Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Ga 09 G2 Charles Tatum Portfolio
1. Business Intelligence
Portfolio
Charles Tatum
charles_tatum@hotmail.com
These are tasks from my H- 404.826.2975
C- 678.358.3421
project work
completed during the
Setfocus Master BI Program
3. SSRS/PPS/Excel Serv/SharPoint
• Introduction: Some example of Reports, Dash
Boards, Score Cards created in SSRS/PPS/Excel and moved to
SharePoint and PPS
• Audience: Interviewer or potential employer
• Project Goals: To demonstrate the use of the different
reporting tools to create/import, deploy and display data in
various formats using different types of charts.
13. % of Employee Labor within Total Quarter Labor Report Shown in Line and Bar
Chart/ % Employee Total Labor by Project Reports Sorted by % Total of Total
Employee Project Labor Cost
28. Imported into Share Point from Performance Point Dashboard that
contains 5 Different Types of Reports
29. Imported into Share Point from SSRS that contains 3 Different Types of
Reports
30. SSIS PROJECT
• Introduction: This is sample from the SSIS
individual project that was required.
• Audience: Interviewer or potential employer.
• Project Goals:To demonstrate the use of Viso
and SSIS Tool to create ETL Process that
extract data from various sources using
connection managers, remove
dups, substitution/ validate values from
lookup tables and other form of data
cleansing.
31. (Project Creation steps)
• Created 8 packages overall using the blank BIDS project
• Create a Master Package that will contain 8 that will run in sequential order
• Each package used data sources files, and populated tables in the database
1. Employee Master Package
2. Employee Rates Package
3. Client Masters Package
4. Client Grouping Package
5. Division Master Package
6. Client Groupings to Client Xref Master Package
7. Project (“Job”) Master Package
8. Job Timesheets Package
• All data must be validated, transformed and load in DB format
• Create all maintenance jobs as part of the process clean up .
10/26/2009 SSIS Project 31
32. Used Viso to create a SQL Script for table creation
10/26/2009 SSIS Project 32
33. Created 8 packages overall using the blank BIDS project
Loading Client Grouping Table
10/26/2009 SSIS Project 33
36. Loading Job Time Sheet Table using a Foreach Loop Container
10/26/2009 SSIS Project 36
37. Master Package Containing all 8 packages
Maintenance jobs included at the end of the process
10/26/2009 SSIS Project 37
38. SSAS PROJECT
• Introduction: This is sample from the SSAS
individual project that was required.
• Audience: Interviewer or potential employer.
• Project Goals:To demonstrate the use of the
SSAS Tools to create OLAP DB (Cube) that
display’s flexibility, optimization of required
aggregation, using two types of relational
tables dimension and facts.
50. MDX/T-SQL Project
• Introduction: Some examples of T-SQL/MDX
• Audience: Interviewer or potential employer
• Project Goals: To demonstrate the use of the
T-SQL/MDX language to extract and analyze
data