NEW ELEVETOR® / TYPICAL CALCULATION                                                                                                                                               NEW ELEVETOR® / PROJECT COST ANALYSIS

F inite-elementofmodelling forpozzolanalandmade by a layer of lean mix 12 cmdeep, of which 6.30 m are soft clay
   and 0.70 m compacted
                               a plot of

The simulated structure was assumed to be
                                            16.82 meters long and 7 meters
                                         and lapillo.
                                                                             thickness, NEW ELEVETOR system                                                ®
                                                                                                                                                                               No. BILL OF MATERIAL
                                                                                                                                                                               1     NEW         ELEVETOR®                  formwork
                                                                                                                                                                                                                                                                                                                 UNIT/MEASURE QUANTITY
                                                                                                                                                                                                                                                                                                                            m2                          1
                                                                                                                                                                                                                                                                                                                                                                            PRICE        TOTAL AMOUNT

95 cm height and a slab 5 cm thickness.
                                                                                                                                                                                2    ø 125 mm tube*                                                                                                                     No./m2                          3
    Plate Stress: MC (kg/cm²)                                                                                                                                                   3    BASE NEW ELEVATOR® footing grid                                                                                                   No./m2                           3
      -0.0484 [Pt: 2106, Nd: 2447]
      -0.0613                                                                                                                                                                   4    Installation of NEW ELEVETOR® system                                                                                             hours/m2                       0.05
      -0.0869
                                                                                                                                                                                5    Rebar mesh ø 6 20x20                                                                                                               kg/m2                      2.328
                                                                                                                                                                                     (cost of material and labour)
      -0.1125
                                                                                                                                                                                6    Concrete class Rck 250 to fill the tubes                                                                                            m3/m2
                                                                                                                                                                                     (cost of material and labour)
      -0.1382
                                                                                                                                                                                7    Concrete class Rck 250 to fill the formwork                                                                                        m3/m2
                                                                                                                                                                                     (material and labour)
      -0.1638
                                                                                                                                                                                8    Concrete class Rck 250 for the floor slab thickness                                                                                m3/m2
      -0.1895
                                                                                                                                                                                     (material and labour)

      -0.2151                                                                                                                                                                                                                                                                                                                                                Total cost €/m2
      -0.2408
                                                                                                                                                                              *Supply of the tubes ø 125 mm can be discussed at the time of order.
      -0.2664
                                                                                                                                                                              **Place ø 8 mm reinforcement bars within the tubes that are part of the NEW ELEVETOR® system. These inserts must be joined to the rebar mesh
                                                                                                                                                                                used to reinforce the slab, and should be long enough to reach the base of the tube.
      -0.2921
                                      Fig 1)   Maximum vertical tension in the clay layer with two concentrated loads of 3,500 kg at centres 2.32 m.
                                                                                                                                                                               NEW ELEVETOR® H=15                                                      cm      DATA
      -0.3049 [Pt: 730, Nd:1422]

                                                                                                                                                                                    DIMENSION                         HEIGHT                  CONCRETE QUANTITY to fill                                         PALLET HEIGHT                               No. OF UNITS/                QUANTITY
                                                                                                                                                        Plate Disp: DZ (cm)
                                                                                                                                                                                       cm                               H                       the formwork - m3/m2                                                 m                                         PALLET                       m²
                                                                                                                                       0.0038 [Pt: 31443, Nd: 38983]
                                                                                                                                                             -0.0043                  58 X 58                               15                                        0.030                                                   2.5                                      225                   75
                                                                                                                                                            -0.0205             The quantity of concrete to fill the pillars is equal to 0.037 m³/m² per meter height.
                                                                                                                                                            -0.0366

                                                                                                                                                            -0.0528
                                                                                                                                                                               Concrete consumption calculation:
                                                                                                                                                            -0.0690             The concrete consumption for each square meter of ELEVETOR® is:

                                                                                                                                                                                      [0,037 X (                                                                                                                                         )] + = [m³/m²]
                                                                                                                                                            -0.0852

                                                                                                                                                            -0.1014                                                   NEW ELEVETOR® system height in meters - 0,15                                                                                                                      concrete
                                                                                                                                                            -0.1175
                                                                                                                                                                                                                                           consumption
                                                                                                                                                            -0.1337            Example for an elevation of 2 meters:
                     Fig 2)   Effect of four 3,500 kg loads in axis to the plate axis
                                                                                                                                                            -0.1499            Requires: Base NEW ELEVETOR® + PVC tube dia. 125 mm 182.5 cm lenght + NEW ELEVETOR® H 15
                                                                                                                                      -0.1580 [Pt: 31480, Nd:39019]            Concrete consumption = (0.037 x 1.85) + 0.030 = 0.098 m³/m²
   NEW ELEVETOR®                                     Flooring             Concrete slab     Lightweight screed     Screed
   formwork
   Wooden support                                                                                                                                                                   NEW ELEVETOR® TANK SYSTEM
   panelist                                                                                                                                    Polystyrene panelist



   PVC tube ø 125 mm

                                                                                                                                               Foundation wall



   Base NEW ELEVETOR®
                                                                                                                                               Lean-mix

   Gravel

   Existing soil




       LOAD TABLE for NEW ELEVETOR® H=120                                                                cm
                                                                                                                                                                                                                                                                                                                                                                                                                      The formwork for ventilated foundations from 70 cm to 250 cm

 TYPE OF                      Overload            Min. slab           Lean mix      Pressure on         Screed        Pressure on  Rebar                   Rebar
                               kg/m²              thickness             cm           the scree         thickness        the soil  diameter                 mesh
 LOAD                                                 cm                               kg/cm²              cm           kg/cm²       mm                   cm x cm
                                                                  0                                  0                3.44
                                                                  5                                  0                1.49
                        1,000                   4                                                                                       6               20 x 20
                                                                  10                                 0                0.82                                                      Stormwater management systems for both residential and industrial use can be made using NEW ELEVETOR®. Tanks can
                                                                                                                                                                                be built for temporary stormwater storage and attenuation, or permanent storage and reuse. The NEW ELEVETOR® system
                                                                  5                 1.49             10               0.52                                                      allows to build tanks of any shape and up to 2 meters depth without using cranes or heavy-lifting equipment.
 RESIDENTIAL
                                                                  0                                  0                5.68                                                      Disclaimer: the values shown in this brochure are for guidance only. They are not meant to be used for design criteria.
                                                                                                                                                                                Their use and reliance thereon for any purpose by anyone is entirely voluntary and at the sole risk of the user. GEOPLAST is not responsible for any loss, claim, or damage resulting from their use.
                                                                  5                                  0                2.45
                        1,800                   5                                                                                       6               20 x 20
                                                                  10                                 0                1.36




                                                                                                                                                                                                                                                                                                                                                                                                        ST. 11/2011
                                                                                                                                                                                                                                                                                                                                                                                                         REV. 004
                                                                  5                 2.45             10               0.86
                        5,000                   7                 10                3.48             25               0.67              6               20 x 20
INDUSTRIAL              10,000                  10                15                4.30             30               0.87              8               20 x 20                                                                                                                                                                                                                                                                             www.geoplast.it
                                                                                     5
NEW ELEVETOR® / USE AND CHARACTERISTICS                                                                                             NEW ELEVETOR® / USE AND CHARACTERISTICS                                                         NEW ELEVETOR® / HOW TO INSTALL
     Create ventilated foundations of any height
     The formwork is treadable before pouring                                                                                                                                                                                       •   Installation surface: cover the subgrade with lean mix to create an even surface for NEW ELEVETOR®.

     High load-bearing capacity                                                                                                                                                                                                         Lean mix thickness to spec;

     It can be laid on the subgrade without lean mix                                                                                                                                                                                •   Installation: place the NEW ELEVETOR® system made by GEOPLAST S.p.A., made by polypropylene
                                                                                                                                                                                                                                        formwork size 58 x 58 x h15 cm, joined with tubes Ø 125 mm of length as by project specification, with
                                                                                                                                                                                                                                        BASE NEW ELEVETOR® footing grid, assembled before the concrete pour:
                                                                                                                                                                                                                                    1. Lay the BASE NEW ELEVETOR® footing grid (58 x 58 x h2.5 cm): it is recommended to place the parts from right
                                                                                                                                                                                                                                        to left and from top to bottom.
                                                                                                                                                                                                                                    2. Fit tubes into each cup of the footing grid. The tubes are cut to the length suitable to achieve the specified height of
                                                                                                                                                                                                                                        NEW ELEVETOR® (from 70 to 200 cm).
                                                                                                                                                                                                                                    3. Place the NEW ELEVETOR® FORMWORK (58 x 58 x h15): the operation is performed attaching the parts to the tubes
                                                                                                                                                                                                                                        from the right-hand side to the left, and from top to bottom, always keeping the printed arrow upwards.
                                                                                                                                                                                                                                    4. The Grid + Tube + Formwork assembly guarantees a perfect perpendicularity of the pillars within the foundation.
                                                                                                                                                                                                                                    5. Place the specified rebar mesh over the surface of the NEW ELEVETOR® system (ref. to load table).
                                                                                                                                                                                                                                    6. Place ø 8 mm reinforcement bars within the tubes that are part of the NEW ELEVETOR® system. These inserts must
                                                                                                                                                                                                                                        be joined to the rebar mesh used to reinforce the slab, and should be long enough to reach the base of the tube.
                                                                                                                                                                                                                                    7. Slab pour: use a Rck 250 kg/cm² concrete to fill the tubes and the formwork, cover the rebar mesh and reach the
                                                                                                                                                                                                                                        designed slab thickness.




BASE NEW ELEVETOR® / ADVANTAGES AND CHARACTERISTICS                                                                                 NEW ELEVETOR® FORMWORK / ADVANTAGES AND CHARACTERISTICS

BASE NEW ELEVETOR® IS AN ELEMENT IN RECYCLED POLYPROPYLENE (*) THAT GUARANTEES AN EASY                                              NEW ELEVETOR® IS AN INNOVATIVE SYSTEM WITH DIMENSIONS 58X58 H15 CM THAT CREATES A
AND QUICK INSTALLATION OF THE PVC TUBES SUPPORTING THE ELEVETOR SYSTEM. INSTALLATION                                                CRAWL SPACE AND ALLOW INSTALLATIONS UNDERNEATH REDUCING CONSIDERABLY CONCRETE
IS PRECISE AND TUBES REMAIN PERFECTLY VERTICAL.                                                                                     CONSUMPTION AND INSTALLATION TIME. THE CONCRETE CONSUMPTION FLUSH WITH THE TOP LAYER
                                                                                                                                    IS 0.030 m³/m², WHILE THE AMOUNT OF CONCRETE NECESSARY TO FILL THE PILLARS IS 0.037 m³/m² PER

QUICK AND EASY SYSTEM                                 2                          2
(*)Recycled Polypropylene: Flexural modulus 1,100 N/mm - Tensile strength 35 N/mm - Coefficient of thermal expansion 0.15 mm/m/°C
                                                                                                                                    LINEAR METER OF HEIGHT.
                                                                                                                                                                                                                                                                      1                                       2                                         3


                                                          2.5 cm                                                                                                         8 cm
                                                                                                                                        15 cm


                                                                                                                                                                47 cm




                                                          58 cm                                                                                                                                                                                                       4                                       5                                         6
                                                                                                                                        58 cm




                           58 cm
                                                                                                                                                                58 cm
1st row
                                                                                                                                            1st row

                     sd
                 2        row
                                                                                                                                                      2sd row
                                                                                 2                                                                                                3                                                                                   7                            4

More Related Content

Viewers also liked (9)

20121205124618
2012120512461820121205124618
20121205124618
 
Cubierta Catálogo Cranford Collection
Cubierta Catálogo Cranford CollectionCubierta Catálogo Cranford Collection
Cubierta Catálogo Cranford Collection
 
Semana 3
Semana 3Semana 3
Semana 3
 
прокуратура мо
прокуратура мопрокуратура мо
прокуратура мо
 
campana_cesar_MMIS
campana_cesar_MMIScampana_cesar_MMIS
campana_cesar_MMIS
 
Curso gratis ita
Curso gratis itaCurso gratis ita
Curso gratis ita
 
All sports live here
All sports live hereAll sports live here
All sports live here
 
χριστουγεννιάτικη πρόσκληση
χριστουγεννιάτικη πρόσκλησηχριστουγεννιάτικη πρόσκληση
χριστουγεννιάτικη πρόσκληση
 
Shell spirax-s6-gxme-tds
Shell spirax-s6-gxme-tdsShell spirax-s6-gxme-tds
Shell spirax-s6-gxme-tds
 

Elevetor eng

  • 1. NEW ELEVETOR® / TYPICAL CALCULATION NEW ELEVETOR® / PROJECT COST ANALYSIS F inite-elementofmodelling forpozzolanalandmade by a layer of lean mix 12 cmdeep, of which 6.30 m are soft clay and 0.70 m compacted a plot of The simulated structure was assumed to be 16.82 meters long and 7 meters and lapillo. thickness, NEW ELEVETOR system ® No. BILL OF MATERIAL 1 NEW ELEVETOR® formwork UNIT/MEASURE QUANTITY m2 1 PRICE TOTAL AMOUNT 95 cm height and a slab 5 cm thickness. 2 ø 125 mm tube* No./m2 3 Plate Stress: MC (kg/cm²) 3 BASE NEW ELEVATOR® footing grid No./m2 3 -0.0484 [Pt: 2106, Nd: 2447] -0.0613 4 Installation of NEW ELEVETOR® system hours/m2 0.05 -0.0869 5 Rebar mesh ø 6 20x20 kg/m2 2.328 (cost of material and labour) -0.1125 6 Concrete class Rck 250 to fill the tubes m3/m2 (cost of material and labour) -0.1382 7 Concrete class Rck 250 to fill the formwork m3/m2 (material and labour) -0.1638 8 Concrete class Rck 250 for the floor slab thickness m3/m2 -0.1895 (material and labour) -0.2151 Total cost €/m2 -0.2408 *Supply of the tubes ø 125 mm can be discussed at the time of order. -0.2664 **Place ø 8 mm reinforcement bars within the tubes that are part of the NEW ELEVETOR® system. These inserts must be joined to the rebar mesh used to reinforce the slab, and should be long enough to reach the base of the tube. -0.2921 Fig 1) Maximum vertical tension in the clay layer with two concentrated loads of 3,500 kg at centres 2.32 m. NEW ELEVETOR® H=15 cm DATA -0.3049 [Pt: 730, Nd:1422] DIMENSION HEIGHT CONCRETE QUANTITY to fill PALLET HEIGHT No. OF UNITS/ QUANTITY Plate Disp: DZ (cm) cm H the formwork - m3/m2 m PALLET m² 0.0038 [Pt: 31443, Nd: 38983] -0.0043 58 X 58 15 0.030 2.5 225 75 -0.0205 The quantity of concrete to fill the pillars is equal to 0.037 m³/m² per meter height. -0.0366 -0.0528 Concrete consumption calculation: -0.0690 The concrete consumption for each square meter of ELEVETOR® is: [0,037 X ( )] + = [m³/m²] -0.0852 -0.1014 NEW ELEVETOR® system height in meters - 0,15 concrete -0.1175 consumption -0.1337 Example for an elevation of 2 meters: Fig 2) Effect of four 3,500 kg loads in axis to the plate axis -0.1499 Requires: Base NEW ELEVETOR® + PVC tube dia. 125 mm 182.5 cm lenght + NEW ELEVETOR® H 15 -0.1580 [Pt: 31480, Nd:39019] Concrete consumption = (0.037 x 1.85) + 0.030 = 0.098 m³/m² NEW ELEVETOR® Flooring Concrete slab Lightweight screed Screed formwork Wooden support NEW ELEVETOR® TANK SYSTEM panelist Polystyrene panelist PVC tube ø 125 mm Foundation wall Base NEW ELEVETOR® Lean-mix Gravel Existing soil LOAD TABLE for NEW ELEVETOR® H=120 cm The formwork for ventilated foundations from 70 cm to 250 cm TYPE OF Overload Min. slab Lean mix Pressure on Screed Pressure on Rebar Rebar kg/m² thickness cm the scree thickness the soil diameter mesh LOAD cm kg/cm² cm kg/cm² mm cm x cm 0 0 3.44 5 0 1.49 1,000 4 6 20 x 20 10 0 0.82 Stormwater management systems for both residential and industrial use can be made using NEW ELEVETOR®. Tanks can be built for temporary stormwater storage and attenuation, or permanent storage and reuse. The NEW ELEVETOR® system 5 1.49 10 0.52 allows to build tanks of any shape and up to 2 meters depth without using cranes or heavy-lifting equipment. RESIDENTIAL 0 0 5.68 Disclaimer: the values shown in this brochure are for guidance only. They are not meant to be used for design criteria. Their use and reliance thereon for any purpose by anyone is entirely voluntary and at the sole risk of the user. GEOPLAST is not responsible for any loss, claim, or damage resulting from their use. 5 0 2.45 1,800 5 6 20 x 20 10 0 1.36 ST. 11/2011 REV. 004 5 2.45 10 0.86 5,000 7 10 3.48 25 0.67 6 20 x 20 INDUSTRIAL 10,000 10 15 4.30 30 0.87 8 20 x 20 www.geoplast.it 5
  • 2. NEW ELEVETOR® / USE AND CHARACTERISTICS NEW ELEVETOR® / USE AND CHARACTERISTICS NEW ELEVETOR® / HOW TO INSTALL Create ventilated foundations of any height The formwork is treadable before pouring • Installation surface: cover the subgrade with lean mix to create an even surface for NEW ELEVETOR®. High load-bearing capacity Lean mix thickness to spec; It can be laid on the subgrade without lean mix • Installation: place the NEW ELEVETOR® system made by GEOPLAST S.p.A., made by polypropylene formwork size 58 x 58 x h15 cm, joined with tubes Ø 125 mm of length as by project specification, with BASE NEW ELEVETOR® footing grid, assembled before the concrete pour: 1. Lay the BASE NEW ELEVETOR® footing grid (58 x 58 x h2.5 cm): it is recommended to place the parts from right to left and from top to bottom. 2. Fit tubes into each cup of the footing grid. The tubes are cut to the length suitable to achieve the specified height of NEW ELEVETOR® (from 70 to 200 cm). 3. Place the NEW ELEVETOR® FORMWORK (58 x 58 x h15): the operation is performed attaching the parts to the tubes from the right-hand side to the left, and from top to bottom, always keeping the printed arrow upwards. 4. The Grid + Tube + Formwork assembly guarantees a perfect perpendicularity of the pillars within the foundation. 5. Place the specified rebar mesh over the surface of the NEW ELEVETOR® system (ref. to load table). 6. Place ø 8 mm reinforcement bars within the tubes that are part of the NEW ELEVETOR® system. These inserts must be joined to the rebar mesh used to reinforce the slab, and should be long enough to reach the base of the tube. 7. Slab pour: use a Rck 250 kg/cm² concrete to fill the tubes and the formwork, cover the rebar mesh and reach the designed slab thickness. BASE NEW ELEVETOR® / ADVANTAGES AND CHARACTERISTICS NEW ELEVETOR® FORMWORK / ADVANTAGES AND CHARACTERISTICS BASE NEW ELEVETOR® IS AN ELEMENT IN RECYCLED POLYPROPYLENE (*) THAT GUARANTEES AN EASY NEW ELEVETOR® IS AN INNOVATIVE SYSTEM WITH DIMENSIONS 58X58 H15 CM THAT CREATES A AND QUICK INSTALLATION OF THE PVC TUBES SUPPORTING THE ELEVETOR SYSTEM. INSTALLATION CRAWL SPACE AND ALLOW INSTALLATIONS UNDERNEATH REDUCING CONSIDERABLY CONCRETE IS PRECISE AND TUBES REMAIN PERFECTLY VERTICAL. CONSUMPTION AND INSTALLATION TIME. THE CONCRETE CONSUMPTION FLUSH WITH THE TOP LAYER IS 0.030 m³/m², WHILE THE AMOUNT OF CONCRETE NECESSARY TO FILL THE PILLARS IS 0.037 m³/m² PER QUICK AND EASY SYSTEM 2 2 (*)Recycled Polypropylene: Flexural modulus 1,100 N/mm - Tensile strength 35 N/mm - Coefficient of thermal expansion 0.15 mm/m/°C LINEAR METER OF HEIGHT. 1 2 3 2.5 cm 8 cm 15 cm 47 cm 58 cm 4 5 6 58 cm 58 cm 58 cm 1st row 1st row sd 2 row 2sd row 2 3 7 4