Federal Register / Vol. 72, No. 216 / Thursday, November 8, 2007 / Notices                                           63169

                                          ACTION:Notice of Closed Teleconference                  Education, Room 5C140, 400 Maryland                   preceding each meeting on the dates
                                          Meeting.                                                Avenue, SW., Washington, DC 20202.                    above. See the SUPPLEMENTARY
                                                                                                                                                        INFORMATION section for details on the
                                                                                                  Kerri L. Briggs,
                                          SUMMARY:   This notice sets forth the                                                                         meeting process.
                                                                                                  Assistant Secretary for Elementary and
                                          schedule and proposed agenda of an                      Secondary Education.                                  ADDRESSES: Requests for information
                                          upcoming teleconference meeting of the                                                                        about this draft EIS, or to receive a copy
                                                                                                  [FR Doc. 07–5591 Filed 11–7–07; 8:45 am]
                                          National Advisory Council on Indian                                                                           of the draft EIS, should be directed to:
                                                                                                  BILLING CODE 4000–01–M
                                          Education (the Council) and is intended                                                                       Mr. Richard A. Hargis, Jr., NEPA
                                          to notify the general public of the                                                                           Document Manager, M/S 922–178C,
                                          meeting. This notice also describes the                                                                       U.S. Department of Energy, National
                                                                                                  DEPARTMENT OF ENERGY                                  Energy Technology Laboratory, P.O. Box
                                          functions of the Council. Notice of the
                                          Council’s meetings is required under                                                                          10940, Pittsburgh, PA 15236–0940.
                                                                                                  Notice of Availability of the Draft
                                          section 10(a)(2) of the Federal Advisory                                                                      Requests may also be submitted by
                                                                                                  Environmental Impact Statement for
                                          Committee Act and by the Council’s                                                                            telephone: 412–386–6065; toll free
                                                                                                  the Mesaba Energy Project
                                                                                                                                                        number: 888–322–7436 ext. 6065; fax:
                                          charter.
                                                                                                  AGENCY: Department of Energy.                         412–386–4604; or electronic mail:
                                            Agenda: The purpose of the meeting                    ACTION: Notice of Availability and                    richard.hargis@netl.doe.gov.
                                          will be for the Council to conduct a                    public hearings.                                         The draft EIS will be available at:
                                          review of the applications for the vacant                                                                     http://www.eh.doe.gov/nepa/. Copies of
                                          position of Director of the Office of                   SUMMARY:    The U.S. Department of                    the draft EIS are also available for
                                          Indian Education and to make their                      Energy (DOE) announces the availability               review at the locations listed in the
                                          recommendation to the Department.                       of the Draft Environmental Impact                     SUPPLEMENTARY INFORMATION section of
                                          This notice is appearing in the Federal                 Statement for the Mesaba Energy Project               this Notice. Written comments on the
                                          Register less than 15 days before the                   (DOE/EIS–0382D) for public comment,                   draft EIS can be submitted by mail, fax,
                                          date of the meeting due to scheduling                   as well as the dates, locations and times             or electronic mail to Mr. Richard A.
                                          difficulties within the agency and with                 for public hearings. The draft                        Hargis, Jr., as indicated above. Oral
                                          the Council.                                            environmental impact statement (EIS)                  comments on the draft EIS will be
                                                                                                  analyzes the potential environmental                  accepted only during the public
                                            Date and Time: Nov. 15, 2007; 1 p.m.
                                                                                                  consequences of DOE’s proposed action                 hearings scheduled for the dates and
                                          to 3 p.m. EST.
                                                                                                  to provide a total of $36 million in co-              locations provided in the DATES section
                                            Location: The Department of                           funding, through a financial assistance               of this Notice.
                                          Education will provide a 1–800–call in                  cooperative agreement, for the design                 FOR FURTHER INFORMATION, CONTACT: For
                                          number for all NACIE members.                           and one-year operational demonstration                further information regarding the
                                          FOR FURTHER INFORMATION CONTACT:
                                                                                                  of a coal-based, Integrated Gasification              proposed project or the draft EIS, please
                                                                                                  Combined Cycle (IGCC) electric                        contact Mr. Richard A. Hargis, Jr., (see
                                          Lana Shaughnessy, Group Leader, Office
                                                                                                  generating facility on the Iron Range of              ADDRESSES). For general information on
                                          of Indian Education, U.S. Department of
                                                                                                  northern Minnesota. DOE may also                      the DOE NEPA process, please contact:
                                          Education, 400 Maryland Avenue, SW.,
                                                                                                  provide a loan guarantee pursuant to the              Ms. Carol M. Borgstrom, Director, Office
                                          Washington, DC 20202. Telephone:
                                                                                                  Energy Policy Act of 2005 to guarantee                of NEPA Policy and Compliance (GC–
                                          202–205–2528. Fax: 202–260–7779.                        a portion of private sector financing for             20), U.S. Department of Energy, 1000
                                          SUPPLEMENTARY INFORMATION:      The                     the project; however, this loan guarantee             Independence Avenue, SW.,
                                          Council advises the Secretary of                        is not part of DOE’s proposed action.                 Washington, DC 20585–0103;
                                          Education on the funding and                            The facility would be demonstrated                    Telephone: 202–586–4600, or leave a
                                          administration (including the                           through a cooperative agreement                       toll-free message at: 800–472–2756.
                                          development of regulations, and                         between DOE and Excelsior Energy Inc.                 SUPPLEMENTARY INFORMATION:
                                          administrative policies and practices) of               (Excelsior) under the Clean Coal Power
                                          any program over which the Secretary                    Initiative (CCPI) program.                            Description of Alternatives and Scope
                                                                                                  DATES: DOE invites the public to                      of the EIS
                                          has jurisdiction and includes Indian
                                          children or adults as participants or                   comment on the draft EIS during the                      DOE’s Proposed Action is to provide
                                          programs that may benefit Indian                        public comment period, which ends                     a total of $36 million in co-funding,
                                          children or adults, including any                       January 11, 2008. DOE will consider all               through a cooperative agreement with
                                          program established under Title VII,                    comments postmarked or received                       Excelsior under the CCPI Program, for
                                          Part A of the ESEA. The Council                         during the public comment period in                   the design and one-year operational
                                          submitted to the Congress June 30 a                     preparing the Final EIS and will                      demonstration testing period for Phase I
                                          report on the activities of the Council                 consider late comments to the extent                  of the proposed two-phased Mesaba
                                          that included recommendations the                       practicable.                                          Energy Project. The first phase would be
                                          Council considers appropriate for the                      DOE will conduct two public hearings               a nominal 606 megawatt electricity
                                          improvement of Federal education                        to obtain comments on the draft EIS.                  (MWe) IGCC power plant with an
                                                                                                  The meetings will be held at the                      estimated cost of $2.16 billion. Phase II,
                                          programs that include Indian children
                                                                                                  Taconite Community Center, 26 Haynes                  which would be an identical, co-located
                                          or adults as participants or that may
                                                                                                  Street, Taconite, Minnesota, on                       606 MWe plant, would be privately
                                          benefit Indian children or adults, and
                                                                                                  Tuesday, November 27, 2007, beginning                 financed and not involve co-funding by
                                          recommendations concerning the                          at 7 p.m., and at Hoyt Lakes Arena, 106               DOE. The project would demonstrate
rwilkins on PROD1PC63 with NOTICES




                                          funding of any such program.                            Kennedy Memorial Drive, Hoyt Lakes,                   the commercial-readiness of the
                                            Records are kept of all Council                       Minnesota, on Wednesday, November                     Conoco-Phillips E-Gas TM gasification
                                          proceedings and are available for public                28, 2007, beginning at 7 p.m. An                      technology, including advanced
                                          inspection at the Office of Indian                      informational session will be held at                 gasification and air separation systems,
                                          Education, United States Department of                  each location from 4 p.m. to 7 p.m.                   feedstock flexibility, improved


                                     VerDate Aug<31>2005   16:54 Nov 07, 2007   Jkt 214001   PO 00000   Frm 00009   Fmt 4703   Sfmt 4703   E:FRFM08NON1.SGM   08NON1
63170                      Federal Register / Vol. 72, No. 216 / Thursday, November 8, 2007 / Notices

                                          environmental performance, and                          of 2005, DOE may also provide a loan                  impacts identified during the scoping
                                          improved thermal efficiency. Although                   guarantee for a portion of the private-               process and analyzed in the draft EIS
                                          DOE’s proposed action would be                          sector financing for the Project;                     relate to the following: aesthetics; air
                                          applicable to Phase I only, the draft EIS               however, this loan guarantee is not part              quality and climate; geology and soils;
                                          considers the combined impacts of both                  of DOE’s proposed action.                             groundwater and surface water
                                          phases as connected actions.                               The Minnesota Power Plant Siting Act               resources; floodplains and wetlands;
                                             DOE prepared this draft EIS in                       is intended to ensure that power plants               biological resources; cultural resources;
                                          accordance with the National                            and high voltage transmission lines are               land use; socioeconomics;
                                          Environmental Policy Act, of 1969                       routed in an orderly manner compatible                environmental justice; utility systems;
                                          (NEPA) (42 U.S.C. 4321 et seq.), the                    with environmental preservation and                   community services; transportation and
                                          Council on Environmental Quality                        the efficient use of resources. The                   traffic; materials and waste
                                          regulations that implement the                          Minnesota Public Utilities Commission                 management; human health and safety;
                                          procedural provisions of NEPA (40 CFR                   oversees permitting in accordance with                and noise.
                                          parts 1500–1508), and the DOE                           the Act. State rules established for the
                                          procedures implementing NEPA (10                        Act require the applicant for a site                  Availability of the Draft EIS
                                          CFR part 1021). Because the proposed                    permit to identify at least two sites for                Copies of the draft EIS have been
                                          facility is considered a Large Electric                 the power plant—a preferred site and an               distributed to Members of Congress;
                                          Power Generating Plant, the Project is                  alternative site. Excelsior identified the            Federal, Native American tribal
                                          subject to the Minnesota Power Plant                    West Range site (Taconite, Itasca                     government, state, and local officials;
                                          Siting Act, which requires the                          County, Minnesota) as its preferred site              and agencies, organizations and
                                          preparation of a state-equivalent EIS.                  and the East Range site (Hoyt Lakes, St.              individuals who may be interested or
                                          The EIS requirements under NEPA and                     Louis County, Minnesota) as its                       affected. The draft EIS will be available
                                          the Act are substantially similar, and                  alternative site. Although DOE has not                on the Internet at: http://
                                          DOE has prepared this draft EIS in                      participated in the identification or                 www.eh.doe.gov/nepa/. Copies of the
                                          cooperation with the Minnesota                          selection of sites, the potential                     draft EIS are available for public review
                                          Department of Commerce to fulfill the                   environmental impacts of locating the                 at the Bovey Public Library, 402 2nd
                                          requirements of both laws. Federal                      project at either site are evaluated in the           Street, Bovey, Minnesota; City of
                                          cooperating agencies for the EIS include                draft EIS. The final decision on which                Taconite Community Center, 28 Haynes
                                          the U.S. Army Corps of Engineers, St.                   site would be permitted, if any, will be              Street, Taconite, Minnesota; Grand
                                          Paul District, and the U.S. Department                  made by the Minnesota Public Utilities
                                                                                                                                                        Rapids Public Library, 140 NE., 2nd
                                          of Agriculture, Forest Service, Superior                Commission in accordance with the
                                                                                                                                                        Street Grand Rapids, Minnesota; the
                                          National Forest, Laurentian District.                   Minnesota Power Plant Siting Act.
                                                                                                     For the No Action Alternative, DOE                 Hibbing Public Library, 2020 East 5th
                                          Because the proposed Project may affect
                                                                                                  would not provide cost-shared funding                 Avenue, Hibbing, Minnesota; and the
                                          floodplains and wetlands in northern
                                                                                                  for the Project beyond that required to               Hoyt Lakes Public Library, 206 Kennedy
                                          Minnesota, the draft EIS includes a
                                                                                                  complete the NEPA process. In this                    Memorial Drive, Hoyt Lakes, Minnesota.
                                          floodplain and wetlands assessment in
                                                                                                  case, the remaining funding withheld                  Additional copies also can be requested
                                          accordance with DOE regulations for
                                                                                                  from the Project may be made available                (see ADDRESSES).
                                          Compliance with Floodplain and
                                          Wetlands Environmental Review                           for other current or future CCPI projects.            Public Meetings
                                          Requirements (10 CFR part 1022).                           Without DOE funding, it is not likely
                                             DOE analyzed two main alternatives                   that the Mesaba Energy Project would be                 DOE will conduct a public hearing
                                          in the draft EIS—the Proposed Action                    built, although it is possible that                   near each of the two alternative sites, in
                                          (including two alternative sites for the                Excelsior could still elect to construct              conjunction with the Minnesota
                                          project) and the No Action Alternative.                 and operate the proposed power plant                  Department of Commerce, to obtain
                                          Under the Proposed Action, DOE would                    provided that it could replace the                    comments on the draft EIS. Requests to
                                          provide cost-shared funding to Excelsior                Federal financing component and obtain                speak at the public hearings can be
                                          for the design and one-year                             the required permits from state and                   made by contacting Mr. Richard A.
                                          demonstration of a coal-based, IGCC                     Federal agencies. However, without                    Hargis, Jr., as indicated in the
                                          electric generating facility to be located              DOE participation, it is possible that the            ADDRESSES section above. Requests to
                                          in the Taconite Tax Relief Area as                      proposed project would be canceled.                   speak that have not been submitted
                                          defined in Minnesota Statutes Section                   Therefore, for purposes of analysis in                prior to the hearing will be accepted in
                                          273.134. DOE has entered into a                         the draft EIS, the No Action Alternative              the order in which they are received at
                                          cooperative agreement with Excelsior,                   is assumed to be equivalent to a ‘‘No                 the hearing. Speakers are encouraged to
                                          which was a successful applicant in                     Build’’ Alternative, meaning that                     provide a written version of their oral
                                          Round 2 of the CCPI program, to                         environmental conditions would remain                 comments for the record. Each speaker
                                          demonstrate the Project. Excelsior is an                in the status quo (no new construction,               will be allowed approximately five
                                          independent energy development                          resource utilization, emissions,                      minutes to present comments. Those
                                          company based in Minnetonka,                            discharges, or wastes generated). The No              speakers who want more than five
                                          Minnesota, that ultimately would be                     Action Alternative would not contribute               minutes should indicate the length of
                                          responsible for the siting, design,                     to the goal of the CCPI program, which                time desired in their request. Depending
                                          construction, demonstration, and                        is to accelerate commercial deployment                on the number of speakers, DOE may
                                          operation of the Project and related                    of advanced technologies that provide                 need to limit all speakers to five
                                          components. Until the NEPA process is                   the United States with clean, reliable,               minutes initially and provide additional
                                          complete, no funds would be provided                    and affordable energy.                                opportunities as time permits.
rwilkins on PROD1PC63 with NOTICES




                                          for project activities that could either                   The draft EIS analyzes the                         Comments will be recorded by a court
                                          have an adverse impact on the                           environmental consequences that may                   reporter and will become part of the
                                          environment or limit the choice of                      result from the proposed action at each               public hearing record. Oral and written
                                          reasonable alternatives available to                    of the two alternative sites, as well as              comments will be given equal
                                          DOE. Pursuant to the Energy Policy Act                  the no action alternative. Potential                  consideration.


                                     VerDate Aug<31>2005   16:54 Nov 07, 2007   Jkt 214001   PO 00000   Frm 00010   Fmt 4703   Sfmt 4703   E:FRFM08NON1.SGM   08NON1
Federal Register / Vol. 72, No. 216 / Thursday, November 8, 2007 / Notices                                            63171

                                            Each hearing will begin with an                       application which is on file with the                 by all other parties. A party must submit
                                          informational session at approximately                  Commission and open to public                         14 copies of filings made with the
                                          4 p.m. DOE will then begin each                         inspection. This filing is accessible on-             Commission and must mail a copy to
                                          meeting’s formal session at 7 p.m. with                 line at http://www.ferc.gov, using the                the applicant and to every other party in
                                          an overview of the project, followed by                 ‘‘eLibrary’’ link and is available for                the proceeding. Only parties to the
                                          oral statements by the scheduled                        review in the Commission’s Public                     proceeding can ask for court review of
                                          speakers. Speakers may be asked                         Reference Room in Washington, DC.                     Commission orders in the proceeding.
                                          questions to help ensure that DOE fully                 There is an ‘‘eSubscription’’ link on the                However, a person does not have to
                                          understands the comments. A presiding                   Web site that enables subscribers to                  intervene in order to have comments
                                          officer will establish the order of                     receive e-mail notification when a                    considered. The second way to
                                          speakers and provide any additional                     document is added to a subscribed                     participate is by filing with the
                                          procedures necessary to conduct the                     docket(s). For assistance with any FERC               Secretary of the Commission, as soon as
                                          meetings.                                               Online service, please e-mail                         possible, an original and two copies of
                                            All meetings will be accessible to                    FERCOnlineSupport@ferc.gov, or call                   comments in support of or in opposition
                                          people with disabilities. Any individual                (866) 208–3676 (toll free). For TTY, call             to this project. The Commission will
                                          with a disability requiring special                     (202) 502–8659.                                       consider these comments in
                                          assistance, such as sign language                          Southern Star states that due to the               determining the appropriate action to be
                                          interpreter, or a translator, should                    abandonment of the Craig storage field                taken, but the filing of a comment alone
                                          contact Mr. Richard A. Hargis, Jr., the                 as authorized by order of the                         will not serve to make the filer a party
                                          NEPA Document Manager, (see                             Commission in Docket No. CP98–280–                    to the proceeding. The Commission’s
                                          ADDRESSES) at least 48 hours in advance                 000 (85 FERC ¶61,184) the compressor                  rules require that persons filing
                                          of the meeting so that arrangements can                 engines are no longer required to                     comments in opposition to the project
                                          be made.                                                provide the storage field compression                 provide copies of their protests only to
                                                                                                  service for which they were originally                the party or parties directly involved in
                                          Meeting Schedule                                        installed. Southern Star stated in the                the protest.
                                          West Range Site—Taconite                                aforementioned application that the
                                                                                                                                                           Persons who wish to comment only
                                                                                                  compressor engines at the Craig station
                                            Date: Tuesday, November 27, 2007.                                                                           on the environmental review of this
                                                                                                  were being evaluated at that time for use
                                            Place: Taconite Community Center,                                                                           project should submit an original and
                                                                                                  elsewhere on its pipeline system.
                                          26 Haynes Street, Taconite, Minnesota.                     Southern Star further states that one              two copies of their comments to the
                                                                                                  compressor engine will be removed                     Secretary of the Commission.
                                          East Range Site—Hoyt Lakes                                                                                    Environmental commentors will be
                                                                                                  from the Craig compressor station,
                                            Date: Wednesday, November 28,                         refurbished and installed at the South                placed on the Commission’s
                                          2007.                                                   Welda storage field as booster                        environmental mailing list, will receive
                                            Place: Hoyt Lakes Arena, 106                          compression. Southern Star has                        copies of the environmental documents,
                                          Kennedy Memorial Drive, Hoyt Lakes,                     requested authorization for said engine               and will be notified of meetings
                                          Minnesota.                                              installation at South Welda storage field             associated with the Commission’s
                                            Issued in Washington, DC, on November 2,              in Docket No. CP08–4–000, which is                    environmental review process.
                                          2007.                                                   currently pending before the                          Environmental commentors will not be
                                          Mark J. Matarrese,                                      Commission. The other compressor                      required to serve copies of filed
                                          Director, Office of Environment, Security,              engine will be removed and warehoused                 documents on all other parties.
                                          Safety and Health, Office of Fossil Energy.             at Southern Star’s Welda compressor                   However, the non-party commentors
                                          [FR Doc. E7–21959 Filed 11–7–07; 8:45 am]               station. The existing Craig compressor                will not receive copies of all documents
                                                                                                  building will remain in place to be used              filed by other parties or issued by the
                                          BILLING CODE 6450–01–P
                                                                                                  as a warehouse facility for pipe,                     Commission (except for the mailing of
                                                                                                  equipment and supplies.                               environmental documents issued by the
                                          DEPARTMENT OF ENERGY                                       Any questions regarding this                       Commission) and will not have the right
                                                                                                  application should be directed to David               to seek court review of the
                                          Federal Energy Regulatory                               N. Roberts, Manager, Regulatory Affairs,              Commission’s final order.
                                          Commission                                              at (270) 852–4654.                                       Comments, protests and interventions
                                                                                                     There are two ways to become                       may be filed electronically via the
                                          [Docket No. CP08–12–000]
                                                                                                  involved in the Commission’s review of                Internet in lieu of paper. See 18 CFR
                                          Southern Star Central Gas Pipeline,                     this project. First, any person wishing to            385.2001(a)(1)(iii) and the instructions
                                          Inc.; Notice of Application                             obtain legal status by becoming a party               on the Commission’s Web site under the
                                                                                                  to the proceedings for this project                   ‘‘e-Filing’’ link at http://www.ferc.gov.
                                          November 1, 2007.                                       should, on or before the comment date                 The Commission strongly encourages
                                            Take notice that on October 30, 2007,                 stated below, file with the Federal                   intervenors to file electronically.
                                          Southern Star Central Gas Pipeline, Inc.                Energy Regulatory Commission, 888                     Persons unable to file electronically
                                          (Southern Star), 4700 State Highway 56,                 First Street, NE., Washington, DC 20426,              should submit an original and 14 copies
                                          Owensboro, Kentucky 42301, filed in                     a motion to intervene in accordance                   of the protest or intervention to the
                                          Docket No. CP08–12–000, an                              with the requirements of the                          Federal Energy Regulatory Commission,
                                          application pursuant to section 7(b) of                 Commission’s Rules of Practice and                    888 First Street, NE., Washington, DC
                                          the Natural Gas Act (NGA) and Part 157                  Procedure (18 CFR 385.214 or 385.211)                 20426.
                                          of the Commission’s Regulations, for an                 and the Regulations under the NGA (18                    Comment Date: November 23, 2007.
rwilkins on PROD1PC63 with NOTICES




                                          order permitting and approving the                      CFR 157.10). A person obtaining party
                                          abandonment by reclaim of two 660-                      status will be placed on the service list             Kimberly D. Bose,
                                          horsepower White Superior compressor                    maintained by the Secretary of the                    Secretary.
                                          units located in Johnson County,                        Commission and will receive copies of                 [FR Doc. E7–21919 Filed 11–7–07; 8:45 am]
                                          Kansas, all as more fully set forth in the              all documents filed by the applicant and              BILLING CODE 6717–01–P




                                     VerDate Aug<31>2005   16:54 Nov 07, 2007   Jkt 214001   PO 00000   Frm 00011   Fmt 4703   Sfmt 4703   E:FRFM08NON1.SGM   08NON1

More Related Content

Viewers also liked (8)

NOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon CaptureNOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon Capture
 
March 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons LearnedMarch 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons Learned
 
NOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy ProjectNOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy Project
 
NOI - Mesaba Energy Project
NOI - Mesaba Energy ProjectNOI - Mesaba Energy Project
NOI - Mesaba Energy Project
 
Sept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons LearnedSept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons Learned
 
NOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC ProjectNOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC Project
 
NOI - Texas Clean Energy
NOI - Texas Clean EnergyNOI - Texas Clean Energy
NOI - Texas Clean Energy
 
Dec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons LearnedDec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons Learned
 

Similar to NOA DEIS (DOE) - Mesaba Energy Project

NRDC Kyoto FOIA Appeal Response 11.30.01
NRDC Kyoto FOIA Appeal Response 11.30.01NRDC Kyoto FOIA Appeal Response 11.30.01
NRDC Kyoto FOIA Appeal Response 11.30.01Obama White House
 
N Y S Broadband N O F A Workshop Flyer
N Y S  Broadband  N O F A  Workshop  FlyerN Y S  Broadband  N O F A  Workshop  Flyer
N Y S Broadband N O F A Workshop FlyerCCBBVT Greenville NY
 
The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...CPWF Mekong
 
IRJET-Environmental Impact Assessment for Infrastructure Development project...
IRJET-Environmental Impact Assessment for Infrastructure  Development project...IRJET-Environmental Impact Assessment for Infrastructure  Development project...
IRJET-Environmental Impact Assessment for Infrastructure Development project...IRJET Journal
 

Similar to NOA DEIS (DOE) - Mesaba Energy Project (16)

ANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive WasteANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive Waste
 
CAR Email 3.5.03
CAR Email 3.5.03CAR Email 3.5.03
CAR Email 3.5.03
 
CCSP Email 11.4.05
CCSP Email 11.4.05CCSP Email 11.4.05
CCSP Email 11.4.05
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
DOE/EIS-0394 NOI
DOE/EIS-0394 NOIDOE/EIS-0394 NOI
DOE/EIS-0394 NOI
 
Future gen noi_42840
Future gen noi_42840Future gen noi_42840
Future gen noi_42840
 
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
 
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
 
NOI - Energia Sierra Juarez
NOI - Energia Sierra JuarezNOI - Energia Sierra Juarez
NOI - Energia Sierra Juarez
 
NRDC Kyoto FOIA Appeal Response 11.30.01
NRDC Kyoto FOIA Appeal Response 11.30.01NRDC Kyoto FOIA Appeal Response 11.30.01
NRDC Kyoto FOIA Appeal Response 11.30.01
 
N Y S Broadband N O F A Workshop Flyer
N Y S  Broadband  N O F A  Workshop  FlyerN Y S  Broadband  N O F A  Workshop  Flyer
N Y S Broadband N O F A Workshop Flyer
 
CAR Email 2.10.03
CAR Email 2.10.03CAR Email 2.10.03
CAR Email 2.10.03
 
The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...
 
IRJET-Environmental Impact Assessment for Infrastructure Development project...
IRJET-Environmental Impact Assessment for Infrastructure  Development project...IRJET-Environmental Impact Assessment for Infrastructure  Development project...
IRJET-Environmental Impact Assessment for Infrastructure Development project...
 
NOI - Abengoa Biorefinery
NOI - Abengoa BiorefineryNOI - Abengoa Biorefinery
NOI - Abengoa Biorefinery
 

More from DOE Office of NEPA Policy & Compliance (12)

June 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons LearnedJune 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons Learned
 
NOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLCNOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLC
 
NOI - Santa Susana
NOI - Santa SusanaNOI - Santa Susana
NOI - Santa Susana
 
ANOI - Santa Susana
ANOI - Santa SusanaANOI - Santa Susana
ANOI - Santa Susana
 
NOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive WasteNOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive Waste
 
NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)
 
NOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa BiorefineryNOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa Biorefinery
 
Amended NOI - Abengoa Biorefinery
Amended NOI - Abengoa BiorefineryAmended NOI - Abengoa Biorefinery
Amended NOI - Abengoa Biorefinery
 
NOI - Solar Energy Development
NOI - Solar Energy DevelopmentNOI - Solar Energy Development
NOI - Solar Energy Development
 
NOI - Champlain Hudson Power
NOI - Champlain Hudson PowerNOI - Champlain Hudson Power
NOI - Champlain Hudson Power
 
NOI - Hooper Springs EIS
NOI - Hooper Springs EISNOI - Hooper Springs EIS
NOI - Hooper Springs EIS
 
Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project
 

NOA DEIS (DOE) - Mesaba Energy Project

  • 1. Federal Register / Vol. 72, No. 216 / Thursday, November 8, 2007 / Notices 63169 ACTION:Notice of Closed Teleconference Education, Room 5C140, 400 Maryland preceding each meeting on the dates Meeting. Avenue, SW., Washington, DC 20202. above. See the SUPPLEMENTARY INFORMATION section for details on the Kerri L. Briggs, SUMMARY: This notice sets forth the meeting process. Assistant Secretary for Elementary and schedule and proposed agenda of an Secondary Education. ADDRESSES: Requests for information upcoming teleconference meeting of the about this draft EIS, or to receive a copy [FR Doc. 07–5591 Filed 11–7–07; 8:45 am] National Advisory Council on Indian of the draft EIS, should be directed to: BILLING CODE 4000–01–M Education (the Council) and is intended Mr. Richard A. Hargis, Jr., NEPA to notify the general public of the Document Manager, M/S 922–178C, meeting. This notice also describes the U.S. Department of Energy, National DEPARTMENT OF ENERGY Energy Technology Laboratory, P.O. Box functions of the Council. Notice of the Council’s meetings is required under 10940, Pittsburgh, PA 15236–0940. Notice of Availability of the Draft section 10(a)(2) of the Federal Advisory Requests may also be submitted by Environmental Impact Statement for Committee Act and by the Council’s telephone: 412–386–6065; toll free the Mesaba Energy Project number: 888–322–7436 ext. 6065; fax: charter. AGENCY: Department of Energy. 412–386–4604; or electronic mail: Agenda: The purpose of the meeting ACTION: Notice of Availability and richard.hargis@netl.doe.gov. will be for the Council to conduct a public hearings. The draft EIS will be available at: review of the applications for the vacant http://www.eh.doe.gov/nepa/. Copies of position of Director of the Office of SUMMARY: The U.S. Department of the draft EIS are also available for Indian Education and to make their Energy (DOE) announces the availability review at the locations listed in the recommendation to the Department. of the Draft Environmental Impact SUPPLEMENTARY INFORMATION section of This notice is appearing in the Federal Statement for the Mesaba Energy Project this Notice. Written comments on the Register less than 15 days before the (DOE/EIS–0382D) for public comment, draft EIS can be submitted by mail, fax, date of the meeting due to scheduling as well as the dates, locations and times or electronic mail to Mr. Richard A. difficulties within the agency and with for public hearings. The draft Hargis, Jr., as indicated above. Oral the Council. environmental impact statement (EIS) comments on the draft EIS will be analyzes the potential environmental accepted only during the public Date and Time: Nov. 15, 2007; 1 p.m. consequences of DOE’s proposed action hearings scheduled for the dates and to 3 p.m. EST. to provide a total of $36 million in co- locations provided in the DATES section Location: The Department of funding, through a financial assistance of this Notice. Education will provide a 1–800–call in cooperative agreement, for the design FOR FURTHER INFORMATION, CONTACT: For number for all NACIE members. and one-year operational demonstration further information regarding the FOR FURTHER INFORMATION CONTACT: of a coal-based, Integrated Gasification proposed project or the draft EIS, please Combined Cycle (IGCC) electric contact Mr. Richard A. Hargis, Jr., (see Lana Shaughnessy, Group Leader, Office generating facility on the Iron Range of ADDRESSES). For general information on of Indian Education, U.S. Department of northern Minnesota. DOE may also the DOE NEPA process, please contact: Education, 400 Maryland Avenue, SW., provide a loan guarantee pursuant to the Ms. Carol M. Borgstrom, Director, Office Washington, DC 20202. Telephone: Energy Policy Act of 2005 to guarantee of NEPA Policy and Compliance (GC– 202–205–2528. Fax: 202–260–7779. a portion of private sector financing for 20), U.S. Department of Energy, 1000 SUPPLEMENTARY INFORMATION: The the project; however, this loan guarantee Independence Avenue, SW., Council advises the Secretary of is not part of DOE’s proposed action. Washington, DC 20585–0103; Education on the funding and The facility would be demonstrated Telephone: 202–586–4600, or leave a administration (including the through a cooperative agreement toll-free message at: 800–472–2756. development of regulations, and between DOE and Excelsior Energy Inc. SUPPLEMENTARY INFORMATION: administrative policies and practices) of (Excelsior) under the Clean Coal Power any program over which the Secretary Initiative (CCPI) program. Description of Alternatives and Scope DATES: DOE invites the public to of the EIS has jurisdiction and includes Indian children or adults as participants or comment on the draft EIS during the DOE’s Proposed Action is to provide programs that may benefit Indian public comment period, which ends a total of $36 million in co-funding, children or adults, including any January 11, 2008. DOE will consider all through a cooperative agreement with program established under Title VII, comments postmarked or received Excelsior under the CCPI Program, for Part A of the ESEA. The Council during the public comment period in the design and one-year operational submitted to the Congress June 30 a preparing the Final EIS and will demonstration testing period for Phase I report on the activities of the Council consider late comments to the extent of the proposed two-phased Mesaba that included recommendations the practicable. Energy Project. The first phase would be Council considers appropriate for the DOE will conduct two public hearings a nominal 606 megawatt electricity improvement of Federal education to obtain comments on the draft EIS. (MWe) IGCC power plant with an The meetings will be held at the estimated cost of $2.16 billion. Phase II, programs that include Indian children Taconite Community Center, 26 Haynes which would be an identical, co-located or adults as participants or that may Street, Taconite, Minnesota, on 606 MWe plant, would be privately benefit Indian children or adults, and Tuesday, November 27, 2007, beginning financed and not involve co-funding by recommendations concerning the at 7 p.m., and at Hoyt Lakes Arena, 106 DOE. The project would demonstrate rwilkins on PROD1PC63 with NOTICES funding of any such program. Kennedy Memorial Drive, Hoyt Lakes, the commercial-readiness of the Records are kept of all Council Minnesota, on Wednesday, November Conoco-Phillips E-Gas TM gasification proceedings and are available for public 28, 2007, beginning at 7 p.m. An technology, including advanced inspection at the Office of Indian informational session will be held at gasification and air separation systems, Education, United States Department of each location from 4 p.m. to 7 p.m. feedstock flexibility, improved VerDate Aug<31>2005 16:54 Nov 07, 2007 Jkt 214001 PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 E:FRFM08NON1.SGM 08NON1
  • 2. 63170 Federal Register / Vol. 72, No. 216 / Thursday, November 8, 2007 / Notices environmental performance, and of 2005, DOE may also provide a loan impacts identified during the scoping improved thermal efficiency. Although guarantee for a portion of the private- process and analyzed in the draft EIS DOE’s proposed action would be sector financing for the Project; relate to the following: aesthetics; air applicable to Phase I only, the draft EIS however, this loan guarantee is not part quality and climate; geology and soils; considers the combined impacts of both of DOE’s proposed action. groundwater and surface water phases as connected actions. The Minnesota Power Plant Siting Act resources; floodplains and wetlands; DOE prepared this draft EIS in is intended to ensure that power plants biological resources; cultural resources; accordance with the National and high voltage transmission lines are land use; socioeconomics; Environmental Policy Act, of 1969 routed in an orderly manner compatible environmental justice; utility systems; (NEPA) (42 U.S.C. 4321 et seq.), the with environmental preservation and community services; transportation and Council on Environmental Quality the efficient use of resources. The traffic; materials and waste regulations that implement the Minnesota Public Utilities Commission management; human health and safety; procedural provisions of NEPA (40 CFR oversees permitting in accordance with and noise. parts 1500–1508), and the DOE the Act. State rules established for the procedures implementing NEPA (10 Act require the applicant for a site Availability of the Draft EIS CFR part 1021). Because the proposed permit to identify at least two sites for Copies of the draft EIS have been facility is considered a Large Electric the power plant—a preferred site and an distributed to Members of Congress; Power Generating Plant, the Project is alternative site. Excelsior identified the Federal, Native American tribal subject to the Minnesota Power Plant West Range site (Taconite, Itasca government, state, and local officials; Siting Act, which requires the County, Minnesota) as its preferred site and agencies, organizations and preparation of a state-equivalent EIS. and the East Range site (Hoyt Lakes, St. individuals who may be interested or The EIS requirements under NEPA and Louis County, Minnesota) as its affected. The draft EIS will be available the Act are substantially similar, and alternative site. Although DOE has not on the Internet at: http:// DOE has prepared this draft EIS in participated in the identification or www.eh.doe.gov/nepa/. Copies of the cooperation with the Minnesota selection of sites, the potential draft EIS are available for public review Department of Commerce to fulfill the environmental impacts of locating the at the Bovey Public Library, 402 2nd requirements of both laws. Federal project at either site are evaluated in the Street, Bovey, Minnesota; City of cooperating agencies for the EIS include draft EIS. The final decision on which Taconite Community Center, 28 Haynes the U.S. Army Corps of Engineers, St. site would be permitted, if any, will be Street, Taconite, Minnesota; Grand Paul District, and the U.S. Department made by the Minnesota Public Utilities Rapids Public Library, 140 NE., 2nd of Agriculture, Forest Service, Superior Commission in accordance with the Street Grand Rapids, Minnesota; the National Forest, Laurentian District. Minnesota Power Plant Siting Act. For the No Action Alternative, DOE Hibbing Public Library, 2020 East 5th Because the proposed Project may affect would not provide cost-shared funding Avenue, Hibbing, Minnesota; and the floodplains and wetlands in northern for the Project beyond that required to Hoyt Lakes Public Library, 206 Kennedy Minnesota, the draft EIS includes a complete the NEPA process. In this Memorial Drive, Hoyt Lakes, Minnesota. floodplain and wetlands assessment in case, the remaining funding withheld Additional copies also can be requested accordance with DOE regulations for from the Project may be made available (see ADDRESSES). Compliance with Floodplain and Wetlands Environmental Review for other current or future CCPI projects. Public Meetings Requirements (10 CFR part 1022). Without DOE funding, it is not likely DOE analyzed two main alternatives that the Mesaba Energy Project would be DOE will conduct a public hearing in the draft EIS—the Proposed Action built, although it is possible that near each of the two alternative sites, in (including two alternative sites for the Excelsior could still elect to construct conjunction with the Minnesota project) and the No Action Alternative. and operate the proposed power plant Department of Commerce, to obtain Under the Proposed Action, DOE would provided that it could replace the comments on the draft EIS. Requests to provide cost-shared funding to Excelsior Federal financing component and obtain speak at the public hearings can be for the design and one-year the required permits from state and made by contacting Mr. Richard A. demonstration of a coal-based, IGCC Federal agencies. However, without Hargis, Jr., as indicated in the electric generating facility to be located DOE participation, it is possible that the ADDRESSES section above. Requests to in the Taconite Tax Relief Area as proposed project would be canceled. speak that have not been submitted defined in Minnesota Statutes Section Therefore, for purposes of analysis in prior to the hearing will be accepted in 273.134. DOE has entered into a the draft EIS, the No Action Alternative the order in which they are received at cooperative agreement with Excelsior, is assumed to be equivalent to a ‘‘No the hearing. Speakers are encouraged to which was a successful applicant in Build’’ Alternative, meaning that provide a written version of their oral Round 2 of the CCPI program, to environmental conditions would remain comments for the record. Each speaker demonstrate the Project. Excelsior is an in the status quo (no new construction, will be allowed approximately five independent energy development resource utilization, emissions, minutes to present comments. Those company based in Minnetonka, discharges, or wastes generated). The No speakers who want more than five Minnesota, that ultimately would be Action Alternative would not contribute minutes should indicate the length of responsible for the siting, design, to the goal of the CCPI program, which time desired in their request. Depending construction, demonstration, and is to accelerate commercial deployment on the number of speakers, DOE may operation of the Project and related of advanced technologies that provide need to limit all speakers to five components. Until the NEPA process is the United States with clean, reliable, minutes initially and provide additional complete, no funds would be provided and affordable energy. opportunities as time permits. rwilkins on PROD1PC63 with NOTICES for project activities that could either The draft EIS analyzes the Comments will be recorded by a court have an adverse impact on the environmental consequences that may reporter and will become part of the environment or limit the choice of result from the proposed action at each public hearing record. Oral and written reasonable alternatives available to of the two alternative sites, as well as comments will be given equal DOE. Pursuant to the Energy Policy Act the no action alternative. Potential consideration. VerDate Aug<31>2005 16:54 Nov 07, 2007 Jkt 214001 PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 E:FRFM08NON1.SGM 08NON1
  • 3. Federal Register / Vol. 72, No. 216 / Thursday, November 8, 2007 / Notices 63171 Each hearing will begin with an application which is on file with the by all other parties. A party must submit informational session at approximately Commission and open to public 14 copies of filings made with the 4 p.m. DOE will then begin each inspection. This filing is accessible on- Commission and must mail a copy to meeting’s formal session at 7 p.m. with line at http://www.ferc.gov, using the the applicant and to every other party in an overview of the project, followed by ‘‘eLibrary’’ link and is available for the proceeding. Only parties to the oral statements by the scheduled review in the Commission’s Public proceeding can ask for court review of speakers. Speakers may be asked Reference Room in Washington, DC. Commission orders in the proceeding. questions to help ensure that DOE fully There is an ‘‘eSubscription’’ link on the However, a person does not have to understands the comments. A presiding Web site that enables subscribers to intervene in order to have comments officer will establish the order of receive e-mail notification when a considered. The second way to speakers and provide any additional document is added to a subscribed participate is by filing with the procedures necessary to conduct the docket(s). For assistance with any FERC Secretary of the Commission, as soon as meetings. Online service, please e-mail possible, an original and two copies of All meetings will be accessible to FERCOnlineSupport@ferc.gov, or call comments in support of or in opposition people with disabilities. Any individual (866) 208–3676 (toll free). For TTY, call to this project. The Commission will with a disability requiring special (202) 502–8659. consider these comments in assistance, such as sign language Southern Star states that due to the determining the appropriate action to be interpreter, or a translator, should abandonment of the Craig storage field taken, but the filing of a comment alone contact Mr. Richard A. Hargis, Jr., the as authorized by order of the will not serve to make the filer a party NEPA Document Manager, (see Commission in Docket No. CP98–280– to the proceeding. The Commission’s ADDRESSES) at least 48 hours in advance 000 (85 FERC ¶61,184) the compressor rules require that persons filing of the meeting so that arrangements can engines are no longer required to comments in opposition to the project be made. provide the storage field compression provide copies of their protests only to service for which they were originally the party or parties directly involved in Meeting Schedule installed. Southern Star stated in the the protest. West Range Site—Taconite aforementioned application that the Persons who wish to comment only compressor engines at the Craig station Date: Tuesday, November 27, 2007. on the environmental review of this were being evaluated at that time for use Place: Taconite Community Center, project should submit an original and elsewhere on its pipeline system. 26 Haynes Street, Taconite, Minnesota. Southern Star further states that one two copies of their comments to the compressor engine will be removed Secretary of the Commission. East Range Site—Hoyt Lakes Environmental commentors will be from the Craig compressor station, Date: Wednesday, November 28, refurbished and installed at the South placed on the Commission’s 2007. Welda storage field as booster environmental mailing list, will receive Place: Hoyt Lakes Arena, 106 compression. Southern Star has copies of the environmental documents, Kennedy Memorial Drive, Hoyt Lakes, requested authorization for said engine and will be notified of meetings Minnesota. installation at South Welda storage field associated with the Commission’s Issued in Washington, DC, on November 2, in Docket No. CP08–4–000, which is environmental review process. 2007. currently pending before the Environmental commentors will not be Mark J. Matarrese, Commission. The other compressor required to serve copies of filed Director, Office of Environment, Security, engine will be removed and warehoused documents on all other parties. Safety and Health, Office of Fossil Energy. at Southern Star’s Welda compressor However, the non-party commentors [FR Doc. E7–21959 Filed 11–7–07; 8:45 am] station. The existing Craig compressor will not receive copies of all documents building will remain in place to be used filed by other parties or issued by the BILLING CODE 6450–01–P as a warehouse facility for pipe, Commission (except for the mailing of equipment and supplies. environmental documents issued by the DEPARTMENT OF ENERGY Any questions regarding this Commission) and will not have the right application should be directed to David to seek court review of the Federal Energy Regulatory N. Roberts, Manager, Regulatory Affairs, Commission’s final order. Commission at (270) 852–4654. Comments, protests and interventions There are two ways to become may be filed electronically via the [Docket No. CP08–12–000] involved in the Commission’s review of Internet in lieu of paper. See 18 CFR Southern Star Central Gas Pipeline, this project. First, any person wishing to 385.2001(a)(1)(iii) and the instructions Inc.; Notice of Application obtain legal status by becoming a party on the Commission’s Web site under the to the proceedings for this project ‘‘e-Filing’’ link at http://www.ferc.gov. November 1, 2007. should, on or before the comment date The Commission strongly encourages Take notice that on October 30, 2007, stated below, file with the Federal intervenors to file electronically. Southern Star Central Gas Pipeline, Inc. Energy Regulatory Commission, 888 Persons unable to file electronically (Southern Star), 4700 State Highway 56, First Street, NE., Washington, DC 20426, should submit an original and 14 copies Owensboro, Kentucky 42301, filed in a motion to intervene in accordance of the protest or intervention to the Docket No. CP08–12–000, an with the requirements of the Federal Energy Regulatory Commission, application pursuant to section 7(b) of Commission’s Rules of Practice and 888 First Street, NE., Washington, DC the Natural Gas Act (NGA) and Part 157 Procedure (18 CFR 385.214 or 385.211) 20426. of the Commission’s Regulations, for an and the Regulations under the NGA (18 Comment Date: November 23, 2007. rwilkins on PROD1PC63 with NOTICES order permitting and approving the CFR 157.10). A person obtaining party abandonment by reclaim of two 660- status will be placed on the service list Kimberly D. Bose, horsepower White Superior compressor maintained by the Secretary of the Secretary. units located in Johnson County, Commission and will receive copies of [FR Doc. E7–21919 Filed 11–7–07; 8:45 am] Kansas, all as more fully set forth in the all documents filed by the applicant and BILLING CODE 6717–01–P VerDate Aug<31>2005 16:54 Nov 07, 2007 Jkt 214001 PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 E:FRFM08NON1.SGM 08NON1