MILLING AND WELL CONTROL
Kicks occur when formation pressures exceed mud hydrostatic pressure, formation
fluids enter well bore. Uncontrolled influx of formation fluids leads to blow out
Causes of kicks
• Failure to keep the hole full
• Insufficient mud density
• Swabbing during tripping
• Lost circulation
Detecting kicks
• Pit volume gain
• Increased flow on return line
• Drilling break
• Incorrect fill-up on trips
• Decrease in circulating pressure
• Shows of oil, gas or salt water
• increase in hook load
Presentation title - Place and Country - Date Month Day Year 2
WELL CONTROL AND MONITORING
KICKS AND BLOW OUT
Presentation title - Place and Country - Date Month Day Year 3
Annular preventer
•13 5/8” X 5000 shaffer Annular Preventer
•Uses a ring of synthetic rubber to close around
any pipe size
•Utilise upward well pressure to remain closed
•Allows stripping
•Operated hydraulically
Pipe rams
•Close around specific pipe sizes
Blind rams
•Close in when there is no pipe in hole
WELL CONTROL AND MONITORING
WELL CONTROL EQUIPMENT
Blow out preventers
Seal off the well when a kick is detected
Drilling spool
Provides connection for choke and kill lines
Presentation title - Place and Country - Date Month Day Year 4
Accumulator unit
Provides means of opening or closing the BOPs and HCR values
Accumulator bottles
•Maintains hydraulic fluid at high pressures
•10gallons Ea
•N2 at 1000Psi
•Operating pressure of 3000Psi
Pumps
•Electric pump automatically pumps hydraulic
fluid to maintain pressure in bottles
•Pneumatic pumps are backups
Reservoir
•Stores hydraulic fluid (1500L)
Pressure regulators
•control pressures to open annular and ram
preventers
WELL CONTROL AND MONITORING
WELL CONTROL EQUIPMENT
Driller’s bop control panel
Controls opening and closing of BOPs and choke line
Presentation title - Place and Country - Date Month Day Year 5
• Used to circulate out a kick
• A system of valves and lines provides
several flow routes
• Consists of adjustable manual and
hydraulic chokes
• Chokes are adjusted to keep the right
amount of back pressure on the well
WELL CONTROL AND MONITORING
WELL CONTROL EQUIPMENT
Choke manifold
Choke manifold control pannel
• Used to adjust the choke opening
• Watching pressures on drill pipe and casing and
pump rates allows maintaining of a constant BHP
Presentation title - Place and Country - Date Month Day Year 6
Separates gas from drilling mud
Design features
•Height and diameter to handle mud volumes
•Diameter and length of gas outlet
•Internal baffle plates for gas break out
•U-tube arrangement to maintain fluid head in
separator
WELL CONTROL AND MONITORING
WELL CONTROL EQUIPMENT
Poor boy Degasser
Equipment testing
• BOPs, choke and kill manifolds, choke and kill lines, accumulators must be regularly
pressure and function tested
• Low pressure test 500Psi X5min
• High pressure test 3000psi X10min
Drill string valves
• Kelly cock values
• Full opening safety valves (FOSV) or TIW
Presentation title - Place and Country - Date Month Day Year 7
WELL CONTROL AND MONITORING
WELL CONTROL EQUIPMENT
Trip tank
• Used when POOH or RIH
• Volumes in trip tanks are regularly monitored
• Pump fed
• Isolated from surface mud system to prevent gain or loss in case valves are left
open
Flow check
1. Disengage rotary and pick up kelly until tool joints clears rotary table
2. Shut down the mud pump
3. If there is no flow, resume operations. If well is flowing, shut in
Hard shut in
1. Close annular preventer with choke line closed
2. Open choke line with manifold chokes closed
3. Read SIDP and SICP
Presentation title - Place and Country - Date Month Day Year 8
SHUT IN PROCEDURE
WELL CONTROL AND MONITORING
Presentation title - Place and Country - Date Month Day Year 9
parameter Location/description
Rate of penetration Block Position Indicator sensor mounted on
drawworks
Hook load/WOB Load cell on deadline anchor
RPM A metal target is mounted on a coupling shaft
between the rotary table and the drive motor
Rotary torque Rotary table transmission
Stand pipe manifold Standpipe Manifold.
SICP Choke Manifold.
Mud flow rate Paddle on mud return line
Pump stroke
H2S mounted on trip tank and Shale shakers.
WELL CONTROL AND MONITORING
WELL MONITORING

Contenu connexe

Tendances

Well control during drilling operations
Well control during drilling operationsWell control during drilling operations
Well control during drilling operationsENOBAKHARE OSARUGUE
 
rig drilling_equipment
 rig drilling_equipment rig drilling_equipment
rig drilling_equipmentamrhaggag
 
Wireline Operations
Wireline OperationsWireline Operations
Wireline OperationsMubarik Rao
 
application of Direction control valve in automatic transmission
application of Direction control valve in automatic transmissionapplication of Direction control valve in automatic transmission
application of Direction control valve in automatic transmissionZIYAD AMBALANGADAN
 
CONTROL VALVES: CHARACTERISTICS, GAIN & TRANSFER FUNCTION
CONTROL VALVES: CHARACTERISTICS, GAIN & TRANSFER FUNCTION CONTROL VALVES: CHARACTERISTICS, GAIN & TRANSFER FUNCTION
CONTROL VALVES: CHARACTERISTICS, GAIN & TRANSFER FUNCTION Angel Darío González-Delgado
 
Hydraulic Valves (Valves) (Pneumatics also)
Hydraulic Valves (Valves) (Pneumatics also)Hydraulic Valves (Valves) (Pneumatics also)
Hydraulic Valves (Valves) (Pneumatics also)Mohammad Azam Khan
 
Control Valves And Actuators
Control Valves And ActuatorsControl Valves And Actuators
Control Valves And ActuatorsBinit Goenka
 
01 General Control Valves Training.
01 General Control Valves Training.01 General Control Valves Training.
01 General Control Valves Training.SuryamshVikrama
 
Basic Operation and Function of Control Valves
Basic Operation and Function of Control ValvesBasic Operation and Function of Control Valves
Basic Operation and Function of Control ValvesBelilove Company-Engineers
 
Internship Report
Internship ReportInternship Report
Internship ReportMalik Ehsan
 
Basic Fluid Dynamics - Control Valves
Basic Fluid Dynamics - Control Valves  Basic Fluid Dynamics - Control Valves
Basic Fluid Dynamics - Control Valves Brannon Gant
 

Tendances (20)

Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)
 
Well control during drilling operations
Well control during drilling operationsWell control during drilling operations
Well control during drilling operations
 
rig drilling_equipment
 rig drilling_equipment rig drilling_equipment
rig drilling_equipment
 
Final Control Element
Final Control ElementFinal Control Element
Final Control Element
 
Wireline Operations
Wireline OperationsWireline Operations
Wireline Operations
 
application of Direction control valve in automatic transmission
application of Direction control valve in automatic transmissionapplication of Direction control valve in automatic transmission
application of Direction control valve in automatic transmission
 
Overview of control valves
Overview of control valvesOverview of control valves
Overview of control valves
 
CONTROL VALVES: CHARACTERISTICS, GAIN & TRANSFER FUNCTION
CONTROL VALVES: CHARACTERISTICS, GAIN & TRANSFER FUNCTION CONTROL VALVES: CHARACTERISTICS, GAIN & TRANSFER FUNCTION
CONTROL VALVES: CHARACTERISTICS, GAIN & TRANSFER FUNCTION
 
Hydraulic Valves (Valves) (Pneumatics also)
Hydraulic Valves (Valves) (Pneumatics also)Hydraulic Valves (Valves) (Pneumatics also)
Hydraulic Valves (Valves) (Pneumatics also)
 
Control Valves And Actuators
Control Valves And ActuatorsControl Valves And Actuators
Control Valves And Actuators
 
01 General Control Valves Training.
01 General Control Valves Training.01 General Control Valves Training.
01 General Control Valves Training.
 
Control valves
Control valves Control valves
Control valves
 
Basic Operation and Function of Control Valves
Basic Operation and Function of Control ValvesBasic Operation and Function of Control Valves
Basic Operation and Function of Control Valves
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Flow control valve
Flow control valveFlow control valve
Flow control valve
 
Well intervention
Well interventionWell intervention
Well intervention
 
Basic Fluid Dynamics - Control Valves
Basic Fluid Dynamics - Control Valves  Basic Fluid Dynamics - Control Valves
Basic Fluid Dynamics - Control Valves
 
Control Valves (THINKTANK®️)
Control Valves (THINKTANK®️)Control Valves (THINKTANK®️)
Control Valves (THINKTANK®️)
 
Bk 1 camco
Bk 1 camcoBk 1 camco
Bk 1 camco
 
Safety valves
Safety valvesSafety valves
Safety valves
 

En vedette

PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0Shanice Sua
 
Transocean well control
Transocean  well controlTransocean  well control
Transocean well controlSteffones K
 
Advanced blowout and well control robert d. grace
Advanced blowout and well control   robert d. graceAdvanced blowout and well control   robert d. grace
Advanced blowout and well control robert d. graceThần Chết Nụ Hôn
 
Well control
Well controlWell control
Well controlSaba Saif
 
Drilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsDrilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsAFATous
 
Maersk Training Presentation
Maersk Training Presentation Maersk Training Presentation
Maersk Training Presentation Chittra Koman
 
4th Presentation
4th Presentation4th Presentation
4th PresentationBarun
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsAFATous
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA DesignM.T.H Group
 
Torque and Drag: Concepts that Every Drilling and Completion Engineer Should ...
Torque and Drag: Concepts that Every Drilling and Completion Engineer Should ...Torque and Drag: Concepts that Every Drilling and Completion Engineer Should ...
Torque and Drag: Concepts that Every Drilling and Completion Engineer Should ...pvisoftware
 

En vedette (19)

PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0
 
Transocean well control
Transocean  well controlTransocean  well control
Transocean well control
 
Advanced blowout and well control robert d. grace
Advanced blowout and well control   robert d. graceAdvanced blowout and well control   robert d. grace
Advanced blowout and well control robert d. grace
 
Well control
Well controlWell control
Well control
 
blow out preventer system
blow out preventer systemblow out preventer system
blow out preventer system
 
Well control
Well control Well control
Well control
 
Drilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsDrilling Fluid Circulation Systems
Drilling Fluid Circulation Systems
 
SWAB UNIT
SWAB UNITSWAB UNIT
SWAB UNIT
 
Ot surveillance
Ot surveillanceOt surveillance
Ot surveillance
 
BOP
BOPBOP
BOP
 
Maersk Training Presentation
Maersk Training Presentation Maersk Training Presentation
Maersk Training Presentation
 
Kick t1
Kick t1Kick t1
Kick t1
 
4th Presentation
4th Presentation4th Presentation
4th Presentation
 
The Macondo blowout
The Macondo blowoutThe Macondo blowout
The Macondo blowout
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
Torque and Drag: Concepts that Every Drilling and Completion Engineer Should ...
Torque and Drag: Concepts that Every Drilling and Completion Engineer Should ...Torque and Drag: Concepts that Every Drilling and Completion Engineer Should ...
Torque and Drag: Concepts that Every Drilling and Completion Engineer Should ...
 

Similaire à Dk well control

IAHR2015 - Preventing salt intrusion through shipping locks, Weiler, Deltares...
IAHR2015 - Preventing salt intrusion through shipping locks, Weiler, Deltares...IAHR2015 - Preventing salt intrusion through shipping locks, Weiler, Deltares...
IAHR2015 - Preventing salt intrusion through shipping locks, Weiler, Deltares...Deltares
 
Petroleum Cycle.pdf
Petroleum Cycle.pdfPetroleum Cycle.pdf
Petroleum Cycle.pdfALANMARTIN95
 
Inspection Static.pdf
Inspection Static.pdfInspection Static.pdf
Inspection Static.pdfMuhammadAn3
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxodiliagilby
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER) Arez Luqman
 
IDENTIFYING ZONES FOR REFRAC USING A NEW DOWNHOLE TESTING TOOL
IDENTIFYING ZONES FOR REFRAC USING A NEW DOWNHOLE TESTING TOOLIDENTIFYING ZONES FOR REFRAC USING A NEW DOWNHOLE TESTING TOOL
IDENTIFYING ZONES FOR REFRAC USING A NEW DOWNHOLE TESTING TOOLiQHub
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.pptSafarulhaqueKp
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.pptSafarulhaqueKp
 
ROTAMETER: ITS CONSTRUCTION AND WORKING
ROTAMETER: ITS CONSTRUCTION AND WORKINGROTAMETER: ITS CONSTRUCTION AND WORKING
ROTAMETER: ITS CONSTRUCTION AND WORKINGSammisla R Nayak
 
Best practices day one pm new
Best practices day one pm newBest practices day one pm new
Best practices day one pm newAhmed Radwan
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptAndresRios87791
 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Ramez Abdalla, M.Sc
 

Similaire à Dk well control (20)

IAHR2015 - Preventing salt intrusion through shipping locks, Weiler, Deltares...
IAHR2015 - Preventing salt intrusion through shipping locks, Weiler, Deltares...IAHR2015 - Preventing salt intrusion through shipping locks, Weiler, Deltares...
IAHR2015 - Preventing salt intrusion through shipping locks, Weiler, Deltares...
 
Petroleum Cycle.pdf
Petroleum Cycle.pdfPetroleum Cycle.pdf
Petroleum Cycle.pdf
 
Inspection Static.pdf
Inspection Static.pdfInspection Static.pdf
Inspection Static.pdf
 
Oil production
Oil productionOil production
Oil production
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
Plt
PltPlt
Plt
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
 
IDENTIFYING ZONES FOR REFRAC USING A NEW DOWNHOLE TESTING TOOL
IDENTIFYING ZONES FOR REFRAC USING A NEW DOWNHOLE TESTING TOOLIDENTIFYING ZONES FOR REFRAC USING A NEW DOWNHOLE TESTING TOOL
IDENTIFYING ZONES FOR REFRAC USING A NEW DOWNHOLE TESTING TOOL
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Three Phase Separators
Three Phase SeparatorsThree Phase Separators
Three Phase Separators
 
176589.pptx.ppt
176589.pptx.ppt176589.pptx.ppt
176589.pptx.ppt
 
ROTAMETER: ITS CONSTRUCTION AND WORKING
ROTAMETER: ITS CONSTRUCTION AND WORKINGROTAMETER: ITS CONSTRUCTION AND WORKING
ROTAMETER: ITS CONSTRUCTION AND WORKING
 
Rotameters
RotametersRotameters
Rotameters
 
Best practices day one pm new
Best practices day one pm newBest practices day one pm new
Best practices day one pm new
 
UO MODULE 2.pptx
UO MODULE 2.pptxUO MODULE 2.pptx
UO MODULE 2.pptx
 
UO MODULE 2.pdf
UO MODULE 2.pdfUO MODULE 2.pdf
UO MODULE 2.pdf
 
Valves and pump
Valves and pumpValves and pump
Valves and pump
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.ppt
 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well
 

Dernier

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

Dernier (20)

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

Dk well control

  • 1. DSV TRAINING PRESENTATION II MILLING AND WELL CONTROL
  • 2. Kicks occur when formation pressures exceed mud hydrostatic pressure, formation fluids enter well bore. Uncontrolled influx of formation fluids leads to blow out Causes of kicks • Failure to keep the hole full • Insufficient mud density • Swabbing during tripping • Lost circulation Detecting kicks • Pit volume gain • Increased flow on return line • Drilling break • Incorrect fill-up on trips • Decrease in circulating pressure • Shows of oil, gas or salt water • increase in hook load Presentation title - Place and Country - Date Month Day Year 2 WELL CONTROL AND MONITORING KICKS AND BLOW OUT
  • 3. Presentation title - Place and Country - Date Month Day Year 3 Annular preventer •13 5/8” X 5000 shaffer Annular Preventer •Uses a ring of synthetic rubber to close around any pipe size •Utilise upward well pressure to remain closed •Allows stripping •Operated hydraulically Pipe rams •Close around specific pipe sizes Blind rams •Close in when there is no pipe in hole WELL CONTROL AND MONITORING WELL CONTROL EQUIPMENT Blow out preventers Seal off the well when a kick is detected Drilling spool Provides connection for choke and kill lines
  • 4. Presentation title - Place and Country - Date Month Day Year 4 Accumulator unit Provides means of opening or closing the BOPs and HCR values Accumulator bottles •Maintains hydraulic fluid at high pressures •10gallons Ea •N2 at 1000Psi •Operating pressure of 3000Psi Pumps •Electric pump automatically pumps hydraulic fluid to maintain pressure in bottles •Pneumatic pumps are backups Reservoir •Stores hydraulic fluid (1500L) Pressure regulators •control pressures to open annular and ram preventers WELL CONTROL AND MONITORING WELL CONTROL EQUIPMENT Driller’s bop control panel Controls opening and closing of BOPs and choke line
  • 5. Presentation title - Place and Country - Date Month Day Year 5 • Used to circulate out a kick • A system of valves and lines provides several flow routes • Consists of adjustable manual and hydraulic chokes • Chokes are adjusted to keep the right amount of back pressure on the well WELL CONTROL AND MONITORING WELL CONTROL EQUIPMENT Choke manifold Choke manifold control pannel • Used to adjust the choke opening • Watching pressures on drill pipe and casing and pump rates allows maintaining of a constant BHP
  • 6. Presentation title - Place and Country - Date Month Day Year 6 Separates gas from drilling mud Design features •Height and diameter to handle mud volumes •Diameter and length of gas outlet •Internal baffle plates for gas break out •U-tube arrangement to maintain fluid head in separator WELL CONTROL AND MONITORING WELL CONTROL EQUIPMENT Poor boy Degasser Equipment testing • BOPs, choke and kill manifolds, choke and kill lines, accumulators must be regularly pressure and function tested • Low pressure test 500Psi X5min • High pressure test 3000psi X10min
  • 7. Drill string valves • Kelly cock values • Full opening safety valves (FOSV) or TIW Presentation title - Place and Country - Date Month Day Year 7 WELL CONTROL AND MONITORING WELL CONTROL EQUIPMENT Trip tank • Used when POOH or RIH • Volumes in trip tanks are regularly monitored • Pump fed • Isolated from surface mud system to prevent gain or loss in case valves are left open
  • 8. Flow check 1. Disengage rotary and pick up kelly until tool joints clears rotary table 2. Shut down the mud pump 3. If there is no flow, resume operations. If well is flowing, shut in Hard shut in 1. Close annular preventer with choke line closed 2. Open choke line with manifold chokes closed 3. Read SIDP and SICP Presentation title - Place and Country - Date Month Day Year 8 SHUT IN PROCEDURE WELL CONTROL AND MONITORING
  • 9. Presentation title - Place and Country - Date Month Day Year 9 parameter Location/description Rate of penetration Block Position Indicator sensor mounted on drawworks Hook load/WOB Load cell on deadline anchor RPM A metal target is mounted on a coupling shaft between the rotary table and the drive motor Rotary torque Rotary table transmission Stand pipe manifold Standpipe Manifold. SICP Choke Manifold. Mud flow rate Paddle on mud return line Pump stroke H2S mounted on trip tank and Shale shakers. WELL CONTROL AND MONITORING WELL MONITORING