Branch Infrastructure Projects – Scope of Work
Projectsare initiated/requestedbythe followingBusinessUnits
 OM Finance Properties,Procurement&Logistics (ex CRES) viae-mail orprojectspecific
meetings(PFA,PWM,OMW,BD, AFD)
 Mass FoundationCluster(RMM/ Group Schemes) viae-mailorSNOWrequests
 OMCS viae-mail orSNOW requests
Once a request(above)hasbeenreceived,adetailedscopingprocessneedstobe completed,I
followthe followingguidelines
 NewBranch
o Newdata infrastructure required?
o Newvoice infrastructure required?
o Physical address
o Telephone numberof anadjacentexistingbusiness
o Clientcontactdetails
o Projectandrecurringbudgetcentres
o Branch floorplans/ layouts
o Auditscompleted(clienttocomplete)
o
 Branch Move
o Existingsite details (physical address,PLOCID)
o Existinginfrastructure audits(dataandvoice)
o Newsite details(physical address)
o Telephone numberof anadjacent existingbusiness
o Clientcontactdetails
o Projectandrecurringbudgetcentres
o Branch floorplans/ layouts
o Auditscompleted(clienttocomplete)
 Branch Decommission
o Existingsite details(physical address,PLOCID)
o Existinginfrastructure audits(dataand voice)
o Clientcontactdetails
o Projectandrecurringbudgetcentres
o Auditscompleted(clienttocomplete)
Once the scopingand auditshave beencompleted,Iproceedwiththe call loggingphase of the
project.
 TelkomData Calls(MercuryInfrastructure - Omcore)
o Newdata lines,routersandswitches –dependentonthe amountof branchusers
o OutdoorTransfers – move of data lines,routersandswitchestonew locations
o IndoorTransfers – move of data lines,routersandswitchestonew floors,blocks
withinthe same office parks/buildings
o Decommissionof datalines
o Recoveryof routersandswitches
 T-Systems(MercuryInfrastructure –Omcore)
o Create DHCP Scope onthe new VLAN
o Install /Move / DecommBDP Serverwhere applicable
 TelkomData (NonMercury Infrastructure - OMRAD)
o Newdata lines,routersandswitches –dependentonthe amountof branchusers
o OutdoorTransfers – move of data lines,routersandswitchestonew locations
o IndoorTransfers – move of data lines,routersandswitchestonew floors, blocks
withinthe same office parks/buildings Decommissionof datalines
o Recoveryof routersandswitches
o
 TelkomVoice Calls(Mercury)
o NewISDN’s/BRI’s – dependentonthe amountof branchusers
o NewPRI’s – dependentonthe amountof branchusers,typicallybrancheswith50or
more extn’sorfaxes
o Decommissionof BRI’sandPRI’s
o Recoveryof ISDN’sandPRI Infrastructure
o
 Data and Voice cabling(Mercury)
o Supplyandinstall cabinets(complete) asrequired
o Relocate existingcabinetsasrequired
o Decommissioncabinetsasrequired
o Install dataand voice cabling,trunking
o Decommissionredundantdataandvoice cabling
o
 Data and Voice cabling(NonMercury)
o Supplyandinstall cabinets(complete) asrequired
o Relocate existingcabinetsasrequired
o Decommission cabinetsasrequired
o Install dataand voice cabling,trunking
o Decommissionredundantdataandvoice cabling
o Install IPTcablingandinfrastructure asrequired
 NashuaCommunications(Mercury)
o Supplyandinstall PABX’s
o Move existingPABX’s
o DecommissionPABX’s
o Supplyandinstall handsetsasrequired
o Provide trainingasrequired
ProjectQuotes needtobe obtainedfromthe variousteamsandsubmittedforclient/project
approval
 TelkomMercuryQuotes(Data andVoice)
 TelkomNonMercuryQuotes(Data)
 CablingandInfrastructure Quotes –Mercury (MIT & Forrest)
 CablingandInfrastructure Quotes –Non Mercury(CCI)
 NashuaCommunications –PABX& Telephony
 T-Systems –EUC projectrelatedrequests
 Manage any variable projectcosts
ProjectPlanning–thisto coverall IT relatedtasks
 Manage all Telkomdataand voice installations
 Manage all Infrastructure andcablinginstallations
 Manage all telephonyinstallations
 Manage all EUC (TSSA andDistributionIT) installations
 Manage all printingandscanninginstallations
 Setupandattendall projectmeetingswithclientsandinstallationteams
 Manage all reportingforthe clientandsuppliers
ProjectInstallations,TestingandSignoff
 Onsite management(whererequired) of all IT
 Remote management(if notrequiredonsite)of all IT
 Facilitate andmanage the requiredtestingwiththe variousteams
 Signoff all IT
ProjectSnagging
 Manage all ProjectrelatedITsnags
ProjectTravelling
 Whenrequiredtobe onsite,Ineedtomanage all the followingbookings;
o Flights
o Accommodation
o Car Rental
o AirportTransfers
 All S&T needstobe recordedandreconciled
 Anyclaimsneedtobe submittedforapproval (meals,toll fees,incidentalexpenses,fuel)
Branch Infrastructure Projects - Job Description 14 May 2015

Contenu connexe

En vedette

Mutoh_ValueJet_Series
Mutoh_ValueJet_SeriesMutoh_ValueJet_Series
Mutoh_ValueJet_SeriesWale Oyelola
 
Práticas contábeis e legislaçães do terceiro setor - contador Tadeu Pedro Vieira
Práticas contábeis e legislaçães do terceiro setor - contador Tadeu Pedro VieiraPráticas contábeis e legislaçães do terceiro setor - contador Tadeu Pedro Vieira
Práticas contábeis e legislaçães do terceiro setor - contador Tadeu Pedro VieiraInstituto Comunitário Grande Florianópolis
 
Captone Paper Final (4)
Captone Paper Final (4)Captone Paper Final (4)
Captone Paper Final (4)Lauren Brunner
 
Îndrumar pentru Oficiile teritoriale de informare ale Parlamentului
Îndrumar pentru Oficiile teritoriale de informare ale ParlamentuluiÎndrumar pentru Oficiile teritoriale de informare ale Parlamentului
Îndrumar pentru Oficiile teritoriale de informare ale ParlamentuluiUNDP Moldova
 

En vedette (7)

Mutoh_ValueJet_Series
Mutoh_ValueJet_SeriesMutoh_ValueJet_Series
Mutoh_ValueJet_Series
 
Práticas contábeis e legislaçães do terceiro setor - contador Tadeu Pedro Vieira
Práticas contábeis e legislaçães do terceiro setor - contador Tadeu Pedro VieiraPráticas contábeis e legislaçães do terceiro setor - contador Tadeu Pedro Vieira
Práticas contábeis e legislaçães do terceiro setor - contador Tadeu Pedro Vieira
 
Captone Paper Final (4)
Captone Paper Final (4)Captone Paper Final (4)
Captone Paper Final (4)
 
Îndrumar pentru Oficiile teritoriale de informare ale Parlamentului
Îndrumar pentru Oficiile teritoriale de informare ale ParlamentuluiÎndrumar pentru Oficiile teritoriale de informare ale Parlamentului
Îndrumar pentru Oficiile teritoriale de informare ale Parlamentului
 
Ppt pncernaan (2)
Ppt pncernaan (2)Ppt pncernaan (2)
Ppt pncernaan (2)
 
American general
American generalAmerican general
American general
 
final
finalfinal
final
 

Similaire à Branch Infrastructure Projects - Job Description 14 May 2015

CSS Antenna TRU-OMNI R727
CSS Antenna TRU-OMNI R727CSS Antenna TRU-OMNI R727
CSS Antenna TRU-OMNI R727savomir
 
CBEC New _Wide Area Network customs .ppt
CBEC New _Wide Area Network customs .pptCBEC New _Wide Area Network customs .ppt
CBEC New _Wide Area Network customs .pptprotsahit
 
CSS Antenna TRU-OMNI S727
CSS Antenna TRU-OMNI S727CSS Antenna TRU-OMNI S727
CSS Antenna TRU-OMNI S727savomir
 
Sr. VoIP Engineer
Sr. VoIP EngineerSr. VoIP Engineer
Sr. VoIP EngineerFaisal Khan
 
amandio resume_11 12 16
amandio resume_11 12 16amandio resume_11 12 16
amandio resume_11 12 16Amandio Soares
 
3Com SPA-4XOC3-POS
3Com SPA-4XOC3-POS3Com SPA-4XOC3-POS
3Com SPA-4XOC3-POSsavomir
 
Darsh Dharamdeo- Linkedin
Darsh Dharamdeo- LinkedinDarsh Dharamdeo- Linkedin
Darsh Dharamdeo- LinkedinDarsh Dharamdeo
 
Lauri guthrie 07122019
Lauri guthrie 07122019Lauri guthrie 07122019
Lauri guthrie 07122019LAURIGUTHRIE
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Joseph Melanson
 
Telecommunications[1][1]
Telecommunications[1][1]Telecommunications[1][1]
Telecommunications[1][1]John Bernhard
 
RFS APXV86-906515-C
RFS APXV86-906515-CRFS APXV86-906515-C
RFS APXV86-906515-Csavomir
 

Similaire à Branch Infrastructure Projects - Job Description 14 May 2015 (20)

Brenda K Lorentzen Resume
Brenda K Lorentzen ResumeBrenda K Lorentzen Resume
Brenda K Lorentzen Resume
 
CSS Antenna TRU-OMNI R727
CSS Antenna TRU-OMNI R727CSS Antenna TRU-OMNI R727
CSS Antenna TRU-OMNI R727
 
CBEC New _Wide Area Network customs .ppt
CBEC New _Wide Area Network customs .pptCBEC New _Wide Area Network customs .ppt
CBEC New _Wide Area Network customs .ppt
 
CSS Antenna TRU-OMNI S727
CSS Antenna TRU-OMNI S727CSS Antenna TRU-OMNI S727
CSS Antenna TRU-OMNI S727
 
Sr. VoIP Engineer
Sr. VoIP EngineerSr. VoIP Engineer
Sr. VoIP Engineer
 
amandio resume_11 12 16
amandio resume_11 12 16amandio resume_11 12 16
amandio resume_11 12 16
 
DMP_CV_2015_v1.5
DMP_CV_2015_v1.5DMP_CV_2015_v1.5
DMP_CV_2015_v1.5
 
DK
DKDK
DK
 
3Com SPA-4XOC3-POS
3Com SPA-4XOC3-POS3Com SPA-4XOC3-POS
3Com SPA-4XOC3-POS
 
Darsh Dharamdeo- Linkedin
Darsh Dharamdeo- LinkedinDarsh Dharamdeo- Linkedin
Darsh Dharamdeo- Linkedin
 
Lauri guthrie 07122019
Lauri guthrie 07122019Lauri guthrie 07122019
Lauri guthrie 07122019
 
Ccna labs
Ccna labsCcna labs
Ccna labs
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
Disney Max 6000 Configurations
Disney Max 6000 ConfigurationsDisney Max 6000 Configurations
Disney Max 6000 Configurations
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013
 
Brian Harrison 2014
Brian Harrison 2014Brian Harrison 2014
Brian Harrison 2014
 
Ccna labs
Ccna labsCcna labs
Ccna labs
 
SM Consulting Services Inc.
SM Consulting Services Inc.SM Consulting Services Inc.
SM Consulting Services Inc.
 
Telecommunications[1][1]
Telecommunications[1][1]Telecommunications[1][1]
Telecommunications[1][1]
 
RFS APXV86-906515-C
RFS APXV86-906515-CRFS APXV86-906515-C
RFS APXV86-906515-C
 

Branch Infrastructure Projects - Job Description 14 May 2015

  • 1. Branch Infrastructure Projects – Scope of Work Projectsare initiated/requestedbythe followingBusinessUnits  OM Finance Properties,Procurement&Logistics (ex CRES) viae-mail orprojectspecific meetings(PFA,PWM,OMW,BD, AFD)  Mass FoundationCluster(RMM/ Group Schemes) viae-mailorSNOWrequests  OMCS viae-mail orSNOW requests Once a request(above)hasbeenreceived,adetailedscopingprocessneedstobe completed,I followthe followingguidelines  NewBranch o Newdata infrastructure required? o Newvoice infrastructure required? o Physical address o Telephone numberof anadjacentexistingbusiness o Clientcontactdetails o Projectandrecurringbudgetcentres o Branch floorplans/ layouts o Auditscompleted(clienttocomplete) o  Branch Move o Existingsite details (physical address,PLOCID) o Existinginfrastructure audits(dataandvoice) o Newsite details(physical address) o Telephone numberof anadjacent existingbusiness o Clientcontactdetails o Projectandrecurringbudgetcentres o Branch floorplans/ layouts o Auditscompleted(clienttocomplete)  Branch Decommission o Existingsite details(physical address,PLOCID) o Existinginfrastructure audits(dataand voice) o Clientcontactdetails o Projectandrecurringbudgetcentres o Auditscompleted(clienttocomplete)
  • 2. Once the scopingand auditshave beencompleted,Iproceedwiththe call loggingphase of the project.  TelkomData Calls(MercuryInfrastructure - Omcore) o Newdata lines,routersandswitches –dependentonthe amountof branchusers o OutdoorTransfers – move of data lines,routersandswitchestonew locations o IndoorTransfers – move of data lines,routersandswitchestonew floors,blocks withinthe same office parks/buildings o Decommissionof datalines o Recoveryof routersandswitches  T-Systems(MercuryInfrastructure –Omcore) o Create DHCP Scope onthe new VLAN o Install /Move / DecommBDP Serverwhere applicable  TelkomData (NonMercury Infrastructure - OMRAD) o Newdata lines,routersandswitches –dependentonthe amountof branchusers o OutdoorTransfers – move of data lines,routersandswitchestonew locations o IndoorTransfers – move of data lines,routersandswitchestonew floors, blocks withinthe same office parks/buildings Decommissionof datalines o Recoveryof routersandswitches o  TelkomVoice Calls(Mercury) o NewISDN’s/BRI’s – dependentonthe amountof branchusers o NewPRI’s – dependentonthe amountof branchusers,typicallybrancheswith50or more extn’sorfaxes o Decommissionof BRI’sandPRI’s o Recoveryof ISDN’sandPRI Infrastructure o  Data and Voice cabling(Mercury) o Supplyandinstall cabinets(complete) asrequired o Relocate existingcabinetsasrequired o Decommissioncabinetsasrequired o Install dataand voice cabling,trunking o Decommissionredundantdataandvoice cabling o  Data and Voice cabling(NonMercury) o Supplyandinstall cabinets(complete) asrequired o Relocate existingcabinetsasrequired o Decommission cabinetsasrequired o Install dataand voice cabling,trunking o Decommissionredundantdataandvoice cabling o Install IPTcablingandinfrastructure asrequired  NashuaCommunications(Mercury) o Supplyandinstall PABX’s o Move existingPABX’s o DecommissionPABX’s
  • 3. o Supplyandinstall handsetsasrequired o Provide trainingasrequired ProjectQuotes needtobe obtainedfromthe variousteamsandsubmittedforclient/project approval  TelkomMercuryQuotes(Data andVoice)  TelkomNonMercuryQuotes(Data)  CablingandInfrastructure Quotes –Mercury (MIT & Forrest)  CablingandInfrastructure Quotes –Non Mercury(CCI)  NashuaCommunications –PABX& Telephony  T-Systems –EUC projectrelatedrequests  Manage any variable projectcosts ProjectPlanning–thisto coverall IT relatedtasks  Manage all Telkomdataand voice installations  Manage all Infrastructure andcablinginstallations  Manage all telephonyinstallations  Manage all EUC (TSSA andDistributionIT) installations  Manage all printingandscanninginstallations  Setupandattendall projectmeetingswithclientsandinstallationteams  Manage all reportingforthe clientandsuppliers ProjectInstallations,TestingandSignoff  Onsite management(whererequired) of all IT  Remote management(if notrequiredonsite)of all IT  Facilitate andmanage the requiredtestingwiththe variousteams  Signoff all IT ProjectSnagging  Manage all ProjectrelatedITsnags ProjectTravelling  Whenrequiredtobe onsite,Ineedtomanage all the followingbookings; o Flights o Accommodation o Car Rental o AirportTransfers  All S&T needstobe recordedandreconciled  Anyclaimsneedtobe submittedforapproval (meals,toll fees,incidentalexpenses,fuel)