SlideShare a Scribd company logo
1 of 12
Download to read offline
p9Group


Statement of Work for (___)
    Professional Services

         Prepared for
     CLIENT’S LOGO

     CLIENT’S NAME

   IMPLEMENTATION
CLIENT’S LOGO




                                   Table of Contents
1.   Introduction ------------------------------------------------------------------------------------3
2.   Scope of Work Summary --------------------------------------------------------------------3
3.   Assumptions ------------------------------------------------------------------------------------4
4.   Service Description----------------------------------------------------------------------------4
5.   Description of Tasks, Deliverables and Services----------------------------------------5
  5.1     Business Process Analysis (Requirements Assessment) ----------------------------5
  5.2     Functional Configuration ----------------------------------------------------------------6
  5.3     Technical Configuration -----------------------------------------------------------------6
  5.4     Supplier/Catalog Adoption --------------------------------------------------------------7
  5.5     Training ------------------------------------------------------------------------------------7
  5.6     Testing and Acceptance------------------------------------------------------------------8
  5.7     Quality Review----------------------------------------------------------------------------9
  5.8     Documentation ----------------------------------------------------------------------------9
  5.9     Post Implementation Support -----------------------------------------------------------9
6. Service Approach---------------------------------------------------------------------------- 11
7. Investment Summary----------------------------------------------------------------------- 12




                                       Proprietary & Confidential                        Client Services
                                              Page 2 of 12
CLIENT’S LOGO


1. Introduction
The purpose of this document is to summarize the scope of work for a pilot
implementation of the procurement system. The scope of work is outlined with the tasks
necessary for a complete implementation of the system. Each task and the associated
Deliverables and Completion Criteria are described in details.

The Scope of Work document is based on information provided during the sales process
and will lay the foundation for development of the Project Plan and definition of p9 and
CLIENT’S NAME resources. The scope of work will include the data integration points,
supplier catalogs, and system users identified for Phase I of the project.

Additional integration points, supplier catalogs, and users will be addressed through
subsequent project phases.


2. Scope of Work Summary
The tasks below outline the scope of work for Phase I implementation:

   1. A Business Process Analysis to assess current procurement related workflows and
       processes and a proposed procurement model that incorporates the _____system.
   2. Functional configuration of the ______system for users, and System
       Administrator at CLIENT’S NAME.
   3. Technical configuration of the system.
   4. Integration Points??
   5. Development of Custom Purchase Order form.
   6. Supplier adoption incorporating ___ catalogs.
   7. Training to 20 users and one System Administrator.
   8. Test plan scenarios and guidance for users participation in the Testing and
       Acceptance activities.
   9. Quality Review to identify any discrepancies or conflicts in the configured
       system.
   10. Documentation including BPA Summary, Technical Readiness, Functional
       Readiness, Functional Test Plan Scenarios, Training Manual, Technical
       Landscape, Quality Review, and Miscellaneous Change.
   11. Post implementation support for five (5) days after the final “go-live” date.

The tasks stated above will be delivered as described in Section 5.




                                  Proprietary & Confidential                  Client Services
                                         Page 3 of 12
CLIENT’S LOGO

3. Assumptions
    Backup and Disaster Recovery Planning
    _______ will provide a summary document on the system and application databases
    to be backed up. It is assumed that a regular and comprehensive backup and
    recovery process is established at CLIENT’S NAME and will include the application
    when implementation is complete.
    Remote Connectivity to CLIENT’S NAME Network
    A remote connection to the production server will be necessary for technical
    specialists to perform certain configuration and troubleshooting tasks remotely.
    Availability of Project Team Members
    All project team members are expected to be available for regular Project Team
    meetings and additional issue resolution meetings. Issues that may affect the project
    time-line are expected to be resolved expeditiously so that project delays are not
    realized.
    Project Team Working Space
    The project team members will need a workspace that includes a digital or analog
    telephone line and a network connection. The space should accommodate a
    minimum of two project team members at once.
    Integration Activities
   The “owner” of the ___________that will be integrated with the system is expected
   to be a member of the CLIENT’S NAME project team. This individual’s
   involvement will be critical to the successful integration of the purchasing system
   (TBD).


4. Service Description
In this engagement, the client shall perform the following tasks, which will be deliberated
in the next section. p9 will assign a minimum of one (1) full-time functional analyst for
the duration of the project.

        Task        Activity
        Number
           1        Business Process Analysis (BPA)
           2        Functional Configuration
           3        Technical Configuration
           4        Supplier/Catalog Adoption
           5        Training
           6        Testing and Acceptance
           7        Quality Review
           8        Documentation
           9        Post Implementation Support
                                  Proprietary & Confidential                  Client Services
                                         Page 4 of 12
CLIENT’S LOGO



5. Description of Tasks, Deliverables and Services
The following section defines the Tasks, Deliverables and Services to be provided by
p9Group in this Statement of Work. (Refer to table illustrated in Section 4)

5.1 Business Process Analysis

Overview
The objective of this task is to develop comprehensive functional requirements and
document through an in-depth discovery process. Through this process, the current
CLIENT’S NAME procurement business processes will be defined and recommendations
for improvements will be made. The Business Process Analysis (BPA) document will
serve as the blueprint for the design, configuration, and deployment of the system.
This task consists of the following activities:

       Gather and document current CLIENT’S NAME procurement
       practices/processes.
       Development of the Business Process Analysis Summary document for
       system configuration.

The focus of the BPA workshops and summary documentation will include:

       Functional Readiness
       All critical information regarding the CLIENT’S NAME’s procurement
       practices/processes, as well as the scope of work, will be defined. During this
       exercise, industry standards, including “Best Practices” in procurement and e-
       business, will be applied to the existing business process. As the procurement
       process is analyzed, a proposal for an improved purchasing model will be
       developed including roles and responsibilities.

       Technical Readiness
       This task is to ensure the appropriate software and hardware infrastructure is in
       place for deployment of the system. The Technical Architect, in coordination
       with the CLIENT’S NAME System Owner(s) will complete and sign-off on the
       Technical Readiness Sign-off document. This will confirm that the appropriate
       software and hardware configuration is agreed upon and accepted.




                                 Proprietary & Confidential                   Client Services
                                        Page 5 of 12
CLIENT’S LOGO

Deliverables
Business Process Analysis (BPA) Summary includes:
    Documentation of current business processes.
    Recommendation for improved business processes.
    Custom PO form requirements identified and documented.
    Organizational structure, spend limits and approval hierarchy defined.


Completion Criteria
This task will be completed when the BPA Summary document is delivered and
signed-off by CLIENT’S NAME.


5.2 Functional Configuration

Overview
The team will configure all modules of the system based on the findings in the BPA
document. Functional configuration will include ___ users and ____ System
Administrators.

Deliverables
Configured systems for ____ users and ____ System Administrators.

Completion Criteria
This task will be completed when the system is installed, configured, and ready for
formal functional testing from each user’s PC.


5.3 Technical Configuration

Overview
The Technical Team will be responsible for the installation of the software. They will
also be responsible for configuring the databases and executing the ‘Start-up’ Standard
Operation Procedures (SOPs).


This task consists of the following activities:

       Hardware Installation
       p9 shall participate on an as needed basis; to be determined by CLIENT’S NAME
       IT staff, in the installation of any required hardware.

       Licensed Program Installation
       p9 shall perform the installation of the systems.

       Database Connectivity
       p9and CLIENT’S NAME will jointly perform all necessary steps to confirm
       connectivity between the application and database servers(s).
                                   Proprietary & Confidential                Client Services
                                          Page 6 of 12
CLIENT’S LOGO


Deliverables
    Completed hardware and software installation to the existing network.
    Completed CLIENT’S NAME technical landscape documentation.

Completion Criteria
This task will be completed when the required servers are installed and connected to the
CLIENT’S NAME network.

5.4 Supplier/Catalog Adoption

Overview
____ supplier catalogs have been identified for import into the system for Phase I.
p9will perform all necessary import activities and tasks. CLIENT’S NAME’s data
format requirements will be submitted to the appropriate suppliers.

Import of additional supplier catalogs will be addressed with subsequent project phases.

Deliverables
Supplier catalogs imported into the system.

Completion Criteria
Confirmation of successful import of the supplier catalogs during functional testing.

5.5 ERP/Legacy Integration

Deliverables
Interface Specification document.

Completion Criteria


5.6 Training

Overview
The purpose of this task is to ensure a smooth hand-over of the system to CLIENT’S
NAME. Training will be conducted in a phased manner for identified users. All
necessary preparation for successful completion of the training courses will be completed
by the Training Manager.

 Class                               Duration         No. of participants   No. of sessions
 Application Training
 System Administration Training




                                  Proprietary & Confidential                   Client Services
                                         Page 7 of 12
CLIENT’S LOGO

Deliverables
End-users trained.

Completion Criteria
The task will be completed when the above training sessions are successfully conducted
on-site during previously agreed upon dates.

5.7 Testing and Acceptance

Overview
The goal of the testing and acceptance activities is to ensure that the configured system
meets all the functional and technical requirements specified in the BPA Summary
document. p9 will provide CLIENT’S NAME end-users, who will prepare the user
acceptance test, activities to ensure that the delivered system meets their requirements.
The users involved with the Testing and Acceptance activities will be those who have
supplied input during the user requirements gathering stage and who are authorized to
sign-off on the user requirements documentation. The project team will guide these users
through the creation of the acceptance scenarios.

Test plan scenarios will be created utilizing the finalized BPA. Testing will be conducted
upon successful completion of the system configuration (TBD). A test environment
(sandbox) will be used to execute all CLIENT’S NAME test plan scenarios. Upon
completion of the testing scenarios an intact database will be restored on the production
server.

This task consists of the following activities:
    Identify a select group of test users.
    Test users will participate in the preparation of the necessary test data.
    Test users will be given test scenarios to execute and document.
    Test users are required to verify the test results.
    System error or problems found during this period will be logged and resolved
    accordingly by the p9 project team.

Deliverables
Functional test plan scenarios created, executed successfully, and signed-off by
appropriate CLIENT’S NAME team members.

Completion Criteria
This task will be completed upon sign-off of the Test Plan Scenarios by CLIENT’S
Project Manager.




                                  Proprietary & Confidential                  Client Services
                                         Page 8 of 12
CLIENT’S LOGO

5.8 Quality Review

Overview
During this task, a p9 Senior Consultant, who did not participate as a member of the core
project team, will execute the configured pre-production system through the Functional
test plan scenarios executed during the Testing and Acceptance Phase. Any
discrepancies or conflicts in the configured system will be formally reported to the
Project Manager and escalated according to procedures.

Deliverables
Reported issues from the quality review will appear in the system issues management
database.

Completion Criteria
Issues to be resolved according to due dates set in the issues management database.

5.9 Documentation

Overview
p9will submit documentation upon completion of various project milestones. The list of
documentation (in hardcopy) that will be delivered for the proposed CLIENT’S NAME
system is provided below. CLIENT’S NAME may reproduce as many copies of the
documentation as necessary.

Deliverables

         Documentation Description                                      Quantity
 1       BPA Summary Document
 2       Technical Readiness Survey
 3       Functional Readiness Survey
 4       Completed Functional Test Plan
 5       Training Manual
 6       Technical Landscape Document

Completion Criteria
The task will be completed when the above documents have been delivered to the
CLIENT’S NAME Project Manager.

5.10 Post Implementation Support

Post implementation support shall be provided by a minimum of one (1) functional
analyst for five (5) days after the final “go-live” date (Formal sign-off of the functional
Test Plan Scenarios). The p9 project team will provide the “go-live” support.




                                   Proprietary & Confidential                    Client Services
                                          Page 9 of 12
CLIENT’S LOGO

Deliverables
One-on-one support from the p9 project team members to the CLIENT’S NAME end-
users.

Completion Criteria
This task will be completed upon expiry of the post implementation support agreement.




                                Proprietary & Confidential                 Client Services
                                      Page 10 of 12
CLIENT’S LOGO


6. Service Approach
p9 Working Approach
   p9shall complete the work described through a combination of work on-site and work
   at office facilities.
   p9shall produce a schedule of meeting dates for the key personnel to base their
   appointments on. This schedule will be produced when the project commences.
   p9 will revisit and where necessary, update the project schedule and corresponding
   details after completing the requirement validation task.

Project Delays
   p9 shall not be responsible for the timely delivery of the hardware and other materials
   not explicitly provided by p9. However, in the event there is a delay, p9 shall use
   best effort to accommodate the delay into the project’s schedule.
   Where there is a delay to the original project schedule, which was not caused by p9,
   shall discuss such changes to the original project schedule.
   It is also assumed that CLIENT’S NAME’s management turnaround time on project
   related issues is to be two (2) business days.

Project Changes
All changes that any party may wish to make to this SOW shall be mutually reviewed to
asses the cost and timing impacts of those changes, and must be approved by all parties
in the project.

New Releases
The system is p9’s product. All functionalities and features of the product are limited to
the release purchased by CLIENT’S NAME.




                                  Proprietary & Confidential                   Client Services
                                        Page 11 of 12
CLIENT’S LOGO


7. Investment Summary
Resource                   Billable Days      Standard Daily Rate    Extension
Project Mgr.                                  $                      $
Functional Consultant                         $                      $
Technical Consultant                          $                      $
Quality Manager                               $                      $
Training Manager                              $                      $
Forms Developer                               $                      $


                                              Total for Professional Services      $




                          Proprietary & Confidential                  Client Services
                                Page 12 of 12

More Related Content

What's hot

Ch24-Software Engineering 9
Ch24-Software Engineering 9Ch24-Software Engineering 9
Ch24-Software Engineering 9
Ian Sommerville
 
Ch25-Software Engineering 9
Ch25-Software Engineering 9Ch25-Software Engineering 9
Ch25-Software Engineering 9
Ian Sommerville
 
Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805
Udaya Kumar
 
Ch5 software imprementation1.0
Ch5 software imprementation1.0Ch5 software imprementation1.0
Ch5 software imprementation1.0
Kittitouch Suteeca
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
Chandan Chaurasia
 
Configuration management
Configuration managementConfiguration management
Configuration management
Kobi Vider
 

What's hot (19)

Ch24-Software Engineering 9
Ch24-Software Engineering 9Ch24-Software Engineering 9
Ch24-Software Engineering 9
 
Changes in Necessities Trade After Migrating to the SaaS Model
Changes in Necessities Trade After Migrating to the SaaS ModelChanges in Necessities Trade After Migrating to the SaaS Model
Changes in Necessities Trade After Migrating to the SaaS Model
 
Ch25-Software Engineering 9
Ch25-Software Engineering 9Ch25-Software Engineering 9
Ch25-Software Engineering 9
 
Ch 9(spi)cm mi reqm
Ch 9(spi)cm mi reqmCh 9(spi)cm mi reqm
Ch 9(spi)cm mi reqm
 
Software re engineering
Software re engineeringSoftware re engineering
Software re engineering
 
DO-254 for dummies 7
DO-254 for dummies 7DO-254 for dummies 7
DO-254 for dummies 7
 
Ch 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqaCh 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqa
 
Configuration Management
Configuration Management Configuration Management
Configuration Management
 
Application Implementation Methodology (AIM)
Application Implementation Methodology (AIM)Application Implementation Methodology (AIM)
Application Implementation Methodology (AIM)
 
Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805
 
461361 1013243 chapter_2_dec__11
461361 1013243 chapter_2_dec__11461361 1013243 chapter_2_dec__11
461361 1013243 chapter_2_dec__11
 
Week 1
Week 1Week 1
Week 1
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
 
SolidWorks Enterprise PDM - 6 Enhancements from BWIR
SolidWorks Enterprise PDM - 6 Enhancements from BWIRSolidWorks Enterprise PDM - 6 Enhancements from BWIR
SolidWorks Enterprise PDM - 6 Enhancements from BWIR
 
Pankaj Singh_CV
Pankaj Singh_CVPankaj Singh_CV
Pankaj Singh_CV
 
Workflow Automation in SolidWorks Enterprise PDM
Workflow Automation in SolidWorks Enterprise PDMWorkflow Automation in SolidWorks Enterprise PDM
Workflow Automation in SolidWorks Enterprise PDM
 
Ch5 software imprementation1.0
Ch5 software imprementation1.0Ch5 software imprementation1.0
Ch5 software imprementation1.0
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
 
Configuration management
Configuration managementConfiguration management
Configuration management
 

Similar to Sow p9

19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
satyaragha786
 
3Audit Software & Tools.pptx
3Audit Software & Tools.pptx3Audit Software & Tools.pptx
3Audit Software & Tools.pptx
jack952975
 
RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docx
joellemurphey
 

Similar to Sow p9 (20)

0.3 aim phases_and_documentations
0.3 aim phases_and_documentations0.3 aim phases_and_documentations
0.3 aim phases_and_documentations
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manual
 
Arun Sivakumar
Arun SivakumarArun Sivakumar
Arun Sivakumar
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal
 
Print report
Print reportPrint report
Print report
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
 
My Resume-2
My Resume-2My Resume-2
My Resume-2
 
3Audit Software & Tools.pptx
3Audit Software & Tools.pptx3Audit Software & Tools.pptx
3Audit Software & Tools.pptx
 
Project-fit Blueprint.docx
Project-fit Blueprint.docxProject-fit Blueprint.docx
Project-fit Blueprint.docx
 
System requirements analysis
System requirements analysisSystem requirements analysis
System requirements analysis
 
Software Monetization KickStart
Software Monetization KickStartSoftware Monetization KickStart
Software Monetization KickStart
 
GuideIT Customer Success Criteria Guide
GuideIT Customer Success Criteria GuideGuideIT Customer Success Criteria Guide
GuideIT Customer Success Criteria Guide
 
J11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docxJ11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docx
 
RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docx
 
Cloud Testing Research
Cloud Testing ResearchCloud Testing Research
Cloud Testing Research
 
INTRODUCTION to software engineering requirements specifications
INTRODUCTION to software engineering requirements specificationsINTRODUCTION to software engineering requirements specifications
INTRODUCTION to software engineering requirements specifications
 
Feasible
FeasibleFeasible
Feasible
 
Software engineering
Software engineeringSoftware engineering
Software engineering
 
Software engineering
Software engineeringSoftware engineering
Software engineering
 

Recently uploaded

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Recently uploaded (20)

Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 

Sow p9

  • 1. p9Group Statement of Work for (___) Professional Services Prepared for CLIENT’S LOGO CLIENT’S NAME IMPLEMENTATION
  • 2. CLIENT’S LOGO Table of Contents 1. Introduction ------------------------------------------------------------------------------------3 2. Scope of Work Summary --------------------------------------------------------------------3 3. Assumptions ------------------------------------------------------------------------------------4 4. Service Description----------------------------------------------------------------------------4 5. Description of Tasks, Deliverables and Services----------------------------------------5 5.1 Business Process Analysis (Requirements Assessment) ----------------------------5 5.2 Functional Configuration ----------------------------------------------------------------6 5.3 Technical Configuration -----------------------------------------------------------------6 5.4 Supplier/Catalog Adoption --------------------------------------------------------------7 5.5 Training ------------------------------------------------------------------------------------7 5.6 Testing and Acceptance------------------------------------------------------------------8 5.7 Quality Review----------------------------------------------------------------------------9 5.8 Documentation ----------------------------------------------------------------------------9 5.9 Post Implementation Support -----------------------------------------------------------9 6. Service Approach---------------------------------------------------------------------------- 11 7. Investment Summary----------------------------------------------------------------------- 12 Proprietary & Confidential Client Services Page 2 of 12
  • 3. CLIENT’S LOGO 1. Introduction The purpose of this document is to summarize the scope of work for a pilot implementation of the procurement system. The scope of work is outlined with the tasks necessary for a complete implementation of the system. Each task and the associated Deliverables and Completion Criteria are described in details. The Scope of Work document is based on information provided during the sales process and will lay the foundation for development of the Project Plan and definition of p9 and CLIENT’S NAME resources. The scope of work will include the data integration points, supplier catalogs, and system users identified for Phase I of the project. Additional integration points, supplier catalogs, and users will be addressed through subsequent project phases. 2. Scope of Work Summary The tasks below outline the scope of work for Phase I implementation: 1. A Business Process Analysis to assess current procurement related workflows and processes and a proposed procurement model that incorporates the _____system. 2. Functional configuration of the ______system for users, and System Administrator at CLIENT’S NAME. 3. Technical configuration of the system. 4. Integration Points?? 5. Development of Custom Purchase Order form. 6. Supplier adoption incorporating ___ catalogs. 7. Training to 20 users and one System Administrator. 8. Test plan scenarios and guidance for users participation in the Testing and Acceptance activities. 9. Quality Review to identify any discrepancies or conflicts in the configured system. 10. Documentation including BPA Summary, Technical Readiness, Functional Readiness, Functional Test Plan Scenarios, Training Manual, Technical Landscape, Quality Review, and Miscellaneous Change. 11. Post implementation support for five (5) days after the final “go-live” date. The tasks stated above will be delivered as described in Section 5. Proprietary & Confidential Client Services Page 3 of 12
  • 4. CLIENT’S LOGO 3. Assumptions Backup and Disaster Recovery Planning _______ will provide a summary document on the system and application databases to be backed up. It is assumed that a regular and comprehensive backup and recovery process is established at CLIENT’S NAME and will include the application when implementation is complete. Remote Connectivity to CLIENT’S NAME Network A remote connection to the production server will be necessary for technical specialists to perform certain configuration and troubleshooting tasks remotely. Availability of Project Team Members All project team members are expected to be available for regular Project Team meetings and additional issue resolution meetings. Issues that may affect the project time-line are expected to be resolved expeditiously so that project delays are not realized. Project Team Working Space The project team members will need a workspace that includes a digital or analog telephone line and a network connection. The space should accommodate a minimum of two project team members at once. Integration Activities The “owner” of the ___________that will be integrated with the system is expected to be a member of the CLIENT’S NAME project team. This individual’s involvement will be critical to the successful integration of the purchasing system (TBD). 4. Service Description In this engagement, the client shall perform the following tasks, which will be deliberated in the next section. p9 will assign a minimum of one (1) full-time functional analyst for the duration of the project. Task Activity Number 1 Business Process Analysis (BPA) 2 Functional Configuration 3 Technical Configuration 4 Supplier/Catalog Adoption 5 Training 6 Testing and Acceptance 7 Quality Review 8 Documentation 9 Post Implementation Support Proprietary & Confidential Client Services Page 4 of 12
  • 5. CLIENT’S LOGO 5. Description of Tasks, Deliverables and Services The following section defines the Tasks, Deliverables and Services to be provided by p9Group in this Statement of Work. (Refer to table illustrated in Section 4) 5.1 Business Process Analysis Overview The objective of this task is to develop comprehensive functional requirements and document through an in-depth discovery process. Through this process, the current CLIENT’S NAME procurement business processes will be defined and recommendations for improvements will be made. The Business Process Analysis (BPA) document will serve as the blueprint for the design, configuration, and deployment of the system. This task consists of the following activities: Gather and document current CLIENT’S NAME procurement practices/processes. Development of the Business Process Analysis Summary document for system configuration. The focus of the BPA workshops and summary documentation will include: Functional Readiness All critical information regarding the CLIENT’S NAME’s procurement practices/processes, as well as the scope of work, will be defined. During this exercise, industry standards, including “Best Practices” in procurement and e- business, will be applied to the existing business process. As the procurement process is analyzed, a proposal for an improved purchasing model will be developed including roles and responsibilities. Technical Readiness This task is to ensure the appropriate software and hardware infrastructure is in place for deployment of the system. The Technical Architect, in coordination with the CLIENT’S NAME System Owner(s) will complete and sign-off on the Technical Readiness Sign-off document. This will confirm that the appropriate software and hardware configuration is agreed upon and accepted. Proprietary & Confidential Client Services Page 5 of 12
  • 6. CLIENT’S LOGO Deliverables Business Process Analysis (BPA) Summary includes: Documentation of current business processes. Recommendation for improved business processes. Custom PO form requirements identified and documented. Organizational structure, spend limits and approval hierarchy defined. Completion Criteria This task will be completed when the BPA Summary document is delivered and signed-off by CLIENT’S NAME. 5.2 Functional Configuration Overview The team will configure all modules of the system based on the findings in the BPA document. Functional configuration will include ___ users and ____ System Administrators. Deliverables Configured systems for ____ users and ____ System Administrators. Completion Criteria This task will be completed when the system is installed, configured, and ready for formal functional testing from each user’s PC. 5.3 Technical Configuration Overview The Technical Team will be responsible for the installation of the software. They will also be responsible for configuring the databases and executing the ‘Start-up’ Standard Operation Procedures (SOPs). This task consists of the following activities: Hardware Installation p9 shall participate on an as needed basis; to be determined by CLIENT’S NAME IT staff, in the installation of any required hardware. Licensed Program Installation p9 shall perform the installation of the systems. Database Connectivity p9and CLIENT’S NAME will jointly perform all necessary steps to confirm connectivity between the application and database servers(s). Proprietary & Confidential Client Services Page 6 of 12
  • 7. CLIENT’S LOGO Deliverables Completed hardware and software installation to the existing network. Completed CLIENT’S NAME technical landscape documentation. Completion Criteria This task will be completed when the required servers are installed and connected to the CLIENT’S NAME network. 5.4 Supplier/Catalog Adoption Overview ____ supplier catalogs have been identified for import into the system for Phase I. p9will perform all necessary import activities and tasks. CLIENT’S NAME’s data format requirements will be submitted to the appropriate suppliers. Import of additional supplier catalogs will be addressed with subsequent project phases. Deliverables Supplier catalogs imported into the system. Completion Criteria Confirmation of successful import of the supplier catalogs during functional testing. 5.5 ERP/Legacy Integration Deliverables Interface Specification document. Completion Criteria 5.6 Training Overview The purpose of this task is to ensure a smooth hand-over of the system to CLIENT’S NAME. Training will be conducted in a phased manner for identified users. All necessary preparation for successful completion of the training courses will be completed by the Training Manager. Class Duration No. of participants No. of sessions Application Training System Administration Training Proprietary & Confidential Client Services Page 7 of 12
  • 8. CLIENT’S LOGO Deliverables End-users trained. Completion Criteria The task will be completed when the above training sessions are successfully conducted on-site during previously agreed upon dates. 5.7 Testing and Acceptance Overview The goal of the testing and acceptance activities is to ensure that the configured system meets all the functional and technical requirements specified in the BPA Summary document. p9 will provide CLIENT’S NAME end-users, who will prepare the user acceptance test, activities to ensure that the delivered system meets their requirements. The users involved with the Testing and Acceptance activities will be those who have supplied input during the user requirements gathering stage and who are authorized to sign-off on the user requirements documentation. The project team will guide these users through the creation of the acceptance scenarios. Test plan scenarios will be created utilizing the finalized BPA. Testing will be conducted upon successful completion of the system configuration (TBD). A test environment (sandbox) will be used to execute all CLIENT’S NAME test plan scenarios. Upon completion of the testing scenarios an intact database will be restored on the production server. This task consists of the following activities: Identify a select group of test users. Test users will participate in the preparation of the necessary test data. Test users will be given test scenarios to execute and document. Test users are required to verify the test results. System error or problems found during this period will be logged and resolved accordingly by the p9 project team. Deliverables Functional test plan scenarios created, executed successfully, and signed-off by appropriate CLIENT’S NAME team members. Completion Criteria This task will be completed upon sign-off of the Test Plan Scenarios by CLIENT’S Project Manager. Proprietary & Confidential Client Services Page 8 of 12
  • 9. CLIENT’S LOGO 5.8 Quality Review Overview During this task, a p9 Senior Consultant, who did not participate as a member of the core project team, will execute the configured pre-production system through the Functional test plan scenarios executed during the Testing and Acceptance Phase. Any discrepancies or conflicts in the configured system will be formally reported to the Project Manager and escalated according to procedures. Deliverables Reported issues from the quality review will appear in the system issues management database. Completion Criteria Issues to be resolved according to due dates set in the issues management database. 5.9 Documentation Overview p9will submit documentation upon completion of various project milestones. The list of documentation (in hardcopy) that will be delivered for the proposed CLIENT’S NAME system is provided below. CLIENT’S NAME may reproduce as many copies of the documentation as necessary. Deliverables Documentation Description Quantity 1 BPA Summary Document 2 Technical Readiness Survey 3 Functional Readiness Survey 4 Completed Functional Test Plan 5 Training Manual 6 Technical Landscape Document Completion Criteria The task will be completed when the above documents have been delivered to the CLIENT’S NAME Project Manager. 5.10 Post Implementation Support Post implementation support shall be provided by a minimum of one (1) functional analyst for five (5) days after the final “go-live” date (Formal sign-off of the functional Test Plan Scenarios). The p9 project team will provide the “go-live” support. Proprietary & Confidential Client Services Page 9 of 12
  • 10. CLIENT’S LOGO Deliverables One-on-one support from the p9 project team members to the CLIENT’S NAME end- users. Completion Criteria This task will be completed upon expiry of the post implementation support agreement. Proprietary & Confidential Client Services Page 10 of 12
  • 11. CLIENT’S LOGO 6. Service Approach p9 Working Approach p9shall complete the work described through a combination of work on-site and work at office facilities. p9shall produce a schedule of meeting dates for the key personnel to base their appointments on. This schedule will be produced when the project commences. p9 will revisit and where necessary, update the project schedule and corresponding details after completing the requirement validation task. Project Delays p9 shall not be responsible for the timely delivery of the hardware and other materials not explicitly provided by p9. However, in the event there is a delay, p9 shall use best effort to accommodate the delay into the project’s schedule. Where there is a delay to the original project schedule, which was not caused by p9, shall discuss such changes to the original project schedule. It is also assumed that CLIENT’S NAME’s management turnaround time on project related issues is to be two (2) business days. Project Changes All changes that any party may wish to make to this SOW shall be mutually reviewed to asses the cost and timing impacts of those changes, and must be approved by all parties in the project. New Releases The system is p9’s product. All functionalities and features of the product are limited to the release purchased by CLIENT’S NAME. Proprietary & Confidential Client Services Page 11 of 12
  • 12. CLIENT’S LOGO 7. Investment Summary Resource Billable Days Standard Daily Rate Extension Project Mgr. $ $ Functional Consultant $ $ Technical Consultant $ $ Quality Manager $ $ Training Manager $ $ Forms Developer $ $ Total for Professional Services $ Proprietary & Confidential Client Services Page 12 of 12