ProjectConnections.com Template Project Status Reports
INTRODUCTION: Project Status Reports
The status report formats/examples start on page 3
What This Is
Five different formats and types of status information that can be used to summarize and communicate project
status to the team and Management.
 Document formats to capture status on one page and easily hand out, post, or email.
 Simple 3-slide set for presenting top-level status to management in meetings
 One-page format for summarizing status on multiple projects.
Why It’s Useful
Regular status reports help ensure that the team has clear visibility to the true state of a project and that
Management stays properly informed about project progress, difficulties, and issues, by periodically getting the
right kinds of information from the project manager. Frequent communication of project status and issues is a
vital part of effective project risk management.
The reports should let management know whether the project is on track to deliver its outcome as planned, and
must highlight to management any place where their decision-making or direct help is needed.
How to Use It
1. Review the included status report formats and select the one that seems most appropriate for your needs, or
create your own hybrid.
2. In communication planning with your team and stakeholders during the project front-end, decide on the initial
period for the status report and who should receive it. This can be documented in your Communications
Plan.
3. Decide on appropriate definitions for indicators in the report. For example, if you choose a format that calls
for a ‘red, yellow, green’ indicator of project health: Green can mean the project is on track for hitting
schedule, cost, and requirements (scope) goals, and there are no major issues; Yellow can mean early
warning of potential risk to either cost, schedule, or scope, and refer the reader to the Issues section for
details; and Red can mean that one or more serious issues have put project success in jeopardy. Adjust
these definitions to fit your project’s critical success factors and goals.
4. The project manager then creates and sends this report at the agreed-upon frequency to the recipients. Note
that you don’t have to wait until the Execution Phase of the project to start sending status reports – updating
the team and stakeholders during the earlier project phases is a good way to increase project knowledge
and decrease risk. It is essential to be periodically updating the team and stakeholders by the Execution
Phase at the latest. Also, you can change the frequency of the reports as necessary—a bi-weekly report can
become weekly during a time of intense project activity.
5. Pay attention to the type and level of detail the report suggests. Sometimes communication with
management can be of low quality because too MUCH information is provided, and busy executives can't
determine what actions they need to take to help the project.
Special note for small projects: If you’re on a relatively short timeframe project or a project with a very small
team—say a very short feature enhancement to an existing product or an internal department project, or any
similar, very straightforward effort—it may seem like no formal status reporting is needed. Before you reach this
conclusion think about the following:
(continued on next page)
The status report examples and formats start on page 3
Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 1
Permission for Members to use personally according to our Terms of Service
ProjectConnections.com Template Project Status Reports
INTRODUCTION: Project Status Reports (continued)
How to Use It (continued)
Special note for small projects: (continued)
 What status tracking and “reporting” will be helpful for your team members (and their managers)?
Even if there are just a few of you, it can still be helpful to keep everyone on the same page with what’s
done, what’s not, and what issues need to be worked. Actually this can be really important for small projects,
because by definition your team members are probably working on multiple other projects at once. You need
to keep status of YOUR project in front of everyone so nothing gets dropped! See formats 1 and 2; these
formats provide two different ways to convey current status simply through keeping track of planned vs.
actual work.
 Who are the project stakeholders besides those few people doing work on your project?
Stakeholders are those who have some reason to care about the outcome of your project. They could be
customers or users of the project’s eventual deliverable; they could be managers whose staff are working on
the project; they could the ones providing the budget for the program. Do these people need to be informed
of status along the way? What would they like to know about how the project is progressing? See format #4
– it shows how to summarize the project, status, and issues, in ‘slide format’ for easy reading. And of course,
this info can simply be used as bullets in an email to the right people.
Contents of the file:
1. Periodic Progress Summary Report: Report format for publishing progress, plans, and issues at regular
intervals.
2. Project Status – Major Task Completion: Presents status for a project phase, with emphasis on reporting
completion status of major tasks.
3. Project Status – Work-plan Measure: Presents status for a project phase, with emphasis on reporting
completion metrics on various items.
4. Project Status Presentation: Provides typical 3-slide-per-project information bullets for summarizing
project status in a management meeting.
5. Multiple-Project Status Summary: Provides one-page overview of current phase and planned completion
date of a set of projects being updated.
The status report examples and formats start on the following page.
Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 2
Permission for Members to use personally according to our Terms of Service
ProjectConnections.com Template Project Status Reports
Project Status Report Formats
(1) Project Status Report – Periodic Progress Summary
Content: A template for a 1 – 2 page report summarizing progress on a project. The format is “what we did last
period,” “what we’re doing next period” and “issues we’re working on now.” The report is formatted to allow
stakeholders and team members to quickly assess a project’s status, progress, and key current activities.
Bottom Line: The “what we did” and “what we are going to do” sections help establish a rhythm for the team as
well as keep management apprised of progress and alerted to early indications of slip. The “Issues” section
helps expose project risk areas early, focus attention on tasks to mitigate them, and communicate a possible
need for help from outside the immediate project team.
Note: When a project is running smoothly, there should a visible correlation between one report’s “Upcoming
tasks for this period” and the next report’s “Key accomplishments last period.” Most of the task descriptions
should just change their action verbs to past tense. If there is little correlation between what you intend to do
each week and what you ended up accomplishing, the project is probably experiencing problems such as
inadequate resources, unclear requirements, or convergence on solutions that meets requirements.
Summary Progress Report
To: {distribution list} From: {project manager}
Subject: Summary Progress Report, xxx Project Date: mm/dd/yy
Project Name: Report Period:
Project Manager: Phone, E-mail:
Project Description: Project Priority:
Project Status Summary: ____Green ____Yellow ____Red
Key accomplishments last period:
List brief 1- or 2- sentence descriptions of what was accomplished in this last period:
 Include important schedule milestones if any occurred in this last period.
 Include any events that significantly reduced risk in the project.
 Include key tasks that closed an issue that was marked “open” on the previous report.
Upcoming tasks for this period:
List brief 1- or 2-sentence descriptions of what you plan to accomplished this next period.
 Include important schedule milestones if any that will occur in this period.
 Include any upcoming events that will significantly reduce risk in the project.
 Include key tasks that will move an open issue toward closure.
 Include any item you specifically need Management’s help on – and what actions you need.
Issues:
List principal open issues.
 Include any item you specifically need Management’s help on – and what actions you need.
 Identify an owner of the issue – who is driving the resolution.
 Include a task in the “Upcoming tasks for this period” that will move this issue toward closure.
 Don’t try to track all project issues in this report. Just list the principal ones along with any progress
toward closing them.
 If resolving the issue needs management action, be specific about what action is needed and by
when.
Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 3
Permission for Members to use personally according to our Terms of Service
ProjectConnections.com Template Project Status Reports
(2) Project Status Report - Major Task Completion
Contents: Presents status for a project phase, with emphasis on reporting completion status of major tasks.
Variations: a) This format can be used to give status on current phase or you can expand it to include all major
phases. b) You can reduce the level of detail in each phase and report on a smaller number of major
milestones. c) Some people prefer to leave out "percent complete.”
Bottom line: This status report is a good summary for a team and functional managers. By providing planned
and actual start and end dates for the various tasks/milestones, it lets you see at a glance whether the project is
on schedule. It is not a complete picture for reporting to executives, because it does not provide highly targeted
and summarized information on issues they need to understand where to focus their attention to assist the
project. At most the Status or Comments column could be used to convey some of that information.
Project Name: Biz1 Data Warehouse Status Date: __________________
PROJECT STATUS Planned
Start Date
Actual
Start Date
Planned
Complete
Date
Actual
Complete
Date
Percent
complete
Status or Comments
Business Analysis
Review current capabilities
Develop requirements
Refine requirements
Develop Deliverable
Source Data Analysis
Develop Data Model
Develop Data
Transformations
Data Conversion Analysis
Legacy system review
Develop conversion
requirements
Data conversion cost-benefit
Technology Analysis
Software acquisition
Develop infrastructure
Transformation test
Develop prototype
Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 4
Permission for Members to use personally according to our Terms of Service
ProjectConnections.com Template Project Status Reports
(3) Project Status Report - Work-Plan Measure
Contents: Presents status for a phase of a project, with emphasis on reporting completion metrics on various
items.
Bottom line: This status report is a good companion to the status report on the previous page, for a team to
keep visible the work that is getting done and what is left. The dates on report (1) give the time view of the
project tasks. This one (2) provides a very objective measure of the work associated with all those tasks and
how much of that work has been completed. The example below is from an IT data warehouse development
project. Substitute the work items and metrics that fit your projects and make sense to keep visible in this way.
Other examples where this could be useful include testing phases of projects, where test cases are being written
and executed; writing/publications projects; web projects where many elements of graphics, page designs, page
contents, etc. must be created.
Project Name: Biz1 Data Warehouse Status Date: __________________
PROJECT STATUS Selected
Measures
Totals Planned Actual In
progress
Not
started
Status or Comments
Business Analysis 33 19 19 0 12
Review current
capabilities
No. Interviews
completed
21 9 9 0 12 Considered complete
at 9 instead of 21
Develop requirements No. subject
areas
complete
8 8 8 0 0
Refine requirements No. interviews
completed
4 2 2 0 0
Source Data
Analysis
26 15 8 1 6
Develop Data Model No. interviews 20 9 8 1 0
Develop Data
Transformations
No. of source
systems
6 6 0 0 6
Data Conversion
Analysis
10 6 6 0 0
Legacy system review No. interviews 6 6 6 0 0
Map legacy to source No. JAD
sessions
4 0 0 0 0
Data conversion cost-
benefit
Final report 1 0 0 0 0
Technology
Analysis
15 8 4 4 0
Technology
Requirements
No. of work
sessions
11 4 0 4 0
Prototype No. of
scenarios
4 4 4 0 0
Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 5
Permission for Members to use personally according to our Terms of Service
ProjectConnections.com Template Project Status Reports
(4) Project Status Presentation
Contents: Provides guidance for content to put in several presentation slides for summarizing project status in a
management meeting. Content bullets are similar to those in #1 Periodic Progress Summary report.
Bottom line: This status report emphasizes quickly summarizing the state of the project for management. It can
be used for a monthly project review meeting with management, and each project can use this format.
Key: This report helps a project manager emphasize to executives whether the project is on plan, and what the
execs need to do to help (if anything). Why is this important? Some reports to management provide way too
much detail about all the work being done as opposed to 1) a ruthlessly objective statement of how it's doing
relative to plan, and 2) the actions management can take to help resolve any issues.
First slide: Project Overview
 Project Name:
 Project Manager:
 Product Manager or Business Team member:
 Brief description of project objective:
 Current lifecycle phase project is in:
 Projected completion date:
Second slide: Milestone Status
 Key accomplishments since last report: Major phases or activities completed, issues resolved
(not a laundry list of everything that got done.)
 High-level project milestones: Planned and actual or projected completion dates.
 Vision status: Has the Project Vision (major project objectives) changed? Summarize the changes.
 Status summary statement: Red/yellow/green to indicate seriousness of issues. Qualitative
statement of state: Is the project on track? Struggling but team has action plans to address? In dire need of
management assistance to recover?
Third Slide: Issues Detail (report major issues in this format):
 Issue 1: Summarize the issue.
 Impact: Give a succinct statement of how it impacts the project if not resolved – cost issue?
Schedule issue? Scope issue? Particular customer contract in jeopardy? What business objectives not
met?
 Action being taken by team: Owner, and summary of team’s plan to resolve it, including key
resources involved, and date by which team will have more information or know that the issue is resolved.
 Action requested that management take (if any): What do you need from Management to help
resolve the issue? Be very specific about what you need, when you need it by, and why.
Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 6
Permission for Members to use personally according to our Terms of Service
ProjectConnections.com Template Project Status Reports
Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 7
Permission for Members to use personally according to our Terms of Service
ProjectConnections.com Template Project Status Reports
(5) Multiple-Project Status Summary
Contents: Provides one page summary of current set of projects.
Variations: You can add various columns to provide whatever info you want to convey.
Bottom line: This status report is a good summary for functional managers to see the landscape of projects
their people are being assigned to; and good for executives to understand where resources are being deployed
and how those efforts are going. The delta columns at right point out quickly which projects are changing or
slipping. The "resets" column indicates projects that had such radical change or issues that they were
considered restarted.
Portfolio Name: Commercial Drug Division 1 Status Date: __________________
Project
Priority
PROJECT NAME Category Resets Current
Phase
Project
Completion
Date
Delta
since
Last
Month
Delta
since
July 05
1 Drug2 formulation Process 3 6/30/05
2 Lab Information
System upgrades
IT 4 8/14/05 1 week
3 UK2 Pilot line
Construction
Construction 1 3 2/02/06 3 months
4 Process2
development
Process 3 8/01/05
5 Process3
development
Process 1 2 3/03/06
6 Mfg capacity ramp
Drug1
Capacity 4 5/05/05 3 weeks
7 Etc.
8
9
10
11
12
NOTE: “Resets” refers to the number of times the project has been re-scoped and re-planned and the
Completion date re-baselined.
Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 8
Permission for Members to use personally according to our Terms of Service

Contenu connexe

Tendances

Project scope, schedule, cost, quality Management
Project scope, schedule, cost, quality ManagementProject scope, schedule, cost, quality Management
Project scope, schedule, cost, quality ManagementHaykanush Ayvazyan, PMP
 
Project Description PowerPoint Presentation Slides
Project Description PowerPoint Presentation Slides Project Description PowerPoint Presentation Slides
Project Description PowerPoint Presentation Slides SlideTeam
 
The Project Charter in a Nutshell
The Project Charter in a NutshellThe Project Charter in a Nutshell
The Project Charter in a NutshellPatrice Graillet
 
Lean DMAIC for Obsolete Material Stock Reduction
Lean DMAIC for Obsolete Material Stock ReductionLean DMAIC for Obsolete Material Stock Reduction
Lean DMAIC for Obsolete Material Stock ReductionRodrigo André Marques
 
Project scope statement template v2.3
Project scope statement template v2.3Project scope statement template v2.3
Project scope statement template v2.3Aditya Pandey
 
Project Management Organizational Structures
Project Management Organizational StructuresProject Management Organizational Structures
Project Management Organizational StructuresJ. Scott Christianson
 
Project management
Project managementProject management
Project managementIrfan Tahir
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeTheodore Van Patten, Jr.
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaJoshua Render
 
Project Management Diploma
Project Management DiplomaProject Management Diploma
Project Management DiplomaTheunis Venter
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updatedFarhana Rehman
 
PC 2012 PMO plan
PC 2012 PMO planPC 2012 PMO plan
PC 2012 PMO plandrewboy07
 
Risk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareRisk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareDavid Bustin
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-controleidalin95
 
Project Status Report With Budget Estimation And Milestones Printable Report ...
Project Status Report With Budget Estimation And Milestones Printable Report ...Project Status Report With Budget Estimation And Milestones Printable Report ...
Project Status Report With Budget Estimation And Milestones Printable Report ...SlideTeam
 

Tendances (20)

Project scope, schedule, cost, quality Management
Project scope, schedule, cost, quality ManagementProject scope, schedule, cost, quality Management
Project scope, schedule, cost, quality Management
 
Project Description PowerPoint Presentation Slides
Project Description PowerPoint Presentation Slides Project Description PowerPoint Presentation Slides
Project Description PowerPoint Presentation Slides
 
The Project Charter in a Nutshell
The Project Charter in a NutshellThe Project Charter in a Nutshell
The Project Charter in a Nutshell
 
Lean DMAIC for Obsolete Material Stock Reduction
Lean DMAIC for Obsolete Material Stock ReductionLean DMAIC for Obsolete Material Stock Reduction
Lean DMAIC for Obsolete Material Stock Reduction
 
Project scope statement template v2.3
Project scope statement template v2.3Project scope statement template v2.3
Project scope statement template v2.3
 
Project Management Organizational Structures
Project Management Organizational StructuresProject Management Organizational Structures
Project Management Organizational Structures
 
Microsoft Project
Microsoft ProjectMicrosoft Project
Microsoft Project
 
EP Project Charter OpenWells2.3
EP Project Charter OpenWells2.3EP Project Charter OpenWells2.3
EP Project Charter OpenWells2.3
 
Project management
Project managementProject management
Project management
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge Area
 
Project Management Diploma
Project Management DiplomaProject Management Diploma
Project Management Diploma
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
 
Project Finance
Project FinanceProject Finance
Project Finance
 
PC 2012 PMO plan
PC 2012 PMO planPC 2012 PMO plan
PC 2012 PMO plan
 
Risk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareRisk management plan for Human Resource Software
Risk management plan for Human Resource Software
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
 
Project Status Report With Budget Estimation And Milestones Printable Report ...
Project Status Report With Budget Estimation And Milestones Printable Report ...Project Status Report With Budget Estimation And Milestones Printable Report ...
Project Status Report With Budget Estimation And Milestones Printable Report ...
 
Project Sign Off Tempalte
Project Sign Off TempalteProject Sign Off Tempalte
Project Sign Off Tempalte
 

En vedette

13 feasibility report sample answer
13 feasibility report sample answer13 feasibility report sample answer
13 feasibility report sample answerEDIN BROW, DCE, AMET
 
Oracle Implementation Project Template
Oracle Implementation Project TemplateOracle Implementation Project Template
Oracle Implementation Project Templateacribe
 
TYPES OF TECHNICAL REPORTS
TYPES OF TECHNICAL REPORTSTYPES OF TECHNICAL REPORTS
TYPES OF TECHNICAL REPORTSfarwa jafar
 
ERP Project Management Primer
ERP Project Management PrimerERP Project Management Primer
ERP Project Management Primersureshgk
 
Earned Value Reporting
Earned Value ReportingEarned Value Reporting
Earned Value Reportingcfreema7
 
Summer internship project on home loans
Summer internship project on home loansSummer internship project on home loans
Summer internship project on home loansSomendra Singh
 
One page effective project status report
One page effective project status reportOne page effective project status report
One page effective project status reportTechno-PM PTY LTD
 
The Project Management Process - Week 9 Performance Management
The Project Management Process - Week 9   Performance ManagementThe Project Management Process - Week 9   Performance Management
The Project Management Process - Week 9 Performance ManagementCraig Brown
 
Project management communication
Project management communicationProject management communication
Project management communicationlaksha vijayaratnam
 
Types of technical reports
Types of technical reportsTypes of technical reports
Types of technical reportsNeyo Adasko
 
Recommendation Report
Recommendation ReportRecommendation Report
Recommendation ReportProf S
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 

En vedette (15)

13 feasibility report sample answer
13 feasibility report sample answer13 feasibility report sample answer
13 feasibility report sample answer
 
Oracle Implementation Project Template
Oracle Implementation Project TemplateOracle Implementation Project Template
Oracle Implementation Project Template
 
TYPES OF TECHNICAL REPORTS
TYPES OF TECHNICAL REPORTSTYPES OF TECHNICAL REPORTS
TYPES OF TECHNICAL REPORTS
 
ERP Project Management Primer
ERP Project Management PrimerERP Project Management Primer
ERP Project Management Primer
 
Earned Value Reporting
Earned Value ReportingEarned Value Reporting
Earned Value Reporting
 
Summer internship project on home loans
Summer internship project on home loansSummer internship project on home loans
Summer internship project on home loans
 
One page effective project status report
One page effective project status reportOne page effective project status report
One page effective project status report
 
The Project Management Process - Week 9 Performance Management
The Project Management Process - Week 9   Performance ManagementThe Project Management Process - Week 9   Performance Management
The Project Management Process - Week 9 Performance Management
 
Project Report on Performance Management System
Project Report on Performance Management SystemProject Report on Performance Management System
Project Report on Performance Management System
 
Project management communication
Project management communicationProject management communication
Project management communication
 
Technical Report Writing
Technical Report WritingTechnical Report Writing
Technical Report Writing
 
Types of technical reports
Types of technical reportsTypes of technical reports
Types of technical reports
 
Cutover Plan V2
Cutover Plan V2Cutover Plan V2
Cutover Plan V2
 
Recommendation Report
Recommendation ReportRecommendation Report
Recommendation Report
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 

Similaire à Status reports

ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project CharterBogdan Gorka
 
Project plan preparation guidelines
Project plan preparation guidelinesProject plan preparation guidelines
Project plan preparation guidelinesKapila Kapila
 
The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkitsIT-Toolkits.org
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management ProjectMary Stevenson
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxbriancrawford30935
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docxhallettfaustina
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxAASTHA76
 
System Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptSystem Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptAynetuTerefe2
 
Project Report Introduction
Project Report IntroductionProject Report Introduction
Project Report IntroductionFinanceseva
 
Project Charter Tips.pptx
Project Charter Tips.pptxProject Charter Tips.pptx
Project Charter Tips.pptxManishBaluni2
 
Project proposal format
Project proposal formatProject proposal format
Project proposal formatRashmi Yadav
 
8 project management reports you need for your project
8 project management reports you need for your project8 project management reports you need for your project
8 project management reports you need for your projectPM Majik
 
Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)scorpissons123
 
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxAssignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxtrippettjettie
 

Similaire à Status reports (20)

ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project Charter
 
Planning And Managing The Project
Planning And Managing The ProjectPlanning And Managing The Project
Planning And Managing The Project
 
Project plan preparation guidelines
Project plan preparation guidelinesProject plan preparation guidelines
Project plan preparation guidelines
 
The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkits
 
Cmgt 410 cmgt410
Cmgt 410 cmgt410Cmgt 410 cmgt410
Cmgt 410 cmgt410
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
 
System Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptSystem Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).ppt
 
Project Report Introduction
Project Report IntroductionProject Report Introduction
Project Report Introduction
 
Project Charter Tips.pptx
Project Charter Tips.pptxProject Charter Tips.pptx
Project Charter Tips.pptx
 
Project proposal format
Project proposal formatProject proposal format
Project proposal format
 
8 project management reports you need for your project
8 project management reports you need for your project8 project management reports you need for your project
8 project management reports you need for your project
 
Mini PID
Mini PIDMini PID
Mini PID
 
Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)
 
Caltrans Communication Plan Template
Caltrans Communication Plan TemplateCaltrans Communication Plan Template
Caltrans Communication Plan Template
 
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxAssignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 

Plus de Samir Sami

إدارة الاولويات
إدارة الاولوياتإدارة الاولويات
إدارة الاولوياتSamir Sami
 
The art of tactics
The art of tacticsThe art of tactics
The art of tacticsSamir Sami
 
Fm 3-20.97 the-recce_and_brt_troop_draft
Fm 3-20.97 the-recce_and_brt_troop_draftFm 3-20.97 the-recce_and_brt_troop_draft
Fm 3-20.97 the-recce_and_brt_troop_draftSamir Sami
 
Battle staff4 sample1
Battle staff4 sample1Battle staff4 sample1
Battle staff4 sample1Samir Sami
 
التفاوض علم وفن
التفاوض علم وفن التفاوض علم وفن
التفاوض علم وفن Samir Sami
 
فن إدارة الوقت إليك كتابى
فن إدارة الوقت إليك كتابىفن إدارة الوقت إليك كتابى
فن إدارة الوقت إليك كتابىSamir Sami
 
Issues and-challenges-facing-e-entrepreneurship-and-e-innovation
Issues and-challenges-facing-e-entrepreneurship-and-e-innovationIssues and-challenges-facing-e-entrepreneurship-and-e-innovation
Issues and-challenges-facing-e-entrepreneurship-and-e-innovationSamir Sami
 
Ssrn id2203122
Ssrn id2203122Ssrn id2203122
Ssrn id2203122Samir Sami
 
103201221214516720000
103201221214516720000103201221214516720000
103201221214516720000Samir Sami
 
103201211214516440000
103201211214516440000103201211214516440000
103201211214516440000Samir Sami
 

Plus de Samir Sami (20)

إدارة الاولويات
إدارة الاولوياتإدارة الاولويات
إدارة الاولويات
 
The art of tactics
The art of tacticsThe art of tactics
The art of tactics
 
Suts2 sample
Suts2 sampleSuts2 sample
Suts2 sample
 
Fm6(03)
Fm6(03)Fm6(03)
Fm6(03)
 
Fm 3-20.97 the-recce_and_brt_troop_draft
Fm 3-20.97 the-recce_and_brt_troop_draftFm 3-20.97 the-recce_and_brt_troop_draft
Fm 3-20.97 the-recce_and_brt_troop_draft
 
Fm3 21x11
Fm3 21x11Fm3 21x11
Fm3 21x11
 
Fm3 21x11 (1)
Fm3 21x11 (1)Fm3 21x11 (1)
Fm3 21x11 (1)
 
Battle staff4 sample1
Battle staff4 sample1Battle staff4 sample1
Battle staff4 sample1
 
Aods4 sample
Aods4 sampleAods4 sample
Aods4 sample
 
Fm101 5 mdmp
Fm101 5 mdmpFm101 5 mdmp
Fm101 5 mdmp
 
التفاوض علم وفن
التفاوض علم وفن التفاوض علم وفن
التفاوض علم وفن
 
فن إدارة الوقت إليك كتابى
فن إدارة الوقت إليك كتابىفن إدارة الوقت إليك كتابى
فن إدارة الوقت إليك كتابى
 
Gaz
GazGaz
Gaz
 
Cyberwarfare
CyberwarfareCyberwarfare
Cyberwarfare
 
Issues and-challenges-facing-e-entrepreneurship-and-e-innovation
Issues and-challenges-facing-e-entrepreneurship-and-e-innovationIssues and-challenges-facing-e-entrepreneurship-and-e-innovation
Issues and-challenges-facing-e-entrepreneurship-and-e-innovation
 
Storeych7
Storeych7Storeych7
Storeych7
 
Ssrn id2203122
Ssrn id2203122Ssrn id2203122
Ssrn id2203122
 
S 9735-pe
S 9735-peS 9735-pe
S 9735-pe
 
103201221214516720000
103201221214516720000103201221214516720000
103201221214516720000
 
103201211214516440000
103201211214516440000103201211214516440000
103201211214516440000
 

Dernier

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 

Dernier (20)

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Status reports

  • 1. ProjectConnections.com Template Project Status Reports INTRODUCTION: Project Status Reports The status report formats/examples start on page 3 What This Is Five different formats and types of status information that can be used to summarize and communicate project status to the team and Management.  Document formats to capture status on one page and easily hand out, post, or email.  Simple 3-slide set for presenting top-level status to management in meetings  One-page format for summarizing status on multiple projects. Why It’s Useful Regular status reports help ensure that the team has clear visibility to the true state of a project and that Management stays properly informed about project progress, difficulties, and issues, by periodically getting the right kinds of information from the project manager. Frequent communication of project status and issues is a vital part of effective project risk management. The reports should let management know whether the project is on track to deliver its outcome as planned, and must highlight to management any place where their decision-making or direct help is needed. How to Use It 1. Review the included status report formats and select the one that seems most appropriate for your needs, or create your own hybrid. 2. In communication planning with your team and stakeholders during the project front-end, decide on the initial period for the status report and who should receive it. This can be documented in your Communications Plan. 3. Decide on appropriate definitions for indicators in the report. For example, if you choose a format that calls for a ‘red, yellow, green’ indicator of project health: Green can mean the project is on track for hitting schedule, cost, and requirements (scope) goals, and there are no major issues; Yellow can mean early warning of potential risk to either cost, schedule, or scope, and refer the reader to the Issues section for details; and Red can mean that one or more serious issues have put project success in jeopardy. Adjust these definitions to fit your project’s critical success factors and goals. 4. The project manager then creates and sends this report at the agreed-upon frequency to the recipients. Note that you don’t have to wait until the Execution Phase of the project to start sending status reports – updating the team and stakeholders during the earlier project phases is a good way to increase project knowledge and decrease risk. It is essential to be periodically updating the team and stakeholders by the Execution Phase at the latest. Also, you can change the frequency of the reports as necessary—a bi-weekly report can become weekly during a time of intense project activity. 5. Pay attention to the type and level of detail the report suggests. Sometimes communication with management can be of low quality because too MUCH information is provided, and busy executives can't determine what actions they need to take to help the project. Special note for small projects: If you’re on a relatively short timeframe project or a project with a very small team—say a very short feature enhancement to an existing product or an internal department project, or any similar, very straightforward effort—it may seem like no formal status reporting is needed. Before you reach this conclusion think about the following: (continued on next page) The status report examples and formats start on page 3 Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 1 Permission for Members to use personally according to our Terms of Service
  • 2. ProjectConnections.com Template Project Status Reports INTRODUCTION: Project Status Reports (continued) How to Use It (continued) Special note for small projects: (continued)  What status tracking and “reporting” will be helpful for your team members (and their managers)? Even if there are just a few of you, it can still be helpful to keep everyone on the same page with what’s done, what’s not, and what issues need to be worked. Actually this can be really important for small projects, because by definition your team members are probably working on multiple other projects at once. You need to keep status of YOUR project in front of everyone so nothing gets dropped! See formats 1 and 2; these formats provide two different ways to convey current status simply through keeping track of planned vs. actual work.  Who are the project stakeholders besides those few people doing work on your project? Stakeholders are those who have some reason to care about the outcome of your project. They could be customers or users of the project’s eventual deliverable; they could be managers whose staff are working on the project; they could the ones providing the budget for the program. Do these people need to be informed of status along the way? What would they like to know about how the project is progressing? See format #4 – it shows how to summarize the project, status, and issues, in ‘slide format’ for easy reading. And of course, this info can simply be used as bullets in an email to the right people. Contents of the file: 1. Periodic Progress Summary Report: Report format for publishing progress, plans, and issues at regular intervals. 2. Project Status – Major Task Completion: Presents status for a project phase, with emphasis on reporting completion status of major tasks. 3. Project Status – Work-plan Measure: Presents status for a project phase, with emphasis on reporting completion metrics on various items. 4. Project Status Presentation: Provides typical 3-slide-per-project information bullets for summarizing project status in a management meeting. 5. Multiple-Project Status Summary: Provides one-page overview of current phase and planned completion date of a set of projects being updated. The status report examples and formats start on the following page. Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 2 Permission for Members to use personally according to our Terms of Service
  • 3. ProjectConnections.com Template Project Status Reports Project Status Report Formats (1) Project Status Report – Periodic Progress Summary Content: A template for a 1 – 2 page report summarizing progress on a project. The format is “what we did last period,” “what we’re doing next period” and “issues we’re working on now.” The report is formatted to allow stakeholders and team members to quickly assess a project’s status, progress, and key current activities. Bottom Line: The “what we did” and “what we are going to do” sections help establish a rhythm for the team as well as keep management apprised of progress and alerted to early indications of slip. The “Issues” section helps expose project risk areas early, focus attention on tasks to mitigate them, and communicate a possible need for help from outside the immediate project team. Note: When a project is running smoothly, there should a visible correlation between one report’s “Upcoming tasks for this period” and the next report’s “Key accomplishments last period.” Most of the task descriptions should just change their action verbs to past tense. If there is little correlation between what you intend to do each week and what you ended up accomplishing, the project is probably experiencing problems such as inadequate resources, unclear requirements, or convergence on solutions that meets requirements. Summary Progress Report To: {distribution list} From: {project manager} Subject: Summary Progress Report, xxx Project Date: mm/dd/yy Project Name: Report Period: Project Manager: Phone, E-mail: Project Description: Project Priority: Project Status Summary: ____Green ____Yellow ____Red Key accomplishments last period: List brief 1- or 2- sentence descriptions of what was accomplished in this last period:  Include important schedule milestones if any occurred in this last period.  Include any events that significantly reduced risk in the project.  Include key tasks that closed an issue that was marked “open” on the previous report. Upcoming tasks for this period: List brief 1- or 2-sentence descriptions of what you plan to accomplished this next period.  Include important schedule milestones if any that will occur in this period.  Include any upcoming events that will significantly reduce risk in the project.  Include key tasks that will move an open issue toward closure.  Include any item you specifically need Management’s help on – and what actions you need. Issues: List principal open issues.  Include any item you specifically need Management’s help on – and what actions you need.  Identify an owner of the issue – who is driving the resolution.  Include a task in the “Upcoming tasks for this period” that will move this issue toward closure.  Don’t try to track all project issues in this report. Just list the principal ones along with any progress toward closing them.  If resolving the issue needs management action, be specific about what action is needed and by when. Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 3 Permission for Members to use personally according to our Terms of Service
  • 4. ProjectConnections.com Template Project Status Reports (2) Project Status Report - Major Task Completion Contents: Presents status for a project phase, with emphasis on reporting completion status of major tasks. Variations: a) This format can be used to give status on current phase or you can expand it to include all major phases. b) You can reduce the level of detail in each phase and report on a smaller number of major milestones. c) Some people prefer to leave out "percent complete.” Bottom line: This status report is a good summary for a team and functional managers. By providing planned and actual start and end dates for the various tasks/milestones, it lets you see at a glance whether the project is on schedule. It is not a complete picture for reporting to executives, because it does not provide highly targeted and summarized information on issues they need to understand where to focus their attention to assist the project. At most the Status or Comments column could be used to convey some of that information. Project Name: Biz1 Data Warehouse Status Date: __________________ PROJECT STATUS Planned Start Date Actual Start Date Planned Complete Date Actual Complete Date Percent complete Status or Comments Business Analysis Review current capabilities Develop requirements Refine requirements Develop Deliverable Source Data Analysis Develop Data Model Develop Data Transformations Data Conversion Analysis Legacy system review Develop conversion requirements Data conversion cost-benefit Technology Analysis Software acquisition Develop infrastructure Transformation test Develop prototype Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 4 Permission for Members to use personally according to our Terms of Service
  • 5. ProjectConnections.com Template Project Status Reports (3) Project Status Report - Work-Plan Measure Contents: Presents status for a phase of a project, with emphasis on reporting completion metrics on various items. Bottom line: This status report is a good companion to the status report on the previous page, for a team to keep visible the work that is getting done and what is left. The dates on report (1) give the time view of the project tasks. This one (2) provides a very objective measure of the work associated with all those tasks and how much of that work has been completed. The example below is from an IT data warehouse development project. Substitute the work items and metrics that fit your projects and make sense to keep visible in this way. Other examples where this could be useful include testing phases of projects, where test cases are being written and executed; writing/publications projects; web projects where many elements of graphics, page designs, page contents, etc. must be created. Project Name: Biz1 Data Warehouse Status Date: __________________ PROJECT STATUS Selected Measures Totals Planned Actual In progress Not started Status or Comments Business Analysis 33 19 19 0 12 Review current capabilities No. Interviews completed 21 9 9 0 12 Considered complete at 9 instead of 21 Develop requirements No. subject areas complete 8 8 8 0 0 Refine requirements No. interviews completed 4 2 2 0 0 Source Data Analysis 26 15 8 1 6 Develop Data Model No. interviews 20 9 8 1 0 Develop Data Transformations No. of source systems 6 6 0 0 6 Data Conversion Analysis 10 6 6 0 0 Legacy system review No. interviews 6 6 6 0 0 Map legacy to source No. JAD sessions 4 0 0 0 0 Data conversion cost- benefit Final report 1 0 0 0 0 Technology Analysis 15 8 4 4 0 Technology Requirements No. of work sessions 11 4 0 4 0 Prototype No. of scenarios 4 4 4 0 0 Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 5 Permission for Members to use personally according to our Terms of Service
  • 6. ProjectConnections.com Template Project Status Reports (4) Project Status Presentation Contents: Provides guidance for content to put in several presentation slides for summarizing project status in a management meeting. Content bullets are similar to those in #1 Periodic Progress Summary report. Bottom line: This status report emphasizes quickly summarizing the state of the project for management. It can be used for a monthly project review meeting with management, and each project can use this format. Key: This report helps a project manager emphasize to executives whether the project is on plan, and what the execs need to do to help (if anything). Why is this important? Some reports to management provide way too much detail about all the work being done as opposed to 1) a ruthlessly objective statement of how it's doing relative to plan, and 2) the actions management can take to help resolve any issues. First slide: Project Overview  Project Name:  Project Manager:  Product Manager or Business Team member:  Brief description of project objective:  Current lifecycle phase project is in:  Projected completion date: Second slide: Milestone Status  Key accomplishments since last report: Major phases or activities completed, issues resolved (not a laundry list of everything that got done.)  High-level project milestones: Planned and actual or projected completion dates.  Vision status: Has the Project Vision (major project objectives) changed? Summarize the changes.  Status summary statement: Red/yellow/green to indicate seriousness of issues. Qualitative statement of state: Is the project on track? Struggling but team has action plans to address? In dire need of management assistance to recover? Third Slide: Issues Detail (report major issues in this format):  Issue 1: Summarize the issue.  Impact: Give a succinct statement of how it impacts the project if not resolved – cost issue? Schedule issue? Scope issue? Particular customer contract in jeopardy? What business objectives not met?  Action being taken by team: Owner, and summary of team’s plan to resolve it, including key resources involved, and date by which team will have more information or know that the issue is resolved.  Action requested that management take (if any): What do you need from Management to help resolve the issue? Be very specific about what you need, when you need it by, and why. Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 6 Permission for Members to use personally according to our Terms of Service
  • 7. ProjectConnections.com Template Project Status Reports Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 7 Permission for Members to use personally according to our Terms of Service
  • 8. ProjectConnections.com Template Project Status Reports (5) Multiple-Project Status Summary Contents: Provides one page summary of current set of projects. Variations: You can add various columns to provide whatever info you want to convey. Bottom line: This status report is a good summary for functional managers to see the landscape of projects their people are being assigned to; and good for executives to understand where resources are being deployed and how those efforts are going. The delta columns at right point out quickly which projects are changing or slipping. The "resets" column indicates projects that had such radical change or issues that they were considered restarted. Portfolio Name: Commercial Drug Division 1 Status Date: __________________ Project Priority PROJECT NAME Category Resets Current Phase Project Completion Date Delta since Last Month Delta since July 05 1 Drug2 formulation Process 3 6/30/05 2 Lab Information System upgrades IT 4 8/14/05 1 week 3 UK2 Pilot line Construction Construction 1 3 2/02/06 3 months 4 Process2 development Process 3 8/01/05 5 Process3 development Process 1 2 3/03/06 6 Mfg capacity ramp Drug1 Capacity 4 5/05/05 3 weeks 7 Etc. 8 9 10 11 12 NOTE: “Resets” refers to the number of times the project has been re-scoped and re-planned and the Completion date re-baselined. Copyright© 2001 - 2006 Emprend Inc/ ProjectConnections.com Page 8 Permission for Members to use personally according to our Terms of Service