LEAN MANUFACTURING


          Presented By:
          Deepesh Singh (2009IPG_14)
          Neha Hemraj (2009IPG_37)
          Sakshi Sharma (2009IPG_68)
What is Lean Manufacturing?
• “Lean Manufacturing, also called Lean Production, is a
  set of tools and methodologies that aims for the
  continuous elimination of all waste in the production
  process. The main benefits of this are lower production
  costs, increased output and shorter production lead
  times” [1]

• “A systematic approach to identifying and eliminating
  waste and NVA (non-value added activity) through
  continuous improvement and flowing the product at the
  pull of the customer in pursuit of perfection”. [2]
History
• Henry Ford
  – Integrated an entire production
     process.
  – 1913: Flow Production
  – Problem: No sort of variety.
• Eiji Toyoda &Taiichui Ohno
  – Reviewed Ford’s concepts
  – Toyota Production System
  – “The Machine That Changed the World”
    1990
  – “Lean Thinking” 1996
Literature Review
•   L. N. Pattanaik & B. P. Sharma, "Implementing lean manufacturing
    with cellular layout:a case study", International Journal of Advance
    Manufacturing Technology (2009) 42:772-779
•   An applied methodology of scientific , objective techniques to
    minimize the non-value adding activities.
     – 36% of US based manufacturing companies (2009)
     – Core concept : Pull Production
     – Driven by demand : Downstream to upstream
•   Cellular Manufacturing System (CMS)
     – Machines are grouped
     – Max. Cell independence
     – Reduces Material Handling, WIP Time, Waiting Time, Bottlenecks
•   A case study on implementing a cellular production layout for a
    series of intermediate production processes at Franklin Corp., a US
    manufacturer of upholstered furniture, reported a 36% increase in
    labor productivity as a result of implementing a lean manufacturing
    system.
Literature Review
•   Report on Introduction to Lean Manufacturing, Mekong Capital Viet
    Nam, June 2004
•   Lean Manufacturing: Set of tools and techniques
    – To eliminate wastages
    – Reduce production costs and WIP
•   Objectives:
    – Defects and Wastage
         •   Reduce defects and unnecessary physical wastage
         •   Unnecessary features
    – Cycle Times
         •   Reduce manufacturing lead times
    – Inventory levels
    – Labor Productivity
         •   Reducing the idle time of workers
    – Utilization of equipment and space
         •   Eliminate bottlenecks and maximize productivity
    – Flexibility
    – Output
7 Types of Waste
1.   Waiting Waste
2.   Defects and Rejects Waste
3.   Inventory Waste
4.   Overproduction Waste
5.   Over-Processing Waste
6.   Motion Waste
7.   Transportation Waste
Key Principles of Lean Manufacturing
   –   Recognition of waste
   –   Standard Processes
   –   Continuous Flow
   –   Pull Production
   –   Quality at the Source
   –   Continuous Improvement


• Latech, US Manufacturing Company after implementing
  LM Model (Compare to Batch Based Production)
   –   Manufacturing space per machine was reduced by 45%;
   –   Defects were reduced by 90%
   –   Production cycle time was reduced from 16 weeks to 14 hours - 5 days
   –   Product delivery lead time was reduced from 4-20 weeks to 1-4 weeks.
Key implications of Lean Manufacturing
                          Traditional batch          Lean Manufacturing
                           manufacturing
     Orientation              Supply driven              Customer driven
                            Orders are pushed        Orders are pulled through
      Planning          through factory based on         factory based on
                         production plan/forecast     customer/downstream
                                                             demand
     Inventory          Buffer of work-in-progress      Little or no work-in-
                        between each production       progress between each
                                   stage                 production stage
Handoff of works in-    Materials after each stage     Materials handed off
    progress            accumulate into works-in-        directly from one
                         progress storage areas       production stage to the
                        before being retrieved by               next
                          next production stage
Production cycle time    Longer than actual time             Shorten
Case 1
• In the years of reconstruction following the
  Second World War, Toyota based in
  Japan faced a major problem.

• How to rebuild a shattered manufacturing
  base without recourse to either the huge
  market or the economies of scale
  available to Western (specifically US)
  companies, and in the face of severe
  credit restrictions imposed by the
Case Solution and Benefits
•   Taiichi Ohno, the company’s Assembly Shop Manager, took in hand the
    task of redesigning production.
•   Ohno redefined production Toyota Production System clearly focusing on
    getting the best out of limited investment.
     – Build only what is needed
     – Eliminate anything which does not add value
     – Stop if something goes wrong


•   1970s saw them overturn the dominance of the local industrial giants Ford
    and GM.
•   More significantly Toyota and other large Japanese companies expanded in
    the 1980s to set up new manufacturing centers in Europe and the Americas.
•   The design and development of a new product takes 12 months for Toyota
    while the primary American and European competitors need 2-3 years to
    develop a new model.
Case 2
• Poli-film America Inc.- a division of a German
  owned company manufactures protective
  masking to prevents abrasion and staining of
  exposed surfaces during manufacturing and
  delivery.

• Problem was an enterprise resource planning
  system that encompassed an unstable
  database leading to loopholes in inventory
  management resulting in inefficiency and
  resource wastage.
Case Solution and Benefits
•   Chose a new program to implement in later 2003 aiming on lean
    manufacturing principles
•   Greatest impact on company’s inventory flow and order distribution
•   Real time traceability allowed to cut down on the 2 mil lbs. of film
    and other materials by more than half and maintain a sufficient
    safety stock for when its time to reorder and restock

•   Time and money has seen dramatic cuts
•   Instead of 20 min to fill an order, takes less than 5 min currently
•   Allowed company to expand for more regional coverage
•   Been simplified for reports
•   Reduce time taken to accomplish certain tasks and add more
    responsibilities
Techniques of Lean manufacturing
1. The Five S’ Model: Set of Rules to organize each
   worker’s work area for maximum efficiency
   – Sort
       • Frequency of usage
       • Sorting what is needed or what is not. Reduce time.
   – Set in order
       • Arrange essential things in order for easy access.
       • Reduce Motion
   – Scrub (Shine)
       • Keep machines and work areas clean
       • Remove Dust through painting
   – Stabilize (Standardize)
       • Implement clear procedures for sorting, straightening and scrubbing.
   – Sustain
       • Promote, communicate and train
2. Total Productivity Maintenance
  – Includes basic preventative maintenance
    work
  – Inspection, Cleaning, Tightening and
    Lubricating
  – Responsibilities given to workers
    • To Identify, monitor and correct the cause of problem
    • Training for higher value added or complicated
      machines
  – Reduce Machine downtime
  – Increase Machine output or lifetime
3. Cellular Manufacturing
  – Production work stations and equipment are arranged
    in a product-aligned sequence.
  – Increased production velocity and flexibility
  – Aims to move products through the manufacturing
    process one-piece at a time, at a rate determined by
    customer demand (the pull).
4. Just In Time (JIT)
- Leverages the cellular manufacturing
   layout to reduce significantly inventory
   and work-in-process (WIP).
- Conditions necessary for the successful:
  -   small lot sizes
  -   short setup and changeover times
  -   efficient and effective quality controls
  -   minimize backups and maximize the
      efficiency of human and machine labor.
References
• Mekong Capital’s Introduction to Lean Manufacturing,
  June 4, 2004.
• Peter Hines & David Taylor: Going Lean. Lean
  Enterprise Research Centre, January 2000.
• L. N. Pattanaik & B. P. Sharma, "Implementing lean
  manufacturing with cellular layout:a case study",
  International Journal of Advance Manufacturing
  Technology (2009) 42:772-779
• Brandt & David, Lean improves logistics, distributions,
  2006, Industrial Engineer, Vol. 38 Issue 10, p50
• Taiichi Ohno, Toyota Production System: Beyond Large-
  Scale Production, 1988
Thank You!

Contenu connexe

Tendances (20)

Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Lean manufacturing [History & Types ]
Lean manufacturing [History & Types ]Lean manufacturing [History & Types ]
Lean manufacturing [History & Types ]
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Kaizen
KaizenKaizen
Kaizen
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Kanban
KanbanKanban
Kanban
 

En vedette

What is VAVE
What is VAVE What is VAVE
What is VAVE Reff Ren
 
Business Process Management in IT company
Business Process Management  in IT company Business Process Management  in IT company
Business Process Management in IT company Dhrubaji Mandal ♛
 
Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1hgalinova
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturingAkhil Bhatia
 
Lean Process Improvement In Outpatient Clinics
Lean Process Improvement In Outpatient ClinicsLean Process Improvement In Outpatient Clinics
Lean Process Improvement In Outpatient Clinicslaganga
 
Lean manufacturing in apparel industries
Lean manufacturing in apparel industriesLean manufacturing in apparel industries
Lean manufacturing in apparel industriesBharath Krishna
 
LEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYLEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYJAGADISH REDDY KP
 
segmentation & indian automobile industry
segmentation & indian automobile industrysegmentation & indian automobile industry
segmentation & indian automobile industrySanjay Verma
 
Lean six sigma (green belt)new
Lean six sigma (green belt)newLean six sigma (green belt)new
Lean six sigma (green belt)newHakeem-Ur- Rehman
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsNon Stop Portals
 
Lean project management
Lean project management Lean project management
Lean project management John Bun
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by LeanANITHA BALA
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvementHemant Patil
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity Waleed Attalla
 
Productivity, Productivity, Productivity
Productivity, Productivity, ProductivityProductivity, Productivity, Productivity
Productivity, Productivity, ProductivityFabian Alcantara
 

En vedette (20)

What is VAVE
What is VAVE What is VAVE
What is VAVE
 
Business Process Management in IT company
Business Process Management  in IT company Business Process Management  in IT company
Business Process Management in IT company
 
Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
Productivity
ProductivityProductivity
Productivity
 
Lean Process Improvement In Outpatient Clinics
Lean Process Improvement In Outpatient ClinicsLean Process Improvement In Outpatient Clinics
Lean Process Improvement In Outpatient Clinics
 
Improving Productivity
Improving ProductivityImproving Productivity
Improving Productivity
 
Lean manufacturing in apparel industries
Lean manufacturing in apparel industriesLean manufacturing in apparel industries
Lean manufacturing in apparel industries
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
LEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYLEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRY
 
segmentation & indian automobile industry
segmentation & indian automobile industrysegmentation & indian automobile industry
segmentation & indian automobile industry
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean six sigma (green belt)new
Lean six sigma (green belt)newLean six sigma (green belt)new
Lean six sigma (green belt)new
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry Helms
 
Lean project management
Lean project management Lean project management
Lean project management
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvement
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity
 
Productivity, Productivity, Productivity
Productivity, Productivity, ProductivityProductivity, Productivity, Productivity
Productivity, Productivity, Productivity
 

Similaire à Lean manufacturing

Similaire à Lean manufacturing (20)

Operation Management
Operation ManagementOperation Management
Operation Management
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
 
Just in time
Just in timeJust in time
Just in time
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Basics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptBasics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.ppt
 
Just in time
Just in timeJust in time
Just in time
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
BASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURINGBASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURING
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operations
 
Just in time
Just in timeJust in time
Just in time
 
10. just in-time
10. just in-time10. just in-time
10. just in-time
 
Just in-time
Just in-timeJust in-time
Just in-time
 
Production & materials management
Production & materials managementProduction & materials management
Production & materials management
 
Just In Time (JIT) Systems
Just In Time (JIT) SystemsJust In Time (JIT) Systems
Just In Time (JIT) Systems
 
Lesson 1 pe - lps introduction
Lesson 1   pe - lps introductionLesson 1   pe - lps introduction
Lesson 1 pe - lps introduction
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systems
 
Lean-TAREQ.pptx
Lean-TAREQ.pptxLean-TAREQ.pptx
Lean-TAREQ.pptx
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
 
BBA UNIT -1 INTRODUCTION ABOUT PRODUCTION.ppt
BBA UNIT -1 INTRODUCTION ABOUT PRODUCTION.pptBBA UNIT -1 INTRODUCTION ABOUT PRODUCTION.ppt
BBA UNIT -1 INTRODUCTION ABOUT PRODUCTION.ppt
 

Dernier

High Profile Call Girls Kodigehalli - 7001305949 Escorts Service with Real Ph...
High Profile Call Girls Kodigehalli - 7001305949 Escorts Service with Real Ph...High Profile Call Girls Kodigehalli - 7001305949 Escorts Service with Real Ph...
High Profile Call Girls Kodigehalli - 7001305949 Escorts Service with Real Ph...narwatsonia7
 
Housewife Call Girls Hsr Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls Hsr Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls Hsr Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls Hsr Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...narwatsonia7
 
Call Girls Viman Nagar 7001305949 All Area Service COD available Any Time
Call Girls Viman Nagar 7001305949 All Area Service COD available Any TimeCall Girls Viman Nagar 7001305949 All Area Service COD available Any Time
Call Girls Viman Nagar 7001305949 All Area Service COD available Any Timevijaych2041
 
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment BookingCall Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Bookingnarwatsonia7
 
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...narwatsonia7
 
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Modelssonalikaur4
 
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...narwatsonia7
 
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowKolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowNehru place Escorts
 
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfHemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfMedicoseAcademics
 
Case Report Peripartum Cardiomyopathy.pptx
Case Report Peripartum Cardiomyopathy.pptxCase Report Peripartum Cardiomyopathy.pptx
Case Report Peripartum Cardiomyopathy.pptxNiranjan Chavan
 
Glomerular Filtration rate and its determinants.pptx
Glomerular Filtration rate and its determinants.pptxGlomerular Filtration rate and its determinants.pptx
Glomerular Filtration rate and its determinants.pptxDr.Nusrat Tariq
 
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls ServiceCall Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Servicesonalikaur4
 
Noida Sector 135 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
Noida Sector 135 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...Noida Sector 135 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
Noida Sector 135 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...rajnisinghkjn
 
Call Girls Service Noida Maya 9711199012 Independent Escort Service Noida
Call Girls Service Noida Maya 9711199012 Independent Escort Service NoidaCall Girls Service Noida Maya 9711199012 Independent Escort Service Noida
Call Girls Service Noida Maya 9711199012 Independent Escort Service NoidaPooja Gupta
 
Hematology and Immunology - Leukocytes Functions
Hematology and Immunology - Leukocytes FunctionsHematology and Immunology - Leukocytes Functions
Hematology and Immunology - Leukocytes FunctionsMedicoseAcademics
 
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original PhotosCall Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photosnarwatsonia7
 

Dernier (20)

High Profile Call Girls Kodigehalli - 7001305949 Escorts Service with Real Ph...
High Profile Call Girls Kodigehalli - 7001305949 Escorts Service with Real Ph...High Profile Call Girls Kodigehalli - 7001305949 Escorts Service with Real Ph...
High Profile Call Girls Kodigehalli - 7001305949 Escorts Service with Real Ph...
 
Housewife Call Girls Hsr Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls Hsr Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls Hsr Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls Hsr Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
 
Call Girls Viman Nagar 7001305949 All Area Service COD available Any Time
Call Girls Viman Nagar 7001305949 All Area Service COD available Any TimeCall Girls Viman Nagar 7001305949 All Area Service COD available Any Time
Call Girls Viman Nagar 7001305949 All Area Service COD available Any Time
 
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment BookingCall Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
 
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
 
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jp Nagar Just Call 7001305949 Top Class Call Girl Service Available
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
 
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
Housewife Call Girls Bangalore - Call 7001305949 Rs-3500 with A/C Room Cash o...
 
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowKolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Kolkata Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
 
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
 
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfHemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
 
Case Report Peripartum Cardiomyopathy.pptx
Case Report Peripartum Cardiomyopathy.pptxCase Report Peripartum Cardiomyopathy.pptx
Case Report Peripartum Cardiomyopathy.pptx
 
Glomerular Filtration rate and its determinants.pptx
Glomerular Filtration rate and its determinants.pptxGlomerular Filtration rate and its determinants.pptx
Glomerular Filtration rate and its determinants.pptx
 
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hsr Layout Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls ServiceCall Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
 
Noida Sector 135 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
Noida Sector 135 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...Noida Sector 135 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
Noida Sector 135 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few C...
 
Call Girls Service Noida Maya 9711199012 Independent Escort Service Noida
Call Girls Service Noida Maya 9711199012 Independent Escort Service NoidaCall Girls Service Noida Maya 9711199012 Independent Escort Service Noida
Call Girls Service Noida Maya 9711199012 Independent Escort Service Noida
 
Hematology and Immunology - Leukocytes Functions
Hematology and Immunology - Leukocytes FunctionsHematology and Immunology - Leukocytes Functions
Hematology and Immunology - Leukocytes Functions
 
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original PhotosCall Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
 

Lean manufacturing

  • 1. LEAN MANUFACTURING Presented By: Deepesh Singh (2009IPG_14) Neha Hemraj (2009IPG_37) Sakshi Sharma (2009IPG_68)
  • 2. What is Lean Manufacturing? • “Lean Manufacturing, also called Lean Production, is a set of tools and methodologies that aims for the continuous elimination of all waste in the production process. The main benefits of this are lower production costs, increased output and shorter production lead times” [1] • “A systematic approach to identifying and eliminating waste and NVA (non-value added activity) through continuous improvement and flowing the product at the pull of the customer in pursuit of perfection”. [2]
  • 3. History • Henry Ford – Integrated an entire production process. – 1913: Flow Production – Problem: No sort of variety. • Eiji Toyoda &Taiichui Ohno – Reviewed Ford’s concepts – Toyota Production System – “The Machine That Changed the World” 1990 – “Lean Thinking” 1996
  • 4. Literature Review • L. N. Pattanaik & B. P. Sharma, "Implementing lean manufacturing with cellular layout:a case study", International Journal of Advance Manufacturing Technology (2009) 42:772-779 • An applied methodology of scientific , objective techniques to minimize the non-value adding activities. – 36% of US based manufacturing companies (2009) – Core concept : Pull Production – Driven by demand : Downstream to upstream • Cellular Manufacturing System (CMS) – Machines are grouped – Max. Cell independence – Reduces Material Handling, WIP Time, Waiting Time, Bottlenecks • A case study on implementing a cellular production layout for a series of intermediate production processes at Franklin Corp., a US manufacturer of upholstered furniture, reported a 36% increase in labor productivity as a result of implementing a lean manufacturing system.
  • 5. Literature Review • Report on Introduction to Lean Manufacturing, Mekong Capital Viet Nam, June 2004 • Lean Manufacturing: Set of tools and techniques – To eliminate wastages – Reduce production costs and WIP • Objectives: – Defects and Wastage • Reduce defects and unnecessary physical wastage • Unnecessary features – Cycle Times • Reduce manufacturing lead times – Inventory levels – Labor Productivity • Reducing the idle time of workers – Utilization of equipment and space • Eliminate bottlenecks and maximize productivity – Flexibility – Output
  • 6. 7 Types of Waste 1. Waiting Waste 2. Defects and Rejects Waste 3. Inventory Waste 4. Overproduction Waste 5. Over-Processing Waste 6. Motion Waste 7. Transportation Waste
  • 7. Key Principles of Lean Manufacturing – Recognition of waste – Standard Processes – Continuous Flow – Pull Production – Quality at the Source – Continuous Improvement • Latech, US Manufacturing Company after implementing LM Model (Compare to Batch Based Production) – Manufacturing space per machine was reduced by 45%; – Defects were reduced by 90% – Production cycle time was reduced from 16 weeks to 14 hours - 5 days – Product delivery lead time was reduced from 4-20 weeks to 1-4 weeks.
  • 8. Key implications of Lean Manufacturing Traditional batch Lean Manufacturing manufacturing Orientation Supply driven Customer driven Orders are pushed Orders are pulled through Planning through factory based on factory based on production plan/forecast customer/downstream demand Inventory Buffer of work-in-progress Little or no work-in- between each production progress between each stage production stage Handoff of works in- Materials after each stage Materials handed off progress accumulate into works-in- directly from one progress storage areas production stage to the before being retrieved by next next production stage Production cycle time Longer than actual time Shorten
  • 9. Case 1 • In the years of reconstruction following the Second World War, Toyota based in Japan faced a major problem. • How to rebuild a shattered manufacturing base without recourse to either the huge market or the economies of scale available to Western (specifically US) companies, and in the face of severe credit restrictions imposed by the
  • 10. Case Solution and Benefits • Taiichi Ohno, the company’s Assembly Shop Manager, took in hand the task of redesigning production. • Ohno redefined production Toyota Production System clearly focusing on getting the best out of limited investment. – Build only what is needed – Eliminate anything which does not add value – Stop if something goes wrong • 1970s saw them overturn the dominance of the local industrial giants Ford and GM. • More significantly Toyota and other large Japanese companies expanded in the 1980s to set up new manufacturing centers in Europe and the Americas. • The design and development of a new product takes 12 months for Toyota while the primary American and European competitors need 2-3 years to develop a new model.
  • 11. Case 2 • Poli-film America Inc.- a division of a German owned company manufactures protective masking to prevents abrasion and staining of exposed surfaces during manufacturing and delivery. • Problem was an enterprise resource planning system that encompassed an unstable database leading to loopholes in inventory management resulting in inefficiency and resource wastage.
  • 12. Case Solution and Benefits • Chose a new program to implement in later 2003 aiming on lean manufacturing principles • Greatest impact on company’s inventory flow and order distribution • Real time traceability allowed to cut down on the 2 mil lbs. of film and other materials by more than half and maintain a sufficient safety stock for when its time to reorder and restock • Time and money has seen dramatic cuts • Instead of 20 min to fill an order, takes less than 5 min currently • Allowed company to expand for more regional coverage • Been simplified for reports • Reduce time taken to accomplish certain tasks and add more responsibilities
  • 13. Techniques of Lean manufacturing 1. The Five S’ Model: Set of Rules to organize each worker’s work area for maximum efficiency – Sort • Frequency of usage • Sorting what is needed or what is not. Reduce time. – Set in order • Arrange essential things in order for easy access. • Reduce Motion – Scrub (Shine) • Keep machines and work areas clean • Remove Dust through painting – Stabilize (Standardize) • Implement clear procedures for sorting, straightening and scrubbing. – Sustain • Promote, communicate and train
  • 14. 2. Total Productivity Maintenance – Includes basic preventative maintenance work – Inspection, Cleaning, Tightening and Lubricating – Responsibilities given to workers • To Identify, monitor and correct the cause of problem • Training for higher value added or complicated machines – Reduce Machine downtime – Increase Machine output or lifetime
  • 15. 3. Cellular Manufacturing – Production work stations and equipment are arranged in a product-aligned sequence. – Increased production velocity and flexibility – Aims to move products through the manufacturing process one-piece at a time, at a rate determined by customer demand (the pull).
  • 16. 4. Just In Time (JIT) - Leverages the cellular manufacturing layout to reduce significantly inventory and work-in-process (WIP). - Conditions necessary for the successful: - small lot sizes - short setup and changeover times - efficient and effective quality controls - minimize backups and maximize the efficiency of human and machine labor.
  • 17. References • Mekong Capital’s Introduction to Lean Manufacturing, June 4, 2004. • Peter Hines & David Taylor: Going Lean. Lean Enterprise Research Centre, January 2000. • L. N. Pattanaik & B. P. Sharma, "Implementing lean manufacturing with cellular layout:a case study", International Journal of Advance Manufacturing Technology (2009) 42:772-779 • Brandt & David, Lean improves logistics, distributions, 2006, Industrial Engineer, Vol. 38 Issue 10, p50 • Taiichi Ohno, Toyota Production System: Beyond Large- Scale Production, 1988