2. INTRODUCTION
Section 1 Facilities: Homayoon Pirooz,
Assistant Director of Public Works
Infrastructure and Engineering
Section 2 Parks: Stefanie Levine,
Senior Project Manager Facilities and Parks
Section 3 Streets, Sidewalks & Alleys:
Suzette Robinson, Director of Public Works
Public Works Summary: Suzette Robinson
2
3. SECTION 1
FACILITIES OVERVIEW
2009 to 2013 Cost Summary Slides and Tables
• Civic Center
• Other City Facilities
• Community Facilities
• Lakefront Facilities
Proposed Projects for 2014
Future Focus
3
4. LORRAINE H. MORTON
CIVIC CENTER
4
$1,772,200
$99,000
$417,000
$139,000
$135,000
$66,000
$44,500
$221,000
$16,300
$49,200
$329,000
2009-13 Capital Investments
Roof replacement - $1,772,200 Front entry reconstruction - $99,000
Washrooms renovations - $417,000 Fire pump replacement - $139,000
Asbestos abatement - $135,000 Tuckpointing - $66,000
Hallway carpet tiles - $44,500 Parking lot lighting - $221,000
ADA doors - $16,300 Misc. HVAC - $49,200
Miscellaneous - $329,000
Total 5 year investment: $3.29 million
7. LAKEFRONT
FACILITIES
7
$1,324,700
$435,000
$1,542,000
$98,000 $32,000
2009-13 Capital Investments
Clark Street Beach House / Entry Drive - $1,324,700
Dempster Street Locker Building and Boat Racks - $435,000
Lakefront Bike Path - $1,542,000
Lagoon Renovation (design only) - $98,000
Harley Clark Mansion - $32,000
Total 5 year investment: $3.43 million
9. PROPOSED 2014
FACILITIES PROJECTS
Project Name GO Bonds Carryover Other Sources Total
Animal Shelter Roof / HVAC $120,000 $120,000
Arrington Lakefront Lagoon Renovations $275,000 $200,000 $900,000 $1,375,000
Chandler-Newberger Study / Interior Improvements $250,000 $250,000
Church Street Boat Ramp Repairs $350,000 $200,000 $550,000
Civic Center Boiler Building Roof and Masonry $120,000 $120,000
Civic Center Security $300,000 $300,000
Clark Street Beach Bird Habitat Restoration $173,000 $173,000
Crown Partnership Study $73,000 $73,000
Dempster Street Beach Boat Racks $75,000 $75,000
Ecology Center Addition $100,000 $100,000
Facilities Capital Contingency $250,000 $250,000
Fire Station 2 First Floor Remodeling $360,000 $360,000
Fleetwood-Jourdain Study / Interior Improvements $250,000 $250,000
Levy Center Structural Study $100,000 $100,000
Salt Dome Reconstruction $380,000 $380,000
Service Center Electrical Study $35,000 $35,000
Total $2,200,000 $1,038,000 $1,273,000 $4,511,000
9
13. PARK
INVESTMENTS
13
Total 5 year investment: $890,900
$269,300
$273,200
$139,800
$133,600
$75,000
2009-13 Capital Investments
Brummel Richmond Tot Lot - $269,300 Firemens Park - $273,200
James Park - $139,800 Ladd Arboretum - $133,600
Twiggs Park - $75,000
14. PROPOSED 2014
PARK PROJECTS
14
Project Name GO Bonds Carryover Other Sources Total
Baker Park $75,000 $25,000 $100,000
Fountain Square Design Study $300,000 $300,000
Grey Park $56,500 $56,500
Ladd Arboretum $22,000 $88,000 $110,000
Needs Assessment and Evaluation $150,000 $150,000
Penny Park $130,000 $20,000 $150,000
Total $225,000 $208,500 $433,000 $866,500
15. PARKS FUTURE
FOCUS
1. Needs Assessment and Evaluation
• Establish current conditions and uses
• Determine park access / proximity to users
• Compare Evanston to national standards
• Define future needs
• Establish long term strategy for future improvements
2. Partnership Opportunities
• Schools
• Open streets / parking lots
3. Fund Raising
• Community groups
• Private organizations
• Grants
15
25. STREETS SUMMARY
Total needed to bring roads up to Fair category by 2018
$36,684,999
Current Funding Levels and Methodology
• $1.4 million MFT, 1.8 million CIP
• $3.2 million total annually is not sufficient to achieve an
overall Fair condition
25
26. PRIMARY ROUTE SUMMARY
26
SURFACE
CONDITION Total SQ YD Cost
Less than 40 35722.42 $1,821,844
40 - 50 51374.89 $2,620,119
50 - 59 91053.18 $4,643,712
60 - 65 89531.91 $4,566,127
Total $13,651,802
SURFACE
CONDITION Total SQ YD Cost
Less than 40 31141.00 $1,276,781
40 - 50 96344.40 $3,950,120
50 - 59 225700.80 $9,253,733
60 - 65 208599.10 $8,552,563
Total $23,033,197
LOCAL STREETS SUMMARY
27. SIDEWALK PROGRAM
Total miles of sidewalk – 268 miles
Current Sidewalk Methodology
• Funding: 50% Resident/ 50% City
• Result: 50,000 SQ FT sidewalk replaced annually
Option One
• Funding: 60% Resident/ 40% City
• Result: 60,000 SQ FT sidewalk replaced annually
Option Two
• Funding: 80% Resident/ 20% City
• Result: 80,000 SQ FT sidewalk replaced annually
27
Before
After
28. ALLEY PROGRAM
28
Total length of alleys in the City – 70 miles
Length of paved alley – 41.7 miles
Previous Alley Methodology
• Funding: 100% Resident
• Result: Program participation dwindled
Current Alley Methodology
• Funding: 50% Resident/ 50% City
• Result: Initially increased and now program numbers are declining
Option One
• Funding: 40% Resident/ 60% City
• Result: More applications, depleting funds
Option Two
• Funding: 20% Resident/ 80% City
• Result: More applications, depleting funds