SlideShare une entreprise Scribd logo
1  sur  15
Kampus West City
Condominium
Presentation Information
Project Details
 Self-contained university town
 Approximately 1.5km to University (UTAR)
 10 minutes’ drive from Gopeng exit from North-
South Express Highway
 Consists of 3 blocks of high-end high rises
condominium
Condominium Details
 Total Land area: 9.21 acres
 Tittle Status : Leasehold(99years), Parcel Strata Title
 Classification : Residential Property
 No. of Blocks : 2 blocks with total 360 units
 Size : Type A – 856sqft and Type B – 713sqft
Condominium Details
 Estimated Completion Date
: Mid of year 2016
 Approval building no.
: Bil (15) dlm MDKpr (OSC) (K) 31/2013/ (04)
 Development Order
: Bil (2) dlm MDKpr (OSC) (K) 21/2013 (01)
 Approving Authority
: Majlis Daerah Kampar
 Advertising License no.
: 1314-1/08-2015/0462 (P)
UTAR & KTAR Information
 The main campus throughout all UTAR
branches.
 Located at Kampar where own around 1300
acres of land.
 Currently with 5 main faculties at UTAR Kampar.
 Up to 3 semesters in a year.
 All graduation ceremony will held at UTAR
Kampar.
Floor Plan Type A
 3 rooms
 2 bathrooms
 1 living room
 2 car parks
 856 sqft
 Price : From RM226,800
Floor Plan Type B
 2 rooms
 2 bathrooms
 1 living room
 1 car park
 713 sqft
 Price : From RM 188,000
Additional Packages (cont)
 Additional Car Park (Add-On)
RM 15,000 per unit (Limited)
*Only 25 extra car park for each block
 Free SPA Legal Fees
 Early Bird Purchase With RM10,000 Discount
(Before 21th Sep 2013)
Project Preview
Specification (Type A)
 Ceiling Lighting Point – 15 Nos
 60” DIA Ceiling Fan Point C/W Fan Hook – 5 Nos
 1x1 3A Switch Socket Outlet – 12 Nos
 1x1 5A Socket Outlet C/W On/Off Switch – 3 Nos
 1x1 5A Socket Outlet C/W 10mA ELCB & On/Off Switch
(For Water Heater Point) – 2 Nos
 Tel Socket Outlet – 1 No
 TV Socket Outlet – 1 No
 Distribution Board – 1 No
Specification (Type B)
 Ceiling Lighting Point – 12 Nos
 60” DIA Ceiling Fan Point C/W Fan Hook – 4 Nos
 1x1 3A Switch Socket Outlet – 10 Nos
 1x1 5A Socket Outlet C/W On/Off Switch – 2 Nos
 1x1 5A Socket Outlet C/W 10mA ELCB & On/Off Switch
(For Water Heater Point) – 2 Nos
 Tel Socket Outlet – 1 No
 TV Socket Outlet – 1 No
 Distribution Board – 1 No
Facilities
 Gated and Guarded Compound
 24 security with CCTV and smart tag access
system
Facilities
 Swimming Pool
 Car Park
Environment
 Shop lot area with large lake side
jogging track
 New General Hospital
 UTAR & KTAR ( Around 20000
Students)
Contact
 Please feel free to contact me for further information or any inquiry
for the property investment :
Contact Person : Dawson Lam
Email : ternwei.lam@gmail.com
Phone Contact : 017-5454061

Contenu connexe

Similaire à Kampus west city condominium kampar

Bergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalBergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalDavid Hults
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2Tej Raj Upreti
 
Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)Mahesh Chandra Manav
 
Junction Nine Residences E-brochure
Junction Nine Residences E-brochureJunction Nine Residences E-brochure
Junction Nine Residences E-brochurePhilip Chua
 
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Thorne & Derrick International
 
Crouzet switches - Railway applications
Crouzet switches - Railway applicationsCrouzet switches - Railway applications
Crouzet switches - Railway applicationsCrouzet
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]Neha Bandhu
 
2009-dec02_Fujitsu
2009-dec02_Fujitsu2009-dec02_Fujitsu
2009-dec02_FujitsuAgora Group
 
Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Eugene Lockett
 

Similaire à Kampus west city condominium kampar (20)

Amkor Portfolio
Amkor PortfolioAmkor Portfolio
Amkor Portfolio
 
Resume_AbgHaider
Resume_AbgHaiderResume_AbgHaider
Resume_AbgHaider
 
Sol acres
Sol acresSol acres
Sol acres
 
Bergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalBergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - Final
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
Chan Mye Tun -CV
Chan Mye Tun -CVChan Mye Tun -CV
Chan Mye Tun -CV
 
Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)
 
Junction Nine Residences E-brochure
Junction Nine Residences E-brochureJunction Nine Residences E-brochure
Junction Nine Residences E-brochure
 
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
 
Crouzet switches - Railway applications
Crouzet switches - Railway applicationsCrouzet switches - Railway applications
Crouzet switches - Railway applications
 
GAVIN'S 2016 CV
GAVIN'S 2016 CVGAVIN'S 2016 CV
GAVIN'S 2016 CV
 
Chandru_CV
Chandru_CVChandru_CV
Chandru_CV
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]Electromagnetic and-electronic-circuitbreaker-[technolead]
Electromagnetic and-electronic-circuitbreaker-[technolead]
 
pradip updated c v
pradip updated c vpradip updated c v
pradip updated c v
 
CV-JKGHOSH_04 Jun 2016
CV-JKGHOSH_04 Jun 2016CV-JKGHOSH_04 Jun 2016
CV-JKGHOSH_04 Jun 2016
 
2009-dec02_Fujitsu
2009-dec02_Fujitsu2009-dec02_Fujitsu
2009-dec02_Fujitsu
 
Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.
 
anindya maity-cv
anindya maity-cvanindya maity-cv
anindya maity-cv
 

Kampus west city condominium kampar

  • 2. Project Details  Self-contained university town  Approximately 1.5km to University (UTAR)  10 minutes’ drive from Gopeng exit from North- South Express Highway  Consists of 3 blocks of high-end high rises condominium
  • 3. Condominium Details  Total Land area: 9.21 acres  Tittle Status : Leasehold(99years), Parcel Strata Title  Classification : Residential Property  No. of Blocks : 2 blocks with total 360 units  Size : Type A – 856sqft and Type B – 713sqft
  • 4. Condominium Details  Estimated Completion Date : Mid of year 2016  Approval building no. : Bil (15) dlm MDKpr (OSC) (K) 31/2013/ (04)  Development Order : Bil (2) dlm MDKpr (OSC) (K) 21/2013 (01)  Approving Authority : Majlis Daerah Kampar  Advertising License no. : 1314-1/08-2015/0462 (P)
  • 5. UTAR & KTAR Information  The main campus throughout all UTAR branches.  Located at Kampar where own around 1300 acres of land.  Currently with 5 main faculties at UTAR Kampar.  Up to 3 semesters in a year.  All graduation ceremony will held at UTAR Kampar.
  • 6. Floor Plan Type A  3 rooms  2 bathrooms  1 living room  2 car parks  856 sqft  Price : From RM226,800
  • 7. Floor Plan Type B  2 rooms  2 bathrooms  1 living room  1 car park  713 sqft  Price : From RM 188,000
  • 8. Additional Packages (cont)  Additional Car Park (Add-On) RM 15,000 per unit (Limited) *Only 25 extra car park for each block  Free SPA Legal Fees  Early Bird Purchase With RM10,000 Discount (Before 21th Sep 2013)
  • 10. Specification (Type A)  Ceiling Lighting Point – 15 Nos  60” DIA Ceiling Fan Point C/W Fan Hook – 5 Nos  1x1 3A Switch Socket Outlet – 12 Nos  1x1 5A Socket Outlet C/W On/Off Switch – 3 Nos  1x1 5A Socket Outlet C/W 10mA ELCB & On/Off Switch (For Water Heater Point) – 2 Nos  Tel Socket Outlet – 1 No  TV Socket Outlet – 1 No  Distribution Board – 1 No
  • 11. Specification (Type B)  Ceiling Lighting Point – 12 Nos  60” DIA Ceiling Fan Point C/W Fan Hook – 4 Nos  1x1 3A Switch Socket Outlet – 10 Nos  1x1 5A Socket Outlet C/W On/Off Switch – 2 Nos  1x1 5A Socket Outlet C/W 10mA ELCB & On/Off Switch (For Water Heater Point) – 2 Nos  Tel Socket Outlet – 1 No  TV Socket Outlet – 1 No  Distribution Board – 1 No
  • 12. Facilities  Gated and Guarded Compound  24 security with CCTV and smart tag access system
  • 14. Environment  Shop lot area with large lake side jogging track  New General Hospital  UTAR & KTAR ( Around 20000 Students)
  • 15. Contact  Please feel free to contact me for further information or any inquiry for the property investment : Contact Person : Dawson Lam Email : ternwei.lam@gmail.com Phone Contact : 017-5454061