FACILITIES, PARKS AND INFRASTRUCTURE
CAPITAL IMPROVEMENT PRESENTATION TO THE
EVANSTON CITY COUNCIL
SEPTEMBER 30, 2013
INTRODUCTION
Section 1 Facilities: Homayoon Pirooz,
Assistant Director of Public Works
Infrastructure and Engineering
Section 2 Parks: Stefanie Levine,
Senior Project Manager Facilities and Parks
Section 3 Streets, Sidewalks & Alleys:
Suzette Robinson, Director of Public Works
Public Works Summary: Suzette Robinson
2
SECTION 1
FACILITIES OVERVIEW
2009 to 2013 Cost Summary Slides and Tables
• Civic Center
• Other City Facilities
• Community Facilities
• Lakefront Facilities
Proposed Projects for 2014
Future Focus
3
LORRAINE H. MORTON
CIVIC CENTER
4
$1,772,200
$99,000
$417,000
$139,000
$135,000
$66,000
$44,500
$221,000
$16,300
$49,200
$329,000
2009-13 Capital Investments
Roof replacement - $1,772,200 Front entry reconstruction - $99,000
Washrooms renovations - $417,000 Fire pump replacement - $139,000
Asbestos abatement - $135,000 Tuckpointing - $66,000
Hallway carpet tiles - $44,500 Parking lot lighting - $221,000
ADA doors - $16,300 Misc. HVAC - $49,200
Miscellaneous - $329,000
Total 5 year investment: $3.29 million
OTHER CITY
FACILITIES
5
$1,214,300
$710,000
$3,277,000
2009-13 Capital Investments
Service Center - $1,214,300 Fire Stations - $710,000
Police/Fire Headquarters - $3,277,000
Total 5 year investment: $5.20 million
COMMUNITY
CENTERS
6
$82,000
$173,000
$15,000
$252,000
$246,000$1,267,500
2009-13 Capital Investments
Chandler-Newberger Center - $82,000 Crown Center - $173,000
Ecology Center - $15,000 Fleetwood-Jourdain Center - $252,000
Levy Senior Center - $246,000 Noyes Cultural Arts Center - $1,267,500
Total 5 year investment: $2.04 million
LAKEFRONT
FACILITIES
7
$1,324,700
$435,000
$1,542,000
$98,000 $32,000
2009-13 Capital Investments
Clark Street Beach House / Entry Drive - $1,324,700
Dempster Street Locker Building and Boat Racks - $435,000
Lakefront Bike Path - $1,542,000
Lagoon Renovation (design only) - $98,000
Harley Clark Mansion - $32,000
Total 5 year investment: $3.43 million
FACILITIES
EXPENDITURES
8
24%
37%
15%
25%
2009-13 Capital Investments By Percentages
Civic Center - 24% Other City Facilities - 37%
Community Centers - 15% Lakefront Facilities - 25%
Total 5 year investment: $13.96 million
PROPOSED 2014
FACILITIES PROJECTS
Project Name GO Bonds Carryover Other Sources Total
Animal Shelter Roof / HVAC $120,000 $120,000
Arrington Lakefront Lagoon Renovations $275,000 $200,000 $900,000 $1,375,000
Chandler-Newberger Study / Interior Improvements $250,000 $250,000
Church Street Boat Ramp Repairs $350,000 $200,000 $550,000
Civic Center Boiler Building Roof and Masonry $120,000 $120,000
Civic Center Security $300,000 $300,000
Clark Street Beach Bird Habitat Restoration $173,000 $173,000
Crown Partnership Study $73,000 $73,000
Dempster Street Beach Boat Racks $75,000 $75,000
Ecology Center Addition $100,000 $100,000
Facilities Capital Contingency $250,000 $250,000
Fire Station 2 First Floor Remodeling $360,000 $360,000
Fleetwood-Jourdain Study / Interior Improvements $250,000 $250,000
Levy Center Structural Study $100,000 $100,000
Salt Dome Reconstruction $380,000 $380,000
Service Center Electrical Study $35,000 $35,000
Total $2,200,000 $1,038,000 $1,273,000 $4,511,000
9
FACILITIES
EXPENDITURES
10
19%
35%15%
30%
2009-14 Capital Investments By Percentages
Civic Center - 19% Other City Facilities - 35%
Community Centers - 15% Lakefront Facilities - 30%
Total 6 year investment: $18.47 million
FACILITIES FUTURE
FOCUS
1. Investments in Existing Community Centers
• Increase investment rate (15% current)?
• Chandler
• Fleetwood
• Levy
2. Harley Clarke Mansion
• Recreation facility?
• Park expansion?
3. Robert Crown
• P3 update
• What next?
4. Skate Park
• Council direction needed
• Locations for consideration
5. Recycling Center
• Recreation facility?
• Park expansion?
6. Shared Recreation Facilities
• District 65
• ETHS
• Northwestern University
11
SECTION 2
PARKS OVERVIEW
12
2009 to 2013 Cost Summary
Proposed Projects for 2014
Future Focus
PARK
INVESTMENTS
13
Total 5 year investment: $890,900
$269,300
$273,200
$139,800
$133,600
$75,000
2009-13 Capital Investments
Brummel Richmond Tot Lot - $269,300 Firemens Park - $273,200
James Park - $139,800 Ladd Arboretum - $133,600
Twiggs Park - $75,000
PROPOSED 2014
PARK PROJECTS
14
Project Name GO Bonds Carryover Other Sources Total
Baker Park $75,000 $25,000 $100,000
Fountain Square Design Study $300,000 $300,000
Grey Park $56,500 $56,500
Ladd Arboretum $22,000 $88,000 $110,000
Needs Assessment and Evaluation $150,000 $150,000
Penny Park $130,000 $20,000 $150,000
Total $225,000 $208,500 $433,000 $866,500
PARKS FUTURE
FOCUS
1. Needs Assessment and Evaluation
• Establish current conditions and uses
• Determine park access / proximity to users
• Compare Evanston to national standards
• Define future needs
• Establish long term strategy for future improvements
2. Partnership Opportunities
• Schools
• Open streets / parking lots
3. Fund Raising
• Community groups
• Private organizations
• Grants
15
SECTION 3 INFRASTRUCTURE
16
Primary
1 2
3
4
5
6
7
89
2010 TO 2014
PRIMARY STREET RESURFACING
17
39.64%
3.32%
12.47%
8.97%
4.62%
7.86%
5.22%
7.41%
4.94%
5.55%
2010-2014 Streets Resurfaced by Ward/Square Yards
Primary Streets-173,176.58 sq yrds Ward 1-14,507.44 sq yrds Ward 2-54,483.11 sq yrds
Ward 3-39,206.66 Ward 4-20,177.77 Ward 5-34,315.44
Ward 6-22,799.83 Ward 7-32,354.44 Ward 8-21,572.44
Ward 9-24,257.67
2
Primary
1
3
4
5
6
7 8 9
SURFACE CONDITION
PRIMARY ROUTES
18
13.35%
19.19%
34.02%
33.45% Very Poor less than 40
Poor 40-50
Poor 50-60
Fair 60-65
SURFACE CONDITION
BY WARD BELOW 40
19
1
2
4
6
7
8
9
SURFACE CONDITION
BY WARD 40 TO 49
20
1
2
3
4
5
6
7
8
9
SURFACE CONDITION
BY WARD 50 TO 59
21
9 1
2
3
4
567
8
SURFACE CONDITION
BY WARD 60 TO 65
22
2
3
4
5
6
7
8
9 1
CITY OF EVANSTON'S
METHODOLOGY FOR
RESURFACING
• Utility Priority
• Development Priority
• Grant/TIF Priority
• Ward Equity
• Surface Condition
• Citizen Input/Field Review
23
RESURFACING
COMPARISON
24
Area Percentage of City Average Percentage Resurfaced
Primary 42% 39.64%
Ward 1 3% 3.32%
Ward 2 9% 12.47%
Ward 3 5% 8.97%
Ward 4 5% 4.62%
Ward 5 4% 7.86%
Ward 6 10% 5.22%
Ward 7 9% 7.41%
Ward 8 6% 4.94%
Ward 9 7% 5.55%
STREETS SUMMARY
Total needed to bring roads up to Fair category by 2018
$36,684,999
Current Funding Levels and Methodology
• $1.4 million MFT, 1.8 million CIP
• $3.2 million total annually is not sufficient to achieve an
overall Fair condition
25
PRIMARY ROUTE SUMMARY
26
SURFACE
CONDITION Total SQ YD Cost
Less than 40 35722.42 $1,821,844
40 - 50 51374.89 $2,620,119
50 - 59 91053.18 $4,643,712
60 - 65 89531.91 $4,566,127
Total $13,651,802
SURFACE
CONDITION Total SQ YD Cost
Less than 40 31141.00 $1,276,781
40 - 50 96344.40 $3,950,120
50 - 59 225700.80 $9,253,733
60 - 65 208599.10 $8,552,563
Total $23,033,197
LOCAL STREETS SUMMARY
SIDEWALK PROGRAM
Total miles of sidewalk – 268 miles
Current Sidewalk Methodology
• Funding: 50% Resident/ 50% City
• Result: 50,000 SQ FT sidewalk replaced annually
Option One
• Funding: 60% Resident/ 40% City
• Result: 60,000 SQ FT sidewalk replaced annually
Option Two
• Funding: 80% Resident/ 20% City
• Result: 80,000 SQ FT sidewalk replaced annually
27
Before
After
ALLEY PROGRAM
28
Total length of alleys in the City – 70 miles
Length of paved alley – 41.7 miles
Previous Alley Methodology
• Funding: 100% Resident
• Result: Program participation dwindled
Current Alley Methodology
• Funding: 50% Resident/ 50% City
• Result: Initially increased and now program numbers are declining
Option One
• Funding: 40% Resident/ 60% City
• Result: More applications, depleting funds
Option Two
• Funding: 20% Resident/ 80% City
• Result: More applications, depleting funds
29
QUESTIONS

Contenu connexe

En vedette (6)

Kit de eletronica para montar
Kit de eletronica para montarKit de eletronica para montar
Kit de eletronica para montar
 
Luxi chen
Luxi chenLuxi chen
Luxi chen
 
GeoServer intro for SDI Days 2013
GeoServer intro for SDI Days 2013GeoServer intro for SDI Days 2013
GeoServer intro for SDI Days 2013
 
Paparan 1 laproan_lembang1
Paparan 1 laproan_lembang1Paparan 1 laproan_lembang1
Paparan 1 laproan_lembang1
 
Capítol 3
Capítol 3Capítol 3
Capítol 3
 
Nuevas tecnologías de la información aplicadas a la discapacidad visual
Nuevas tecnologías de la información aplicadas a la discapacidad visualNuevas tecnologías de la información aplicadas a la discapacidad visual
Nuevas tecnologías de la información aplicadas a la discapacidad visual
 

Similaire à Public works presentation 9 30final

Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Futurejacorbitt
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureFulton County Government
 
City Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity of Dayton
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities us2unionsquare
 
Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14cityofevanston
 
Design Commission 2010 report
Design Commission 2010 reportDesign Commission 2010 report
Design Commission 2010 reportLauren Hauck
 
Municipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingMunicipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingShaun Wilson
 
DS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanDS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanCityofKilleen
 
Water and Wastewater System Master Plans
Water and Wastewater System Master PlansWater and Wastewater System Master Plans
Water and Wastewater System Master PlansCity of College Station
 
Carrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalizationCarrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalizationpeterbraster
 
Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21Franklin Matters
 
Grant Programs & Success Stories
Grant Programs & Success StoriesGrant Programs & Success Stories
Grant Programs & Success StoriesPrein Newhof
 
Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13publicinvolvement
 
2009 Budget Presentation
2009 Budget Presentation2009 Budget Presentation
2009 Budget PresentationBrett Deaton
 

Similaire à Public works presentation 9 30final (20)

Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Future
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Future
 
City of Dauphin State of the City 2013
City of Dauphin State of the City 2013City of Dauphin State of the City 2013
City of Dauphin State of the City 2013
 
2014 Bond Sale and Re-funding
2014 Bond Sale and Re-funding2014 Bond Sale and Re-funding
2014 Bond Sale and Re-funding
 
City Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment Plan
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14
 
Design Commission 2010 report
Design Commission 2010 reportDesign Commission 2010 report
Design Commission 2010 report
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Municipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingMunicipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public Funding
 
2013 Bond Sale and Refunding
2013 Bond Sale and Refunding 2013 Bond Sale and Refunding
2013 Bond Sale and Refunding
 
Roadway Impact Fees
Roadway Impact FeesRoadway Impact Fees
Roadway Impact Fees
 
DS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanDS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master Plan
 
Water and Wastewater System Master Plans
Water and Wastewater System Master PlansWater and Wastewater System Master Plans
Water and Wastewater System Master Plans
 
Carrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalizationCarrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalization
 
Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21Town of Franklin: DPW Overview 04/07/21
Town of Franklin: DPW Overview 04/07/21
 
Grant Programs & Success Stories
Grant Programs & Success StoriesGrant Programs & Success Stories
Grant Programs & Success Stories
 
Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13
 
2009 Budget Presentation
2009 Budget Presentation2009 Budget Presentation
2009 Budget Presentation
 

Dernier

Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...Call Girls in Nagpur High Profile
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Vinodha Devi
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
Basic concepts related to Financial modelling
Basic concepts related to Financial modellingBasic concepts related to Financial modelling
Basic concepts related to Financial modellingbaijup5
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfGale Pooley
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfGale Pooley
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure servicePooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 

Dernier (20)

Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
Basic concepts related to Financial modelling
Basic concepts related to Financial modellingBasic concepts related to Financial modelling
Basic concepts related to Financial modelling
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdf
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 

Public works presentation 9 30final

  • 1. Public Works FACILITIES, PARKS AND INFRASTRUCTURE CAPITAL IMPROVEMENT PRESENTATION TO THE EVANSTON CITY COUNCIL SEPTEMBER 30, 2013
  • 2. INTRODUCTION Section 1 Facilities: Homayoon Pirooz, Assistant Director of Public Works Infrastructure and Engineering Section 2 Parks: Stefanie Levine, Senior Project Manager Facilities and Parks Section 3 Streets, Sidewalks & Alleys: Suzette Robinson, Director of Public Works Public Works Summary: Suzette Robinson 2
  • 3. SECTION 1 FACILITIES OVERVIEW 2009 to 2013 Cost Summary Slides and Tables • Civic Center • Other City Facilities • Community Facilities • Lakefront Facilities Proposed Projects for 2014 Future Focus 3
  • 4. LORRAINE H. MORTON CIVIC CENTER 4 $1,772,200 $99,000 $417,000 $139,000 $135,000 $66,000 $44,500 $221,000 $16,300 $49,200 $329,000 2009-13 Capital Investments Roof replacement - $1,772,200 Front entry reconstruction - $99,000 Washrooms renovations - $417,000 Fire pump replacement - $139,000 Asbestos abatement - $135,000 Tuckpointing - $66,000 Hallway carpet tiles - $44,500 Parking lot lighting - $221,000 ADA doors - $16,300 Misc. HVAC - $49,200 Miscellaneous - $329,000 Total 5 year investment: $3.29 million
  • 5. OTHER CITY FACILITIES 5 $1,214,300 $710,000 $3,277,000 2009-13 Capital Investments Service Center - $1,214,300 Fire Stations - $710,000 Police/Fire Headquarters - $3,277,000 Total 5 year investment: $5.20 million
  • 6. COMMUNITY CENTERS 6 $82,000 $173,000 $15,000 $252,000 $246,000$1,267,500 2009-13 Capital Investments Chandler-Newberger Center - $82,000 Crown Center - $173,000 Ecology Center - $15,000 Fleetwood-Jourdain Center - $252,000 Levy Senior Center - $246,000 Noyes Cultural Arts Center - $1,267,500 Total 5 year investment: $2.04 million
  • 7. LAKEFRONT FACILITIES 7 $1,324,700 $435,000 $1,542,000 $98,000 $32,000 2009-13 Capital Investments Clark Street Beach House / Entry Drive - $1,324,700 Dempster Street Locker Building and Boat Racks - $435,000 Lakefront Bike Path - $1,542,000 Lagoon Renovation (design only) - $98,000 Harley Clark Mansion - $32,000 Total 5 year investment: $3.43 million
  • 8. FACILITIES EXPENDITURES 8 24% 37% 15% 25% 2009-13 Capital Investments By Percentages Civic Center - 24% Other City Facilities - 37% Community Centers - 15% Lakefront Facilities - 25% Total 5 year investment: $13.96 million
  • 9. PROPOSED 2014 FACILITIES PROJECTS Project Name GO Bonds Carryover Other Sources Total Animal Shelter Roof / HVAC $120,000 $120,000 Arrington Lakefront Lagoon Renovations $275,000 $200,000 $900,000 $1,375,000 Chandler-Newberger Study / Interior Improvements $250,000 $250,000 Church Street Boat Ramp Repairs $350,000 $200,000 $550,000 Civic Center Boiler Building Roof and Masonry $120,000 $120,000 Civic Center Security $300,000 $300,000 Clark Street Beach Bird Habitat Restoration $173,000 $173,000 Crown Partnership Study $73,000 $73,000 Dempster Street Beach Boat Racks $75,000 $75,000 Ecology Center Addition $100,000 $100,000 Facilities Capital Contingency $250,000 $250,000 Fire Station 2 First Floor Remodeling $360,000 $360,000 Fleetwood-Jourdain Study / Interior Improvements $250,000 $250,000 Levy Center Structural Study $100,000 $100,000 Salt Dome Reconstruction $380,000 $380,000 Service Center Electrical Study $35,000 $35,000 Total $2,200,000 $1,038,000 $1,273,000 $4,511,000 9
  • 10. FACILITIES EXPENDITURES 10 19% 35%15% 30% 2009-14 Capital Investments By Percentages Civic Center - 19% Other City Facilities - 35% Community Centers - 15% Lakefront Facilities - 30% Total 6 year investment: $18.47 million
  • 11. FACILITIES FUTURE FOCUS 1. Investments in Existing Community Centers • Increase investment rate (15% current)? • Chandler • Fleetwood • Levy 2. Harley Clarke Mansion • Recreation facility? • Park expansion? 3. Robert Crown • P3 update • What next? 4. Skate Park • Council direction needed • Locations for consideration 5. Recycling Center • Recreation facility? • Park expansion? 6. Shared Recreation Facilities • District 65 • ETHS • Northwestern University 11
  • 12. SECTION 2 PARKS OVERVIEW 12 2009 to 2013 Cost Summary Proposed Projects for 2014 Future Focus
  • 13. PARK INVESTMENTS 13 Total 5 year investment: $890,900 $269,300 $273,200 $139,800 $133,600 $75,000 2009-13 Capital Investments Brummel Richmond Tot Lot - $269,300 Firemens Park - $273,200 James Park - $139,800 Ladd Arboretum - $133,600 Twiggs Park - $75,000
  • 14. PROPOSED 2014 PARK PROJECTS 14 Project Name GO Bonds Carryover Other Sources Total Baker Park $75,000 $25,000 $100,000 Fountain Square Design Study $300,000 $300,000 Grey Park $56,500 $56,500 Ladd Arboretum $22,000 $88,000 $110,000 Needs Assessment and Evaluation $150,000 $150,000 Penny Park $130,000 $20,000 $150,000 Total $225,000 $208,500 $433,000 $866,500
  • 15. PARKS FUTURE FOCUS 1. Needs Assessment and Evaluation • Establish current conditions and uses • Determine park access / proximity to users • Compare Evanston to national standards • Define future needs • Establish long term strategy for future improvements 2. Partnership Opportunities • Schools • Open streets / parking lots 3. Fund Raising • Community groups • Private organizations • Grants 15
  • 17. 2010 TO 2014 PRIMARY STREET RESURFACING 17 39.64% 3.32% 12.47% 8.97% 4.62% 7.86% 5.22% 7.41% 4.94% 5.55% 2010-2014 Streets Resurfaced by Ward/Square Yards Primary Streets-173,176.58 sq yrds Ward 1-14,507.44 sq yrds Ward 2-54,483.11 sq yrds Ward 3-39,206.66 Ward 4-20,177.77 Ward 5-34,315.44 Ward 6-22,799.83 Ward 7-32,354.44 Ward 8-21,572.44 Ward 9-24,257.67 2 Primary 1 3 4 5 6 7 8 9
  • 18. SURFACE CONDITION PRIMARY ROUTES 18 13.35% 19.19% 34.02% 33.45% Very Poor less than 40 Poor 40-50 Poor 50-60 Fair 60-65
  • 19. SURFACE CONDITION BY WARD BELOW 40 19 1 2 4 6 7 8 9
  • 20. SURFACE CONDITION BY WARD 40 TO 49 20 1 2 3 4 5 6 7 8 9
  • 21. SURFACE CONDITION BY WARD 50 TO 59 21 9 1 2 3 4 567 8
  • 22. SURFACE CONDITION BY WARD 60 TO 65 22 2 3 4 5 6 7 8 9 1
  • 23. CITY OF EVANSTON'S METHODOLOGY FOR RESURFACING • Utility Priority • Development Priority • Grant/TIF Priority • Ward Equity • Surface Condition • Citizen Input/Field Review 23
  • 24. RESURFACING COMPARISON 24 Area Percentage of City Average Percentage Resurfaced Primary 42% 39.64% Ward 1 3% 3.32% Ward 2 9% 12.47% Ward 3 5% 8.97% Ward 4 5% 4.62% Ward 5 4% 7.86% Ward 6 10% 5.22% Ward 7 9% 7.41% Ward 8 6% 4.94% Ward 9 7% 5.55%
  • 25. STREETS SUMMARY Total needed to bring roads up to Fair category by 2018 $36,684,999 Current Funding Levels and Methodology • $1.4 million MFT, 1.8 million CIP • $3.2 million total annually is not sufficient to achieve an overall Fair condition 25
  • 26. PRIMARY ROUTE SUMMARY 26 SURFACE CONDITION Total SQ YD Cost Less than 40 35722.42 $1,821,844 40 - 50 51374.89 $2,620,119 50 - 59 91053.18 $4,643,712 60 - 65 89531.91 $4,566,127 Total $13,651,802 SURFACE CONDITION Total SQ YD Cost Less than 40 31141.00 $1,276,781 40 - 50 96344.40 $3,950,120 50 - 59 225700.80 $9,253,733 60 - 65 208599.10 $8,552,563 Total $23,033,197 LOCAL STREETS SUMMARY
  • 27. SIDEWALK PROGRAM Total miles of sidewalk – 268 miles Current Sidewalk Methodology • Funding: 50% Resident/ 50% City • Result: 50,000 SQ FT sidewalk replaced annually Option One • Funding: 60% Resident/ 40% City • Result: 60,000 SQ FT sidewalk replaced annually Option Two • Funding: 80% Resident/ 20% City • Result: 80,000 SQ FT sidewalk replaced annually 27 Before After
  • 28. ALLEY PROGRAM 28 Total length of alleys in the City – 70 miles Length of paved alley – 41.7 miles Previous Alley Methodology • Funding: 100% Resident • Result: Program participation dwindled Current Alley Methodology • Funding: 50% Resident/ 50% City • Result: Initially increased and now program numbers are declining Option One • Funding: 40% Resident/ 60% City • Result: More applications, depleting funds Option Two • Funding: 20% Resident/ 80% City • Result: More applications, depleting funds