Stormceptor adjacent to wharf to settle
                                                                                      Closed canopy mangroves     system to settle out contaminants from the                                wharf wash down contaminants
                                                                                                                  wharf wash down.
19                                                                                                                                                                                                                             20
Optional criteria


Optional Criteria   Optional Criterion 8 - Simplicity of the Engineering Solution

                    Cavotec Automatic Mooring System                            Utah Point is located in the narrow neck of Port
                                                                                Hedland Harbour where passing vessels (up to
                    Striving for world’s best practice and simple
                                                                                270KT bulk carriers) exert significant hydrodynamic
                    low cost options for maximising the throughput
                                                                                interaction forces that act to suck vessels from
                    capacity of the Utah Point berth, PHPA made a
                                                                                their moorings. Port Hedland experiences large
                    decision to replace the centuries old practice of
                                                                                tides (7.5 metres) that produce in excess of 2 knot
                    mooring vessels using ropes with an innovative
                                                                                currents, design wind speeds of 23 m/s (45 knots),
                    and simple new technology.
                                                                                fine iron ore dust issues and extreme heat (+45
                    Cavotec’s MoorMaster Automatic Mooring System               degrees Celsius) conditions.
                    uses simple design concepts involving large
                                                                                As Cavotec had not previously designed units
                    manoeuvrable suction cups held under vacuum
                                                                                to withstand these conditions, PHPA contracted
                    to safely capture, berth and release vessels in
                                                                                Cavotec to design and test 14 completely new
                    considerably less time than traditional mooring
                                                                                200MM units capable of handling the large tidal
                    methods. The time saved in mooring and releasing
                                                                                ranges experienced at Port Hedland. The revised
                    vessels using the MoorMaster technology and
                                                                                design replaced the previous top mounted winch
                    its ability to maintain continuous safe loading
                                                                                mechanism with a rail mounted travelling bus
                    operations has improved vessel turn around
                                                                                (motor) to provide a robust structure capable
                    efficiency in Port Hedland by up to 2.5 hours.
                                                                                of withstanding forces equivalent to 20 tonnes
                                                                                perpendicular (280 tonnes total) and 10 tonnes
                                                                                parallel to the berth face.




                              Cavotec units mounted vertically on wharf rails                   Cavotec wharf mounting close up


                                                                                                                                  22
Utah Point Multi-User Bulk Export Facility Port Hedland
         Servicing Australia’s future trade growth                                                                                                                                        Optional criteria


     Since the implications of system failure or under-   Post-installation, the initial hydrodynamic
     design were significant, PHPA commissioned           interaction force concerns did not eventuate
     OMC-International to modify the existing             as the MoorMaster units perform much better
     Port Hedland hydrodynamic harbour mooring            in dampening the impacts of wind, current and
     model to simulate ropes as stiff springs. This       passing vessel forces than during simulation.
     conservative assessment of MoorMaster system         The technology has proved itself to be a more
     capabilities predicted that the impact of passing    than effective and simple replacement of
     vessels would potentially exceed the capacity        traditional rope technology.
     of the design specifications on the end units.
                                                          PHPA challenged long established practices and
     Revised bollard designs for secondary rope
                                                          put their faith in new and conceptually simply
     protection were implemented as a precaution
                                                          technology with the MoorMaster Automatic
     and options for piggy backing the two end units
                                                          Mooring System. This decision may drive a
     were explored.
                                                          revolutionary change in ship berthing practices
                                                          around the world with significant potential to
                                                          improve safety, time and operational costs in
                                                          the future.




                                                                                                                                                        Aerial view of Utah Point berth showing 14 equidistant Cavotec units



                                                                                                                 Key Benefits

                                                                                                                 Through simplicity of operation and design concepts, the MoorMaster system delivers the following
                                                                                                                 significant benefits to PHPA and facility proponents:

                                                                                                                 • Improved safety of mooring operations.              • Improved Utah Point Berth throughput
                                                                                                                                                                          capacity and berth efficiency with maximum
                                                                                                                 • Greater port export efficiency through
                                                                                                                                                                          vessel size increased to a length overall (LOA)
                                                                                                                   elimination of vessel creep, lost time due to
                                                                                                                                                                          of 270 metres compared to 225 metres using
                                                                                                                   passing vessel interactions and reduction in
                                                                                                                                                                          traditional rope mooring methods.
                                                                                                                   the time required to capture, moor and release
                                                                                                                   individual vessels which combined provide an         • Reduced port operating costs for tug boats
                                                                                                                   estimated time saving per vessel of 2.5 hours.         and personnel involved with stevedoring and
                                                                                                                                                                          corresponding reduction in fuel emissions.
                                                                                                                 • Eradication of the need to construct large and
                                                                                                                   expensive Mooring Dolphins.                          Refer Port Strategy May 2007 article in
                                                                                                                                                                        Appendix G for more information on the
                                                               200MM unit factory acceptance testing in France                                                          Cavotec Automatic Mooring System.


23                                                                                                                                                                                                                          24
Utah Point Multi-User Bulk Export Facility Port Hedland
     Servicing Australia’s future trade growth                                                                                                                                             Optional criteria



                                                     OPTIONAL CRITERION 13 -
                                                     LEVEL OF IMPORT REPLACEMENT

                                                     Utah Point Travelling Ship Loader and
                                                     Tripper Conveyor

                                                     In accordance with the project’s stated objective
                                                     and tendering criteria whereby preference was given
                                                     to locally manufactured products, PHPA rejected
                                                     the cheapest tender offer from a reputable Chinese
                                                     manufacturer in favour of project managing the
                                                     design and manufacture of the ship loader using a
                                                     range of local contractors and suppliers.

                                                     Perth based Delta Engineering were awarded the
                                                     contract to design the ship loader and manufacture
                                                     associated mechanical and electrical components                                                                         Ship loader main frame erection, January 2010
                                                     for delivery to the Australian Marine Complex (AMC)
                        Ship loader transfer to
                                                     Common User Facility at Henderson, south of Perth.
                   Henderson Wharf, May 2010
                                                     Upon completion, the 600 tonne ship loader and         Table 1: Local contract partners for construction of the Utah Point ship loader
                                                     80 tonne boom were transferred to a heavy lift ship
                                                                                                            Contractor/Location        Description of Service                                      Contract Type
                                                     for transport to Port Hedland where it was placed      Pinc Group (Perth)         Project Managers for all Utah Point  Henderson             Schedule of rates
                                                     directly onto the rails of the Utah Point wharf.                                  scope of work
                                                                                                            Delta Engineering (Malaga) Overall design  supply of structural                      Fixed lump sum
                                                     Erection of the superstructure using multiple                                     mechanical components
                                                     contractors who had not previously collaborated on     United Industries          Manufacture of the steel superstructure components          Sub-contract to Delta
                                                     such a complex, schedule critical project required     (Henderson)                                                                            Engineering
                                                     tight management of technical, schedule and scope      IE Systems (Perth)        Electrical and control system engineer                      Sub-contract to Delta
                                                                                                                                                                                                   Engineering
                                                     risks to ensure the structure was delivered on time.
                                                                                                            Engineering Dynamics        Design Auditor  certification to Australian Standards     Schedule of rates
                                                     A list of contractors employed on the ship loader
                                                                                                            (Perth)
                                                     construction is outlined in Table 1.                   Engineering Dynamics        Designer of heavy lift ship fatigue                       Schedule of rates
                                                                                                            (Perth)                     transportation requirements
                                                     PHPA were successful in providing new
                                                                                                            ProMet Engineers (Perth)    Lead Engineer for the design management of                 Schedule of rates
                                                     opportunities for local contractors to increase                                    Delta Engineering
                                                     their competitiveness in the manufacture of            United Industries           Erection of ship loader super structure at Henderson       Fixed lump sum
                                                     major capital equipment and ensured the use of         (Henderson)
                                                     locally manufactured steel in construction of the      ProMet Engineers (Perth)    Erection construction management consultants               Schedule of rates
                                                                                                                                        (Henderson)
                                                     ship loader. The all inclusive cost of the Western
                                                                                                            AMC (Henderson)             Facility Manager at Henderson                              Facility lease agreement
                                                     Australian designed and manufactured ship loader
                                                                                                            BigLift (Always Shipping)   Heavy lift ship transport from Henderson to Port Hedland   Fixed lump sum and
                                                     was $16.9m which is in line with standard industry                                                                                            schedule penalties
                                                     costs per tonne for comparative equipment.             GECM (Perth)               Structural, mechanical  electrical Outfitting             Cost reimbursement
                                                                                                                                        (Utah  Henderson)                                         with incentives
                    Transferring ship loader from                                                           Pinc Group (Perth)          Utah Point construction and commissioning managers         Schedule of rates
                                                                                                            IE Systems (Perth)         Utah electrical  control system commissioning/ramp-up     Schedule of rates
                     heavy lift ship to Utah wharf

25                                                                                                                                                                                                                            26
Utah Point Multi-User Bulk Export Facility Port Hedland
         Servicing Australia’s future trade growth                                                                                                                                          Optional criteria



     Optional Criterion 16 - Environmental Implications

     From inception, the Utah Facility project was        negative impacts on town amenity, community
     motivated by the need to solve a number of           health and the environment. The Utah Facility
     significant environmental and health issues          project addressed these issues to improve overall
     affecting the Port Hedland community as a            conditions for Port Hedland residents.
     consequence of bulk ore exports (in particular
                                                          Reduced dust emissions
     chromite and manganese) from Port Hedland’s
     west end.                                            Dust is a major environmental and health issue
                                                          in Port Hedland. Moving the export of chromite
     Transporting and loading large volumes of
                                                          and manganese from the west end to Utah Point
     mineral ores by road train and front end loader to
                                                          enabled a reduction in dust levels to built up
     poorly designed stockpile and materials handling
                                                          areas as is evident in PER Dust Contour Charts
     systems have previously produced significant
                                                          (refer to Appendix F).




                                                                                                                                                            Bentonite geosynthetic clay lining being applied to stockyard floor




                                                                                                                This was achieved through:                                •  roviding concrete dump pockets to feed ore
                                                                                                                                                                            P
                                                                                                                                                                            directly into automatic stackers with
                                                                                                                • Transferring road trains from the west end
                                                                                                                                                                            dust suppression.
                                                                                                                  of Port Hedland to a dedicated 10 kilometre
                                                                                                                                                                          •  torage of ore in a custom built stockyard
                                                                                                                                                                            S
                                                                                                                  long private access road located outside
                                                                                                                                                                            with elevated perimeter road and dust
                                                                                                                  the township.
                                                                                                                                                                            suppression cannons throughout.
                                                                                                                • Mandating covered loads from mine to port.
                                                                                                                                                                          •  rovision of efficient materials handling
                                                                                                                                                                            P
                                                                                                                •  tockpiling ores at Finucane Island’s Utah
                                                                                                                  S
                                                                                                                                                                            infrastructure to limit dust emissions and
                                                                                                                  Point to move dust emissions away from
                                                                                                                                                                            to enable wash down between shipments.
                                                                                                                  populated areas.
                                                                                                                                                                          • Covered tripper conveyor at the back of wharf.
                                                                                                                •  tilising a single and efficient stack and reclaim
                                                                                                                  U
                                                                                                                                                                          • Introduction of truck wash facilities to
                                                                                                                  operation to dispense with the need to double
                                                                                                                                                                            remove dust residue from transport
                                                                                                                  handle materials.
                                                                                                                                                                            vehicles post delivery.
                                                                                                                •  rovision of bulk mineral controls over the
                                                                                                                  P
                                                                                                                                                                          •  rovision of chutes to reduce product
                                                                                                                                                                            P
                                                                                                                  receipt of properly conditioned ores at the gate.
                                                                                                                                                                            degradation and direct ore into ship holds

                                                                            Lined 45,000m3 recirculation pond


27                                                                                                                                                                                                                            28
Utah Point Multi-User Bulk Export Facility Port Hedland
         Servicing Australia’s future trade growth



     Reduced noise emissions                                Groundwater collection discharge and stormwater
                                                                                                                    AppendiCES
     Moving the export operations to the Utah Facility      is pumped to a 45,000m3 recirculation water pond
     shifted quad and triple road trains and front          from where it is settled and harvested for dust
     end loader operations away from the township,          suppression.This recirculated water will provide up
     thereby considerably reducing noise emissions at       to 6 weeks reprieve from the need for expensive
     Port Hedland’s west end.                               scheme water representing a considerable cost
                                                            saving to exporters and conserving water.
     Covered drives and transfer stations and efficient
     mechanical and electrical infrastructure has also      Long term environmental risks have also been
     reduced operating noise levels at the Utah Facility.   mitigated in the construction of the stockyard, with
                                                            a 6-8 metre high perimeter sea wall built to
     Reduced groundwater and harbour                        prevent inundation of stockpiled ores by seawater
     contamination risks                                    in cyclone surge tides.
     Operations at the Utah Facility have implemented       The size of the stockyard and recirculation
     measures to prevent potentially dangerous levels       water pond ensures this facility successfully
     of manganese and chromite contaminating local          contains contaminated stormwater in a 1 in
     groundwater or the harbour.                            100 year flood event to prevent contaminated
     All current and future potentially contaminating       run off into the harbour.
     ores are now environmentally contained within          Protection of native flora
     the stockyard by a bentonite barrier layer and
     groundwater collection system that prevent ore         Carefully orienting the stockyard position and
     residue and dissolved solids from contaminating        minimising its footprint by steepening the seawall
     the groundwater and harbour. Bentonite was             embankment prevented the loss of 1.2 hectares of
     selected as the preferred lining material given        mangroves at a total cost of $0.63 million ($52 per
     its chemical stability, self-sealing properties and    square metre of mangroves preserved).
     ability to adjust to differential movement in the
                                                            Further details on the PHPA’s commitment to
     stockyard floor.
                                                            protecting native flora at Utah Point can be found
                                                            in Mandatory Criterion 6.




                 Perimeter Seawall Protecting Stockyard                             Workers installing Geogrid to
                              from Cyclone Surge Tides                                    seawall embankment

29
AppendiCES



Contents

Appendix A	                                          33

BHPBIO tunnel raking pile General Arrangement

APPENDIX B 	                                         34

Utah Facility Organisational Chart

Appendix C	                                          35

Utah Facility General Arrangement Plan
Process Flowsheet

Appendix D 	                                         37

Mobile Hopper Train General Arrangement (page 1/2)
Mobile Hopper Train General Arrangement (page 2/2)

Appendix E	                                          39

Stockyard Embankment Road Details

Appendix F	                                          40

Public Environmental Review Dust Contour Charts

Appendix G 	                                         41

Australian Port Survey, July/August 2010
Port Strategy, May 2007
WA Business News, October 2007
North West Telegraph, October 2007
The West Australian, October 2007




                                                                       32
AppendiX A: BHPBIO tunnel raking pile general arrangement




                                                            33
AppendiX B: UTAH facility organisational chart


                                                                     CEO PHPA
LEGEND
Pinc Group Resources
PHPA Resources                                                    Port Development
External Consultants                                                   Manager


                                                                  Project Manager

                                             Administration

                                                  Site              Construction
                                              Administration          Manager

                                            Executive Secretary

                                                                                              Senior
                                               Receptionist                                                     Assistant Project
                                                                                             Planner /
                                                                                             Scheduler              Manager




   Procurement                                                       Deputy
                       Commercial Manager                          Construction            Port Engineer
     Manager
                                                                    Manager




  Project Controls         Contracts              OHSE                                      Engineering          Commissioning
                                                                    Site Engineer
      Manager              Manager               Manager
                                                                                           Lead Engineer         Commissioning
                                                                                          Promet Engineers         Manager

    Senior Cost            Contracts          Environmental       Site S'intendents      Detailed Designer      Mechanical Comm.
     Controller              Clerk               Office                                                             Engineer
                                                                   Civil/ Concrete          Van Der Meer

                                                   Site              Mechanical         Stockyard Infras'ture
                                                  Safety                                                          Maintenance
                                                 Manager                                                         SuperIntendent
                                                                      Services
                                                                                         POAGS (Stevedore)
      Project                                                        Cordinator
     Accountant                                                                                 Site
                                                                      Electrical              Process              Electrical
                                                                                              Control            SuperIntendent
                                                                                            IE Systems


 Accounts Payable                                                      Senior
                                                                         Site                                         HV
                                                                      Electrical                                   Switching
                                                                        Eng.                                        Officer


                                                                                                                                       34
AppendiX C: Utah Facility General Arrangement Plan




                                                     35
AppendiX C: Process flowsheet




                                36
AppendiX D: Mobile Hopper Train General Arrangement (page 1)




                                                               37
AppendiX D: Mobile Hopper Train General Arrangement (page 2)




                                                               38
AppendiX E: Stockyard Embankment Road – General Arrangement




                                                              39
AppendiX F: Public environmental review dust contour charts                      Australia Port Survey – Port G: australian(World Port Development July/August 2010)
                                                                                                      AppendiX Hedland Extract port survey, july/august 2010




                   10 24 hour average with no Utah Point from PHPA Public Berth
      Graphic 1: PM10 24 Hour Dust Concentrations – Exportsdevelopment
       Predicted




     Graphic 2: PM1010 24 Hour Dust Concentrations – Exports from the Utah Facility
        Predicted PM 24 hour average with Utah Point development

40                                                                                                                                                                      41
Engineering Australia Excellence Award - Port Hedland Port Authority
Engineering Australia Excellence Award - Port Hedland Port Authority
Engineering Australia Excellence Award - Port Hedland Port Authority
Engineering Australia Excellence Award - Port Hedland Port Authority

Contenu connexe

Tendances

TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTgangadhar7907
 
DAMEN_Corporate_Brochure_English_09_2014
DAMEN_Corporate_Brochure_English_09_2014DAMEN_Corporate_Brochure_English_09_2014
DAMEN_Corporate_Brochure_English_09_2014Jeremy Elschot
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTgangadhar7907
 
CARGO TRAFFIC AT MAJOR INDIAN SEAPORTS: AN ASSESSMENT
CARGO TRAFFIC AT MAJOR INDIAN SEAPORTS: AN ASSESSMENTCARGO TRAFFIC AT MAJOR INDIAN SEAPORTS: AN ASSESSMENT
CARGO TRAFFIC AT MAJOR INDIAN SEAPORTS: AN ASSESSMENTIAEME Publication
 
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...oilandgas
 
Singapore_Maritime business seminar 2016
Singapore_Maritime business seminar 2016Singapore_Maritime business seminar 2016
Singapore_Maritime business seminar 2016Business Finland
 
New base 571 special 30 march 2015
New base 571 special 30 march  2015New base 571 special 30 march  2015
New base 571 special 30 march 2015Khaled Al Awadi
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALRichard Exley
 
Jawaharlal Nehru Port Trust JNPT
Jawaharlal Nehru Port Trust JNPTJawaharlal Nehru Port Trust JNPT
Jawaharlal Nehru Port Trust JNPTManas Tripathy
 
South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...Transnet Port Terminals
 
Port of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 EditionPort of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 EditionMarketing Durban Chamber
 
Chennai port trust
Chennai port trustChennai port trust
Chennai port trustim_sushant
 
New base 751 special 20 december 2015r
New base 751 special  20 december 2015rNew base 751 special  20 december 2015r
New base 751 special 20 december 2015rKhaled Al Awadi
 
An overview to Kandla port
An overview to Kandla portAn overview to Kandla port
An overview to Kandla portMeet Shah
 
Study ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPT
Study ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPTStudy ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPT
Study ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPTmanu786
 
Royal Canadian Mounted Police: Mari-Tech 2017 Presentation
Royal Canadian Mounted Police: Mari-Tech 2017 PresentationRoyal Canadian Mounted Police: Mari-Tech 2017 Presentation
Royal Canadian Mounted Police: Mari-Tech 2017 PresentationRebecca Barton
 

Tendances (20)

TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
DAMEN_Corporate_Brochure_English_09_2014
DAMEN_Corporate_Brochure_English_09_2014DAMEN_Corporate_Brochure_English_09_2014
DAMEN_Corporate_Brochure_English_09_2014
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
CARGO TRAFFIC AT MAJOR INDIAN SEAPORTS: AN ASSESSMENT
CARGO TRAFFIC AT MAJOR INDIAN SEAPORTS: AN ASSESSMENTCARGO TRAFFIC AT MAJOR INDIAN SEAPORTS: AN ASSESSMENT
CARGO TRAFFIC AT MAJOR INDIAN SEAPORTS: AN ASSESSMENT
 
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
 
Singapore_Maritime business seminar 2016
Singapore_Maritime business seminar 2016Singapore_Maritime business seminar 2016
Singapore_Maritime business seminar 2016
 
New base 571 special 30 march 2015
New base 571 special 30 march  2015New base 571 special 30 march  2015
New base 571 special 30 march 2015
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINAL
 
Jawaharlal Nehru Port Trust JNPT
Jawaharlal Nehru Port Trust JNPTJawaharlal Nehru Port Trust JNPT
Jawaharlal Nehru Port Trust JNPT
 
Pipavav Port
Pipavav PortPipavav Port
Pipavav Port
 
South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...South africa’s ports system & position, enables it to access to south south t...
South africa’s ports system & position, enables it to access to south south t...
 
Port of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 EditionPort of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 Edition
 
Chennai port trust
Chennai port trustChennai port trust
Chennai port trust
 
New base 751 special 20 december 2015r
New base 751 special  20 december 2015rNew base 751 special  20 december 2015r
New base 751 special 20 december 2015r
 
An overview to Kandla port
An overview to Kandla portAn overview to Kandla port
An overview to Kandla port
 
Kandala port view
Kandala port viewKandala port view
Kandala port view
 
Study ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPT
Study ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPTStudy ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPT
Study ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPT
 
Amc floating dock
Amc floating dockAmc floating dock
Amc floating dock
 
Ports of africa
Ports of africaPorts of africa
Ports of africa
 
Royal Canadian Mounted Police: Mari-Tech 2017 Presentation
Royal Canadian Mounted Police: Mari-Tech 2017 PresentationRoyal Canadian Mounted Police: Mari-Tech 2017 Presentation
Royal Canadian Mounted Police: Mari-Tech 2017 Presentation
 

En vedette

Tariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEATariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEAAshish Verma
 
ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case studyWaseem Hashmat
 
DEVELOPMENT OF CONDITION BASED MAINTENAENCE FOR COAL HANDLING PLANT
DEVELOPMENT OF CONDITION BASED MAINTENAENCE FOR COAL HANDLING PLANTDEVELOPMENT OF CONDITION BASED MAINTENAENCE FOR COAL HANDLING PLANT
DEVELOPMENT OF CONDITION BASED MAINTENAENCE FOR COAL HANDLING PLANTAkash M
 
Spontaneous Combustion
Spontaneous CombustionSpontaneous Combustion
Spontaneous CombustionRon Thaman
 
Coal seam fire and spontaneous heating [recovered]
Coal seam fire and spontaneous heating [recovered]Coal seam fire and spontaneous heating [recovered]
Coal seam fire and spontaneous heating [recovered]Abhishek Kumar Pandey
 
Spontaneous combustion of coal
Spontaneous combustion of coalSpontaneous combustion of coal
Spontaneous combustion of coalMohit Jain
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantRonak Thakare
 

En vedette (8)

Tariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEATariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEA
 
ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case study
 
DEVELOPMENT OF CONDITION BASED MAINTENAENCE FOR COAL HANDLING PLANT
DEVELOPMENT OF CONDITION BASED MAINTENAENCE FOR COAL HANDLING PLANTDEVELOPMENT OF CONDITION BASED MAINTENAENCE FOR COAL HANDLING PLANT
DEVELOPMENT OF CONDITION BASED MAINTENAENCE FOR COAL HANDLING PLANT
 
Spontaneous Combustion
Spontaneous CombustionSpontaneous Combustion
Spontaneous Combustion
 
Coal seam fire and spontaneous heating [recovered]
Coal seam fire and spontaneous heating [recovered]Coal seam fire and spontaneous heating [recovered]
Coal seam fire and spontaneous heating [recovered]
 
Spontaneous combustion of coal
Spontaneous combustion of coalSpontaneous combustion of coal
Spontaneous combustion of coal
 
Fly ash presentation
Fly ash presentationFly ash presentation
Fly ash presentation
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plant
 

Similaire à Engineering Australia Excellence Award - Port Hedland Port Authority

Accommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle PortsAccommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle PortsEngineers Australia
 
INPEX Ichthys Brochure
INPEX Ichthys BrochureINPEX Ichthys Brochure
INPEX Ichthys BrochureAdrian Buckley
 
Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)Isha Joshi
 
Port opportunities (bhaskar bardhan)
Port opportunities (bhaskar bardhan)Port opportunities (bhaskar bardhan)
Port opportunities (bhaskar bardhan)Bhaskar Bardhan
 
KAKINADA DEEP WATER PORT.pptx
KAKINADA DEEP WATER PORT.pptxKAKINADA DEEP WATER PORT.pptx
KAKINADA DEEP WATER PORT.pptxragulkumar22
 
Business expousure
Business expousureBusiness expousure
Business expousureproject2312
 
Presentation vetria mineração creation
Presentation   vetria mineração creationPresentation   vetria mineração creation
Presentation vetria mineração creationTriunfoRi
 
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...IOSR Journals
 
Jurong Port Corporate Brochure (2012)
Jurong Port Corporate Brochure (2012)Jurong Port Corporate Brochure (2012)
Jurong Port Corporate Brochure (2012)norasheilla
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation Kiran K.V.S.
 
Functional planning of vizhinjam port and design of transit
Functional planning of vizhinjam port and design of transit Functional planning of vizhinjam port and design of transit
Functional planning of vizhinjam port and design of transit ravindransandhya
 
Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22Abeer Ray
 
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...zzztidola
 
SPHERE32_Port_e
SPHERE32_Port_eSPHERE32_Port_e
SPHERE32_Port_eHenry Chan
 
E brochure & corporate presentation 1027915746-2015-03-28_01-49-13
E brochure & corporate presentation  1027915746-2015-03-28_01-49-13E brochure & corporate presentation  1027915746-2015-03-28_01-49-13
E brochure & corporate presentation 1027915746-2015-03-28_01-49-13suyog pagade
 

Similaire à Engineering Australia Excellence Award - Port Hedland Port Authority (20)

Accommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle PortsAccommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle Ports
 
Gwadar
GwadarGwadar
Gwadar
 
Gwadar
GwadarGwadar
Gwadar
 
Compositeworks technical revolution
Compositeworks  technical revolution Compositeworks  technical revolution
Compositeworks technical revolution
 
INPEX Ichthys Brochure
INPEX Ichthys BrochureINPEX Ichthys Brochure
INPEX Ichthys Brochure
 
Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)
 
Port opportunities (bhaskar bardhan)
Port opportunities (bhaskar bardhan)Port opportunities (bhaskar bardhan)
Port opportunities (bhaskar bardhan)
 
KAKINADA DEEP WATER PORT.pptx
KAKINADA DEEP WATER PORT.pptxKAKINADA DEEP WATER PORT.pptx
KAKINADA DEEP WATER PORT.pptx
 
Business expousure
Business expousureBusiness expousure
Business expousure
 
Presentation vetria mineração creation
Presentation   vetria mineração creationPresentation   vetria mineração creation
Presentation vetria mineração creation
 
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
 
Jurong Port Corporate Brochure (2012)
Jurong Port Corporate Brochure (2012)Jurong Port Corporate Brochure (2012)
Jurong Port Corporate Brochure (2012)
 
Kpct presentation
Kpct presentation Kpct presentation
Kpct presentation
 
Functional planning of vizhinjam port and design of transit
Functional planning of vizhinjam port and design of transit Functional planning of vizhinjam port and design of transit
Functional planning of vizhinjam port and design of transit
 
qatar_november_2011_web
qatar_november_2011_webqatar_november_2011_web
qatar_november_2011_web
 
Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22
 
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
Strategies and Condition for a regional hub port in asia (by Datuk Sidik Shai...
 
SPHERE32_Port_e
SPHERE32_Port_eSPHERE32_Port_e
SPHERE32_Port_e
 
PORTS 1302
PORTS 1302PORTS 1302
PORTS 1302
 
E brochure & corporate presentation 1027915746-2015-03-28_01-49-13
E brochure & corporate presentation  1027915746-2015-03-28_01-49-13E brochure & corporate presentation  1027915746-2015-03-28_01-49-13
E brochure & corporate presentation 1027915746-2015-03-28_01-49-13
 

Engineering Australia Excellence Award - Port Hedland Port Authority

  • 1. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth 2011 WA Engineering Excellence Awards Resource Development Category
  • 2. Contents Contents Project Overview 1 Categorisation Statement 4 Mandatory Criteria 6 Optional Criteria 21 AppendiCES 30 Acknowledgements 46
  • 3. Project Overview Project Overview Project Overview The Utah Point Multi-User Bulk Export Facility A number of sustainable technology initiatives (Utah Facility) addresses the resource industry’s and innovative engineering practices were need for expanded port facilities to meet current adopted and significant studies and consultation and future growth in global demand for Western undertaken as part of a full Public Environmental Australian mineral resources and to facilitate Review. This process addressed the complexities export for emerging mineral producers in the associated with designing and constructing Port Hedland region. a port facility to transport, store and export a multitude of minerals with potentially adverse The Utah Facility was constructed on Finucane environmental and community impacts. Island opposite the existing public berths and within the narrow neck of the Port Hedland Innovations were introduced to achieve harbour. The Utah Facility development concept operation efficiency and to mitigate health risks consisted of a new dredged berth pocket and and other community concerns including: a 270 metre long concrete wharf, travelling ship 45,000m3 water recirculation and stormwater loader, 24 hectare stockyard and associated harvesting system; bentonite geosynthetic lined materials handling infrastructure, administration stockyard floor with plastic reinforced seawall and controls facility, and a 10 kilometre dedicated embankments; custom designed automatic access road. vessel mooring system; real time vibration monitoring of the BHPBIO tunnel; quad road train Originally designed for a maximum export wash facilities; unique mobile hopper train ore capacity of 12 to 15 million tonnes per annum, reclaim system and a commitment to a mangrove increased industry demand resulted in design propagation farm. modifications to accommodate an export volume of up to 21 million tonnes per annum. Expanded The Utah Facility performed beyond expectation capacity was achieved by increasing the dredged in achieving nameplate capacity within 6 months depth of the berth pocket, introduction of an of operation and has proved capable of delivering innovative new automatic mooring system to 9 million tonnes of trucked ore per annum berth larger vessels and increasing the materials throughout representing estimated export sales handling system peak loading rate from 5,000 of $1.5 billion per annum. to 7,500 tonnes per hour. These innovations Future increases in industry demand can allow the current facility and stage one of the be accommodated within the Utah Facility stockyards to reach up to 14Mtpa prior to the with provision made for receiving product via construction of future stockpiling. alternative ore transport modes such as rail Using an integrated client team approach, the or slurry pipeline. Additional land has been Port Hedland Port Authority (PHPA) worked allocated adjacent to Utah Point to increase collaboratively with project management opportunities for new and emerging mining consultants, Pinc Group Pty Ltd (Pinc) to deliver companies that would otherwise be denied the project. Project planning commenced in access to export markets. September 2006 and first ore on ship was achieved within 4 years on 17 September 2010 after a 20 month construction phase. 2
  • 4. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth About Port Hedland Port Authority Categorisation StatemenT The Port Hedland Port Authority PHPA’s major functions are the control of all (PHPA) is a statutory authority shipping, and maximising the loaded capacity owned by the Western Australian of ships through the use of world leading Government. The Port Authority technology that allows the Authority to maintain has a charter to operate along minimum safe under keel clearances. The Port commercial lines with a primary Authority also has a responsibility to plan for and purpose to facilitate trade manage new developments whilst protecting the through the port. environment of the port. About Pinc Group Pty LtD Established in 2005, Pinc is an emerging provider of choice for specialist project management and project services to the resource sector. Pinc’s unique PMC management processes and integrated software and systems are designed to support clients to successfully develop major capital works. Previous clients of Pinc include: • Boddington Gold Mine • Fortescue Metals Group Ltd. • Abesque Engineering Ltd. • Karara Mining Ltd. • Extension Hill Pty. Ltd. • Atlantic Ltd. • Midwest Vanadium Pty Ltd. • Atlas Iron Ltd. • Newcrest Mining Ltd. • Ausenco Ltd. • Rio Tinto Ltd. • BHPB Petroleum • Worley Parsons Ltd. 3
  • 5. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth CATegorisation statement Mandatory Criteria The Utah Facility addresses the resource industry Implementation of sustainability initiatives need for expanded port facilities to meet current and innovative engineering practices and and future growth in global demand for Western technologies have not only improved operational Australian mineral resources. efficiency across the port, but reduced environmental and health risks to Port Hedland Construction of a new multi-user bulk export residents, whilst improving amenity for all. facility on the west side of the harbour at Utah Point, with a capacity to receive small cape Within the 2010/11 financial year, the Utah size ships up to 120,000 tonnes deadweight, Facility is expected to increase export tonnage resolves current pressure placed on existing port over the PHPA operated berths by 360% from facilities within Port Hedland, and allows Western the previous year achieving the facility’s designed Australia’s junior mining companies to export nameplate capacity of nine million tonnes per their products to a resource hungry annum with an estimated total export value of global market. $1.5 billion. 5
  • 6. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Mandatory criteria Mandatory Criterion 1 - Occupational Health & Safety As the first major construction project undertaken “The Utah Facility is committed to by PHPA, the Utah Facility presented a number ensuring the highest possible standards of occupational health and safety (OH&S) of occupational health and safety, the challenges for the project management team and minimisation and control of all risks, and contractors given the absence of established to zero harm.” safety management policies and procedures, Excerpt from the Utah Facility’s Safety and minimum safety standards for construction. Management Plan. This situation was further complicated by Safety management initiatives targeted a contracting strategy that required the training, risk assessment and problem solving in construction management team to control high risk areas. It was recognised early that the Seawall construction using concrete impregnated miracell the interfaces between multiple independent most impact could be achieved by focusing on contractors occupying the same work spaces, improving behaviour and attitudes of front line along with Port Hedland’s difficult environmental workers and supervision to improve the overall An example of an effective safety initiative is working conditions where dust exposure and safety awareness and culture. evident in the implementation of safety controls Key OH&S initiatives employed across the high ambient temperatures and humidity pose over the dredging and piling operations over the project included: Backed by a high visibility, supportive and BHPBIO tunnel as detailed in Appendix A. significant health and safety risk. • igh weighting to safety performance and H positive leadership culture in which the entire Real-time vibration monitoring with direct systems in the evaluation of tenders. A carefully crafted project management strategy project management team and contractor contractor communication was established to was established to ensure safe design and personnel were genuinely engaged in predict when dredging and piling operations • azard Identification Analysis (HAZID) and H construction outcomes. The project’s OHS decisions affecting workforce safety, the might exceed pre-determined safe vibration formal risk assessments undertaken regularly. Plan set minimum standards and procedures project management team led work planning limits. This allowed the extent of further work to • Early identification of unacceptable risks that based on industry standards and statutory and communication through daily Tool Box be forecast and quickly agreed upon to ensure could lead to unsafe outcomes. requirements. Outlining site specific requirements meetings and weekly contract meetings with the work undertaken by third parties within the tunnel • Empowering all personnel to stop work where for entering and working on site, the Plan relied Construction Manager that focused primarily could continue safely and without disruption. unsafe practices or risks were observed. heavily on the contractors own quality and safety on safety and environmental issues. Despite the difficult environmental conditions, • Daily, unobtrusive observation of work management systems and procedures. The need relative remoteness of the site and high risk practices with positive feedback for safe work. for cooperation, trust, individual responsibility nature of the construction work, the safety • voidance of safety clichés or rules for which A and accountability were adopted as a basic management strategy delivered a Lost Time the rationale could not be justified. undertaking by all parties. Injury Frequency Rate (LTI FR) of 1.4 resulting • Elimination of unnecessary paper work, from one lost day through injury from a total especially for workers and supervisors. 850,000 site manhours. • genuine no blame system and no penalties A This LTI FR represents only 10% of the WA for lapses or mistakes. construction industry’s average of 13.9 and • Early and comprehensive incident/near only surpassed by the best performing miss reporting. industry sector, that of the finance and insurance industry1. 1 Work Related Lost Time Injuries and Diseases in WA 2006-07 to 2008-09,Worksafe WA. 7 8
  • 7. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Mandatory criteria Mandatory Criterion 2 – Sound Engineering Practices Principles A fresh approach to project management the award of construction contracts in line with the availability of funds. Successful delivery of the Utah Facility can be attributed to the selection of contract and The financial benefit of adopting a fresh approach procurement strategies matched to project and to contracting was evident in the supply and commercial risks and the implementation of an installation of the site’s high voltage electrical effective client integrated team. feeder. A risk loaded fixed price offer presented by the service authority was renegotiated to a Flexible contracting strategy matched to risk reimbursable contract (cost plus fixed fee) that A significant element of the project’s success netted a 57% cost saving for the augmentation of lay in the careful selection of contract strategies power to the site. to minimise scope, cost and time risks. When An integrated team approach to project and the project was assessed as requiring a full construction management Public Environmental Review (PER), the planned fixed lump sum design and construction model Following completion of the concept had unacceptable prolongation risk and was development phase, PHPA commissioned the therefore replaced with a client integrated project services of Pinc Group Pty. Ltd. (Pinc) to work and construction management team. collaboratively as project manager in a genuine integrated team approach where Pinc was This allowed close management of project empowered to think and behave like the client approvals and funding requirements, with Sample of 3D Computer Model Used in Designing the Utah Facility preliminary engineering and procurement During design and procurement, Pinc provided undertaken whilst the scope continued to be the flexibility required, with part-time and full-time developed during the PER process. This strategy multi-disciplined staff allocated according to the led to PHPA taking responsibility for long lead changing needs of project implementation Pinc was able to provide PHPA with the approach provided a more efficient and cost item procurement, managing engineering at a Refer Appendix B for Utah Facility resources, procedures and systems required to effective project management solution. pace consistent with PER outcomes and to stage Organisational Chart. effectively manage project planning, scheduling, Total engineering, procurement and construction procurement, contract management, project management (EPMC) services from concept controls and reporting. This service was development (excluding the PER and associated simplified by the adoption of Pinc’s innovative studies) through to commission and handover proprietary Integrated Project Management were delivered for a minimal 10.2% of total Software (PincSys) which continues to be utilised project capital (as summarised below) in an by PHPA in its ongoing operations. industry where the costs of EPMC services are The client integrated team approach typically in the range of 15-25%. required a high degree of trust to foster close • roject Management P communication, eliminate duplication of and Procurement 1.76 % management and encourage fast decision making. With PHPA’s limited experience in • Engineering 4.30 % the development of major capital assets, this • Construction Management 4.11 % Utah Facility Construction team Photo 9 10
  • 8. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Mandatory criteria Mandatory Criterion 3 - Originality Ingenuity Utah Facility Stockyard Design Flexibility The Utah Facility has a 24 hectare (1030m As selection of facility clients and their products x 235m) multi-user bulk materials stockyard were indeterminate during the design phase and designed to receive nine million tonnes per expected to change over time, the stockyard annum of ore delivered by road train. This facility layout, loading and stacking infrastructure, is the first of its size and purpose in the world materials handling and electrical systems were and is truly unique in the design and construction designed to manage a range of minerals, loading methods used in its creation. rates, material properties and ore sizes ranging from 120mm abrasive chromite lump to superfine Size mineral concentrate. Designed for 20 hour operation (allowing a 4 hour traffic curfew for evening peak hour), this facility is the only one in the world capable of receiving one quad road train transporting up to 106 tonnes of multiple ore products every 5 minutes in a continuous operation. Workers rolling out Geogrid layer to marine mud stockyard floor Construction selected as the preferred lining material given its chemical stability, self-sealing properties and The stockyard was constructed over potential ability to adjust to differential movement in the acid sulphate marine mud to depths up to 2.5 stockyard floor. metres. Too environmentally unstable to expose to oxygen and expensive to treat, the stockyard Each of the 13 stockpiles housed in the was designed to “float” on the mud. To minimise stockyard are capable of exerting a pressure earthwork haulage costs, the stockyard floor was equivalent to a 30 storey building. Two Securgrid restricted to a depth of 2 metres, which required 400/40 geogrid layers with tensile strength of strengthening of the fill to avoid overturning slip 400KN were chosen as the preferred method failure from the weight of stockpiled ores. of reinforcing the stockyard base given their superior strength and environmental stability. The stockyard base contains a bentonite barrier Stockpile height restrictions were imposed on layer and groundwater collection system installed initial stacking operations to allow consolidated 0.9 metres below the stockyard surface to marine mud to develop strength. Fill settlement prevent ore residues and dissolved solids from of up to 20cm was forecast and the stockyard contaminating the groundwater. Bentonite was design accommodated this predicted movement. Preparing marine mud for geogrid layer 11 12
  • 9. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Mandatory criteria A safer, more efficient way to moor vessels Catovec’s MoorMaster Automatic Mooring System uses new technology to improve safety, time and operational costs associated with berthing large ships and significantly increase the port’s throughput. Innovative 200MM units designed to withstand Port Hedland’s extreme tidal, heat and dust conditions have not only improved safety Quad Road Train Adjacent to Stockyard Dump Pocket compared to traditional rope mooring, but reduced vessel capture, moor and release times by approximately 2.5 hours per vessel. Operations Refer Appendix C - Utah Facility General More information on the innovative application Arrangement Plan and Process Flowsheet for of Cavotec technology is found in Mandatory Given the volume of trucks and variety of more further information. Criteria 8. ores being transported to multiple stockpiles within the facility, customised transport, truck Significant cost savings were achieved by management and communications systems were replacing the traditional fixed hoppers with two designed to manage stockyard efficiency. originally designed hopper trains. These rail trains were designed to operate over the central A two lane elevated perimeter road allows trucks reclaim load-out conveyor with trailing power and to circulate, pull out safely and right side dump water cables. The six hoppers and two motor into hoppers capable of automatically identifying control centres required for this solution achieved the truck and its contents before unloading. A considerable capital cost and operating savings. CCTV system linked to a central control room at the entrance was also constructed to ensure Refer Appendix D - Mobile Hopper Train General efficient facility management and security. Arrangements 1 and 2 for further information. 3D model view of stockyard Mobile Hopper Train Schematic 13 14
  • 10. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Mandatory criteria Mandatory Criterion 4 - Economic Contribution Provision was also made for ship loading rates of up to 7,500 tonnes per hour, well in excess of the rate required to service the stockyard. When “This was a development that needed coupled with the increased operating efficiency to happen… it is necessary to meet the provided by the Cavotec Automatic Mooring significant growth that has come through system, the Utah Facility can increase throughput the port but also facilitate iron ore juniors to capacity well beyond the current 9 million tonnes get their products out.”1 per annum. Andre Bush, CEO, Future expansion of the facility has also been Port Hedland Port Authority. considered in its establishment. Additional land has been assigned for the construction of a second stockyard capable of receiving mineral products through a variety of alternative transport modes such as rail, overland conveyor or slurry pipeline. Existing facility capability and Increasing Port Hedland’s export capacity existing public berth infrastructure to increase access road design will permit these options to inner harbour capacity without reducing the be pursued without modification to the current The development of the Utah Facility has had a export capacity of other port users. The BHPBIO materials handling system. fundamental impact on Western Australia’s future under harbour tunnel that crosses at shallow export potential and economic activity. depth under the Utah Wharf constrained the The Utah Facility signals a vital opportunity depth of the Facility berth pocket such that it for new and emerging miners to export their was only suitable for Panamax and Small Cape products to international markets. Commencing vessels with low drafts capable of accessing the the export chain through affordable trucking harbour during low tide when larger ore carriers options is expected to provide a starting point cannot operate. for the generation of valuable cash-flow to new Custom built to manage between 85,000 and market entrants, which will in turn provide future 100,000 road trains per year, the Utah Facility opportunities for expansion through capital stockyard delivers a diverse range of ores from development and encourage investment in mines within a 550 kilometre radius of Port minerals mining well into the future. Hedland. Within the first year of operation, the PHPA’s strategic plan to expand the Port’s inner Utah Facility has achieved nameplate export harbour capacity from 200 million tonnes to 495 capacity of 9 million tonnes of trucked ore per million tonnes per annum cannot be achieved annum worth an estimated $1.5 billion in export without the Utah Facility. Through clever design sales and facilitated a 360% increase in annual and use of technology, the facility accommodates export tonnage for PHPA public berths. Ore being conveyed onto ore carrier docked at Utah Point berth 15 16
  • 11. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Mandatory criteria Mandatory Criterion 5 – Community Benefit Development of the Utah Facility and Strengthening community links relocation of chromite and manganese exports The Utah Facility initiated the establishment of from Port Hedland’s west end to Utah Point the Port Collaboration and Heritage Agreement has resolved a number of significant between PHPA and the local Marapikurrinya environmental issues affecting the local community, the original custodians of the land community. In addition to the significant occupied by the Utah Facility. This agreement environmental and health improvements outlined initiated a number of benefits for the community in Optional Criteria 16, the following have also that were not in place prior to the project, contributed to a significantly improved amenity including a commitment to the provision of for the Port Hedland community. employment, ongoing business development Increasing employment opportunities in assistance, development of a Cultural Heritage the region Masterplan and provision of assistance with cultural heritage training and awareness by The number of employees working for the PHPA the PHPA. increased from 25 to 90 with a diverse range of skill sets, following completion of the project. Traditional land owners also secured JV These personnel were either sourced from the partnerships with three of the major contractors local community or new residents following during construction which resulted in direct a commitment made from staff to live in Port employment, traineeships and dry-hire of Hedland. Given Port Hedland’s typically transient equipment. The project also employed a heritage population, PHPA has made a significant monitor to oversee all construction activities. contribution to strengthening Port Hedland’s Improved traffic flow and road safety permanent employment base. The project improved traffic safety by removing Many local contractors and services were utilised road train traffic from Port Hedland’s suburban during the construction phase. Upon completion and feeder roads. Trucks now enter the Utah site of the facility, three of the four major contractors via a new dedicated 10 kilometre sealed access employed have made long term commitments road, and significant improvements have been to working in the local community and have made to address safety issues associated with set up local offices and established permanent road train and light vehicle interaction on the accommodation arrangements. Great Northern Highway network. Further benefits included the mandated requirement to cover all truck loads to prevent dust and contaminants affecting suburban areas. Utah wharf construction 17 18
  • 12. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Mandatory criteria Mandatory Criterion 6 - Sustainable Development Water conservation and mangrove preservation metre high perimeter seawalls. This allowed the were significant drivers for the development embankment to be steepened and prevented the of sustainable engineering solutions for the loss of 1.2 hectares of mangroves at the seawall Utah Facility. toe at a cost of $0.63m (investment of $52 per square metre of mangroves preserved). Preserving Port Hedland mangroves Refer Appendix E for Stockyard Embankment Twenty four hectares were required to establish Road Details. a stockyard capable of stockpiling trucked Seawall construction using concrete impregnated miracell ores with a nine million tonne per annum Care was also taken to ensure that export potential. mangroves outside of the construction footprint were not disturbed. At the conclusion of Water Quality and Conservation A 45,000m3 lined recirculation water pond and Consistent with the requirements of EPA construction activities, mangroves were thriving controlled discharge pipe system and three Guidance Statements No. 1 (Tropical Arid Zone The potential adverse eco-toxicological effect of at the toe of the seawall as a result of careful 1,000m3 storage tanks were installed to enable Mangroves; EPA 2001) and No. 29 (BPPH chromite and manganese on mangrove construction practices. fire and dust suppression, and management protection; EPA 2004c) to minimise mangrove and marine systems was studied by PHPA loss and in particular, to protect valuable closed In total, 18 hectares of mangroves were of potable water across the site to deliver the during the PER and led to a requirement to canopy mangroves, the stockyard footprint was removed during construction of the stockyard abovementioned water conservation outcomes. prevent ores containing chromite and manganese minimised and re-oriented. and access road. A commitment has been from contaminating groundwater systems and Contaminated stockyard stormwater harvested given by PHPA to the Environmental Protection the harbour. through a ring main pipe system to the A partially disturbed calcarenite (limestone) Authority and local community to meet the recirculation water pond will provide an estimated outcrop at Stanley Point was selected as the The project team developed the following Guidance Statement target of 10% historic 6 weeks reprieve per year from the need most appropriate stockyard location given its initiatives to prevent mineral contamination of loss of mangrove environments since European for expensive scheme water representing a low ecological value as a result of being ground and harbour waters: settlement through the establishment of a considerable cost saving. previously disturbed and consisting mostly of mangrove offset project. This work will further • hysical separation of iron ore from other P sandy saline flats with low open shrubs. generate local jobs in its construction and will contaminating ores in the stockyard. Multiple layers of plastic geogrid (Securgrid support ongoing eco-tourism and aboriginal • Installation of a bentonite barrier layer with 120/20) were also installed within the six to eight heritage opportunities. sub-surface drainage collection system. • Installation of sealed internal roads. • onstruction of an automatically operated C quad road train truck wash station installed with water recirculation system. • Materials handling system designed for wash down and collection of contaminants between shipments for treatment and recirculation. • On site collection and treatment of stormwater that is harvested for dust suppression. • Installation of two Stormceptor units to operate in conjunction with the wharf wash down Stormceptor adjacent to wharf to settle Closed canopy mangroves system to settle out contaminants from the wharf wash down contaminants wharf wash down. 19 20
  • 13. Optional criteria Optional Criteria Optional Criterion 8 - Simplicity of the Engineering Solution Cavotec Automatic Mooring System Utah Point is located in the narrow neck of Port Hedland Harbour where passing vessels (up to Striving for world’s best practice and simple 270KT bulk carriers) exert significant hydrodynamic low cost options for maximising the throughput interaction forces that act to suck vessels from capacity of the Utah Point berth, PHPA made a their moorings. Port Hedland experiences large decision to replace the centuries old practice of tides (7.5 metres) that produce in excess of 2 knot mooring vessels using ropes with an innovative currents, design wind speeds of 23 m/s (45 knots), and simple new technology. fine iron ore dust issues and extreme heat (+45 Cavotec’s MoorMaster Automatic Mooring System degrees Celsius) conditions. uses simple design concepts involving large As Cavotec had not previously designed units manoeuvrable suction cups held under vacuum to withstand these conditions, PHPA contracted to safely capture, berth and release vessels in Cavotec to design and test 14 completely new considerably less time than traditional mooring 200MM units capable of handling the large tidal methods. The time saved in mooring and releasing ranges experienced at Port Hedland. The revised vessels using the MoorMaster technology and design replaced the previous top mounted winch its ability to maintain continuous safe loading mechanism with a rail mounted travelling bus operations has improved vessel turn around (motor) to provide a robust structure capable efficiency in Port Hedland by up to 2.5 hours. of withstanding forces equivalent to 20 tonnes perpendicular (280 tonnes total) and 10 tonnes parallel to the berth face. Cavotec units mounted vertically on wharf rails Cavotec wharf mounting close up 22
  • 14. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Optional criteria Since the implications of system failure or under- Post-installation, the initial hydrodynamic design were significant, PHPA commissioned interaction force concerns did not eventuate OMC-International to modify the existing as the MoorMaster units perform much better Port Hedland hydrodynamic harbour mooring in dampening the impacts of wind, current and model to simulate ropes as stiff springs. This passing vessel forces than during simulation. conservative assessment of MoorMaster system The technology has proved itself to be a more capabilities predicted that the impact of passing than effective and simple replacement of vessels would potentially exceed the capacity traditional rope technology. of the design specifications on the end units. PHPA challenged long established practices and Revised bollard designs for secondary rope put their faith in new and conceptually simply protection were implemented as a precaution technology with the MoorMaster Automatic and options for piggy backing the two end units Mooring System. This decision may drive a were explored. revolutionary change in ship berthing practices around the world with significant potential to improve safety, time and operational costs in the future. Aerial view of Utah Point berth showing 14 equidistant Cavotec units Key Benefits Through simplicity of operation and design concepts, the MoorMaster system delivers the following significant benefits to PHPA and facility proponents: • Improved safety of mooring operations. • Improved Utah Point Berth throughput capacity and berth efficiency with maximum • Greater port export efficiency through vessel size increased to a length overall (LOA) elimination of vessel creep, lost time due to of 270 metres compared to 225 metres using passing vessel interactions and reduction in traditional rope mooring methods. the time required to capture, moor and release individual vessels which combined provide an • Reduced port operating costs for tug boats estimated time saving per vessel of 2.5 hours. and personnel involved with stevedoring and corresponding reduction in fuel emissions. • Eradication of the need to construct large and expensive Mooring Dolphins. Refer Port Strategy May 2007 article in Appendix G for more information on the 200MM unit factory acceptance testing in France Cavotec Automatic Mooring System. 23 24
  • 15. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Optional criteria OPTIONAL CRITERION 13 - LEVEL OF IMPORT REPLACEMENT Utah Point Travelling Ship Loader and Tripper Conveyor In accordance with the project’s stated objective and tendering criteria whereby preference was given to locally manufactured products, PHPA rejected the cheapest tender offer from a reputable Chinese manufacturer in favour of project managing the design and manufacture of the ship loader using a range of local contractors and suppliers. Perth based Delta Engineering were awarded the contract to design the ship loader and manufacture associated mechanical and electrical components Ship loader main frame erection, January 2010 for delivery to the Australian Marine Complex (AMC) Ship loader transfer to Common User Facility at Henderson, south of Perth. Henderson Wharf, May 2010 Upon completion, the 600 tonne ship loader and Table 1: Local contract partners for construction of the Utah Point ship loader 80 tonne boom were transferred to a heavy lift ship Contractor/Location Description of Service Contract Type for transport to Port Hedland where it was placed Pinc Group (Perth) Project Managers for all Utah Point Henderson Schedule of rates directly onto the rails of the Utah Point wharf. scope of work Delta Engineering (Malaga) Overall design supply of structural Fixed lump sum Erection of the superstructure using multiple mechanical components contractors who had not previously collaborated on United Industries Manufacture of the steel superstructure components Sub-contract to Delta such a complex, schedule critical project required (Henderson) Engineering tight management of technical, schedule and scope IE Systems (Perth) Electrical and control system engineer Sub-contract to Delta Engineering risks to ensure the structure was delivered on time. Engineering Dynamics Design Auditor certification to Australian Standards Schedule of rates A list of contractors employed on the ship loader (Perth) construction is outlined in Table 1. Engineering Dynamics Designer of heavy lift ship fatigue Schedule of rates (Perth) transportation requirements PHPA were successful in providing new ProMet Engineers (Perth) Lead Engineer for the design management of Schedule of rates opportunities for local contractors to increase Delta Engineering their competitiveness in the manufacture of United Industries Erection of ship loader super structure at Henderson Fixed lump sum major capital equipment and ensured the use of (Henderson) locally manufactured steel in construction of the ProMet Engineers (Perth) Erection construction management consultants Schedule of rates (Henderson) ship loader. The all inclusive cost of the Western AMC (Henderson) Facility Manager at Henderson Facility lease agreement Australian designed and manufactured ship loader BigLift (Always Shipping) Heavy lift ship transport from Henderson to Port Hedland Fixed lump sum and was $16.9m which is in line with standard industry schedule penalties costs per tonne for comparative equipment. GECM (Perth) Structural, mechanical electrical Outfitting Cost reimbursement (Utah Henderson) with incentives Transferring ship loader from Pinc Group (Perth) Utah Point construction and commissioning managers Schedule of rates IE Systems (Perth) Utah electrical control system commissioning/ramp-up Schedule of rates heavy lift ship to Utah wharf 25 26
  • 16. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Optional criteria Optional Criterion 16 - Environmental Implications From inception, the Utah Facility project was negative impacts on town amenity, community motivated by the need to solve a number of health and the environment. The Utah Facility significant environmental and health issues project addressed these issues to improve overall affecting the Port Hedland community as a conditions for Port Hedland residents. consequence of bulk ore exports (in particular Reduced dust emissions chromite and manganese) from Port Hedland’s west end. Dust is a major environmental and health issue in Port Hedland. Moving the export of chromite Transporting and loading large volumes of and manganese from the west end to Utah Point mineral ores by road train and front end loader to enabled a reduction in dust levels to built up poorly designed stockpile and materials handling areas as is evident in PER Dust Contour Charts systems have previously produced significant (refer to Appendix F). Bentonite geosynthetic clay lining being applied to stockyard floor This was achieved through: • roviding concrete dump pockets to feed ore P directly into automatic stackers with • Transferring road trains from the west end dust suppression. of Port Hedland to a dedicated 10 kilometre • torage of ore in a custom built stockyard S long private access road located outside with elevated perimeter road and dust the township. suppression cannons throughout. • Mandating covered loads from mine to port. • rovision of efficient materials handling P • tockpiling ores at Finucane Island’s Utah S infrastructure to limit dust emissions and Point to move dust emissions away from to enable wash down between shipments. populated areas. • Covered tripper conveyor at the back of wharf. • tilising a single and efficient stack and reclaim U • Introduction of truck wash facilities to operation to dispense with the need to double remove dust residue from transport handle materials. vehicles post delivery. • rovision of bulk mineral controls over the P • rovision of chutes to reduce product P receipt of properly conditioned ores at the gate. degradation and direct ore into ship holds Lined 45,000m3 recirculation pond 27 28
  • 17. Utah Point Multi-User Bulk Export Facility Port Hedland Servicing Australia’s future trade growth Reduced noise emissions Groundwater collection discharge and stormwater AppendiCES Moving the export operations to the Utah Facility is pumped to a 45,000m3 recirculation water pond shifted quad and triple road trains and front from where it is settled and harvested for dust end loader operations away from the township, suppression.This recirculated water will provide up thereby considerably reducing noise emissions at to 6 weeks reprieve from the need for expensive Port Hedland’s west end. scheme water representing a considerable cost saving to exporters and conserving water. Covered drives and transfer stations and efficient mechanical and electrical infrastructure has also Long term environmental risks have also been reduced operating noise levels at the Utah Facility. mitigated in the construction of the stockyard, with a 6-8 metre high perimeter sea wall built to Reduced groundwater and harbour prevent inundation of stockpiled ores by seawater contamination risks in cyclone surge tides. Operations at the Utah Facility have implemented The size of the stockyard and recirculation measures to prevent potentially dangerous levels water pond ensures this facility successfully of manganese and chromite contaminating local contains contaminated stormwater in a 1 in groundwater or the harbour. 100 year flood event to prevent contaminated All current and future potentially contaminating run off into the harbour. ores are now environmentally contained within Protection of native flora the stockyard by a bentonite barrier layer and groundwater collection system that prevent ore Carefully orienting the stockyard position and residue and dissolved solids from contaminating minimising its footprint by steepening the seawall the groundwater and harbour. Bentonite was embankment prevented the loss of 1.2 hectares of selected as the preferred lining material given mangroves at a total cost of $0.63 million ($52 per its chemical stability, self-sealing properties and square metre of mangroves preserved). ability to adjust to differential movement in the Further details on the PHPA’s commitment to stockyard floor. protecting native flora at Utah Point can be found in Mandatory Criterion 6. Perimeter Seawall Protecting Stockyard Workers installing Geogrid to from Cyclone Surge Tides seawall embankment 29
  • 18. AppendiCES Contents Appendix A 33 BHPBIO tunnel raking pile General Arrangement APPENDIX B 34 Utah Facility Organisational Chart Appendix C 35 Utah Facility General Arrangement Plan Process Flowsheet Appendix D 37 Mobile Hopper Train General Arrangement (page 1/2) Mobile Hopper Train General Arrangement (page 2/2) Appendix E 39 Stockyard Embankment Road Details Appendix F 40 Public Environmental Review Dust Contour Charts Appendix G 41 Australian Port Survey, July/August 2010 Port Strategy, May 2007 WA Business News, October 2007 North West Telegraph, October 2007 The West Australian, October 2007 32
  • 19. AppendiX A: BHPBIO tunnel raking pile general arrangement 33
  • 20. AppendiX B: UTAH facility organisational chart CEO PHPA LEGEND Pinc Group Resources PHPA Resources Port Development External Consultants Manager Project Manager Administration Site Construction Administration Manager Executive Secretary Senior Receptionist Assistant Project Planner / Scheduler Manager Procurement Deputy Commercial Manager Construction Port Engineer Manager Manager Project Controls Contracts OHSE Engineering Commissioning Site Engineer Manager Manager Manager Lead Engineer Commissioning Promet Engineers Manager Senior Cost Contracts Environmental Site S'intendents Detailed Designer Mechanical Comm. Controller Clerk Office Engineer Civil/ Concrete Van Der Meer Site Mechanical Stockyard Infras'ture Safety Maintenance Manager SuperIntendent Services POAGS (Stevedore) Project Cordinator Accountant Site Electrical Process Electrical Control SuperIntendent IE Systems Accounts Payable Senior Site HV Electrical Switching Eng. Officer 34
  • 21. AppendiX C: Utah Facility General Arrangement Plan 35
  • 22. AppendiX C: Process flowsheet 36
  • 23. AppendiX D: Mobile Hopper Train General Arrangement (page 1) 37
  • 24. AppendiX D: Mobile Hopper Train General Arrangement (page 2) 38
  • 25. AppendiX E: Stockyard Embankment Road – General Arrangement 39
  • 26. AppendiX F: Public environmental review dust contour charts Australia Port Survey – Port G: australian(World Port Development July/August 2010) AppendiX Hedland Extract port survey, july/august 2010 10 24 hour average with no Utah Point from PHPA Public Berth Graphic 1: PM10 24 Hour Dust Concentrations – Exportsdevelopment Predicted Graphic 2: PM1010 24 Hour Dust Concentrations – Exports from the Utah Facility Predicted PM 24 hour average with Utah Point development 40 41