2. 2
Dear colleagues and partners!
As one of the largest business centers of Ukraine, Dnipropetrovsk region builds open and reliable
partnerships with investors. Investment capital is primarily a source for the creation of appropriate job
positions, renovation and modernization of existing production, launching promising new projects for
business development.
External investments are the indicators of the condition of economic development of the region and our
country in whole and improve the social component of life in Ukraine.
Despite the current challenges, Dnipropetrovsk region remains attractive for investors - all regional
investors continue to work in Dnipropetrovsk region. Unique mineral resources of our land, fertile soils,
favorable geographical location, developed infrastructure, powerful metallurgical complex and chemical
industries, precision engineering, rocket and space technology are of exceptional interest in all parts of the
world. But first of all, Dnipropetrovsk region is a hard-working, talented, intellectually developed people
whose hands create the future.
Dnipropetrovsk Regional Investment Agency (DIA) has been created and successfully operated for over 5
years ago to implement the comprehensive support of investment projects at the regional level. DIA has
proved itself to foreign and domestic companies, business associations, local communities in the best
possible way.
Today DIA continues to effectively carry out the task of maintaining investment activity in the region and provide assistance at all stages of
the investment project - from site selection and licensing procedures to the construction of a new facility and start operation. Thanks to
DIA, potential investors have access to unbiased information about existing possibilities and priorities of the region.
Foundation of relationship with investor is laid at the national level, and flexible limits of the delegated powers of regional authorities can
create conditions for a favorable investment climate in the region.
We are open to constructive dialogue and mutually beneficial long-term partnership. All interested investors will be provided from our side
with guaranteed support and maintenance of investment projects. Our goal is the promising development of Dnipropetrovsk region! Joint
successes and achievements are the key advantages for future victories in an unpredictable competitive environment.
Yours faithfully,
Chairman of Dnipropetrovsk Regional State Administration Valentyn REZNICHENKO
3. Dear colleagues and partners!
Today Dnipropetrovsk region is one of the largest economic centers in Ukraine and strives for the
open and mutually beneficial relationship with investors, because it is expressly understood that
investments are the creation of additional employment and improvement of social environment for
Ukrainians.
Dnipropetrovsk region has all parameters, which make region attractive to foreign investors. The
region has advantageous geographical location, powerful industrial, scientific, intellectual
development level, high concentration of engineering infrastructure.
For our part, the regional government guarantees for investors the availability of government,
transparent conduct of business rules, equal access to the land, transport and energy resources.
At the regional level we provide the comprehensive and system support of investment projects.
For this purpose in 2011, we created the Dnipropetrovsk Regional Investment Agency
(DIA), the effectiveness of which was recognized by investors’ companies and representatives of
business association.
DIA’s function is to present various opportunities of the region to our potential investors as well as
possible. Moreover, DIA administrates and provides support at all stages of investment project
implementation – from the stage of site selection and passing of licensing procedures to the
construction of new object and start of work.
3
DIA allows establishing effective international dialogue and making the process of cooperation most comfortable for potential
partners.
We are the patriots of our country. Above all things we appreciate peace and stability! That is why we create all necessary
conditions for effective, stable and safety entrepreneurial activity.
We will be glad to see you in Dnipropetrovsk region, we guarantee support and administration of all investment projects, together
we will work for achieving headway!
Yours faithfully
Chairman of Dnipropetrovsk
Regional Council Gleb Prigunov
4. 44
Dnipropetrovsk Investment Agency (DIA)
Established by
Dnipropetrovsk
Regional
authorities
More than 5
years of
successful
cooperation
with local and
foreign
companies
12 implemented
projects
$93 million
Projects
portfolio: 72
projects
amounting to
$ 1,9 billion
Services of the
Agency are free
5. 5
Initiates creation of
perspective investment
projects
Generates and provides
primary analytical
information
Performs primary
selection of site
Assists in selection of
potential partners
About 350 sites with total area of
13,8 thousand hectares are presented
Land plots base
Over $ 1,9 billion.
Investment proposals portfolio
Base of competences
More than 150 regional companies of
different sectors are presented
DІА functions Results of DІА
Provides services of
personal investment
manager
The main objective of the road map is
to provide full information concerning
passing the licensing procedures for
starting business in Ukraine
Investor’s road map
DIA AS INSTRUMENT FOR ATTRACTING INVESTMENT
PROJECTS
7. 7
The strategic goal of industrial parks creation the Dnipropetrovsk region – is
regional economy diversification
“Kryvbas” Industrial Park
(Kryvyi Rih)
Area: 26,03 ha
Functional zones • Logistics,
• Machine building,
• Manufacturing of structural material
Distance from the nearest
transport corridor
Highway Н-11 – 5,5 km;
Railway station Kryvyi Rih Sorting” -
1 km
Recourse administrator Kryvyi Rih city Council
“Pavlohrad” Industrial Park
(Pavlohrad district, city of Pavlohrad)
Area: 250 ha
Functional zones • Machine building and energy engineering.
• Logistics.
• Agricultural processing.
• Structural materials.
• Light and processing industry and hi-tech
Distance from the
nearest transport
corridor
• Highway Е-50 (М-04) – 1 km
• Railway station “Pavlohrad-2” - 1,2 km
Recourse
administrator
Dnipropetrovsk Regional State
Administration
“DNEPRINTERHUB” Industrial Park
(Dnipropetrovsk)
Area: 73 ha
Functional zones • Machine building and
instrument engineering.
• Structural engineering,
• Investigation center,
• Logistics.
Distance from the nearest
transport corridor
Highway Е-50 (М-04);
3 railway station in a radius 3 km
Recourse administrator Interpipe company
Pavlohrad
Dnipropetrovsk
Kryvyi Rih
Industrial parks of Dnipropetrovsk region
8. Dnipropetrovsk
Kryvyi Rih
Land plot of “Kryvbas” Industrial Park
City of Kryvyi Rih
Area: 26,03 ha
Intended use Industrial land,
Greenfield
Functional zones according to
the concept
Logistics,
Machine building,
Manufacturing of structural
material
Electricity (nearest electrical
substation, its capacity and
remoteness)
Kryvyi Rih Metrotram-150;
2500 m.
Gas (nearest gas distribution
substation, its carrying capacity
and remoteness)
Gas pipe line 5500 m3/hour;
100 m.
Water supply (nearest
connection point, its carrying
capacity and remoteness)
Network of the city of Kryvyi
Rih, ø225mm; 1000m
Water discharge (nearest
treatment facilities, their
remoteness)
2 000 m
Distance from the nearest
transport corridor (highways
railway stations)
Highway Н-11; 5500 m
Railway station Kryvyi Rih
Sorting” ;1000 m
Recourse administrator Kryvyi Rih city Council
8
26,3 ha
9. Dnipropetrovsk Pavlohrad district
Land plot of “Pavlohrad” Industrial Park
Pavlohrad district, city of Pavlohrad
Area: 250 ha
Intended use Industrial land, Greenfield
Functional zones according to the
concept
Machine building and energy
engineering. Logistics.
Agricultural processing.
Structural materials. Light
and processing industry and
hi-tech
Electricity (nearest electrical
substation, its capacity and
remoteness)
Substation 150/10/6 PJSC
«CEC» 500 m.
Gas (nearest gas distribution
substation, its carrying capacity and
remoteness)
Meter station PMP, 1000 m.
Water supply (nearest connection
point, its carrying capacity and
remoteness)
Network of the city of
Pavlohrad, 63m3/hour;
2000m
Water discharge (nearest treatment
facilities, their remoteness)
4 000 m
Distance from the nearest transport
corridor (highways railway stations)
Highway Е-50 (М-04) 1000m
Railway station “Pavlohrad-
2” 1200 m
Recourse administrator Dnipropetrovsk Regional
State Administration
9
250 ha
10. Dnipropetrovsk
Land plot of “DNEPRINTERHUB” Industrial Park
Dnipropetrovsk
Area: 73 ha
Intended use Industrial land, Brownfield
Functional zones according to
the concept
Machine building and instrument
engineering. Structural
engineering, Investigation center,
Logistics.
Electricity (nearest electrical
substation, its capacity and
remoteness)
24 MW in the territory
Gas (nearest gas distribution
substation, its carrying
capacity and remoteness)
3 electrical substation (low and
middle pressure) in the territory
Water supply (nearest
connection point, its carrying
capacity and remoteness)
Pumping water in the territory
Water discharge (nearest
treatment facilities, their
remoteness)
In the territory
Distance from the nearest
transport corridor (highways
railway stations)
Along the territory of the
Slobozhanskyi Ave, which
crosses the highway Е-50 (М-
04);
3 railway station in a radius 3 km,
railway lines in the territory
Recourse administrator Interpipe company
73 ha
10
13. Dnipropetrovsk
Zhovti Vody
Land plot
Zhovti Vody
Area: 16 ha
Intended use The land plots target for
industrial use
Availability of the
communications on the lad plot
Electricity (nearest electrical
substation, its capacity and
remoteness)
35kV, 560m
Gas (nearest gas distribution
substation, its carrying capacity
and remoteness)
gas distribution substation
3 atm; 6500 m
Water supply (nearest connection
point, its carrying capacity and
remoteness)
ø400mm; 400m
Water discharge (nearest
treatment facilities, their
remoteness)
Distance from the nearest
transport corridor (highways
railway stations)
Railway station “Zhovti
Vody-2”; 2000 m
Recourse administrator Zhovti Vody City Council
13
14. Dnipropetrovsk
Vilnohirsk
Land plot
Vilnohirsk
Area: 22,32 ha
Intended use Industrial land
Availability of the
communications on the lad plot
Electricity (nearest electrical
substation, its capacity and
remoteness)
DP2; 120 m.
Gas (nearest gas distribution
substation, its carrying capacity
and remoteness)
gas distribution substation
2500 m3/hour; 120 m.
Water supply (nearest connection
point, its carrying capacity and
remoteness)
Network of the city of
Vilnohirsk, ø200mm;
100m
Water discharge (nearest
treatment facilities, their
remoteness)
Sewer ø600mm; 150m
Distance from the nearest
transport corridor (highways
railway stations)
Railway station
“Vilnohirsk”, 700m
Recourse administrator Vilnohirsk City Council
14
15. Dnipropetrovsk
Synelnykove
Land plot
Synelnykove
Area: 28 ha
Intended use Industrial land
Availability of the
communications on the lad plot
Electricity (nearest electrical
substation, its capacity and
remoteness)
Resor Substation,
154/35/10 kV, 500m
Gas (nearest gas distribution
substation, its carrying capacity
and remoteness)
gas distribution substation
3 atm; 11 000 m.
Water supply (nearest connection
point, its carrying capacity and
remoteness)
ø1200mm; 800m
Water discharge (nearest
treatment facilities, their
remoteness)
700 m3/day; 300m
Distance from the nearest
transport corridor (highways
railway stations)
Highway М-18; 500m;
Railway station
“Synelnykove-1”;2000 m
Recourse administrator Synelnykove City Council
15
17. Investment-attractive agricultural land
175 plots of agricultural lands
of state property included in
the list of investment-
attractive land
About 3.8 thousand
hectares - total area of the
land masses, offered to
investors
It is planned to lease lands at
open auctions.
Dnipropetrovsk
Novomoskovsk
district
Tsarychanka district
Kryvyi Rih district
17
19. Solar power energy in Dnipropetrovsk region
19
Advantages
Average quantity of sunny hours – 1900 – 2400
Level of sun radiation per year – 1300 – 1450 kWt
Average level of sun radiation - 3,36 kWt/h/sq. meter per day
Green tariff
01.01.2016 – 31.12.2016 year – 0,19 €
01.01.2017 – 31.12.2019 year – 0,18 €
01.01.2020 – 31.12.2024 year – 0,16 €
01.01.2025 – 31.12.2030 year – 0,14 €
Average price for suppliers*
01.03.2016 – 31.08.2016 year – 0,04 €
01.09.2016 – 28.02.2017 year – 0,045 €
01.03.2017 - 0,58 €
Time of action of “Green tariff” – till 2030 year
19
20. Construction of solar power station with 800 MW of power
20
Project
information
Project’s initiator
Organization name: “Dnipropetrovsk Regional Investment Agency
Contact person: Neliubov Andrii
Contact information, web-site, e-mail: +38 056 742 81 22,742 86 21
info@dia.dp.ua, obl_project@ukr.net
Project specification – Construction of solar power station:
• 800 MW
Project economic indices
•The land plot area for SPS placement– 1986 ha;
•The productive efficiency of SPS – 80%
• Preliminary economic evaluation of SPS project 800 MW.
• The requirement for human resources is about 3000 people for the construction period and 400
permanent employee
Indices
• The total capacity of solar panels - 800 MW
• The surface area for placement of solar panels to 2 ha
• Capital investments – ЕUR 1 200 000 000.
• Unit value of project implementation - 1.5 EUR/W
20
21. 21
Nikopol district
Nikopol district
Площа: 1986 га
Cohesiveness of land plot 5 plots
Solar output per year 1.422 kW/m2
Productive efficiency of SPS 80%
Distance from the nearest transport
corridor (highways railway stations)
5-10 m
(highway М-04
Znamianka-Luhansk-
Izvaryne)
Recourse administrator DIA
Land plot for project implementation
21
22. Construction of solar power station
Project
information
Project’s initiator
Company’s name: LLC Arkhrozvytok
Contact person: Shatov Volodymyr
Contact information, web-site, e-mail: +38 067 295 85 37,
arhrozvytok@gmail.com
Project specification – Construction of solar power station:
• 2.4 MW (Pidhorodnie)
Project economic indices
•The land plot area for SPS placement - 4.86 hectares;
•The proximity to external power networks with a capacity of 10-35 kV;
•Efficiency in the spring and summer - 70%;
•Efficiency in the autumn-winter period - 30%;
•Preliminary economic evaluation of SPS project 2400 kW.
Indices
Quantity.
• The total capacity of solar panels - 2,4 MW
• The surface area for placement of solar panels to 4.86 hectares
• Forecasting volume of minimal electricity (for base year) - 2,9GW · hr. / Yr
• Capital investments - EUR 2700000.
• The specific cost of the project - 1.4 Euro / W
• The period of putting into operation until 31.12.2016
• The value of "green" electricity tariffs - 0.19 EUR / kWh with VAT.
22
23. Pidhorodnie
Pidhorodnie
Area: 4,86 ha
Intended use Land plot of energy
power
Electricity (nearest electrical
substation, its capacity)
10-35 кВ
Distance from the nearest transport
corridor (highways railway stations)
5-10 m
(highway М-04
Znamianka-Luhansk-
Izvaryne)
Recourse administrator LLC Arkhrozvytok
Land plot for project implementation
23
24. Construction of the solar power plants
Project
information
Project’s initiator
Company name: Еkotehnik
Head: Director, Yurii Zasyadvovk
Contact telephone, website, e-mail: +38 097 076 92 23, Ekotehnik@ukr.net
Project specification: Construction of the solar power plants:
• 10 MWt (Shyroke district)
• 10 MWt (Kryvyi Rih district)
• 7 Wt (Nikopol district)
24
25. Dnipropetrovsk
Shyroke district
Shyroke district, Shestyrnya Village Council
Area: 21 ha
Intended use Lands of electric power
Electricity (nearest electrical
substation, its capacity and
remoteness)
150 m
Water supply (nearest connection
point, its carrying capacity and
remoteness)
300-400 m
Distance from the nearest transport
corridor (highways railway stations)
5-10 m
(highway Dnipro-Kryvyі Rih-
Kherson)
Resource administrator Еkotehnik
Land plot for the project implementation
25
26. Dnipropetrovsk
Kryvyi Rih district
Urban Type Settlement Radushne, Kryvyi Rih district
Area: 20 ha
Intended use Lands of electric power
Electricity (nearest electrical
substation, its capacity and
remoteness)
1 km
Gas (nearest gas distribution
substation, its carrying
capacity and remoteness)
1 km
Water supply (nearest
connection point, its carrying
capacity and remoteness)
Well bore in the land
plot territory
Distance from the nearest
transport corridor (highways
railway stations)
400 (highway Kryvyi
Rih-Nikopol)
Resource administrator Еkotehnik
Land plot for the project implementation
26
27. Dnipropetrovsk
Nikopol district
Land plot for the project implementation
Nikopol district
Area: 15 ha
Intended use Lands of electric power
Electricity (nearest electrical
substation, its capacity and
remoteness)
50-60 m (in the territory of
Nikopol Ferroalloy Plant)
Water discharge (nearest
treatment facilities, their
remoteness)
No Information available
Distance from the nearest
transport corridor (highways
railway stations)
400
(Kryvyi Rih-Nikopol)
Resource administrator Еkotehnik
27
29. Comprehensive project of construction of solar power station
and fishing industry
29
Project
information
Project’s initiator
Organization name: “Dnipropetrovsk Regional Investment Agency
Contact person: Neliubov Andrii
Contact information, web-site, e-mail: +38 056 742 81 22, 742 86 21,
info@dia.dp.ua, obl_project@ukr.net
Project specification: Comprehensive project of construction of solar power station and
fishing industry
• capacity of SPS - 5,5 MW
• processing of fish products – 3000 tons
Project economic indices
•The land plot area for SPS placement – 13 ha;
Indices
• Total project cost – ЕUR 12 362 673
• Unit value of project implementation – 1,1 EUR/W
• Project pay back period – 5 - 8 years
29
30. 30
Tsarychanka district
Tsarychanka district
Building area: 13 ha
Area of water line: about 270 ha
Distance from the nearest transport
corridor (highways railway stations)
300 m
(highway Р-52 Dnipro
–Tsarychanka-
Kobeliaky)
Recourse administrator DIA
Land plot for project implementation
30
32. Investment projects of Yuzhnoye State Design Office
32
Project information
Project’s initiator
Initiator’s title: Yuzhnoye State Design Office
Legal address: 49008, Dnipropetrovsk region, city of Dnipropetrovsk, 3, Kryvorizka Str.
Contact information, web-site, e-mail: +38 0562 42 00 22; +38 056 738 64 03, 770 01
25; e-mail: space@yuzhnoye.com, info@yuzhnoe.com, www.yuzhnoye.com
Project specification: Organization of containers manufacturing for transportation of natural
compressed gas
Project cost (thousd. USA dollars) and the way of investment funds attraction:
9 600,0 (requirement for investment fund) . Loan funds against state security or targeted
budget financing
Project pay back period: 6,3 years
Project specification: Organization of carbon fiber production
Project cost (thousd. USA dollars) and the way of investment funds attraction: 9 000,0
(requirement for investment fund). Loan funds against state security
Project pay back period: 8,7 years
Project specification: Organization of manufacturing of semi-finished goods of aluminum-
alloys on the production base of steel enterprises of Ukraine
Project cost (thousd. USA dollars) and the way of investment funds attraction:
901 000,0 (requirement for investment fund). Loan funds against state security or targeted
budget financing
Project pay back period: 6, 65 years
32
33. Investment projects of the State Enterprise „Production Association
Yuzhny Machine-Building Plant named after A.M. Makarov” (1/2)
33
Project information
Project’s initiator
Initiator’s title: State Enterprise „Production Association Yuzhny Machine-Building Plant
named after A.M. Makarov” (YUZHMASH)
Legal address: Ukraine, Dnipropetrovsk, 1, Kryvorizka Str.
Contact person: Nehramotnov Anatolii, Executive director of MK «ZRAA» tel./fax: +38 0562 31
37 41
Contact information, web-site, e-mail: www.yuzhmash.com, umz@yuzhmash.com,
+38 0562 34-40-07, fax: +38 0562 39-95-00
Project specification: “Creation of incremental capacity at the State Enterprise „Production
Association Yuzhny Machine-Building Plant named after A.M. Makarov” for expanding of landing
gear production for plane model AN-140, AN-148 and other air aggregate and systems”
Project’s aim: to create incremental capacity at the State Enterprise „Production Association
Yuzhny Machine-Building Plant named after A.M. Makarov” for expanding of landing gear
production for plane model AN-140, AN-148 and other air aggregate and systems
Assigned task: increasing of carrying capability of landing gear production for plane model
AN-140, AN-148 and other air aggregate and systems; labour intensity reduction; ensure the stable
operation of the enterprise
Project cost (thousd. USA dollars) and the way of investment funds attraction: USD 12,03
mln, USD 10,11 mln from which is the sum of needed investment
Terms of attraction of credit resources: The project provides the loans with repayment period of
4 years at 21.5% per annum. This loan provides the state support in the form of partial
reimbursement (50% of the interest rate) from the state budget, the interest rate for availability of
credit resources
Project pay back period: discounted payback period (DPB) is 5,43 year, pay back period (PP) is
3,94 years, net present value (NPV) is USD 3,00 mln, profitability index (PI) – 1,26
33
34. Investment projects of the State Enterprise „Production Association
Yuzhny Machine-Building Plant named after A.M. Makarov” (2/2)
34
Project information
Project’s initiator
Initiator’s title: State Enterprise „Production Association Yuzhny Machine-Building Plant
named after A.M. Makarov” (YUZHMASH)
Legal address: Ukraine, Dnipropetrovsk, 1, Kryvorizka Str.
Contact person: Harmash Viktor, Deputy Director of PC “DTZ” tel: +38 (0562) 35-31-61
Contact information, web-site, e-mail: www.yuzhmash.com, umz@yuzhmash.com,
+38 0562 34-40-07, +38 0562 39-95-00
Project specification: “Organization of tractors production of UMZ brand with 80-100 horsepower
on the basis of capacities of the State Enterprise „Production Association Yuzhny Machine-Building
Plant named after A.M. Makarov”
Project’s aim: bringing to market of new models of domestic production tractors, which hold out for
technical indicators own their foreign analogues and thus provide a technical update of technical park
of agricultural manufacturers with modern and energy-packed tractors.
Universal and cultivating UMZ tractors allow to install the equipment of special purpose for use as
excavator, bulldozer, loader. UMZ tractors can be operated in areas with temperate and tropical
climates.
Project cost (thousd. USA dollars) and the way of investment funds attraction: USD 23,11
mln is the project costs and sum of needed investment
Terms of attraction of credit resources: The project provides the loans under state guarantee
for a period of 7.5 years with a return of 21.5% per annum
Project pay back period: discounted payback period (DPB) is 9,5 year, pay back period (PP) is
7,3 years, net present value (NPV) is USD 15,00 mln, profitability index (PI) is 1,03
34
35. Construction of residential and commercial micro district
"Volodymyrskyi" in uts. Yuvileine of Dnipropetrovsk district
Project information
Opportunities for
cooperation
Project’s initiator
Initiator’s name: LLC Agrarian-Production Enterprise "Sodruzhestvo"
Primary activity: -
Legal address: 52005, Dnipropetrovsk region, Dnipropetrovsk district,
uts. Yuvileine, 23, 8 March Str.
Head: Director General - Volodumyr Kononov
Contact person: Tetyana, +38 056 753 89 10
Contact information, web-site, e-mail: +38 050 320 62 29, Sodr1@ukr.net
Cooperation variants: sublease, assignment of lease rights
Other types of joint activities – prospects of using of the construction site: residential
construction, commercial real estate (retail parks), the establishment of the regional wholesale
market food products
Project specification: Construction of residential and commercial micro district "Volodymyrskyi" in
uts. Yuvileine of Dnipropetrovsk district
Project location: Territory has advantageous location and located at the crossroads of transport
routes of international importance. The distance to the central part of Dnipropetrovsk is 10 km
Cost and project implementation period: approximate period of the project implementation is 7-
10 years
Resources of initiator for the project implementation:
its own construction base with the area of 7 hectares, which is adjacent to the micro district;
90 units of construction equipment;
Its own production line of foam concrete, cinder block, own carpentry shop;
2 construction units and design team.
35
36. uts. Yuvileine
Dnipropetrovsk
Land plot for the construction
Area: 40,2626 hа
Intended use For residential and public construction
The availability of the land
plot communications
All engineering networks are supplied to the
territory of micro district
Electricity (nearest electrical
substation, its capacity and
remoteness)
Currently, the electricity supplies to the
neighboring residential micro district at a
rate of 2 MWt, it is received technical
specifications for 6 MWt
Gas (nearest gas distribution
substation, its carrying
capacity and remoteness)
Gas highway networks were laid and taken
into operation
Water supply (nearest
connection point, its carrying
capacity and remoteness)
Water supply highway networks were laid
and taken into operation
Water discharge (nearest
treatment facilities, their
remoteness)
Water discharge highway networks were
laid and taken into operation
Distance from the nearest
transport corridor (highways
railway stations)
Territory has advantageous location and
located at the crossroads of transport
routes of international importance. The
distance to the central part of
Dnipropetrovsk is 10 km
Resource administrator LLC Agrarian-Production Enterprise
"Sodruzhestvo"
36
37. Construction of refrigerator with regulated gas environment for
fruits storage and establishment of a fruit and vegetable orchard
Project information
Opportunities for
cooperation
Company’s profile
Company’s name: Farm enterprise Vidrodzhennia
Primary activity: Growing agricultural products
Legal address: 51822, Ukraine, Dnipropetrovsk region, Petrykivka district, Khutorske village,
23A, Lenin Str.
Company executive: Yarmoliuk Ivan,
Contact information, web-site, e-mail: +38 05634 2 35 45; minisad@ukr.net
Project specification: Refrigerator construction with regulated gas environment is designed for high
quality fruits and vegetables storage with subsequent sorting, packing, consumer delivery.
Total refrigerator capacity is 5 000 tones.
Availability of project business plan: under development
Project costs and implementation period: EUR 7 245,90 thousd.; 24 months.
Market outlets: markets-wholesale markets, trade networks of Ukraine.
Project readiness degree: design works are completed.
37
Credit, venture capital, project financing.
Other kinds of joint activity – creation of joint venture.
38. Reconstruction of the modern industrial area of processing and
freezing of food products
Project information
Opportunities for
cooperation
Project’s initiator
Initiator’s name: LLC TRADE DIl M.
Primary activity: Classifier of economic activities 10.20; 03.12
Legal address: Nikopol district, v. Kamyanske
Head: Director - Oleksandr Moroz
Contact information, web-site, e-mail: +38 050 500 53 51, +38 067 523 0595, morozai-
64@mail.ru
Project specification: Modern foreign approach to the production (processing) freezing of food products
through reconstruction of the existing refrigerator chambers.
Project location: Industrial building is located on the entrance route to the city of Nikopol on the banks
of the Kakhovka Reservoir, 700 m from the road (forked road for Dnipropetrovsk, Kryvyi Rih,
Zaporizhzhya). Area of the land plot is 1 ha. The available communications of the land plot are: gas
pipeline, electricity, water supply system, wastewater disposal, sealed road. The area of the building is
3000 m2 (production facility for air-and-sunshine drying, smoke drying, fish processing including
refrigerating chambers of 800m2, height of ceilings is 5 m, 2 loading platforms). There is water supply
intake from the river Dnipro.
Cost and project implementation period: 750 000 $
Resources of initiator for the project implementation: 250 000 $
Cooperation variants is the joint venture creation: LLC TRADE Dil M. is ready to create the new
company, where the main owner of the industrial area will be an investor, who would finance preparing
of business plan, the reconstruction of the building, develop logistics and others necessary processes.
LLC TRADE DIl M. expects to have a share in this business. LLC "TRADE Dil M. is open and ready to
discuss any conditions. The main goal is to create the profitable enterprise with the ability to freezing and
storage of food products.
38
39. Dnipropetrovsk
Land plot for the project implementation
Nikopol district, v. Kamyanske
Area: 1 hа
Water supply (nearest connection
point, its carrying capacity and
remoteness)
There is water supply intake
from the river Dnipro
Water discharge (nearest treatment
facilities, their remoteness)
is available
Distance from the nearest transport
corridor (highways railway stations)
Sealed road is available.
700 m from the road (forked
road for Dnipropetrovsk, Kryvyi
Rih, Zaporizhzhya).
Recourse administrator LLC “TRADE DIl M.”
Nikopol
39
40. Creation of industrial greenhouse facility in Kryvyi Rih
Project information
Opportunities for
cooperation
Project’s initiator
Initiator’s name: Kryvyi Rih City Council
Primary activity: Local government body
Legal address: Kryvyi Rih, 1 Radyanska Sq.
Head: Vilkul Yuriy
Contact person: Vera Kharchenko
Contact information, web-site, e-mail: +38 056 492 98 48, irm_kr@i.ua
Cooperation variants is the joint venture creation: To act as an investor placing own
production
Project specification: Creation of industrial greenhouse facility (protected soil) for
growing vegetables (cucumbers, tomatoes) in Kryvyi Rih (Dnipropetrovsk region) in the
area of 1 hectare
Project location: Kryvyi Rih
Cost and project implementation period: TBD
Resources of initiator for the project implementation: land plot
40
41. Dnipropetrovsk
Kryvyi Rih
Land plot
Kryvyi Rih
Area: 1 ha
Land plot location Kryvyi Rih, Dovhyntsi district,
Blahoyeva Str.
The availability of the land
plot communications
Water supply / Electricity
networks are available close
to the land plot
Recourse administrator
Kryvyi Rih City Council
41
43. Object construction of MSW management within the “Western
Donbas” sub-region of Dnipropetrovsk region
Project information
Opportunities for
cooperation
Project’s initiator
Initiator’s name: Pavlohrad City Council
Primary activity: local government body
Legal address: 51400, Pavlohrad, 95 Lenin Str.
Head: Anatolii Vershyna , City Mayor
Contact person: Department on investment attraction, project implementation and regulatory policy of
Pavlohrad City Council
Contact information, web-site, e-mail: +38 0563 20 02 88, pavlogradinvest@mail.ua
Credit, venture capital, project financing : is determined by the investor in cooperation with Pavlohrad City
Council
Other types of joint activities:
providing land plot by the necessary area for the plant construction for the MSW management;
collaboration for the conclusion of agreements for the supply of necessary volume of raw materials to the
object;
assistance in obtaining specifications and laying on the communication to the chosen land plot;
assistance in obtaining the necessary permits, licenses and certificates for construction and operation of the
enterprise;
collaboration with key customers of products of MSW processing to conclude of long-term agreements.
Project specification: the introduction of Comprehensive effective system of municipal solid waste management
involves the implementation of investment project “Object construction of MSW management within the "Western
Donbass“ sub-region in the territory of Pavlohrad „.
Project location: Pavlohrad, Pavlohrad district. The plot for the future object is adjacent to the existing polygon of
Pavlohrad.
Cost and project implementation period: is determined by the investor.
Resources of initiator for the project implementation: Comprehensive research of MSW management in the
"Western Donbass“ sub-region territory is supported by DTEK Pavlogradugol and Federation of Canadian
Municipalities (FCM) within the MLED project, Ukrainian Scientific and Research Institute for the development and
implementation of municipal programs and projects.
43
44. Potential land plot for the construction
Pavlohrad
Area: 10 hа
Intended use land plots of industrial use
Key indicators of the
project
The total population is: 227 109 persons
including:
• Urban population is 168 060 persons (74%)
• Rural population is 59 049 persons (26%).
About 75% of the population of the subregion
are dealing with the services of removal of
MSW.
The annual volume of waste formation in 2015
was approximately 45 ths. tonnes.
Components of MSW,
%
Wood (furniture, boards, plywood) 60
Ceramic materials and products
(sheet glass, plumbing equipment)
15
Metal (Metal components of electrical
and electronic equipment, etc.)
10
Paper and cardboard (large-sized
packages)
6
Rubber, leather, products made of
mixed materials
5
Polymers 4
Companies, that are
involved in MSW
removal
7 companies are involved in removal and
collection of MSW, large-sized and repair waste
in the territory of settlements of Subregion:
5 municipal and 2 private ownership.
44