EXIST ELEV
NO 1 EXIST STAIR
NO 1
EXIST STAIR
NO 1
7654321 83.6
EXIST STAIR
NO 1
7654321 83.6
EXIST ELEV
NO 1 EXIST STAIR
NO 1
BURROUGHS ST
25'-0" WIDE
TECH TOWN PARKING
50 SPACES
TECH TOWN
440 BURROUGHS ST
CASSAVE
30'-0"WIDE
TECHTOWN DISTRICT
PAST
The New Amsterdam Historic District is a concentration of early twentieth century
industrial buildings associated with Detroit’s booming manufacturing base. A number
of the district’s buildings are fine examples of the reinforced concrete architecture
of Albert Kahn.
TODAY
TechTown, an innovation district in Midtown Detroit, is brimming with potential. The
nonprofit provides entrepreneurs and start-ups in Southeast Michigan with programs
and partnering opportunities. The character of the area itself is unique, featuring
building infrastructure that played an important role in the automotive innovations of
a bygone era that is today rich with opportunity for reuse.
FIRST FLOOR RENOVATION
TECH ONE BUILDING
Interior Renovation
20,638 Square Foot (Scope of Work)
TechTown's vision for the first floor renovation is to create a more,
open, collaborative environment of entrepreneurs, along with the
best in class conference center to serve the expanding need for
sophisticated and flexible meeting space for the TechTown
business as a whole.
The First Floor renovation will open up the interior space by
removing existing partitions and expose the big, beautiful windows
to bring more natural light. The first floor, will host a membership
based co-working space of mobile entrepreneurs.
TechTown Management Office relocation from the second floor to
the first floor is also part of this renovation project.
12-29
January 3, 2012
TechTown First Floor Renovation
440 Burroughs St. - Detroit, MI
TECH ONE
INDEX OF DRAWINGS
Sheet
Number Sheet Name Sheet Issue Date
A1.01 First Floor Plan 02/22/13
A2.02 First Floor Reflected Ceiling Plan 02/22/13
A5.01 Enlarged Plans - PTD SHEET 02/22/13
A5.02 Enlarged Plans - PTD SHEET 02/22/13
A5.03 Enlarged Plans 02/22/13
A5.05 Interior Elevations - PTD SHEET 02/22/13
A5.06 Interior Elevations - PTD SHEET 02/22/13
A5.08 Interior Elevations 02/22/13
A5.09 Interior Elevations 02/22/13
A5.10 Interior Sections 02/22/13
A5.11 3-D Interior Views 02/22/13
A6.01 Wall Types + Interior Plan Details 02/22/13
A6.02 Interior Details 02/22/13
A6.03 Interior Details 02/22/13
A6.05 Millwork Details - PTD SHEET 02/22/13
A6.06 Millwork Details - PTD SHEET 02/22/13
A7.01 Door Schedule 02/22/13
A8.01 Finish Plan - PTD SHEET 02/22/13
A8.02 Finish Schedule - PTD SHEET 02/22/13
A8.03 Furniture Plan - PTD SHEET 02/22/13
FP1-01-01 Fire Projection Floor Plan - Level 1 02/22/13
M00-00-01 Mechanical General - Legends + Abbriviations 02/22/13
M00-00-02 Mechanical Specifications 02/22/13
MD1-01-01 Mechanical Demolition Floor Plan - Level 1 02/22/13
MH1-01-01 Mechanical HVAC Floor Plan - Level 1 02/22/13
MH7-00-01 Mechanical Schedules + Details 02/22/13
MP1-01-01 Mechanical Piping Floor Plan - Level 1 02/22/13
MP1-01-02 Mechanical Plumbing Floor Plan - Level 1 02/22/13
SET ISSUED FOR:
QUALITY REVIEW 1/18/2013
PERMIT / BIDS 2/22/2013
AD1.01 First Floor Demolition Plan 02/22/13
AD1.02 Temporary Construction Plan 02/22/13
AD2.01 First Floor Demolition Reflected Ceiling Plan 02/22/13
AD3.01 Demolition Photos 02/22/13
AD3.02 Demolition Photos 02/22/13
AG.01 Cover + Index 02/22/13
AG.02 Code Summary + Egress Plan 02/22/13
AG.03 Reference Symbols + Abbreviations 02/22/13
E00-00-01 Electrical Legend + General Notes 02/22/13
E00-00-02 Electrical Specifications 02/22/13
ED1-01-01 Electrical Demolition Floor Plan- Level 1 02/22/13
EL1-01-01 Electrical Lighting Floor Plan - Level 1 02/22/13
EL5-00-01 Electrical Lighting Details 02/22/13
EL7-00-01 Electrical Lighting Schedules 02/22/13
EL7-00-02 Electrical Lighting Schedules 02/22/13
EP1-01-01 Electrical Power Floor Plan- Level 1 02/22/13
EP6-00-01 Electrical One- Line Diagram 02/22/13
EP7-00-01 Electrical Panel Board Schedules 02/22/13
EP7-00-02 Electrical Panel Board Schedules 02/22/13
EY1-01-01 Electrical Auxiliary System Floor Plan - Level 1 02/22/13
S-1.01 Partition Support Framing Plan + Details 02/22/13
440 BURROUGHS
TECH ONE BUILDING
5 Story
Reinforced Concrete Building
Build in 1929
Designed by Albert Kahn
Originally the G. A. Richards Oakland Company Service Department , now
Tech One Building and home of TechTown innovative business incubator
and acceleration center.
This is a historically designated building contract architect for original
Albert Kahn building documents and State Historical Preservation Office
documents, if required.
PROJECT NUMBER:
DATE:
PROJECT CONTACTS:
Phoenix Contractors, Inc
2111 Golfside
Ypsilanti, Michigan 48197
p 734 487 9640 f 734 487 1252
www.phoenixco.biz
CONSTRUCTION MANAGER:
ISSUED FOR:
SITE MAP:LOCATION MAP:PROJECT DESCRIPTION:
TechTown
440 Burroughs Street
Detroit, Michigan 48202
p 313 921 9340 f 313 921 0986
www.techtownwsu.org
OWNER:
Ghafari Associates LLC.
17101 Michigan Ave.
Dearborn, MI 48126
p 313 441 3000 f 313 441 1545
www.ghafari.com
MECHANICAL ELECTRICAL + PLUMBING:
Patrick Thompson Design, Inc.
486 West Milwaukee, Suite 100C
Detroit, MI 48201
p 313 820 3268
www.patrickthompsondesign.com
INTERIOR DESIGNER:
Centric Design Studio, LLC
440 Burroughs Street, No. 170
Detroit, Michigan 48202
p 313 486 1908 f 313 216 2777
www.centricdesignstudio.com
ARCHITECT:
JMS Engineering Services, LLC
32401 West 8 Mile, Suite 2-5
Livoinia, MI 48152
p 313 399.2932
STRUCTURAL ENINEERING:
INDEX OF DRAWINGS
UP
UP
UPDN
G.4
G
F.4
F
E.4
E
D.4
D
A.7
B
B.5
C.5
C
765432
A.9
G.2
1 8
H
A
A.8
3.6
G.5
TECH TOWN
MANAGEMENT
103
EVENT
SPACE 1
126
EVENT
SPACE 2
125
VESTIBULE
101
KRESGE
CONNECT VIDEO
CONFERENCING
108
TRAINING/ACCELERATION
112
STORAGE B
120
STORAGE A
107
ELEC
109
N.I.C
N.I.C
71'-8"
97'-10"
130'-2"
BUILDING CODE SUMMARY
BUILDING AREA
(PARA 502.1
BUILDING USE GROUP
(CHAPTER 3)
MIXED USE
(TABLE 302.3.2 & PARA 302.3
TYPE OF CONSTRUCTION
(CHAPTER 6)
FIRE SUPPRESSION REQUIRED
(SECTION 903)
ALLOWABLE BUILDING HEIGHT
(TABLE 503)
HEIGHT MODIFICATIONS
(SECTION 504)
TABULAR FLOOR AREA PER STORY
(TABLE 503)
ACTUAL FLOOR AREA PER STORY
(GROSS FLOOR AREA PARA 502.1)
TOTAL AREA
OCCUPANT LOAD PER STUDY
(TABLE 1004.1.2
TOTAL OCCUPANT LOAD
MAXIMUM LENGTH OF EXIT TRAVEL
(TABLE 1015.1)
MAXIMUM LENGTH OF DEAD END CORRIDOR
(PARA 1016.3)
CAPACITY OF EGRESS COMPONENTS
EXIT ACCESS CORRIDORS
(TABLE 1005.1 & PARA 1016.2)
STAIRWAYS
(TABLE 1005.1 & PARA 1009.1)
RAMPS
(TABLE 1005.1 & PARA 1010.5.1)
DOORS
(TABLE 1005.1 & PARA 1006.1.1)
FIRE RESISTANCE RATINGS OF EGRESS COMPONENTS
CORRIDORS
(TABLE 1016.1 & PARA 1016.1)
EXIT PASSAGEWAYS
(PARA 1020.3)
STAIR SHAFTS
(PARA 1019.1)
HORIZONTAL EXITS
(PARA 1021.2)
AREA OF REFUGE
(PARA 1007.6.2)
FIRE RESISTANCE RATING OF SEPARATIONS
SHAFTS - OTHER THAN STAIRS
(PARA 707.4)
ATRIUMS
(PARA 404.5)
FURNACE ROOMS OVER 400,000 BTU
(TABLE 302.1.1)
BOILER ROOMS OVER 15 PSI & 10 HP
(TABLE 302.1.1)
STORAGE ROOMS OVER 100 SF
(TABLE 302.1.1)
WASTE AND LINEN COLLECTION ROOMS
(TABLE 302.1.1)
FIRE WALLS
(TABLE 705.4)
EXTERIOR WALLS
(TABLE 602)
FIRE RESISTANCE RATINGS OF STRUCTURAL ELEMENTS
INTERIOR AND EXTERIOR
BEARING WALLS,
COLUMNS, BEAMS,
GIRDERS, TRUSSES, AND
ARCHES (TABLE 601)
SUPPORTING MORE THAN ONE FLOOR,
COLUMNS OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
28,425 SQ. FT.
B
0 HOUR
TYPE 2B
YES
3 STORIES
N/A
23,000
YES
TOTAL AREA 69,690 SQ. FT./FLOOR ALLOWABLE
SEE EGRESS OCCUPANT LOAD TABLE
SEE EGRESS OCCUPANT LOAD TABLE
300 FEET
50 FEET
0.15 INCHES/OCCUPANT
0.2 INCHES/OCCUPANT
N/A
0.15 INCHES/OCCUPANT
0 HOUR
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
0 HOUR
N/A
2 HOUR
0 HOUR
0 HOUR
0 HOUR
0 HOUR
20,638 SQ. FT. AREA OF SCOPE OF WORK
MIXED USE - BUSINESS, ASSEMBLY & STORAGE UNIT
302.3.1 NON SEPARATED USES
FULLY SPRINKLED BUILDING - EXISTING
1 STORY - 20 FEET
200% INCREASE FOR SPRINKLED BUILDING
INCREASE TO 69,690 SQ. FT.
WITH SPRINKLER SYSTEM
WITH SPRINKLER SYSTEM
2 EXITS REQUIRED - 3 PROVIDED
32' MIN.
EXISTING STAIRS
508.4 TABLE
MIXED USE - BUSINESS & STORAGE USE GROUPS
SEPARATION REQUIREMENTS
EXISTING WALLS
INTERIOR LOAD BEARING WALLS (0 HOUR)
ALL INTERIOR WALL
MICHIGAN BUILDING CODE 2009 EDITION
(UNLESS OTHERWISE NOTED)
MEANS OF EGRESS OCCUPANT LOAD (TABLE 1004.1.1)
OCCUPANCY
BUSINESS (B)
SQUARE FEET OF FLOOR AREA PER OCCUPANT
100 NSF / OCCUPANT
BUILDING FLOOR AREA FOR USE
20,638 SQUARE FEET
OCCUPANT LOAD
270 OCCUPANTS
PLUMBING FIXTURE COUNT
MICHIGAN BUILDING CODE 2009 EDITION
(UNLESS OTHERWISE NOTED)
USE GROUP POPULATION = BUSINESS (B)
NUMBER REQUIRED (TABLE 403.1):
W/C: 1/XX OCC
LAV: 1/XX OCC
NUMBER PROVIDED
JANITOR'S CLOSETS
DRINKING FOUNTAINS
WATER CLOSETS
MALE
2
WC: 1/25 OCC
FOR FIRST 50
WC: 1/50 FOR
REMAINING
4 EXISTING
1 SERVICE SINK REQUIRED
1 SERVICE SINK PROVIDED
1 PER 100 (B) 2 DRINKING FOUNDATIONS REQUIRED
2 DRINKING FOUNDATION EXISTING
FEMALE
2
WC: 1/25 OCC
FOR FIRST 50
WC: 1/50 FOR
REMAINING
4 EXISTING
URINALS
SEE NOTE 1
1
UNISEX MALE
2
LAV: 1/40 OCC
FOR FIRST 50
WC: 1/80 FOR
REMAINING
4
FEMALE
3
LAV: 1/40 OCC
FOR FIRST 50
WC: 1/80 FOR
REMAINING
4
UNISEX
LAVATORIES BATHTUBS/SHOWERS
MALE
N/A
FEMALE
N/A
1 HOUR FIRE SEPARATION
2 HOUR FIRE SEPARATION
EXIT
EGRESS TRAVEL DISTANCE
AREA OF WORK
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:37:58PM
AG.02
Code Summary +
Egress Plan
02/22/13
C.M/ C.B.
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/16" = 1'-0"A5.05
1 EGRESS PLAN
1/18/2013 QUALITY REVIEW
CODE SUMMARY
BUILDING: MICHIGAN BUILDING CODE 2009, WHICH INCLUDES MICHIGAN BARRIER-FREE DESIGN RULES
MECHANICAL: MICHIGAN MECHANICAL CODE 2009
PLUMBING: MICHIGAN PLUMBING CODE 2009
ELECTRICAL: MICHIGAN ELECTRICAL CODE 2009, NEC
ENERGY: 2009 MICHIGAN UNIFORM ENERGY CODE
ZONING:
PER CITY OF DETROIT ZONING ORDINANCE
M3 GENERAL INDUSTRIAL DISTRICT 103.0000
RESEARCH OR TESTING LABORATORIES + BUSINESS PERMITTED AS MATTER OF RIGHT
USE GROUP "B"
NOTE TO CONTRACTORS
EXIST RESTROOMS TO REMAIN. RESTROOMS
NOT IN CONTRACT SCOPE FOR THIS
PROJECT. NO CHANGES ARE REQUIRED
2/22/2013 PERMITS/BIDS
Date: Submitted for:
AB ANCHOR BOLT
ABR ABRASIVE
ABV ABOVE
AC ACOUSTIC/ACOUSTICAL
A/C AIR CONDITIONING
ACC ACCESS
ACH AIR CONDITIONING UNIT
ADD ADDENDUM
ADDN ADDITION
ADDNL ADDITIONAL
ADH ADHESIVE
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AGGR AGGREGATE
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM/AL ALUMINUM
AMP AMPERE
AMT AMOUNT
ANCH ANCHOR
& AND
ANOD ANODIZED
AP ACCESS PANEL
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECT/ARCHITECTURAL
ASPH ASPHALT
ASSY ASSEMBLY
@ AT
AUTO AUTOMATIC
AVG AVERAGE
B/B BACK TO BACK
BBD BULLETIN BOARD
BD BOARD
BETW BETWEEN
BF BARRIER FREE
BIT BITUMINOUS
BJF BITUMINOUS JOINT FILLER
BLDG BUILDING
BLK BLOCK/BLOCKING
BLVD BOULEVARD
BM BEAM/BENCHMARK
BOT BOTTOM
BPL BASE PLATE
BR BEDROOM/BRASS/BULLET RESISTANT
BRG BEARING
BRK BRICK
BRL BEARING PLATE
BS BOTH SIDES
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BULL BULLETIN
BUR BUILT-UP ROOF
BW BOTH WAYS
CA COMPRESSED AIR
CAB CABINET
CAT CATALOG NUMBER
CB CATCH BASIN/CHALKBOARD
C/C CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CEM CEMENT
CER CERAMIC
CF CUBIC FEET
CFL COUNTER FLASHING
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CH COAT HOOK
CI CAST IRON
CIP CAST IRON PIPE/CAST IN PLACE
CIR CIRCLE/CIRCULAR
CJ CONTROL JOINT
CL CENTERLINE/CLASS
CLG CEILING
CLL CONTRACT LIMIT LINE
CLOS CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNL CHANNEL
CNTR COUNTER
CO CLEAN OUT/COMPANY
COL COLUMN
COMP COMPOSITION/COMPOSITE
CONC CONCRETE
COND CONDUIT
CONF CONFERENCE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE/CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR/CORRUGATED
CP CONTROL PANEL
CPL CEMENT PLASTER
CSK COUNTERSINK
CTR CENTER/CENTERED
CUH CABINET UNIT HEATER
CW COLDWATER
CY CUBIC YARD
CYC CYCLES
CYL CYLINDER
D DEEP/DEPTH
DA DOUBLE ACTING
DB DECIBEL
DBL DOUBLE
DES DESIGN
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISC DISCONNECT
DISP DISPENSER/DISPOSAL
DIV DIVIDER/DIVISION
DL DEAD LOAD
DN DOWN
DO DITTO
DP DAMPPROOFING
DR DOOR/DRAIN/DINING ROOM
DRN DRAIN
DS DOWN SPOUT
DT DRAIN TILE
DUP DUPLICATE
DW DISHWASHER
DWG DRAWING
E EAST
EA EACH
EB EXPANSION BOLT
EC ELECTRICAL CONTACTOR/EXPOSED CONSTRUCTION
E/E END TO END
EE EACH END
EF EACH FACE/EXHAUST FAN
EG EXHAUST GRILLE
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EJF EXPANSION JOINT FILLER
EL/ELEV ELEVATION/ELEVATOR
ELAST ELASTOMERIC
ELEC ELECTRIC/ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE/ENCLOSED
ENTR ENTRANCE/ENTRY
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL/EQUIVALENT
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ESC ESCALATOR
EST ESTIMATE
ETC ETCETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
MT METAL THRESHOLD
MTD MOUNTED
MTG MEETING
MTL METAL/METTALIC
MTL WP METALLIC WATERPROOFING
MULL MULLION
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NIC NOT IN CONTRACT
NO or # NUMBER
NOM NOMINAL
NOR NORMAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OUTSIDE AIR/OVERALL
OBGL OBSCURE GLASS
OC ON CENTER
OD OUTSIDE DIAMETER/OUTSIDE DIMENSION
OF OUTSIDE FACE DIMENSION
OFF OFFICE
OH OPPOSITE HAND/OVERHEAD
O/O OUT TO OUT
OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED
OPER OPERATOR/OPERATION
OPG OPENING
OPP OPPOSITE
ORIG ORIGINAL
ORN ORNAMENTAL
OZ OUNCE
PA PUBLIC ADDRESS
PASS PASSAGE/PASSENGER
PBD PARTICLE BOARD
PC PIECE/PIECES/PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCP PRECAST CONCRETE PANEL
PE PASSANGER ELEVATOR
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PG PAGE
PKG PARKING
PL PLATE/PROPERTY LINE
PLAS PLASTER
PLAT PLATFORM
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLWD PLYWOOD
PNL PANEL
POL POLISHED
PORT PORTABLE
POS POSITION/POSITIVE
PR PAIR
PREFAB PREFABRICATED
PRL PARALLEL
PROJ PROJECT/PROJECTION
PROP PROPERTY/PROPOSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT/PAINT
PTD PAINTED
PTN PARTITION
PVG PAVING
PVC POLYVINYLCLORIDE
PVMT PAVEMENT
QTY QUANTITY
QTR QUARTER
EX EXPOSED
EXC EXCAVATED
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
F DEGREES FAHRENHEIT
FA FIRE ALARM
FAB FABRICATED
FACP FIRE ALARM CONTROL PANEL
FAS FASTENER
FD FLOOR DRAIN
FDAPR FIRE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FACTORY FINISH
F/F FACE TO FACE/FINISH TO FINISH
FFE FINISH FLOOR ELEVATION
FF&E FIXTURES, FURNISHINGS AND EQUIPMENT
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH/FINISHED
FIN FLR/FF FINISH FLOOR
FIXT FIXTURE
FLASH FLASHING
FLG FLOORING/FLASHING/FLANGE
FLR FLOOR
FLUOR FLUORESCENT
FPM FEET PER MINUTE
FPR FIREPROOF/FIREPROOFING
FR FIRE RETARDANT
FRM FRAME
FS FULL SIZE
FT FEET/FOOT
FTG FOOTING
FTP FULLY TEMPERED
FTR FINNED TUBE RADIATION
FURN FURNISH/FURNISHED
FURR FURRING/FURRED
FUT FUTURE
FVC FIRE VALVE CABINET
FVS FIRE VALVE STATION
G GAS
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GENL GENERAL
GF GROUND FACE
GFRC GLASS FIBER REINFORCED CONCRETE
GL GLASS/GRID LINE
GND GROUND
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GWB GYPSUM WALL BOARD
GYP GYPSUM
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HD HEAVY DUTY
HDWD HARDWOOD
HDWE HARDWARE
HEX HEXAGON
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT/HORSE POWER/HIGH PRESSURE
HR HOUR
HS HEAT STRENGTHENED
HT HEIGHT
HTG HEATING
HTR HEATER
H/V HEATING AND VENTILATION
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HVC HOSE VALVE CABINET
HW HOT WATER
HWH HOT WATER HEATER
ID IDENTIFICATION/INSIDE DIAMETER
IE INVERT ELEVATION
IN or " INCH/INCHES
INCAND INCANDESCENT
INCL INCLUDE/INCLUDING
INFO INFORMATION
INSUL INSULATATE/INSULATION
INT INTERIOR/INTERNAL
INTER INTERMEDIATE
INV INVERT
IS INSIDE
JB JUNCTION BOX/JOINT BACKER
JC JANITOR CLOSET
JF JOINT FILLER
JR JUNIOR
JST JOIST
JT JOINT
K KIP (1000#)
KD KNOCK DOWN
KIT KITCHEN
KO KNOCK OUT
KP KICK PLATE
LAB LABORATORY
LAM LAMINATE/LAMINATED
LAV LAVATORY
LEV LEVEL
LF LINEAR FEET/FOOT
LG LONG
LH LEFT HAND
LHRB LEFT HAND REVERSE BEVEL
LIN LINEAR DIFFUSER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LP LIGHTING PANEL/LOW POINT
LSF LIGHT GAUGE STEEL FRAMING
LT LIGHT/LAUNDRY TRAY
LTG LIGHTING
LV LOW VOLTAGE
LW LIGHT WEIGHT
LWC LIGHT WEIGHT AGGREGATE CONCRETE
MACH MACHINE
MAINT MAINTENANCE
MAS MASONRY
MATL MATERIAL
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MC MEDICINE CABINET/MECHANICAL CONTRACTOR
MCC MOTOR CONTROL CENTER
MDOT MICHIGAN DEPARTMENT OF TRANSPORTATION
MDS METAL DIVIDER STRIP
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MES METAL EDGE STRIP
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MI MISCELLANEOUS IRON
MIN MINIMUM
MISC MISCELLANEOUS
MK MARK
ML METAL LATH
mm MILLIMETER
MO MASONRY OPENING
MOD MODEL/MODULE
MOV MOVEABLE
R RISER
RAD or R RADIUS
RAG RETURN AIR GRILLE
RC RAIN CONDUCTOR
RCP REFLECTED CEILING PLAN
RD ROAD/ROOF DRAIN
REBAR REINFORCEMENT BAR
REC RECESS
RECV RECEIVE/RECEIVING
REF REFER/REFERENCE
REFL REFLECTIVE/REFLECTED
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCED
CONCRETE/REINFORCE/REINFORCEMENT
REM REMOVE/REMOVABLE
REQD REQUIRED
RET RETURN
REV REVISED/REVISION
RFG ROOFING
RH RIGHT HAND
RHR RIGHT HAND REVERSE
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RS ROOF SUMP
RTU ROOF TOP UNIT
RV ROOF VENTILATION
RWC RAIN WATER CONDUCTOR
S SOUTH/STORM/SINK
SA SUPPLY AIR
SAG SUPPLY AIR GRILLE
SAN SANITARY
SAR SUPPLY AIR REGISTER
SB SOIL BEARING
SC SOLID CORE
SCHED SCHEDULE
SD SUPPLY DUCT/DIFFUSER
SECT SECTION
SF SQUARE FEET/SQUARE FOOT/SUPPLY FAN
SHR SHOWER
SHT SHEET
SIM SIMILAR
SNT SEALANT
SOG SLAB ON GRADE
SP SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
STAG STAGGERED
STC SOUND TRANSMISSION CLASS
SS SERVICE SINK
SST STAINLESS STEEL
ST STREET
STD STANDARD
STIFF STIFFENER
STL STEEL
STM STEAM
STOR STORAGE
STRL STRUCTURAL
SUB SUBSTATION
SUPP SUPPORT
SURF SURFACE/SURFACING
SUSP SUSPEND/SUSPENSION
SW SWITCH
SYM SYMBOL/SYMMETRICAL
SYS SYSTEM
T THERMOSTAT/TREAD
T/ TOP OF
TAN TANGENT
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TB TEST BOARING/TOWEL BAR
TBD TACKBOARD/TO BE DETERMINED
TD TRENCH DRAIN
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE/TEMPORARY/TEMPERED
THK THICK/THICKNESS
THR THRESHOLD
THRU THROUGH/THROUGHOUT
TOS TOP OF STEEL/TOP OF SLAB
TP TANGENT POINT
TRAN TRANSOM/TRANSFORMER
TS TUBE SECTION/TUBE STEEL/THICKENED SLAB
TV TELEVISION
TW THROUGH WALL
TYP TYPICAL
UC UNDERCUT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
ULT ULTIMATE
UNEX UNEXCAVATED
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
UR URINAL
USGS UNITED STATES GEOLOGICAL SURVEY
VAC VACUUM
VAR VARIABLE/VARIES
VCP VITRIFIED CLAY PIPE
VENT VENTILATE/VENTILATION
VERT VERTICAL/VERTICALLY
VEST VESTIBULE
VIF VERIFY IN FIELD
VIT VITREOUS
VOL VOLUME
VR VAPOR RETARDER
VTR VENT THRU ROOF
W WIDE/WIDTH/WEST/WASTE/WATTS
W/ WITH
WC WATER CLOSET
WCAB WALL CABINET
WD WOOD
WH WALL HYDRANT
WL WORKING LINE
WM WATER METER
WO WINDOW OPENING
W/O WITHOUT
WP WATERPROOFING/WATERPROOF/WEATHERPROOF
WP WORKING POINT
WR WASTE RECEPTICLE/WATER RESISTANT
WSCT WAINSCOT
WT WEIGHT/WATERTIGHT
W/W WALL TO WALL
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
WGL WIRE GLASS
YD YARD
YP YIELD POINT
YR YEAR
YS YIELD STRENGTH
101
1 View Name
1/8" = 1'-0"A101
A101
2
3
4
1
0
Room
name
101
Name
Elevation
A101
1
DESCRIPTION STARTS AT WALL SURFACE
DESIGNATED
WALL CONSTRUCTION TYPE NUMBER
AS SEEN ON WALL TYPE SHEET.
1
A-101.01
MATCH LINE
A-102.01
A-101.01
MATCH LINE
A-102.01
SHEET IDENTIFICATION
NUMBER (INDICATES SHEET
NUMBER OF DRAWING)
SHEET IDENTIFICATION NUMBER
(INDICATES SHEET NUMBER
WHERE DRAWN)
0
SHEET IDENTIFICATION
(INDICATES SHEET WHERE DRAWN)
IDENTIFICATION
NUMBER (NUMBER
ON SHEET WHERE
DRAWN)
SHEET IDENTIFICATION
(INDICATES SHEET
WHERE DRAWN)
COLUMN IDENTIFICATION FOR
EXISTING CONSTRUCTION
COLUMN IDENTIFICATION FOR
NEW CONSTRUCTION
SHEET IDENTIFICATION
DETAIL & ENLARGED PLAN LOCATION INDICATION
SECTION INDICATION
SIMILAR TO IDENTIFIED DETAIL
ELEVATION INDICATION
COLUMN INDICATION
NORTH INDICATION
REVISION IDENTIFICATION
DIMENSION LINE IDENTIFICATION
REVISION CLOUD IDENTIFICATIONDOOR IDENTIFICATION
OPENINGS (DOOR & BORROWED LIGHT) SHALL
REPEAT ROOM NUMBER ASSIGNED TO ROOM.
MULTIPLE OPENINGS TO ROOM SHALL REPEAT
ROOM NUMBER WITH A POSTSCRIPT LETTER FOR
EACH ADDITIONAL OPENING REQUIRED.
101 / 101A / 101B FOR NUMBER NEEDED
ROOM NAME AND NUMBER IDENTIFICATION
IDENTIFICATION NUMBER
(NUMBER ON SHEET
WHERE DRAWN)
SHEET IDENTIFICATION
(INDICATES SHEET
WHERE DRAWN)
WINDOW IDENTIFICATION
WALL IDENTIFICATION
CEILING HEIGHT IDENTIFICATION
LEVEL INDICATION
INDICATES
DIRECTION OF VIEW
DESCRIPTION STARTS AT WALL SURFACE
DESIGNATED
MATCHLINE IDENTIFICATION
REFERENCE SYMBOLS
8'-0"
1
A101
1i
1t
0' - 2"
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:38:19PM
AG.03
Reference Symbols +
Abbreviations
02/22/13
CM
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
Date: Submitted for:
2/22/2013 PERMITS/BIDS
UP
TectonicCopyright2007
UP
UP
DN
T
T
T
T
T
UP
UP
G.4
G
F.4
F
E.4
E
D.4
D
A.7
B
B.5
C.5
C
765432
A.9
G.2
1 8
H
A
A.8
3.6
G.5
EXIST
MAINTENANCE
OFFICE
EXIST
LOADING
DOCK
EXIST
STORAGE
EXIST
STORAGE
EXIST ELEV
MACHINE
ROOM
EXIST ELEV
NO 3
EXIST STAIR
NO 3
EXIST
CORRIDOR
EXIST
GENERATOR
ROOM
EXIST BOILER
ROOM
EXIST ELEV
NO 1 EXIST STAIR
NO 1
EXIST MEN
EXIST WOMEN
EXIST
JC
EXIST STAIR
NO 2
EXIST ELEV
NO 2
EXIST
VESTIBULE
EXIST FIRE
PUMP ROOM
EXIST IT
EXIST
STORAGE
EXIST
STORAGE
EXIST CONF
EXIST
OFFICE
EXIST PRE FUNCTION
EXIST
MAILBOXES
EXIST CONF
EXIST CONF EXIST CONF EXIST CONF
EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE
EXIST CAFE
EXIST SERVICE
EXIST
KITCHENEXIST COPY
ROOM
EXIST OPEN
OFFICE
EXIST
SERVICE/
SECURITY
DESK
EXIST OFFICE
EXIST OFFICE
EXIST
STORAGE
EXIST OFFICE
EXIST
CORRIDOR
EXIST LUNCH
EXIST MECH
EXIST OFFICE
EXIST OFFICE
EXIST OFFICE
EXIST OFFICE
EXIST CONF
EXIST CONF
EXIST
STORAGE
EXIST
STORAGE
EXIST
STORAGE EXIST OFFICE
EXIST OFFICE
EXIST CONF
EXIST OFFICE EXIST OFFICE EXIST OFFICE
EXIST OFFICE
EXIST OFFICE
EXIST OPEN
OFFICE
EXIST OFFICE
EXIST
UNISEX
EXIST
OFFICE
EXIST OFFICEEXIST OFFICE
EXIST
CORRIDOR
EXIST
VESTIBULE
EXIST
MAINTENANCE
OFFICE
EXIST
KITCHENETTE
EXIST
MAILBOXES
EXIST MECH
EXIST OFFICE
150'-0"
30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0"
188' - 6"
10'-8"2'-8"1'-2"6'-6"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"6'-0"6'-2"8'-6"
1
1
11
8
1
1
10
1 10
1
10
1
8
1 1 1
1
1
1
1
1
8
11
1
1
1
1
1
1
1
1
1
1 1
1
1
1
1
1
1
11
1
1
8 1
1
1
1
1
1
1
1
1
1
1 1 1
1
1
8
1
8
1
8
1
3
1
1
1
8
1
1
11
1
1
1
1
1
1
11
1
1
1
1
1
1
1
11
1
1
2
9
1
1
1
3
1
8
11
1
1111
11
12
VIF
3'-0"
1
14
13
13 13
3
3 33
3
13
13
13
13
13
EXISTING MILLWORK
AND SINK TO REMAIN
11
8
16
A5.09 13
EXISTING CHASE
TO REMAIN
19 18
19
19
EXISTING TO BE REMOVED
EXISTING TO REMAIN
EXISTING FLOOR FINISH TO BE REMOVED
NIC - NOT IN CONTRACT
DEMOLITION - LEGEND
ALL WALLS, CEILINGS, DOORS AND FLOOR FINISHES
SHALL BE REMOVED UNLESS NOTED OTHERWISE OR
SHOWN AS REMAINING.
SEE MECH AND ELEC DEMO DRAWINGS FOR ADDITIONAL
DEMO WORK AND FOR SERVICES THAT MUST REMAIN
ACTIVE.
SAWCUT AND REMOVE FLOOR SLAB AS REQUIRED FOR
UTILITIES. COORDINATE WITH MECH AND ELEC DRAWINGS.
PATCH AND REPAIR ALL EXISTING MATERIALS
TO REMAIN AS NEEDED WHERE REMOVAL OF EXISTING
CONSTRUCTION OR WHERE THE REQUIRED OF NEW
CONSTRUCTION, ALTERS THE EXISTING MATERIALS.
DEMO DRAWINGS SHOW GENERAL INTENT AND AREA.
EXACT EXTENT IS TO BE DETERMINED BY FIELD
VERIFICATION AND COORDINATION WITH THE CONTRACT
DOCUMENTS. REFER TO PROJECT MANUAL FOR
ADDITIONAL REQUIREMENTS. ALL CONDITIONS SHALL
BE FIELD VERIFIED DURING BID PROCESS. NOTIFY
ARCHITECT AND/OR CONSTRUCTION MANAGER OF ALL
CONDITIONS AFFECTING INTENT OF NEW CONSTRUCTION.
ALL DOOR HARDWARE TO BE REMOVED AND SALVAGED.
TURN OVER TO OWNER'S REPRESENTATIVE UPON
COMPLETION OF DEMOLITION PHASE.
ALL ITEMS TO REMAIN SHALL BE CLEANED, INSPECTED
AND VERIFIED OF WORKING ORDER. NOTIFY ARCHITECT /
ENGINEER AND OWNER'S REPRESENTATIVE IF ANY ITEM
IS NOT IN WORKING ORDER.
CONTRACTOR TO LOCATE ON SITE INDIVIDUAL DUMPSTER
FOR RECYCLE DEMOLITION ITEMS PER N.I.H. REGULATIONS.
COORDINATE FINAL LOCATIONS WITH OWNER'S
REPRESENTATIVE.
EXISTING FIRE EXIT SIGNS, STROBES, HORNS,
SPEAKER AND SMOKE DETECTORS. SEE ARCHITECTURAL +
ELECTRICAL DRAWINGS.
CONTRACTOR TO REMOVE ALL FURNITURE, FILE CABINETS
AND STORAGE UNITS UNLESS OTHERWISE NOTED.
CONTRACTOR TO REMOVE ALL ART WORK, SIGNAGE,
MARKER BOARDS, TACK BOARDS, PROJECTION SCREENS
AND CLOCKS. SALVAGE AND COORDINATE STORAGE WITH
OWNER FOR REUSE. SEE ARCHITECTURAL FOR REUSE
LOCATION.
ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE
LOCAL AND STATE CODES.
SEE MECHANICAL, AND ELECTRICAL DEMOLITION DRAWINGS
FOR ADDITIONAL SCOPE OF DEMOLITION AND NEW WORK.
DEMOLITION - GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
10
1
2
3
REMOVE EXISTING PARTITION, DOORS AND ASSOCIATED
COMPONENTS.
REMOVE PORTION OF WALL AND ASSOCIATED COMPONENTS
AS REQUIRED FOR NEW OPENING.
REMOVE PLUMBING FIXTURES, SEE MECH FOR ADDITIONAL
SCOPE.
RECEPTION DESK TO REMAIN FOR PRECONSTRUCTION
PHASE- REMOVAL, DEMOLITION TO BE COORDINATED WITH
CONSTRUCTION MANAGER.
REMOVE SIDE LITE, GLASS AND ASSOCIATED
COMPONENTS.
REMOVE CARPET TILE FLOOR AS REQUIRED FOR WORK.
SALVAGE FOR RECYCLING + COORDINATE STORAGE WITH
OWNER.
REMOVE TILE FLOORING IN CAFE.
REMOVE EXISTING MILLWORK/CASEWORK AND ASSOCIATED
COMPONENTS TO FACILITATE WORK.
REMOVE EXISTING EXHAUST FAN VENT FROM EXISTING
WINDOW PANE. SEE SHEET AD1.01 & MECH. FOR ADDITIONAL
SCOPE.
REMOVE EXISTING MAILBOXES AND ASSOCIATED
COMPONENTS TO FACILITATE WORK. SALVAGE AND
COORDINATE STORAGE WITH OWNER FOR REUSE. SEE A1.01
FOR REUSE LOCATION.
REMOVE EXISTING DOOR, FRAME AND ASSOCIATED
COMPONENTS TO FACILITATE WORK. (RECYLE DOORS).
COORDINATE WITH CM/OWNER FOR STORAGE.
REMOVE EXISTING ACOUSTICAL PANEL AND ASSOCIATED
COMPONENTS. EXISTING STUD FRAMING, GYP. BD. SOFFIT
AND GYP. BD. ON KITCHEN SIDE TO REMAIN.
REMOVE EXISTING EQUIPMENT.
REMOVE EXISTING ELECTRICAL EQUIPMENT. SEE ELEC. FOR
ADDITIONAL SCOPE.
REMOVE ROLLER SHADES AND SALVAGE FOR REUSE.
COORDINATE STORAGE WITH CM/ OWNER.
REMOVE EXISTING TUBE STEEL COLUMN AND HEADER
PATCH / REPAIR FLOOR AS NEEDED TO FACILITATE NEW
WORK.
REMOVE REACH-IN COOLER- STORE FOR REUSE-
COORDINATE WITH CM/ OWNER.
EXISTING CARPET TILES TO REMAIN DURING 1ST PHASE OF
DEMOLITION / CONSTRUCTION. TILE TO BE REMOVED AS
REQUIRED FOR WORK. SALVAGE FOR REYCLING,
COORDINATE STORAGE WITH OWNER. SEE SHEET AD1.02
FOR TEMPORARY CONSTRUCTION LAYOUT. COORDINATE
PHASING REMOVAL WITH CM / OWNER.
EXISTING CERAMIC FLOOR TILES TO REMAIN DURING 1ST
PHASE OF DEMOLITION / CONSTRUCTION. SEE SHEET AD1.02
FOR TEMPORARY CONSTRUCTION LAYOUT. FLOOR TILES TO
BE TO BE REMOVED AS REQUIRED FOR NEW WORK. FLOOR
AREA TO BE LEVELED, PATCHED, & PREPED FOR NEW FLOOR
FINISH. COORDINATE PHASING REMOVAL WITH CM / OWNER.
4
5
6
7
8
9
11
DEMOLITION - KEYNOTES
12
13
14
15
16
17
19
18
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:34:12PM
AD1.01
First Floor Demolition
Plan
02/22/13
CM
D. Thomas
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/8" = 1'-0"A5.05
1 FIRST FLOOR DEMOLITION PLAN
1/18/2013 QUALITY REVIEW
2/22/2013 PERMITS/BIDS
Date: Submitted for:
NOTE TO CONTRACTOR
THIS IS A HISTORICALLY DESIGNATED BUILDING. WINDOWS ARE TO REMAIN
AS IS. CONTACT ARCHITECT FOR ORIGINAL BUILDING DOCUMENTS AND
STATE HISTORIC PRESERVATION OFFICE DOCUMENTS, IF REQUIRED.
REFERENCE SHEETS AD3.01 & AD3.02 FOR FURTHER CLARITY OF
DEMOLITION SCOPE.
SEE SHEET A1.01, MECH & ELEC DRAWINGS FOR REQUIRED FLOOR SAW CUT
LOCATIONS.
UP
TectonicCopyright2007
UP
UP
DN
T
T
T
T
G.4
G
F.4
F
E.4
E
D.4
D
A.7
B
B.5
C.5
C
765432
A.9
G.2
1 8
H
A
A.8
3.6
G.5
1' - 6"
RELOCATION OF
EXISTING MAILBOXES
FOR TEMPORARY
CONSTRUCTION
(TYP)
EXIST SERVICE/
SECURITY DESK
EXIST
VESTIBULE
EXIST
SERVICE/
SECURITY
DESK
EXIST STAIR
NO 2
EXIST ELEV
NO 2
PRIOR TO DEMO
KEEP EXISTING BACK
WALL (V.I.F.)
31' - 1"
15'-2"
A
A
A
A
PROVIDE TEMPORARY HEATING AND COOLING FOR TEMPORARY
RECEPTION/ ELEVATOR AREA DURING CONSTRUCTION.
PROVIDE TEMPORARY DATA AND TELEPHONE FOR TEMPORARY
RECEPTION/ ELEVATOR LOBBY DURING CONSTRUCTION.
PROVIDE TEMPORARY ELECTRIC AND LIGHTING WITH LOCAL
SWICTH WITH ADEQUATE ILLUMINATION FOR OWNER USE OF
TEMPORARYRECEPTION/ EVEVATOR AREA DURING
CONSTRUCTION.
TEMPORARY CONSTRUCTION DRAWINGS SHOW GENERAL INTENT
AND AREA. EXACT EXTENT IS TO BE DETERMINED BY FIELD
VERIFICATION AND COORDINATION WITH THE CONTRACT
DOCUMENTS. ALL CONDITIONS SHALL BE FIELD VERIFIED DURING
BID PROCESS. NOTIFY ARCHITECT AND/OR CONSTRUCTION
MANAGER OF ALL CONDITIONS AFFECTING INTENT OF TEMPORARY
CONSTRUCTION RECEPTION / ELEVATOR LOBBY.
ALL TEMPORARY CONSTRUCTION ITEMS TO REMAIN SHALL BE
CLEANED, INSPECTED AND VERIFIED OF WORKING ORDER. NOTIFY
ARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE IF ANY
ITEM IS NOT IN WORKING ORDER.
REUSE EXISTING FIRE EXIT SIGNS, STROBES, HORNS,
AND SMOKE DETECTORS.
PROVIDE DUST FREE PARTITIONS AND TRAFFIC AREA IN
TEMPORARY RECEPTION/ ELEVATOR LOBBY DURING
CONSTRUCTION.
REUSE OF EXISTING OWNER'S MAILBOXES IS TWO PHASED-
PHASE 1- TEMPORARY CONSTRUCTION AREA - RECEPTION
/ELEVATOR LOBBY.
PHASE 2 - FINAL LAYOUT- MAILBOXES ROOM #118
TEMPORARY CONSTRUCTION -
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
3/1/201312:10:55PM
AD1.02
Temporary
Construction Plan
02/22/13
CM
S.LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/8" = 1'-0"A5.05
1 FIRST FLOOR TEMPORARY CONSTRUCTION PLAN
Date: Submitted for:
2/22/2013 PERMITS/BIDS
NOTE TO CONTRACTOR
TEMPORARY CONSTRUCTION PLAN TO BE VERIFY BY
CONSTRUCTION MANAGER AND SUBCONTRACTORS.
THE INTENT OF THE TEMPORARY CONSTRUCTION PLAN
IS TO GIVE THE CONTRACTOR A BASIS TO PRICE AND
CONSTRUCT TEMPORARY PARTITIONS TO ALLOW
BUILDING ACCESS FOR THE TENANTS OF THE BUILDING
ON THE UPPER FLOORS, TENANTS MAIL BOX ACCESS
AND RECEPTION DESK FUNCTIONS. PARTITION LAYOUT,
EGRESS ACCESS, CONTRACTOR ACCESS POINTS ARE
TO BE VERIFIED WITH CONSTRUCTION MANAGER AND
BUILT TO STATE CODES.
NOTE TO CONTRACTOR
LAYOUT MUST ACCOMMODATE (19) EXISTING
RELOCATED MAILBOXES- TEMPORARY CONSTRUCTION
LAYOUT SHOW FOR PRICING ONLY.
G.4
G
F.4
F
E.4
E
D.4
D
A.7
B
B.5
C.5
C
765432
A.9
G.2
1 8
H
A
A.8
3.6
G.5
EXIST
MAINTENANCE
OFFICE
EXIST
LOADING
DOCK
EXIST
STORAGE
EXIST
STORAGE
EXIST ELEV
MACHINE
ROOM
EXIST ELEV
NO 3
EXIST STAIR
NO 3
EXIST
GENERATOR
ROOM
EXIST BOILER
ROOM
EXIST ELEV
NO 1 EXIST STAIR
NO 1
EXIST MEN
EXIST WOMEN
EXIST
JC
EXIST STAIR
NO 2
EXIST ELEV
NO 2
EXIST PUMP
ROOM
EXIST IT
EXIST
STORAGE
EXIST
STORAGE
EXIST CONF
EXIST
OFFICE
EXIST PRE FUNCTION
EXIST
MAILBOXES
EXIST CONF
EXIST CONF EXIST CONF EXIST CONF
EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE
EXIST CAFE
EXIST SERVICE
EXIST COPY
ROOM
EXIST OPEN
OFFICE
EXIST
SERVICE/
SECURITY
DESK
EXIST OFFICE
EXIST OFFICE
EXIST
STORAGE
EXIST OFFICE
EXIST
CORRIDOR
EXIST
KITCHEN
EXIST LUNCH
EXIST MECH
EXIST OFFICE
EXIST OFFICE
EXIST OFFICE
EXIST CONF EXIST CONF
EXIST
STORAGE
EXIST
STORAGE EXIST OFFICE
EXIST CONF
EXIST OFFICE EXIST OFFICE EXIST OFFICE
EXIST OFFICE
EXIST OFFICE
EXIST OPEN
OFFICE
EXIST OFFICE
EXIST
OFFICE
EXIST OFFICEEXIST OFFICE
EXIST
VESTIBULE
EXIST
MAINTENANCE
OFFICE
EXIST
MAINTENANCE
OFFICE
EXIST
LOADING
DOCK
EXIST
STORAGE
EXIST
STORAGE
EXIST ELEV
MACHINE
ROOM
EXIST ELEV
NO 3
EXIST STAIR
NO 3
EXIST
CORRIDOR
EXIST
GENERATOR
ROOM
EXIST BOILER
ROOM
EXIST ELEV
NO 1 EXIST STAIR
NO 1
EXIST MEN
EXIST WOMEN
EXIST
JC
EXIST STAIR
NO 2
EXIST ELEV
NO 2
EXIST
VESTIBULE
EXIST PUMP
ROOM
EXIST IT
EXIST
STORAGE
EXIST
STORAGE
EXIST
KITCHEN
EXIST CONF
EXIST
OFFICE
EXIST PRE FUNCTION
EXIST
MAILBOXES
EXIST CONF
EXIST CONF EXIST CONF EXIST CONF
EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE
EXIST CAFE
EXIST SERVICE
EXIST KITCHEN
EXIST COPY
ROOM
EXIST OPEN
OFFICE
EXIST
SERVICE/
SECURITY
DESK
EXIST OFFICE
EXIST OFFICE
EXIST
STORAGE
EXIST OFFICE
EXIST
CORRIDOR
EXIST
KITCHEN
EXIST LUNCH
EXIST MECH
EXIST OFFICE EXIST OFFICE
EXIST OFFICE
EXIST OFFICE
EXIST CONF EXIST CONF
EXIST CONF
EXIST
STORAGE
EXIST
OFFICE
EXIST
STORAGE EXIST OFFICE
EXIST OFFICE
EXIST CONF
EXIST OFFICE EXIST OFFICE EXIST OFFICE
EXIST OFFICE
EXIST OFFICE
EXIST OPEN
OFFICE
EXIST OFFICE
EXIST
UNISEX
EXIST
OFFICE
EXIST OFFICEEXIST OFFICE
EXIST
CORRIDOR
EXIST
VESTIBULE
EXIST
MAINTENANCE
OFFICE
30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0"
188' - 6"
10'-8"2'-8"1'-2"6'-6"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"6'-0"6'-2"8'-6"
150'-0"
N.I.C
N.I.CN.I.C
N.I.C
N.I.CN.I.C
N.I.C
N.I.C
N.I.C
N.I.C. - NOT IN CONTRACT
7
4
4
7
11 TYP.TYP.
6
6
TYP.
TYP.
8
TYP.
6
6
6
6
3
3
5
66 TYP.
10
10
10
1 TYP.
1 TYP.
1 TYP.
7 TYP.
7 TYP.
9TYP.
9TYP.
9 TYP.
6
1 TYP.
1 TYP.
1 TYP.
1 TYP.
1 TYP.
1 TYP.
4444
4
4
4
4
4
4
4
4
1 TYP.
1 TYP.
1 TYP.
1 TYP.
1 TYP.
1 TYP.
1 TYP.
1 TYP.
8
TYP.
8
TYP.
8 TYP.
6 TYP.
2
9 TYP.
11
DEMOLITION CEILING LEGEND
RECESSED CAN
LIGHT FIXTURE
2X4 PARABOLIC
(REUSE)
LINEAR SUSPENDED
REMOVE EXISTING LINEAR LIGHT FIXTURE AND
ASSOCIATED COMPONENTS TO FACILITATE WORK.
SALVAGE + COORDINATE STORAGE WITH OWNER
FOR REUSE.
MAIN DUCT WORK RUNS TO REMAIN. COORDINATE
WITH MECHANICAL DRAWINGS.
REMOVE EXISTING GYP. BD. CEILING, AND
ASSOCIATED COMPONENTS REQUIRED TO FACILITATE
WORK.
REMOVE EXISTING LAY-IN CEILING +GRID AND
ASSOCIATED COMPONENTS REQUIRED TO FACILITATE
WORK.
REMOVE EXISTING ACOUSTICAL PANEL CEILING
CLOUD AND ASSOCIATED COMPONENTS REQUIRED
TO FACILITATE WORK.
STORE EXISTING RECESSED CAN LIGHT FIXTURE FOR
RECYCLING /SALVAGE + COORDINATE STORAGE WITH
OWNER FOR REUSE.
REMOVE EXISTING ACOUSTICAL LAY-IN CLOUD AND
ASSOCIATED COMPONENTS.
EXISTING 2X4 PARABOLIC FIXTURE RECESSED.
SALVAGE + COORDINATE STORAGE WITH OWNER.
EXISTING LIGHT FIXTURE TO REMAIN. CONTRACTOR
TO CLEAN FIXTURE AND/OR LENS COVERS AFTER
CONSTRUCTION.
EXISTING CEILING TO REMAIN.
REMOVE EXISTING TRACK LIGHTING.
1
2
3
4
5
6
7
8
9
CEILING DEMOLITION - KEYNOTES
10
11
ALL WALLS, CEILINGS, DOORS AND FLOOR FINISHES
SHALL BE REMOVED UNLESS NOTED OTHERWISE OR
SHOWN AS REMAINING.
SEE MECH AND ELEC DEMO DRAWINGS FOR ADDITIONAL
DEMO WORK AND FOR SERVICES THAT MUST REMAIN
ACTIVE.
SAWCUT AND REMOVE FLOOR SLAB AS REQUIRED FOR
UTILITIES. COORDINATE WITH MECH AND ELEC DRAWINGS.
PATCH AND REPAIR ALL EXISTING MATERIALS
TO REMAIN AS NEEDED WHERE REMOVAL OF EXISTING
CONSTRUCTION OR WHERE THE REQUIRED OF NEW
CONSTRUCTION, ALTERS THE EXISTING MATERIALS.
DEMO DRAWINGS SHOW GENERAL INTENT AND AREA.
EXACT EXTENT IS TO BE DETERMINED BY FIELD
VERIFICATION AND COORDINATION WITH THE CONTRACT
DOCUMENTS. REFER TO PROJECT MANUAL FOR
ADDITIONAL REQUIREMENTS. ALL CONDITIONS SHALL
BE FIELD VERIFIED DURING BID PROCESS. NOTIFY
ARCHITECT AND/OR CONSTRUCTION MANAGER OF ALL
CONDITIONS AFFECTING INTENT OF NEW CONSTRUCTION.
ALL DOOR HARDWARE TO BE REMOVED AND SALVAGED.
TURN OVER TO OWNER'S REPRESENTATIVE UPON
COMPLETION OF DEMOLITION PHASE.
ALL ITEMS TO REMAIN SHALL BE CLEANED, INSPECTED
AND VERIFIED OF WORKING ORDER. NOTIFY ARCHITECT /
ENGINEER AND OWNER'S REPRESENTATIVE IF ANY ITEM
IS NOT IN WORKING ORDER.
CONTRACTOR TO LOCATE ON SITE INDIVIDUAL DUMPSTER
FOR RECYCLE DEMOLITION ITEMS PER N.I.H. REGULATIONS.
COORDINATE FINAL LOCATIONS WITH OWNER'S
REPRESENTATIVE.
EXISTING FIRE EXIT SIGNS, STROBES, HORNS,
SPEAKER AND SMOKE DETECTORS. SEE ARCHITECTURAL +
ELECTRICAL DRAWINGS.
CONTRACTOR TO REMOVE ALL FURNITURE, FILE CABINETS
AND STORAGE UNITS UNLESS OTHERWISE NOTED.
CONTRACTOR TO REMOVE ALL ART WORK, SIGNAGE,
MARKER BOARDS, TACK BOARDS, PROJECTION SCREENS
AND CLOCKS. SALVAGE AND COORDINATE STORAGE WITH
OWNER FOR REUSE. SEE ARCHITECTURAL FOR REUSE
LOCATION.
ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE
LOCAL AND STATE CODES.
SEE MECHANICAL, AND ELECTRICAL DEMOLITION DRAWINGS
FOR ADDITIONAL SCOPE OF DEMOLITION AND NEW WORK.
DEMOLITION - GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:35:43PM
AD2.01
First Floor Demolition
Reflected Ceiling Plan
02/22/13
C.M
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/8" = 1'-0"A5.05
1 DEMOLITION FIRST FLOOR REFLECTED CEILING PLAN
1/18/2013 QUALITY REVIEW
2/22/2013 PERMITS/BIDS
Date: Submitted for:
NOTE TO CONTRACTOR:
196 REUSED LENIAR LIGHTING FIXTURES. SAVE 20% FOR PARTS USED
FOR RETROFITTING FIXTURES. CONTRACTOR TO FEILD VERIFY LIGHTING
FIXTURE COUNT.
10
1
2
3
REMOVE EXISTING PARTITION, DOORS AND ASSOCIATED
COMPONENTS.
REMOVE PORTION OF WALL AND ASSOCIATED COMPONENTS
AS REQUIRED FOR NEW OPENING.
REMOVE PLUMBING FIXTURES, SEE MECH FOR ADDITIONAL
SCOPE.
RECEPTION DESK TO REMAIN FOR PRECONSTRUCTION
PHASE- REMOVAL, DEMOLITION TO BE COORDINATED WITH
CONSTRUCTION MANAGER.
REMOVE SIDE LITE, GLASS AND ASSOCIATED
COMPONENTS.
REMOVE CARPET TILE FLOOR AS REQUIRED FOR WORK.
SALVAGE FOR RECYCLING + COORDINATE STORAGE WITH
OWNER.
REMOVE TILE FLOORING IN CAFE.
REMOVE EXISTING MILLWORK/CASEWORK AND ASSOCIATED
COMPONENTS TO FACILITATE WORK.
REMOVE EXISTING EXHAUST FAN VENT FROM EXISTING
WINDOW PANE. SEE SHEET AD1.01 & MECH. FOR ADDITIONAL
SCOPE.
REMOVE EXISTING MAILBOXES AND ASSOCIATED
COMPONENTS TO FACILITATE WORK. SALVAGE AND
COORDINATE STORAGE WITH OWNER FOR REUSE. SEE A1.01
FOR REUSE LOCATION.
REMOVE EXISTING DOOR, FRAME AND ASSOCIATED
COMPONENTS TO FACILITATE WORK. (RECYLE DOORS).
COORDINATE WITH CM/OWNER FOR STORAGE.
REMOVE EXISTING ACOUSTICAL PANEL AND ASSOCIATED
COMPONENTS. EXISTING STUD FRAMING, GYP. BD. SOFFIT
AND GYP. BD. ON KITCHEN SIDE TO REMAIN.
REMOVE EXISTING EQUIPMENT.
REMOVE EXISTING ELECTRICAL EQUIPMENT. SEE ELEC. FOR
ADDITIONAL SCOPE.
REMOVE ROLLER SHADES AND SALVAGE FOR REUSE.
COORDINATE STORAGE WITH CM/ OWNER.
REMOVE EXISTING TUBE STEEL COLUMN AND HEADER
PATCH / REPAIR FLOOR AS NEEDED TO FACILITATE NEW
WORK.
REMOVE REACH-IN COOLER- STORE FOR REUSE-
COORDINATE WITH CM/ OWNER.
EXISTING CARPET TILES TO REMAIN DURING 1ST PHASE OF
DEMOLITION / CONSTRUCTION. TILE TO BE REMOVED AS
REQUIRED FOR WORK. SALVAGE FOR REYCLING,
COORDINATE STORAGE WITH OWNER. SEE SHEET AD1.02
FOR TEMPORARY CONSTRUCTION LAYOUT. COORDINATE
PHASING REMOVAL WITH CM / OWNER.
EXISTING CERAMIC FLOOR TILES TO REMAIN DURING 1ST
PHASE OF DEMOLITION / CONSTRUCTION. SEE SHEET AD1.02
FOR TEMPORARY CONSTRUCTION LAYOUT. FLOOR TILES TO
BE TO BE REMOVED AS REQUIRED FOR NEW WORK. FLOOR
AREA TO BE LEVELED, PATCHED, & PREPED FOR NEW FLOOR
FINISH. COORDINATE PHASING REMOVAL WITH CM / OWNER.
4
5
6
7
8
9
11
DEMOLITION - KEYNOTES
12
13
14
15
16
17
19
18
1
1
1
1
1
11
1
13
3
3
3
3
3 3
8
8
13
13
8
8
8
8
10 10
10
1
8
8
4
8
12
11
11
11
11
17
14
1
11
1
PICTURES TAKEN @ EXISTING CAFE ENTRY
PICTURES TAKEN @ RECEPTION AREA PICTURES TAKEN EXISTING
LUNCH ROOM AREA
PICTURES TAKEN @ MAIL
ROOM AREA
PICTURES TAKEN OF TYPICAL DEMOLITION CONDITIONS
PICTURES TAKEN @ EXISTING CAFE KITCHEN PICTURES TAKEN @
EXISTING CAFE RESTROOM
9
15
15
5
15
18
1818
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:36:09PM
AD3.01
Demolition Photos
02/22/13
SR
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/18/2013 QUALITY REVIEW
2/22/2013 PERMITS/BIDS
Date: Submitted for:
REMOVE EXISTING LINEAR LIGHT FIXTURE AND
ASSOCIATED COMPONENTS TO FACILITATE WORK.
SALVAGE + COORDINATE STORAGE WITH OWNER
FOR REUSE.
MAIN DUCT WORK RUNS TO REMAIN. COORDINATE
WITH MECHANICAL DRAWINGS.
REMOVE EXISTING GYP. BD. CEILING, AND
ASSOCIATED COMPONENTS REQUIRED TO FACILITATE
WORK.
REMOVE EXISTING LAY-IN CEILING +GRID AND
ASSOCIATED COMPONENTS REQUIRED TO FACILITATE
WORK.
REMOVE EXISTING ACOUSTICAL PANEL CEILING
CLOUD AND ASSOCIATED COMPONENTS REQUIRED
TO FACILITATE WORK.
STORE EXISTING RECESSED CAN LIGHT FIXTURE FOR
RECYCLING /SALVAGE + COORDINATE STORAGE WITH
OWNER FOR REUSE.
REMOVE EXISTING ACOUSTICAL LAY-IN CLOUD AND
ASSOCIATED COMPONENTS.
EXISTING 2X4 PARABOLIC FIXTURE RECESSED.
SALVAGE + COORDINATE STORAGE WITH OWNER.
EXISTING LIGHT FIXTURE TO REMAIN. CONTRACTOR
TO CLEAN FIXTURE AND/OR LENS COVERS AFTER
CONSTRUCTION.
EXISTING CEILING TO REMAIN.
REMOVE EXISTING TRACK LIGHTING.
1
2
3
4
5
6
7
8
9
CEILING DEMOLITION - KEYNOTES
10
11
1
2
11 1
2
9
2
7
3
6
3
6
4
8
5
6
1
7
4
8
TECHTOWN GENERAL LIGHTING CONDITIONS
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:36:28PM
AD3.02
Demolition Photos
02/22/13
SR
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/18/2013 QUALITY REVIEW
2/22/2013 PERMITS/BIDS
Date: Submitted for:
UP
UP
UP
DN
T
T
T
T
UP
UP
G.4
G
F.4
F
E.4
E
D.4
D
A.7
B
B.5
C.5
C
765432
A.9
G.2
6'-0"
ELEC
109
1 8
H
A
A.8
3.6
G.5
RECEPTION/SECURITY
DESK
129
STORAGE A
107
TECH TOWN
MANAGEMENT
103
STORAGE B
120
A5.08
KRESGE
CONNECT VIDEO
CONFERENCING
108
EVENT
SPACE 2
125
EVENT
SPACE 1
126
CONFERENCE
ROOM 1
127 CONFERENCE
ROOM 2
128
CONF
ROOM 5
124
TECH TOWN
CONF RM
105
DIRECTORS
OFFICE
104
COPY
CENTER
137
A5.01
4
A5.03
4
COORIDOR 4
119
ELEVATOR
LOBBY
102
MEETING
RM 4
117
MTG
RM 3
116
MTG
RM 2
115
MEETING
RM 1
114
A5.03
3
EXIST
MAINTENANCE
OFFICE
EXIST
LOADING
DOCK
EXIST
STORAGE
EXIST
STORAGE
EXIST ELEV
MACHINE
ROOM
EXIST ELEV
NO 3
EXIST STAIR
NO 3
EXIST
CORRIDOR
EXIST
GENERATOR
ROOM
EXIST BOILER
ROOM
EXIST STAIR
NO 1
EXIST MEN
EXIST WOMEN
EXIST
JC
EXIST STAIR
NO 2
EXIST ELEV
NO 2
EXISTING
FIRE PUMP
ROOMEXIST IT
COPIER/PRINTER
CO-WORKING
AREA - A
136
COORIDOR 1
110
PHONE
132
PHONE
133
PHONE
134
CO-WORKING
AREA - B
130
CO-WORKING
CONFERNCE
135
EXIST MECH
ROOM
COORIDOR 2
111
TRAINING/ACCELERATION
112
KITCHENETTE B
013 KITCHEN
AREA
131
5'-6"8'-0"5'-6"5'-10"8'-0"5'-10"
A5.03
6
3
A5.10
6'-2"
17' - 6"
A5.03
2
A5.01
1
30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0"
188' - 6"
10'-8"2'-8"1'-2"6'-6"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"6'-0"6'-2"8'-6"
150'-0"
KITCHENETTE A
106
B
A1
A1
A1
A1
A1
A1A1
B
B
A1
A
A1
A5.082
A6.01
1
WOOD BENCH
LOCKERS
B
A
A
C
A
B
B
A1 A1
A1
A1
1
A5.10
A1
A1
A1
A1
A1
C
A1
B
126A
125A
124123122
120
105
104
102
127
126B
128
125B
139
132 133 134109
117
114
126C
125C
VESTIBULE
101
13' - 0"
10'-11"+/-
5
1
A5.08
6
A5.087
A5.08
9
A5.0910
A5.08
10
8
A5.09 7
13'-4"+/-
EQ EQ
12'-6"42'-6"15'-0"5'-3"
EQEQ
44' - 11"
A5.03
5
19'-2"
6'-11"14'-4"5'-3"
A5.01
5
1' - 3"
LINE OF RECEPTION/
SECURITY DESK. SEE
A5.01
A6.01
2
A6.01
6
A6.01
4
A5.05
1
116
115
A5.01
2
A5.03
1
A5.03
8
103
108
112
15' - 0" 14' - 5" 15' - 0"
CONF
ROOM 4
123
CONF
ROOM 3
122
A5.10
7
4
A5.10
MAINTENANCE
ROOM
139
CLEAR OPENING
16' - 10"
CLEAR OPENING
20' - 0"
OPERABLE
PARTITION
1'-4"
1'-7"
LINE OF
OVERHEAD DOOR
ABOVE (TYP)
A6.01
3
A6.01
3
Sim
OPERABLE
PARTITION
A6.01
3
Sim
108A108B108C
A
A1
REPAIR EXIST
FLOOR TO MATCH
A5.09
A5.09
11
17'-8"
140
28'-1"
A
A
E
A
6"STUD
5'-2"
8'-6" TALL GYP BD
ON METAL STUD
PARTITION
A5.09
8
FEC
FEC
FEC
FEC
C
FEC
7'-6"
A5.09
14
A5.09
15
A5.10
5
2
A5.10
A5.09
15Sim
12
A5.09 12
Sim
A6.02
1
Sim
A6.02
1
Sim
A1
ALIGN EXIST
AND NEW
PARTITIONS
PARTITION TO
BE 6" STUD
FROMDESK
6'-6"CLEAR
VIDEO CONF. TV
OF/CI
A5.054
A5.05 5
6
6" STUD
PARTITION
VIDEO CONF.
TV OF/CI
VIDEO
CONF.
TV
OF/CI
N.I.C. - NOT IN CONTRACT
A6.02
13
ESTIMATED AREAS OF EXIST.
CONC. SLAB TO BE CUT AND
PATCHED FOR NEW
UNDERGROUND UTILITIES.
COORDINATE WITH
MECHANICAL AND
ELECTRICAL SHEETS FOR
EXACT LOCATIONS (TYP.)
CLEAR
9' - 2" 12' - 8"
A5.09
8 Sim
A1
A1
ALIGN
RECEPTIONDESK
WITHPARTITION
A6.02
12
EXISTING DOOR, SEE
DOOR SCHEDULE
SHEET A7.01
141
COORIDOR 3
121
MAIL BOXES
118
SAW CUT FLOOR AREAS FOR
UNDERGROUND UTILITIES
11' - 11"
10' - 7"
REMOVE EXISTING PANIC
DOOR HARDWARE. PROVIDE
NEW DELAYED EGRESS PANIC
HARDWARE PER BASIS OF
DESIGN DETEX DE EasyKit
IT SHALL BE EACH TRADE CONTRACTORS
RESPONSIBILITY TO VISIT THE SITE AND FAMILIARIZE
HIMSELF/ HERSELF WITH ALL EXISTING CONDITIONS.
EACH CONTRACTOR SHALL TAKE ALL NECESSARY FIELD
MEASUREMENTS AND OTHERWISE VERIFY ALL
DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS
INDICATED AND/ OR SHOWN ON THE DRAWINGS. SHOULD
ANY ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR
SHALL NOT PROCEED WITH THE WORK AFFECTED
THEREBY UNTIL REPORTING THE SAME TO THE
ARCHITECT AND OWNER REPRESENTATIVE FOR
CLARIFICATION AND/ OR CORRECTION.
DIMENSIONS FOLLOWED BY +/- SHALL BE REVIEWED
AND ALL NECESSARY ADJUSTMENTS MADE PRIOR TO
FABRICATION AND/OR INSTALLATION OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES
BEFORE PROCEEDING WITH THE WORK.
VERIFY QUANTITY, SIZE AND LOCATION OF ALL FLOOR
AND WALL OPENINGS FOR MECHANICAL AND ELECTRICAL
WORK WITH THE APPROPRIATE TRADE. PROVIDE ALL
OPENINGS SHOWN OR REQUIRED FOR COMPLETION OF
WORK.
PROVIDE FIRE WATCH DURING FIELD CUTTING AND
WELDING OPERATIONS MEETING OWNERS REQUIRED.
THE CONTRACTOR SHALL VERIFY THE EXISTENCE AND
LOCATION OF ALL UTILITIES IN WORK AREAS PRIOR TO
PROCEEDING WITH CONSTRUCTION. ALL DISCREPANCIES
SHALL BE DOCUMENTED AND FORWARDED TO ARCHITECT
AND OWNER REPRESENTATIVE OF ACTION.
IT IS THE CONTRACTOR RESPONSIBILITY TO INVESTIGATE
FIELD CONDITIONS AND PROVIDE AS NEEDED TEMPORARY
SUPPORTS, SHORING AND STRUCTURES AND
UNDERGROUND UTILITIES DURING EXECUTION ALL
PHASES OF WORK.
RELEVANT DIMENSIONS AND ELEVATIONS FOR
EQUIPMENT INSTALLATIONS SHALL BE VERIFIED AGAINST
MANUFACTURES CERTIFIED EQUIPMENT DRAWINGS.
ALL NEW GYPSUM BOARD CONSTRUCTION TO BE PRIMED
AND PAINTED TO MATCH THE EXISTING ADJACENT
CONSTRUCTION. VERIFY EXTEND OF PAINTING WITH
ARCHITECT AND OWNER REPRESENTATIVE FOR
CLARIFICATION AND/ OR ACTION. PROVIDE NEW WB-1 AT
NEWLY CREATED ROOMS PARTITIONS AND EXISTING
EXTERIOR CONCRETE WALLS (SEE 8.02 FOR FINISHES).
DO NOT SCALE DRAWINGS TO DETERMINE SIZES AND
DIMENSIONS. USE FIGURED DIMENSIONS ONLY.
DIMENSIONS ARE TO FINISHED
FACE OF WALLS UNLESS OTHERWISE NOTED. ALL
PERIMETER DIMENSION ARE FROM FACE OF PERIMETER
WALLS.
ALL PENETRATIONS TO RATED FLOORS, CEILINGS AND
WALLS SHALL BE SEALED AND FIRE STOPPED TO FIRE
RATING EQUAL TO THE CONSTRUCTION BEING
PENETRATED.
NEW WORK SHALL ALIGN TO MATCH EXISTING WORK
UNLESS NOTED OTHERWISE.
SEE SHEET A6.01 FOR WALL TYPE DETAILS.
ALL WORK TO CONFORM TO REQUIREMENTS OF THE
LOCAL AND STATE CODES.
CONSTRUCTION - GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
3/1/201312:09:45PM
A1.01
First Floor Plan
02/22/13
CM
Checker
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/8" = 1'-0"A5.05
1 FIRST FLOOR PLAN
NOTE TO CONTRACTOR
THIS IS A HISTORICALLY DESIGNATED BUILDING.
WINDOWS ARE TO REMAIN AS IS. CONTACT
ARCHITECT FOR ORIGINAL BUILDING DOCUMENTS
AND STATE HISTORIC PRESERVATION OFFICE
DOCUMENTS, IF REQUIRED.
1/18/2013 QUALITY REVIEW
2/22/2013 PERMITS/BIDS
S. LITTLE
Date: Submitted for:
D. THOMAS
G.4
G
F.4
F
E.4
E
D.4
D
A.7
B
B.5
C.5
C
765432
A.9
G.2
1 8
H
A
A.8
3.6
G.5
TECH TOWN
MANAGEMENT
103
DIRECTORS
OFFICE
104
TECH TOWN
CONF RM
105
STORAGE A
107
CONF
ROOM 5
124
?
?
ELEC
109
EVENT
SPACE 2
125
EVENT
SPACE 1
126
CONFERENCE
ROOM 1
127
CONFERENCE
ROOM 2
128
RECEPTION/SECURITY
DESK
129
VESTIBULE
101
COPY
CENTER
137
KRESGE
CONNECT VIDEO
CONFERENCING
108
STORAGE B
120
CO-WORKING
AREA - B
130
MEETING
RM 1
114
MTG
RM 2
115
MTG
RM 3
116
MEETING
RM 4
117
COORIDOR 1
110
CO-WORKING
AREA - A
136
PHONE
132
PHONE
133
PHONE
134
CO-WORKING
CONFERNCE
135
COORIDOR 2
111
ELEVATOR
LOBBY
102
COORIDOR 4
119
EXIST
MAINTENANCE
OFFICE
EXIST
LOADING
DOCK
EXIST
STORAGE
EXIST
STORAGE
EXIST ELEV
MACHINE
ROOM
EXIST ELEV
NO 3
EXIST STAIR
NO 3
EXIST
CORRIDOR
EXIST
GENERATOR
ROOM
EXIST BOILER
ROOM
EXIST STAIR
NO 1
EXIST MEN
EXIST WOMEN
EXIST
JC
EXIST STAIR
NO 2
EXIST ELEV
NO 2
EXIST PUMP
ROOM
EXIST IT
EXIST
MAINTENANCE
ROOM
EXIST MECH
ROOM
30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0"
188' - 6"
10'-8"2'-8"1'-2"6'-6"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"6'-0"6'-2"8'-6"
150'-0"
CONF
ROOM 3
122
CONF
ROOM 4
123
6'-1"
8' - 0"8' - 0"8' - 0"
8' - 6"
8' - 6"8' - 6"
8' - 0"
7' - 6"
7' - 6"
7' - 6"
8' - 0" 8' - 0" 8' - 0"
8' - 0"
8' - 0"
8' - 6"
A6.03
4
3' - 0" 14' - 0"
CENTER LINE
3'-0"12'-0"
7'-5"7'-5"
1'-8"
8' - 0" 8' - 0"
12'-0"1'-8"
14' - 0" 4' - 7" 14' - 0" 7' - 5"
23'-11"
11' - 9"
23' - 0"
11'-6"6'-5"
17' - 9"
8'-0"
17' - 10"
8'-0"
38' - 0"
14'-0"
6'-0"6'-0"
A6.02
15
7' - 6"
A6.03
4
Sim
4'-0"6'-0"4'-0"4'-0"6'-0"4'-0"
0' - 6"
38' - 0" 0' - 6"
0' - 6" 38' - 0"
0' - 6"
PROJECTOR
MOUNTED TO
UNDERSIDE OF
STRUCTURE
OF/CI (TYP.)
RETRACTABLE PROJECTOR OF/CI
EXISTING CEILING &
LIGHT FIXTURES
2x2 LAY-IN
ACOUSTIC
CEILING
CLOUD
(TYP.)
EXISTING CEILING
TO REMAIN
2X2
ACOUSTIC
LAY-IN
CEILING
2X2 ACOUSTIC LAY-IN
CEILING CLOUD. CENTER
IN ROOM (AT EVENT
SPACE 1 & 2 AND CONF.
ROOMS 1 & 2
EQ EQ
11' - 3" 11' - 3" 11' - 3" 5' - 8"
14'-0"(TYP.)7'-8"
8' - 6"
8' - 0"
8' - 0"
4'-8"4'-8"4'-8"4'-8"
LIGHTS TO BE
CENTERED ABOVE
ISLAND
ALIGN
A6.03
6
5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0"
5'-0"5'-0"5'-0"5'-0"5'-0"5'-0"2'-6"
6' - 1"
3' - 10"3' - 10"
HIDDEN LINE OF
GYP. BD. CEILING
ABOVE. SEE A5.03
17
A6.02
17
A6.02
Sim
EXPOSED
CEILING
EXPOSED
CEILING
CEILING PLAN LEGEND
LINEAR SUSPENDED
LINEAR SUSPENDED
(4) COMBINED IN
'X' FORMATION
(REUSE)
FABRIC CORD PENDANT
LIGHT (GROUP OF 5 LIGHTS)
LINEAR SUSPENDED
(REUSE)
2X4 PARABOLIC (REUSE)
SUPPLY AIR DIFFUSER
2'X4' RECESSED LIGHT
FIXTURE
4' LINEAR PENDANT LIGHT
WALL SCONCE
RECESSED DOWNLIGHT
2'X2' LAY-IN OR
ACOUSTICAL CLOUD
GYPSUM BOARD CEILING
PENDANT LIGHT (8" & 14")
RETURN AIR DIFFUSER
EXIT SIGN
N.I.C. - NOT IN CONTRACT
REFER TO SHEET AG.02 FOR FIRE RATED WALL
LOCATIONS.
REFER TO SHEET A1.01 FOR WALL TYPES.
REFER TO ROOM FINISH SCHEDULE FOR PAINTING
REQUIREMENTS.
REFER TO SHEET A8.03 FOR FURNITURE INFORMATION.
PROVIDE CEILING COORDINATION SHOP DRAWINGS FOR
ARCHITECT APPROVAL.
PATCH, REPAIR, CLEAN AND PREP CONCRETE CEILING
AND DUCTWORK FOR PAINT.
CEILING IS EXPOSED TO EXISTING CONCRETE
STRUCTURE AND PAINTED EXCEPT WHERE INDICATED.
COORDINATE ALL LIGHTING FIXTURES, POWER/DATA
OUTLETS, SWITCHES, PANELS, EQUIPMENT, AND
ASSOCIATED COMPONENTS WITH ELECTRICAL
DRAWINGS. REFER TO ELECTRICAL DRAWINGS FOR
ADDITIONAL SCOPE.
COORDINATE ALL MECHANICAL DIFFUSERS,
EQUIPMENT, FIRE PROTECTION AND ASSOCIATED
COMPONENTS WITH MECHANICAL DRAWINGS. REFER
TO MECHANICAL DRAWINGS FOR ADDITIONAL SCOPE.
COORDINATE ALL EGRESS, FIRE ALARM, STROBES,
EXIT SIGNS, PULL BOXES WITH FIRE PROTECTION AND
ELECTRICAL DRAWINGS.
ALL WORK TO CONFORM TO THE REQUIREMENTS OF
THE LOCAL AND STATE CODES.
CEILING GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:27:29PM
A2.02
First Floor Reflected
Ceiling Plan
02/22/13
CM
Checker
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/8" = 1'-0"A5.05
1 FIRST FLOOR REFLECTED PLAN
NOTE TO CONTRACTOR:
PROVIDE CEILING COORDINATION
SHOP DRAWING FOR ARCHITECT
APPROVAL INCLUDE ALL MECHANICAL/
ELECTRICAL RUNS.
S. LITTLE
Date: Submitted for:
1/18/2013 QUALITY REVIEW
2/22/2013 PERMITS/BIDS
NOTE TO CONTRACTOR:
EXISTING CONCRETE BEAMS + STRUCTURE PAINT PER FINISH SCHEDULE.
EXPOSED DUCTWORK IS REMOVED FROM ELEVATIONS (FOR CLARITY) PAINT TO
MATCH EXIST STRUCTURE ABOVE (SEE FINISH SCHEDULE).
LIGHTING REMOVED FROM ELEVATIONS (FOR CLARITY).
STOREFRONT SYSTEM GLASS TO BE TEMPERED (TYP.).
T
T
B
C
3
A5.092
1' - 5" 4' - 11" 3' - 5"
A6.01
5
6
A5.091
1'-6"8'-9"
A5.09
5
EQ EQ
3
4
10' - 6"
9
A6.02
5
A6.02
15'-10"
3' - 4"
RELOCATED
MAILBOXES (TYP.) COUNTER
TOP
COUNTER
TOP
C
43.6
MEETING
RM 4
117
MTG
RM 2
115
MTG
RM 3
116
11' - 11"
EQ EQ
14'-4"6'-11"
FEC
A5.09
16
A5.09
16Sim
SEE SHEET A5.06
FOR ELEVATIONS &
MILLWORK
E
4
ELEC
109
1'-1"6'-5"
A5.08
3
6'-1"
EXISTING
TRANSFORMER
(ABOVE)
LINE OF CEILING
ABOVE. SEE A2.02
ALIGN
11'-11" ALIGN WITH IT WALL
INFORMATION KIOSK
AREA, MILLWORK
TO BE DETERMINED
BY OWNER
4
H
VESTIBULE
101
4'-11"
ALIGN
EXISTING GYP BD
WALLS TO REMAIN
(PAINT PER FINISH SCHEDULE)
SHEET A8.02.
F
E.4
E
32
KRESGE
CONNECT VIDEO
CONFERENCING
108
A5.10
7
A6.01
8
A
AA
A
D
10' - 8" 17' - 6" 7' - 6"
EQEQ
0' - 5"
CENTERPARTITIONTOROOM
12'-8"
CENTER
LINE
2'-0"
2'-0"
CLOSET SHELF, MOUNTED
WITH METAL ROD
COUNTERTOP ON
BASE CABINETS
1' - 0"
3
A6.02
LINE OF GYP. BD. CEILING
ABOVE. COORDINATE WITH
SHEET A2.02 & SECTION 4
ON SHEET A5.10
AUDIO VISUAL
EQUIPMENT CLOSET
E
7 8
ALIGN
EQ EQ EQ
A6.02
1
7'-6"
1' - 4"
1'-4"
SS-1 SHELF
@ 20" A.F.F.
(TYP.)
H
COPY
CENTER
137
A6.02
2
ALIGN
A5.054
A5.05 5
COPIER EQUIPMENT.
OF/CI
2' - 0" 5' - 0" 4' - 0"
4'-0"10'-0"
LINE OF CEILING
CLOUD ABOVE.
SEE SHEET A2.02
WALL CABINETS ABOVE
COPY CENTER
ISLAND. SEE
5/A5.05
BASE CABINET
COUNTER TOP.
SEE 4/A5.05
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:28:29PM
A5.03
Enlarged Plans
02/22/13
D. Thomas
Checker
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/4" = 1'-0"A1.01
4 ENLARGED PLAN - MAIL BOXES
1/4" = 1'-0"A1.01
3 ENLARGED PLAN - MEETING ROOMS
1/4" = 1'-0"A1.01
2 ENLARGED PLAN - INFORMATION/BULLITEN
1/4" = 1'-0"A1.01
1 ENLARGED PLAN - VESTIBULE
1/4" = 1'-0"A1.01
8
ENLARGED PLAN -
KRESGE CONNECT - VIDEO CONFERNCING
1/4" = 1'-0"A1.01
5 ENLARGED PLAN - PHONE BOOTHS
1/4" = 1'-0"A1.01
6 ENLARGED PLAN - COPY CENTER
S. LITTLE
Date: Submitted for:
1/18/2013 QUALITY REVIEW
2/22/2013 BIDS/PERMITS
43.6
8'-0"
2'-2"
ELECTRONIC
EQUIPMENT
TO BE
DETERMINED
BY OWNER
GYP. BD.
HANGING
SOFFIT
INFORMATION
KIOSK AREA,
MILLWORK TO
BE DETERMINED
BY OWNER
CORRIDOR 2 CORRIDOR 1
D C.5 C
20' - 2"
GLASS + ALUM.
STOREFRONT SYSTEM.
ALL GLASS TO BE
TEMPERED (SEE A7.01)
7'-2"
EQEQEQEQ
17' - 0" (5 EQUAL SPACES)DOOR OPENING
E.4ED.4DB.5 C.5C
EXISTING GYPSUM
BOARD FOR FINISHES
SEE: SCHEDULE
WOOD SLIDING DOOR WITH GLASS
(EXPOSED DOOR HARDWARE CLEAR
ANODIZED FINISH)
EXIST IT ROOM DOOR
FLOATING GYP. BD.
SOFFIT SUSPENDED
FROM STRUCTURE
ABOVE
WALL BASE PER SCHEDULE
NEW GYP. BD.
GYP. BD. CONTROL
JOINT BETWEEN NEW
+ EXISTING GYP. BD.
HOLLOW METAL DOOR
AS SCHEDULED
INFORMATION KIOSK
MILLWORK TO BE
DETERMINED BY OWNER
F.4 F E.4
15' - 11" 17' - 10"
TECHTOWN MANAGEMENT KRESGE CONNECT
GLASS + ALUM.
STOREFRONT WINDOW
SYSTEM - ALL GLASS
TO BE TEMPERED (SEE
SHEET A7.01)
GYP. BD. PAINT
PER SCHEDULE
9' - 9" (3 EQUAL SPACES)
AS SCHEDULED
DOOR OPENING
AS SCHEDULED
DOOR OPNG. 14' - 8" (5 EQUAL SPACES)
7'-2"
EQEQEQEQ
7'-2"
EQEQEQEQ
5/8" EXISTING GYP. BD - PAINT
PER FINISH SCHEDULE
EXISTING ENTRY +
STOREFRONT TO REMAIN
2" BASE PER
SCHEDULE
EXIST FIN TUBE TO REMAIN.
PAINT TO MATCH CONCRETE
WALL (SEE SCHEDULE)
GYP. BD. CONTROL JOINT
COPY CENTER ISLAND
MILLWORK (SEE A5.05).
PT-1 FACE AND
UNDERSIDE OF
GYP. BD. SOFFIT
EXIST ROLLING
SHADES
REINSTALLED AT
ALL EXTERIOR
WINDOWS (TYP.)
GYP. BD. SOFFIT
SUSPENDED FROM
STRUCTURE ABOVE
LINE OF GYP. BD. CEILING
BEYOND
A6.02
11
Sim
F E.4 E D.4 D B.5C.5 C
EXISTING CONCRETE
BEAM STRUCTURE +
DUCTWORK
PT -1 @ FACE AND UNDERSIDE OF
GYP. BD. SOFFIT. SEE A2.02 FOR
REFERENCE
GYP. BD. CONTROL JOINT
@ ALIGNMENT IF EXISTING
+ NEW GYP. BD.
2" BASE PER SCHEDULE
EXISTING GYP. BD. PT-2
SLIDING WOOD DOOR
W/GLASS - EXPOSED ALUM.
HARDWARE
EXIST. COLUMN
INFORMATION KIOSK
MILLWORK TO BE
DETERMINED BY OWNER
EXIST. COLUMN
8'-0"
EXISTING COLUMN
GYP. BD. SOFFIT
SUSPENDED FROM
STRUCTURE ABOVE
A6.02
10
A6.02
11
6 5 4'x8' SHEETS OF BALTIC BIRCH
PLYWOOD PRE-FINISHED WITH
HIDDEN FASTENERS
CONFERENCE ROOM SIGNAGE
OF/CI (TYP.)
WOOD DOOR W/ GLASS (SEE FLOOR PLAN AND
DOOR SCHEDULE FOR DOOR TYPES AND
ADDITIONAL INFORMATION
654' x 8' SHEETS OF BALTIC
BIRCH PLYWOOD
PRE-FINISHED W/ HIDDEN
FASTENERS
EXTEND PLYWOOD TO UNDERSIDE
OF DECK AND ABOVE DUCTWORK
GLASS + ALUM.
STOREFRONT SYSTEM.
SEE SHEET A7.01 FOR
ADDITIONAL INFORMATION
CORRIDOR 1 KITCHEN
3/4" REVEAL 20' - 2" (6 EQUAL SPACES) 20' - 2" (6 EQUAL SPACES)
7'-2"
EQEQEQEQ
-
---
4 3.6
GYP. BD.
CONTROL JOINT
FINISH OF EXISTING
GYP. BD. TO BE
DETERMINED BY
OWNER
7' - 0"
(2 EQ. SPACES)
3' - 9"
SCHEDULED
DOOR AS
GLASS + ALUM.
STOREFRONT SYSTEM
EQEQEQEQ
7'-2"
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:28:50PM
A5.08
Interior Elevations
02/22/13
C.M.
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/4" = 1'-0"A5.03
3 ELEV OF KIOSK INFORMATION AREA
1/4" = 1'-0"A1.01
2 EXTERIOR ELEV OF TRAINING ROOM
1/4" = 1'-0"A1.01
5 WEST ELEV AT MEETING ROOMS
1/4" = 1'-0"A1.01
1 EXTERIOR ELEV AT TECH TOWN MANAGEMENT
1/4" = 1'-0"A1.01
6 ELEV AT COPY CENTER
1/4" = 1'-0"A1.01
7 ELEV AT EAST WALL OF MEETING ROOMS
1/4" = 1'-0"A1.01
9 ELEV AT COORIDOR 3 (LOOKING SOUTH)
1/4" = 1'-0"A1.01
10 ELEV AT CONF ROOMS 1 & 2 (LOOKING NORTH)
1/4" = 1'-0"A1.01
8 ELEV AT ELEVATOR LOBBY
NOTE TO CONTRACTOR:
EXISTING CONCRETE BEAMS
+ STRUCTURE PAINT PER
FINISH SCHEDULE.
EXPOSED DUCTWORK IS
REMOVED FROM ELEVATIONS
(FOR CLARITY) PAINT TO
MATCH EXIST STRUCTURE
ABOVE (SEE FINISH SCHEDULE).
LIGHTING REMOVED FROM
ELEVATIONS (FOR CLARITY).
STOREFRONT SYSTEM GLASS
TO BE TEMPERED (TYP.).
Quality Review 1/18/2013
1/18/2013 QUALITY REVIEW
Date: Submitted for:
2/22/2013 BIDS/PERMITS
E.4 E D.4 D B.5C.5 C
1
A5.10
4'x 8' SHEETS OF BALTIC BIRCH
PLYWOOD PRE-FINISHED
WITH HIDDEN FASTENERS
WOOD DOOR WITH
FULL GLASS (TYPICAL)
+ ALUMINUM FRAME
OVERHEAD DOOR
(HANGER STYLE)
EXISTING CONCRETE
BEAM & STRUCTURE
CORRIDOR 3
RECEPTION
3/4" REVEAL AT BASE OF
PLYWOOD PANELS
1
A6.03
Sim
B.5
4" MTL STUD -
SUPPORT (BEYOND)
COUNTER SS-1COUNTER SS-1
2" BASE AS
SCHEDULED
RELOCATED
MAILBOXES
3'-0"
B.5B.5
RELOCATED
MAIL BOXESCOUNTER
SS-1
A6.02
4
6'-3"
2" BASE AS
SCHEDULED
3
COUNTER SS-1
2" BASE AS
SCHEDULED
GYP. BD. PAINT
RELOCATED
MAIL BOXES
BEYOND
GYP. BD. PAINT
E.4ED.4DB.5 C.5C
CONFERENCE ROOM
SIGNAGE OF/CI (TYP.)
BUTT SEAMS (NO EXPOSED
FASTENERS) TYPICAL
BALTIC BIRCH PLYWOOD TO UNDERSIDE
OF DECK (ABOVE DUCTWORK)
CORRIDOR
3/4" REVEAL AT BASE OF
PLYWOOD PANELS
RECEPTION
3
RELOCATED
MAILBOXES
EXIST CONC
COLUMN
(BEYOND)
GYP. BD. PAINT
2" BASE TYP.
COUNTER SS-1
GYP. BD. PAINT
3
GYPSUM BOARD
PAINT (TYPICAL)
EXISTING
CONCRETE
BEAM +
STRUCTURE
GYPSUM BOARD
PAINT (TYPICAL)
2" BASE (TYP.)
GYP. BD. PAINT
DRY ERASE PAINT
(THIS AREA)
4'-0"3'-0"
10' - 3"
GYP. BD. PAINT
8'-6"
EXISTING CONCRETE
BEAM + STRUCTURE
KITCHEN MILLWORK
SEE 5/A5.01
GYP. BD. PAINT
2" BASE (TYP.)
F
REMOVE EXIST FILM COATING
FROM EXISTING GLAZING (TYP. ALL PANES
IN OLD RESTROOM)
REMOVE EXISTING EXHAUST LOUVER.
REPLACE W/GLAZING PANE TO
MATCH EXIST
REMOVE EXIST PARTITIONS AND
CEILING. SEE AD1.01 & AD2.01 FOR
ADDITIONAL SCOPE
REMOVE EXIST
TOILET FIXTURES
AND ACCESSORIES.
SEE AD1.01 & MECH DWG
FOR ADDITIONAL
SCOPE
REMOVE EXIST MILLWORK. SEE
AD1.01 FOR ADDITIONAL SCOPE
6
EXIST FIN TUBE TO
REMAIN. PAINT TO
MATCH CONCRETE
WALL (SEE FINISH
SCHEDULE)
(HISTORICAL)
EXISTING
WINDOW.
ROLLING SHADE
(SEE FINISH
SCHEDULE)
EXITING CONCRETE BEAM.
PAINT (SEE SCHEDULE)
EXISTING GYP. BD..
PAINT (SEE SCHEDULE)
EXISTING
CONCRETE
BEAM +
STRUCTURE
ACOUSTIC LAY-IN
CEILING CLOUD
SUSPENDED FROM EXIST
STRUCTURE ABOVE
CENTER CLOUD IN
ROOM.
SEE A2.02
GYP. BD. - PAINT
2" BASE PER SCHEDULE
LIGHTING FIXTURE
AS SCHEDULED
(TYP.)
CONFERENCE ROOM 1
EXISTING COLUMN
8'-6"
DRY ERASE PAINT
THIS AREA
4'-0"3'-0"
B.5C
DRY ERASE
PAINT THIS
AREA
2" BASE (TYP.)
2'X2' ACOUSTIC LAY-
IN CEILING
SUSPENDED FROM
STRUCTURE ABOVE
GYP. BD. PAINT
4'-0"3'-0"
4 3.6
2" BASE AS
SCHEDULED
EXIST
COLUMN
3'-0"4'-0"
7'-6"
DRY ERASE
PAINT THIS
AREA
ACOUSTIC LAY-IN
CEILING SUSPENDED
FROM STRUCTURE
ABOVE
GYP. BD. -
PAINT
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:29:05PM
A5.09
Interior Elevations
02/22/13
C.M / C.B
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/4" = 1'-0"A1.01
10 ELEV AT EVENT SPACE 1 & 2 (LOOKING WEST)
1/4" = 1'-0"A5.03
1 ELEV AT MAIL BOX ISLAND (LOOKING WEST)
1/4" = 1'-0"A5.03
2 ELEV AT MAIL BOX AREA (LOOKING WEST)
1/4" = 1'-0"A5.03
6 ELEV AT MAIL BOX ISLAND (LOOKING EAST)
1/4" = 1'-0"A5.03
5 ELEV AT MAIL BOX ISLAND (LOOKING SOUTH)
1/4" = 1'-0"A1.01
7 ELEV AT EVENT SPACE (LOOKING EAST)
1/4" = 1'-0"A5.03
3 ELEV AT MAIL BOX (LOOKING SOUTH)
1/4" = 1'-0"A5.03
4 ELEV AT MAIL BOX (LOOKING NORTH)
1/18/2013 QUALITY REVIEW
1/4" = 1'-0"A1.01
11 ELEV AT CONF 4
1/4" = 1'-0"A1.01
8 ELEV AT KITCHEN (LOOKING SOUTH)
1/4" = 1'-0"AD1.01
13 ELEV AT EXIST RESTROOM/LOUNGE
1/4" = 1'-0"A1.01
14 TYPICAL INTERIOR ELEV AT EXTERIOR WINDOW
1/4" = 1'-0"A1.01
15 ELEV AT CONFERENCE ROOM 1
1/4" = 1'-0"A1.01
12 ELEV AT CONF ROOM 3
1/4" = 1'-0"A5.03
16 ELEV AT MEETING RM 4
Date: Submitted for:
2/22/2013 BIDS/PERMITS
NOTE TO CONTRACTOR:
EXISTING CONCRETE BEAMS
+ STRUCTURE PAINT PER
FINISH SCHEDULE.
EXPOSED DUCTWORK IS
REMOVED FROM ELEVATIONS
(FOR CLARITY) PAINT TO
MATCH EXIST STRUCTURE
ABOVE (SEE FINISH SCHEDULE).
LIGHTING REMOVED FROM
ELEVATIONS (FOR CLARITY).
STOREFRONT SYSTEM GLASS
TO BE TEMPERED (TYP.).
1ST LEVEL
0' - 0"
2ND LEVEL
13' - 0"
6 5
A6.03
2
VERTICAL OPERABLE
PARTITION POCKET
ENCLOSURE
STL SUPPORT (TYP)
EXISTING CONC BEAM
(BEYOND)
1
A6.03
EXISTING COLUMNEXISTING COLUMN
LOCATE GYP. BD. ACCESS
PANELS AT OPERABLE PARTITION
MOTOR (TYP.)
OVERHEAD
HANGING STYLE
DOOR
VERTICAL OPERABLE
PARTITION
CORRIDOR 2
CEILING HANGERS AS
REQUIRED (TYP.)
CEILING AS
SCHEDULED
1ST LEVEL
0' - 0"
2ND LEVEL
13' - 0"
E.4ED.4DB.5 C.5C
8'-0"
OVERHEAD DOOR
OPENING BEYOND
EXIST COLUMN
(BEYOND)
OPERABLE
PARTITION
OVERHEAD DOOR
CONTROLLER
(BEYOND)
OVERHEAD DOOR
OPENING BEYOND
DOOR BEYOND
(TYP)
8'-0"
A6.03
3
A7.01
16
DOOR BEYOND
ACOUSTIC LAY-IN
CEILING
ACOUSTICAL LAY-IN
CEILING CLOUD
PROJECTOR MOUNTED
TO STRUCTURE ABOVE
OF/CI
PROJECTOR MOUNTED
TO STRUCTURE ABOVE
OF/CI
VERTICAL OPERABLE
PARTITION CONTROL
SWITCH. SEE SECTION
2, THIS SHEET FOR
LOCATION DIMENSIONS
1ST LEVEL
0' - 0"
2ND LEVEL
13' - 0"
F E.4 E
RETRACTABLE CEILING MOUNTED
PROJECTOR WITH STL SUPPORT
MOUNTED TO EXIST STRUCTURE
ABOVE. OF/CI
A6.02
6
A6.06
1
SIM.
PARTITION BEYOND.
SEE A1.01 FOR
PARTITION TYPES
EXISTING PARTITION
2X2 ACOUSTIC LAY-IN
CEILING. SEE A2.02
GYP. BD. CEILING SEE A2.02.
ALIGN WITH PARTITION
BEYOND
8'-6"
8'-0"
PARTITION BEYOND
A6.02
8
WALL MOUNTED
PROJECTION
SCREEN OF/CI
1ST LEVEL
0' - 0"
2ND LEVEL
13' - 0"
E D.4 D C.5 C
0' - 6" 0' - 6"
4'-0"
VERTICAL OPERABLE
PARTITION CONTROL
SWITCH
CONFERENCE ROOM 3
CONFERENCE ROOM 1 EVENT SPACE 1 EVENT SPACE 2
VERTICAL OPERABLE PARTITION
8'-6"
8'-6"
DOOR BEYOND DOOR BEYOND
WALL MOUNTED
PROJECTION
SCREEN OF/CI
WALL MOUNTED
PROJECTION
SCREEN OF/CI
ACOUSTICAL LAY-IN
CEILING CLOUD
ACOUSTICAL
LAY-IN CEILING
CLOUD
CEILING HANGERS AS
REQUIRED (TYP.)
EXISTING CONCRETE
BEAM + STRUCTURE
WALL MOUNTED
PROJECTION SCREEN
OF/CI
PROJECTOR
OF/CI
GYP. BD. PAINT
PER SCHEDULE
2" BASE AS SCHEDULED
F.4
4'-0"3'-0"
GYP. BD. PAINT
PER SCHEDULE
DRY ERASE PAINT
(THIS AREA)
2" BASE AS
SCHEDULED
EXISTING CONCRETE
BEAM + STRUCTURE
3 2
CEILING AS
SCHEDULED
EXISTING CONCRETE
STRUCTURE
2" BASE AS
SCHEDULED
A6.02
7
8'-0"
A6.02
7
Sim
(7) 30" BASE CABINETS = 17' - 6"
SS-1 COUNTER TOP WITH
4" BACK SPLASH
BI-FOLD DOORS.
SEE A1.01 AND
A7.01 FOR DOOR
TYPES (TYP.)
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:29:36PM
A5.10
Interior Sections
02/22/13
C.M / D.T
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1/4" = 1'-0"A1.01
1 SECTION @ EVENT SPACE 2
1/4" = 1'-0"A1.01
3 SECTION THROUGH CONF ROOMS & EVENT SPACES
1/4" = 1'-0"A1.01
4 KRESGE CONNECT-VIDEO CONFERENCING
1/4" = 1'-0"A1.01
2 SECTION AT EVENT SPACES 1 & 2
1/4" = 1'-0"A1.01
5 ELEV AT TECHTOWN CONF ROOM (SOUTH WALL)
1/4" = 1'-0"A1.01
6 ELEV AT TECHTOWN CONF ROOM (EAST WALL)
1/4" = 1'-0"A1.01
7 ELEV AT KRESGE CONNECT-VIDEO CONFERENCING
Date: Submitted for:
NOTE TO CONTRACTOR:
EXISTING CONCRETE BEAMS
+ STRUCTURE PAINT PER
FINISH SCHEDULE.
EXPOSED DUCTWORK IS
REMOVED FROM ELEVATIONS
(FOR CLARITY) PAINT TO
MATCH EXIST STRUCTURE
ABOVE (SEE FINISH SCHEDULE).
LIGHTING REMOVED FROM
ELEVATIONS (FOR CLARITY).
STOREFRONT SYSTEM GLASS
TO BE TEMPERED (TYP.).
1/18/2013 QUALITY REVIEW
2/22/2013 BIDS/PERMITS
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20138:23:01PM
A5.11
3-D Interior Views
02/22/13
D.T
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1 VIEW LOOKING EAST FROM LOBBY2 VIEW FROM EVENT SPACE 2 LOOKING EAST
3 VIEW OF MAILBOX AREA
Date: Submitted for:
1/18/2013 QUALITY REVIEW
2/22/2013 BIDS/PERMITS
C
3
CAULK WHERE COL
& WALL MEET
COUNTERTOP
WD BLOCKING
WHERE REQUIRED
CAULK WHERE
GYP BD & COLUMN
MEET (TYP)
GYP. BD. ON MTL STUDS
@ 16" O.C. (TYP.)
ALIGN
ALUM STOREFRONT
SYSTEM
SS-1
COUNTERTOP
EXIST RELOCATED
MAILBOXES
ALIGN
EXIST COL
A
A
2' - 10"
WOOD TRIM
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
5/8" GYP BD
4" MTL STUD
(6" METAL STUD
WHERE NOTED ON
PLAN).
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
(TYPE A1)
0' - 5"
CEILING AS
SCHEDULED
UNDERSIDE OF
EXISTING CONC.
STRUCTURE
ACOUSTIC
INSULATION
AT PARTITION
TYPE A1 ONLY
1/2" PLYWOOD
PANEL
SECURED W/
HIDDEN
FASTENERS
4" MTL STUD
5/8" GYP BD
WALL BASE
RE: SCHEDULE
0' - 6"
ACOUSTIC
INSULATION
CEILING AS
SCHEDULED
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
UNDERSIDE
OF EXISTING
CONC.
STRUCTURE
0'-5 1/2"
5
5/8" GYP BD (BOTH SIDES)
(RE: PLAN FOR WALL TYPE)
0' - 5"0' - 5"
SEALANT
BOTH SIDES (TYP)
ALUM STOREFRONT
SYSTEM W/ FULL GLASS
(TYP)
1' - 0"
1/2"
RE: ARCHITECTURAL PLAN
FOR WALL TYPE
E
5
CAULK AT COLUMN
(TYP.)
WD BLOCKING
WHERE REQD
(TYP)
GYP. BD. ON
MTL STUDS @
16" O.C. (TYP.)
EXIST CONC COLUMN
RE: ARCHITECTURAL
PLAN FOR
WALL TYPE
EVENT SPACE 1
CONFERENCE
ROOM 1
CONFERENCE
ROOM 2
D
6
OPERABLEPARTITION
1'-1"(TYP.)@
VIF
2' - 3"
VIF
2' - 0"
EXIST COL
OPERABLE
PARTITION
WD BLOCKING
WHERE REQD
1' - 3"
5/8"GYP BD
ON 3 5/8" MTL STUD
(BOTH SIDES)
B
D D
D
5
EXIST CONC COL
VIF
1' - 5"
VIF
1' - 5"
1'-1"
EVENT SPACE 2
EVENT SPACE 1
CAULK AT COLUMN
(TYP.)
D
D
F
3
CAULK
TYPICAL
AT COLUMN
WD BLOCKING
WHERE REQD
GYP. BD. ON
MTL STUDS @
16" O.C. (TYP.)
D
D D
D
EXIST COL
KRESGE CONNECT
VIDEO CONFERENCING
5/8" TYPE X
GYP BD
0' - 5"
CEILING AS
SCHEDULED
CONTINUOUS
ACOUSTIC
SEALANT EACH
SIDE
GYP. BD.
CLOSURE
UNDERSIDE
OF EXISTING
CONC.
STRUCTURE
4" MTL STUD
1 HOUR RATED
UL DESIGN U465
BASE AS
SCHEDULED
5/8" GYP BD
4" MTL STUD
0' - 5"
UNDERSIDE
OF EXISTING
CONC STRUCTURE
CEILING AS
SCHEDULED
CONTINUOUS
ACOUSTIC
SEALANT
EACH SIDE
CONTINUOUS
ACOUSTIC SEALANT
EACH SIDE
5/8" GYP BD
HORIZONTAL
MTL BRACING
ACOUSTIC
INSULATION 0' - 5"
1/2" FIRE RESISTANT
PLYWOOD PAINTED
TO MATCH WALL TYPE. UNDERSIDE OF
EXISTING CONC.
STRUCTURE
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
3/1/201312:10:00PM
A6.01
Wall Types + Interior
Plan Details
02/22/13
D. Thomas
S. Little
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1 1/2" = 1'-0"A5.03
5 PLAN DETAIL @ MAIL BOXES COUNTER
1 1/2" = 1'-0"
A & A1 GYPSUM BOARD WALL
1 1/2" = 1'-0"
B GYPSUM BOARD WALL WITH PLYWOOD PANELS
1 1/2" = 1'-0"A1.01
2 PLAN DETAIL @ CONF RM 1 & 2
1 1/2" = 1'-0"A1.01
1 PLAN DETAIL @ CONF RM 2
1 1/2" = 1'-0"A1.01
3 PLAN DETAIL @ CONF RM & EVENT SPACE 1
1 1/2" = 1'-0"A1.01
4 PLAN DETAIL @ OPERABLE PARTITION
1 1/2" = 1'-0"A1.01
6 PLAN DETIAL @ OPERABLE PARTITIONS
1 1/2" = 1'-0"A5.03
8 PLAN DEAIL @ KRESGE CONNECT
1 1/2" = 1'-0"
C GYPSUM BOARD FIRE RATED WALL
1 1/2" = 1'-0"
D GYPSUM BOARD WALL (1 SIDED)
1 1/2" = 1'-0"A5.01
E GYPSUM BOARD CHASE WALL
1/18/2013 QUALITY REVIEW
2/22/2013 PERMITS/BIDS
Date: Submitted for:
EXIST STEEL COLUMN 5/8" GYP BD ON METAL STUDS @ 16" O.C.
SEE A1.01 FOR PARTITION TYPES
SEALANT
BOTH SIDES
EXISTING
STOREFRONT
8
VIF
3 1/4"
EXISTING WINDOW
MULLION
TAPE & FLOAT
5/8" GYP BD
ON METAL STUDS
NEOPRENE GASKET
W/ ADHESIVE
PROVIDE ACOUSTIC
INSULATION BETWEEN
ALUM. CHANNELS
.063 ALUM. ENCLOSURE
FINISH TO MATCH ALUM.
WINDOW - SET IN SEALANT
AND SECURE TO WINDOW
AND ALUM. CHANNEL WITH
COUNTERSUNK SCREWS
@ 6" O.C.
90.00°
FIXTU
R
ES
TO
C
EN
TER
AR
R
AN
G
E
LIG
H
T
FIXTU
R
ES
TO
C
EN
TER
AR
R
AG
N
G
E
LIG
H
T
NOTE:
EXISTING FIXTURES ARRANGED IN
LAYOUT ABOVE AT AREAS SHOWN ON
CEILING PLAN (A2.02). SEE DETAIL 16,
THIS SHEET FOR ISOMETRIC VIEW AND
TYPICAL MOUNTING HEIGHTS
CONTRACTOR TO MOUNT LOWER FIXTURE
AT 8'-0" FROM FINISHED FLOOR TO BOTT.
OF LIGHT FIXTURE
CONTRACTOR TO MOUNT HIGHER FIXTURE
AT 8'-6" FROM FINISHED FLOOR TO BOTT.
OF LIGHT FIXTURE
VAREIS
SPACER
(TYP)
LIGHT FIXTURE
(TYP)
10'-53/4"+/-
4'-2"
0'-8"
5'-6"A.F.F.
0'-4"
1' - 4"
0' - 4"
0'-3"
SOLID SURFACE
SHELF & BRACKET @
36" O.C. MAX. PROVIDE
BRACE @ EACH END
GYP. BD. ON METAL
STUD. SEE SHEET A1.01
FOR PARTITION TYPES
1 1/2" DIA. METAL ROAD W/
END BRACKETS
WALL REINFORCEMENT
STUD FRAMING
1' - 6"
0'-2"
3'-0"A.F.F.
SOLID SURFACE
BRACKETS (3 EQUALLY
SPACED)
SOLID SURFACE
COUNTER TOP
WALL REINFORCEMENT
STUD FRAMING
SEALANT
4" MTL STUD
WITH FRAMING
@ 16" O.C. (TYP.)
5/8" GYP. BD. ON
METAL STUD (TYP.)
RELOCATED
MAILBOXES
1X2 WD TRIM (TYP.)
HORIZONTAL
BRACING
SLOPE
3/4" FIRE RESISTANT
PLYWOOD PAINTED
TO MATCH WALL TYPE
3' - 3"
2'-5"
VIF
3'-2"
6'-1"0'-3"
RELOCATED
MAILBOXES
GYP. BD. ON METAL
STUD. SEE A1.01 FOR
PARTITION TYPES
1' - 6"
1' - 6"
WIRE HANGERS AS
REQUIRED FOR
SUSPENDED CEILINGS
0'-6"
SEEPLAN
0' - 8"
CEILING AS SCHEDULED
5/8" GYP. BD.
ON METAL STUDS
@ 16" O.C. SECURE
TO STRUCTURE ABOVE
ALUM FRAME
EDGE WITH
MATCHING FINISH
CORNER BEAD
0' - 6"
EXISTING PARTITION
SEE A1.01
WIRE HANGERS AS
REQUIRED FOR
SUSPENDED CEILINGS
CEILING AS SCHEDULED
ALUM EDGE FRAME
WITH MATCHING FINISH
CEILING AS SCHEDULED
EXISTING WALL SEE
A1.01 FOR PARTITION TYPES
ALUM EDGE FRAME
WITH MATCHING FINISH
AT GYP. BD.
PROVIDE 1/4" JOINT
5/8" GYP. BD. ON METAL
STUDS @ 16" O.C.
ALUM. TRIM. FINISH
TO MATCH SOFFIT.
GYP. BD. PARTITION
SEE A1.01 FOR TYPE
WIRE SOFFIT HANGER
AS REQUIRED (TYP.)
CORNER BEAD
NOTE:
SEE DETAIL 10, THIS
SHEET FOR SIM NOTES
& DIMENSIONS
ALUM STOREFRONT SYSTEM W/
FULL GLASS (TYP)
ALIGN NEW PARTITION WITH EXIST.
GYP. BD. (BOTH SIDES) ON
METAL STUDS. SEE SHT.
A1.01 FOR PARTITION TYPES
SEALANT BOTH SIDES
SEMI-RECESSED FIRE
RATED CABINET
NON-RATED WALL
ASSEMBLY, SEE PLAN
FOR TYPE
FE
GYP. BD. CEILING HT.
8' - 6"
WIRE HANGER AS
REQUIRED (TYP.)
5/8" GYP. BD. ON METAL
STUDS @ 16" O.C.
CORNER BEAD
GYP. BD. PARTITION
SEE A1.01 FOR TYPE
EXISTING GYP. BD.
PARTITION. SEE A1.01
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:32:32PM
A6.02
Interior Details
02/22/13
D.T / C.B
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1 1/2" = 1'-0"A5.03
2 PLAN DETAIL AT COPY CENTER
3" = 1'-0"A1.01
1 PLAN DETAIL@ WINDOW
3/8" = 1'-0"A2.02
15 LIGHTING FIXTURE LAYOUT DETAIL
16 LIGHT FIXTURE ISOMETRIC VIEW
1/2" = 1'-0"
14 TYPICAL PENDANT LIGHT FIXTURE
1 1/2" = 1'-0"A5.03
3 COAT ROD AND SHELF DETAIL
Date: Submitted for:
1 1/2" = 1'-0"A5.09
4 COUNTER DETIAL AT MAIL BOX
1/18/2013 QUALITY REVIEW
2/22/2013 BIDS/PERMITS
1" = 1'-0"A5.03
9 SECTION AT MAIL BOX ISLAND
1" = 1'-0"A5.03
5 SECTION THROUGH MAILBOX
NOTE:
SEE DETAIL 9,
THIS SHEET FOR
TYP. NOTES &
DIMENSIONS
1 1/2" = 1'-0"A5.10
6 COMPOSITE CEILING DETAIL AT KRESGE CONNECT ROOM
1 1/2" = 1'-0"A5.10
7 CEILING EDGE DETAIL AT KRESGE CONNECT ROOM
1 1/2" = 1'-0"A5.10
8 EDGE CEILING DETAIL AT KRESGE CONNECT ROOM
1 1/2" = 1'-0"A5.08
10 SOFFIT DETAIL AT PARTITION
1 1/2" = 1'-0"A5.08
11 SOFFIT EDGE DETAIL
1 1/2" = 1'-0"A1.01
12 PLAN DETAIL @ ELEVATOR LOBBY
1" = 1'-0"A1.01
13 FIRE EXTINGUISHER DETAIL
1 1/2" = 1'-0"A2.02
17 CEILING DETIAL AT KRESGE CONNECT
SEALANT
BENT ANGLE
REFER TO STRUCTURAL
DRAWING FOR ADDITIONAL
SCOPE
HEADER
DOUBLE BULB
SEAL
5/8" GYP. BD. ON
METAL STUDS
1/2" BALTIC BIRCH
PLYWOOD
RE: ARCHITECTURAL PLAN
EXISTING CONC
BEAM BEYOND
DOOR
(OPEN POSITION)
D
18"x18"GYP.BD.ACCESSPANEL
1'-7"STUDSPACINGFOR
VIF
1'-8"+/-1'-9"
6' - 1"
CEILING
8' - 0"
(2) LAYERS 5/8"
GYP. BD. (ACOUSTIC
BARRIER AS PER ASTM
E 557
EXISTING CONC
BEAM
MOTOR
(BEYOND)
SUSPENDED CEILING
GYP. BD. SOFFIT ON
METAL STUDS @ 16"
O.C.
BATT INSULATION
DEFLECTION MATERIAL
(TYP.)
DIAGONAL BRACING
AS REQUIRED (TYP.)
ELECTRICAL CONTROL
BOX (PAINT TO MATCH
SOFFIT)
5/8" GYP. BD. ON
3 5/8" METAL
STUD @ 16" O.C.
(TYP.)
ACOUSTIC OPERABLE
PARTITION PANEL
POCKET PANEL
9' - 2"
VIF
1'-5"+/-
EXISTING COLUMN
BEYOND
UNDERSIDE OF
EXISTING STRUCTURE
NOTE:
REFER TO STRUCTURAL
DRAWINGS FOR ADDITIONAL
SCOPE
1/2" PLYWOOD PANEL
ON GYP. BD. ON METAL
STUDS. SEE FINISH
SCHEDULE FOR
PLYWOOD TYPE & SHEET
A1.01 FOR PARTITION
TYPES
DOOR FRAME ASSEMBLY.
SEE STRUCTURAL
OVERHEAD DOOR
ASSEMBLY
STEEL ANGLES
SEE STRUCTURAL
D
5
5
A6.03
GYP. BD. SOFFIT
ON METAL STUDS
OPERABLE PARTITION
PANEL
EXISTING COLUMN
5/8" GYP. BD.
ON METAL
STUDS
EXISTING
STRUCTURAL BEAM
ABOVE (TYP.)
ALIGN
GYP.BD.
SOFFIT
WITH
GYP.BD.
PARTITION
(TYP.)
CEILING
8' - 0"
DIAGONAL BRACING
AS REQUIRED
5/8" GYP. BD. SOFFIT
ON METAL STUDS @
16; O.C.
5/8" GYP. BD. ON
METAL STUDS
@ 16" O.C.
CORNER BEAD
UNDERSIDE OF EXISTING
STRUCTURE
F
5
2' - 4"
2'-4"
EQ EQ EQ EQ
2'-4"EQEQ
11'-6"
23' - 0"
LIGHTING FIXTURE.
SEE SHEET A2.02
EXISTING COLUMN
GYP. BD. CEILING CLOUD
8' - 0"
-
---
11
A6.02
SIM.A6.03
7
LIGHTING FIXTURE. SEE SHEET
A2.02 & ELECTRICAL SHEETS
FOR FIXTURE TYPE & ADDITIONAL
SCOPE (TYP.)
0'-3"0'-4"
0' - 4"0' - 2"
0' - 4" 0' - 2"
0'-5"0'-2"
USE DETAIL 6, THIS SHEET
FOR LOCATION OF CENTER
LIGHT FIXTURE #1. LOCATE
LIGHT FIXTURES #2 THRU #5
USING DIMENSIONS SHOWN
ON THIS DETAIL
CENTER LIGHT FIXTURE #1
LIGHT FIXTURE #3
LIGHT FIXTURE #2LIGHT
FIXTURE #5
LIGHT
FIXTURE #4
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20138:21:08PM
A6.03
Interior Details
02/22/13
C.M
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
1 1/2" = 1'-0"A5.10
2 SECTION DETAIL @ HEAD OVERHEAD DOOR
1 1/2" = 1'-0"A5.10
3 OPERABLE WALL DETAIL @ CEILING
1/18/2013 QUALITY REVIEW
2/1/2013 PERMITS/BIDS
Date: Submitted for:
1 1/2" = 1'-0"A5.09
1 JAMB DETAIL OF OVERHEAD DOOR
1" = 1'-0"A2.02
4 CEILING PLAN DETAIL @ OPERABLE PARTITION
1 1/2" = 1'-0"A6.03
5 SECTION DETAIL AT SOFFIT
1/4" = 1'-0"A2.02
6 CEILING AT RECEPTION/SECURITY DESK
1" = 1'-0"A6.03
7 LIGHTING DETAIL
GF
CB D EA
6" W
DOOR WIDTH
6" W
DOORHEIGHT
1'-0"HGT
SAFETY
GLASS
TYPE-1
ALUM. FRAME
(TYP.)
5/8" GYP BD
RE: ARCHITECTURAL
PLAN FOR WALL TYPE
5/8" GYP BD
RE: ARCHITECTURAL
PLAN FOR WALL TYPE
ALUM. FRAME
(TYP.)
EXISTING GYP BD.
WALL
ALIGN
5/8" GYP BD
RE: ARCHITECTURAL
PLAN FOR WALL TYPE
CAULK
BOTH SIDES
(TYP)
5/8" GYP BD
RE: ARCHITECTURAL
PLAN FOR WALL TYPE
ALUM. FRAME
(TYP.)
0'-4"
5/8" GYP BD
RE: ARCHITECTURAL
PLAN FOR WALL TYPE
5/8" GYP BD W/ PLYWD
RE: ARCHITECTURAL
PLAN FOR WALL TYPE
20' - 2"DOOR WIDTH
DOORHEIGHT
17' - 10"
DOOR WIDTH
DOORHEIGHT
15' - 11"
H
DOORHEIGHT
DOOR WIDTH
DOOR WIDTH
DOORHEIGHT
7' - 0"
DOOR WIDTH
DOORHEIGHT
20' - 2"
A
B
C
ALUMINUM STOREFRONT
WOOD - 5 PLY - FULL GLASS
WOOD - 5 PLY - FULL GLASS SLIDER
HOLLOW METAL
EXISTING HOLLOW METAL DOOR
WOOD BIFOLD DOOR
GLASS OVERHEAD DOOR- (HANGER - STYLE)
D
E
F
G
DOOR TYPE - LABELS
5/8" GYPSUM BD
RE: ARCHITECTURAL
PLAN FOR WALL TYPE
GLASS TYPE RE:
SCHEDULE
ALUM. STOREFRONT
SYSTEMALUM. CLOSURE
PIECE (TYP.)
CAULK
BOTH SIDES
(TYP)
ALUM. CLOSURE
PIECE (TYP.)
2 1/2"
0' - 4"
5/8" GYP BD
RE: ARCHITECTURAL
PLAN FOR WALL TYPE
SEALANT
BOTH SIDES
(TYP)
RE: ARCHITECTURAL
PLAN FOR
WALL TYPE
STOREFRONT
FRAME W/
FULL GLASS
EXIST
CONC FLOOR
DOOR SCHEDULE INDICATES NEW DOORS AND
EXISTING DOORS REQUIRING MODIFICATIONS.
CONTRACTOR SHALL COORDINATE THE KEYING
OF NEW, REWORKED AND EXISTING DOOR WITH
OWNER'S REQUIREMENTS. ADDITIONAL DOORS
DISCOVERED THAT REQUIRE MODIFICATION SHALL
BE PROMPTLY REPORTED TO THE ARCHITECT.
LOCATION DOORS FRAMES A MINIMUM OF 4"
FROM THE CORNER TO THE BACK OF FRAME
UNLESS OTHERWISE INDICATED
UNDERCUT DOORS AS REQUIRED TO CLEAR
FINISH FLOOR MATERIALS AND TO MAINTAIN FIRE
RATING.
DOORS SHALL BE SINGLE SWING. (UNLESS
OTHER WISE NOTED)
SEE PROJECT MANUAL FOR DOOR HARDWARE
SETS
SECTION 087100 DOOR HARDWARE.
REMARKS:
WOOD TYPE DOOR TO BE ROTARY CUT WHITE
BIRCH
GLASS TYPE- TYPE 1 - SAFETY GLASS
(TEMPERED GLASS)
GENERAL NOTES - DOORS
1.
2.
3.
4.
5.
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C Detroit, MI 48202
313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
Project number
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
2/28/20137:33:24PM
A7.01
Door Schedule
02/22/13
C.M
S. LITTLE
12-29
TechTown First Floor
Renovation
440 Burroughs St. - Detroit, MI
Door Schedule
Door
Number
Door
Fire Rating Hardware
Frame Frame Frame Frame Frame
CommentsWidth Height Thickness Material Finish Type Material Finish Jamb Head
102 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 3 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A
103 6' - 0" 7' - 0" 0' - 1 1/2" ALUM ANODIZE 5 5 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - H, DOUBLE DOOR
104 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
105 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
108 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 2 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A
108A 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY
108B 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY
108C 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY
109 3' - 0" 7' - 0" 0' - 2 1/2" HM PAINT 1HR 6 EXIST. HM PAINT 12 &
13/A7.01
10/A7.01 DOOR TYPE - D, COLOR SELECTION IN SHOP DWG
112 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 1 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A
114 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 6 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
115 3' - 0" 7' - 0" 0' - 2" WOOD STAIN 3 1 DOOR TYPE - C, GYP. BD. FRAMELESS ENTRY
116 3' - 0" 7' - 0" 0' - 2" WOOD STAIN 3 DOOR TYPE - C, GYP. BD. FRAMELESS ENTRY
117 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
120 4' - 0" 6' - 8" 0' - 2" HM PAINT 6 1 HM PAINT 12 &
13/A7.01
10/A6.03 DOOR TYPE - E, COLOR SELECTION IN SHOP DWG
122 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
123 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
124 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 2 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
125A 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
125B 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
125C 12' - 0" 8' - 0" 0' - 2" ALUM ANODIZE NONE ALUM ANODIZE 1/A6.03 2/A6.03 DOOR TYPE - G, OVERHEAD HANGER DOOR
126A 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
126B 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
126C 12' - 0" 8' - 0" 0' - 2" ALUM ANODIZE NONE ALUM ANODIZE 1/A6.03 2/A6.03 DOOR TYPE - G, OVERHEAD HANGER DOOR
127 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 2 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
128 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 2 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
132 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
133 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
134 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B
139 4' - 0" 6' - 8" 0' - 2" HM PAINT 6 1 HM PAINT 12 &
13/A7.01
10/A7.01 DOOR TYPE - E, REUSE OF EXISTING DOOR
1 1/2" = 1'-0"
10
HM DOOR HEAD DETAIL
1 1/2" = 1'-0"
7
WD DOOR HEAD DETAIL
1 1/2" = 1'-0"
13
HM JAMB @ HINGE
1 1/2" = 1'-0"
12
HM DOOR @ STRIKE
1 1/2" = 1'-0"
8
WD DOOR DETAIL JAMB
1 1/2" = 1'-0"
9
WD DOOR JAMB DETAIL @ STRIKE
1/4" = 1'-0"
4
STOREFRONT GLAZING TYPE
1/4" = 1'-0"
2
STOREFRONT FRAME KRESGE CONNECT VIDEO
CONFERENCING
1/4" = 1'-0"
5
TECH TOWN MANAGEMENT STOREFRONT TYPE 2
1/4" = 1'-0"
3
STOREFRONT FRAME ELEVATOR LOBBY
1/4" = 1'-0"
6
STOREFRONT FRAME TRAINING ROOM
1/4" = 1'-0"
FRAME ELEVATION
1 1/2" = 1'-0"
14
STOREFRONT DOOR HEAD DETAIL
1 1/2" = 1'-0"
15
STOREFRONT DOOR JAMB DETAIL
1/18/2013 QUALITY REVIEW
1 1/2" = 1'-0"
16
STOREFRONT SILL
2/22/2013 PERMITS/BIDS
Date: Submitted for:
NOTE:
STOREFRONT FRAME DIMENSIONS - SEE SHEET A5.08 - INTERIOR
ELEVATIONS FOR THE DIMENSIONS FOR THE STOREFRONT
FRAMING. ALL GLASS IS TO BE SAFETY GLASS TYPE GL - 1.
FLUSH METAL
DOOR (TYP)
SAFETY
GLASS
TYPE GL -1
TYP. FOR
ALUM
DOORS
1
NOTE:
DIMENSION S TYPICAL FOR
DOOR TYPES A, B AND C.
SAFETY GLASS
TYPE GL-1
(TYP.)
SAFETY GLASS
TYPE GL-1
(TYP.)
141 EXIST. EXIST. EXIST. EXIST. EXIST. 8 EXIST. EXIST. EXIST. DOOR TYPE - E, REUSE OF EXISTING DOOR
LC Skyfold wall
LC Skyfold wall
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
www.centricdesignstudio.com
Do Not Scale Drawings
Date
Drawn by
Checked by
Client:
Project:
Location:
Consultants:
Seal:
Sheet Title:
Date: Submitted for:
440 Burroughs St.
Detroit, MI 48202
12-29Project number
TechTown First Floor
Renovations
JMS Engineering Services
32401 West 8 Mile, Suite 2-5
Livonia, MI 48152 | 313.399.2932
Patrick Thompson Design
485 Milwaukee Ave. Ste. 100C
Detroit, MI 48202 | 313.820.3268
www.patrickthompsondesign.com
Ghafari Associates, LLC
17101 Michigan Ave. Dearborn, MI 48126 USA
TEL +1.313.441.3000
www.ghafari.com
S - 1
PARTITION SUPPORT
FRAMING PLAN AND
DETAILS
DECEMBER, 2012
JMS
JMS
122112
2 / 22 / 2013 BIDS/PERMITS

Contenu connexe

Tendances

Farmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CAFarmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CARichard Clark
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Shin Kameyama
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLISSean Roper
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdfMin Khant Kyaw
 
One House Project Drawing
One House Project DrawingOne House Project Drawing
One House Project DrawingHassankhosa
 
Linked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecsLinked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecsClaire Gudmanz
 

Tendances (20)

KASSIN GYM
KASSIN GYMKASSIN GYM
KASSIN GYM
 
Farmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CAFarmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CA
 
502 north market
502 north market502 north market
502 north market
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
Lowe's Carmel, IN
Lowe's   Carmel, INLowe's   Carmel, IN
Lowe's Carmel, IN
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLIS
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Drafting and Design
Drafting and DesignDrafting and Design
Drafting and Design
 
Working drawings sample
Working drawings sampleWorking drawings sample
Working drawings sample
 
One House Project Drawing
One House Project DrawingOne House Project Drawing
One House Project Drawing
 
IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Linked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecsLinked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecs
 

En vedette

Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Sean Roper
 
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31Damon Thomas
 
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31Damon Thomas
 
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30Damon Thomas
 
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30Damon Thomas
 
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30Damon Thomas
 
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...Aadhar Homes
 
Details in skechup
Details in skechupDetails in skechup
Details in skechupAsif Haroon
 
Wall finishes and wall patterns
Wall finishes and wall patternsWall finishes and wall patterns
Wall finishes and wall patternsELFIndia
 
Plan symbols
Plan symbolsPlan symbols
Plan symbolsgopaltry
 

En vedette (12)

Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
 
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
 
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
 
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
 
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
 
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
 
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
 
Details in skechup
Details in skechupDetails in skechup
Details in skechup
 
Wall finishes and wall patterns
Wall finishes and wall patternsWall finishes and wall patterns
Wall finishes and wall patterns
 
Wall finishes
Wall finishesWall finishes
Wall finishes
 
FALSE CEILING
FALSE CEILINGFALSE CEILING
FALSE CEILING
 
Plan symbols
Plan symbolsPlan symbols
Plan symbols
 

Similaire à TechTown 1st Floor Renovation

Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationTan Jaden
 
Construction management sample drawing file
Construction management sample drawing fileConstruction management sample drawing file
Construction management sample drawing fileLing Ma
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfCanberra Institute of technology
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawingsGirish Ravikumar
 
086073 COTTONWOOD VILLAGE Rezoning Plan 6.11
086073 COTTONWOOD VILLAGE Rezoning Plan 6.11086073 COTTONWOOD VILLAGE Rezoning Plan 6.11
086073 COTTONWOOD VILLAGE Rezoning Plan 6.11Karl Fritschen, AICP, RLA
 
Victoria Building Final Presentation
Victoria Building Final PresentationVictoria Building Final Presentation
Victoria Building Final PresentationGhazal Fateh
 
Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Panji Krisnamurti
 
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...IRJET Journal
 
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...IRJET Journal
 
Facility Plan_220720.pdf
Facility Plan_220720.pdfFacility Plan_220720.pdf
Facility Plan_220720.pdfNeerajOjha17
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
IRJET- Techno – Economic Study of Different Type of Slab
IRJET-  	  Techno – Economic Study of Different Type of SlabIRJET-  	  Techno – Economic Study of Different Type of Slab
IRJET- Techno – Economic Study of Different Type of SlabIRJET Journal
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth K.Samy
 

Similaire à TechTown 1st Floor Renovation (20)

Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilation
 
Construction management sample drawing file
Construction management sample drawing fileConstruction management sample drawing file
Construction management sample drawing file
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Baseplate
BaseplateBaseplate
Baseplate
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
086073 COTTONWOOD VILLAGE Rezoning Plan 6.11
086073 COTTONWOOD VILLAGE Rezoning Plan 6.11086073 COTTONWOOD VILLAGE Rezoning Plan 6.11
086073 COTTONWOOD VILLAGE Rezoning Plan 6.11
 
Victoria Building Final Presentation
Victoria Building Final PresentationVictoria Building Final Presentation
Victoria Building Final Presentation
 
1200 9
1200 91200 9
1200 9
 
Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3
 
FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12
 
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
 
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...
IRJET- Response of Buildings with and Without Setbacks Subjected to Earthquak...
 
Facility Plan_220720.pdf
Facility Plan_220720.pdfFacility Plan_220720.pdf
Facility Plan_220720.pdf
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
IRJET- Techno – Economic Study of Different Type of Slab
IRJET-  	  Techno – Economic Study of Different Type of SlabIRJET-  	  Techno – Economic Study of Different Type of Slab
IRJET- Techno – Economic Study of Different Type of Slab
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
 

Dernier

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 

Dernier (20)

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 

TechTown 1st Floor Renovation

  • 1. EXIST ELEV NO 1 EXIST STAIR NO 1 EXIST STAIR NO 1 7654321 83.6 EXIST STAIR NO 1 7654321 83.6 EXIST ELEV NO 1 EXIST STAIR NO 1 BURROUGHS ST 25'-0" WIDE TECH TOWN PARKING 50 SPACES TECH TOWN 440 BURROUGHS ST CASSAVE 30'-0"WIDE TECHTOWN DISTRICT PAST The New Amsterdam Historic District is a concentration of early twentieth century industrial buildings associated with Detroit’s booming manufacturing base. A number of the district’s buildings are fine examples of the reinforced concrete architecture of Albert Kahn. TODAY TechTown, an innovation district in Midtown Detroit, is brimming with potential. The nonprofit provides entrepreneurs and start-ups in Southeast Michigan with programs and partnering opportunities. The character of the area itself is unique, featuring building infrastructure that played an important role in the automotive innovations of a bygone era that is today rich with opportunity for reuse. FIRST FLOOR RENOVATION TECH ONE BUILDING Interior Renovation 20,638 Square Foot (Scope of Work) TechTown's vision for the first floor renovation is to create a more, open, collaborative environment of entrepreneurs, along with the best in class conference center to serve the expanding need for sophisticated and flexible meeting space for the TechTown business as a whole. The First Floor renovation will open up the interior space by removing existing partitions and expose the big, beautiful windows to bring more natural light. The first floor, will host a membership based co-working space of mobile entrepreneurs. TechTown Management Office relocation from the second floor to the first floor is also part of this renovation project. 12-29 January 3, 2012 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI TECH ONE INDEX OF DRAWINGS Sheet Number Sheet Name Sheet Issue Date A1.01 First Floor Plan 02/22/13 A2.02 First Floor Reflected Ceiling Plan 02/22/13 A5.01 Enlarged Plans - PTD SHEET 02/22/13 A5.02 Enlarged Plans - PTD SHEET 02/22/13 A5.03 Enlarged Plans 02/22/13 A5.05 Interior Elevations - PTD SHEET 02/22/13 A5.06 Interior Elevations - PTD SHEET 02/22/13 A5.08 Interior Elevations 02/22/13 A5.09 Interior Elevations 02/22/13 A5.10 Interior Sections 02/22/13 A5.11 3-D Interior Views 02/22/13 A6.01 Wall Types + Interior Plan Details 02/22/13 A6.02 Interior Details 02/22/13 A6.03 Interior Details 02/22/13 A6.05 Millwork Details - PTD SHEET 02/22/13 A6.06 Millwork Details - PTD SHEET 02/22/13 A7.01 Door Schedule 02/22/13 A8.01 Finish Plan - PTD SHEET 02/22/13 A8.02 Finish Schedule - PTD SHEET 02/22/13 A8.03 Furniture Plan - PTD SHEET 02/22/13 FP1-01-01 Fire Projection Floor Plan - Level 1 02/22/13 M00-00-01 Mechanical General - Legends + Abbriviations 02/22/13 M00-00-02 Mechanical Specifications 02/22/13 MD1-01-01 Mechanical Demolition Floor Plan - Level 1 02/22/13 MH1-01-01 Mechanical HVAC Floor Plan - Level 1 02/22/13 MH7-00-01 Mechanical Schedules + Details 02/22/13 MP1-01-01 Mechanical Piping Floor Plan - Level 1 02/22/13 MP1-01-02 Mechanical Plumbing Floor Plan - Level 1 02/22/13 SET ISSUED FOR: QUALITY REVIEW 1/18/2013 PERMIT / BIDS 2/22/2013 AD1.01 First Floor Demolition Plan 02/22/13 AD1.02 Temporary Construction Plan 02/22/13 AD2.01 First Floor Demolition Reflected Ceiling Plan 02/22/13 AD3.01 Demolition Photos 02/22/13 AD3.02 Demolition Photos 02/22/13 AG.01 Cover + Index 02/22/13 AG.02 Code Summary + Egress Plan 02/22/13 AG.03 Reference Symbols + Abbreviations 02/22/13 E00-00-01 Electrical Legend + General Notes 02/22/13 E00-00-02 Electrical Specifications 02/22/13 ED1-01-01 Electrical Demolition Floor Plan- Level 1 02/22/13 EL1-01-01 Electrical Lighting Floor Plan - Level 1 02/22/13 EL5-00-01 Electrical Lighting Details 02/22/13 EL7-00-01 Electrical Lighting Schedules 02/22/13 EL7-00-02 Electrical Lighting Schedules 02/22/13 EP1-01-01 Electrical Power Floor Plan- Level 1 02/22/13 EP6-00-01 Electrical One- Line Diagram 02/22/13 EP7-00-01 Electrical Panel Board Schedules 02/22/13 EP7-00-02 Electrical Panel Board Schedules 02/22/13 EY1-01-01 Electrical Auxiliary System Floor Plan - Level 1 02/22/13 S-1.01 Partition Support Framing Plan + Details 02/22/13 440 BURROUGHS TECH ONE BUILDING 5 Story Reinforced Concrete Building Build in 1929 Designed by Albert Kahn Originally the G. A. Richards Oakland Company Service Department , now Tech One Building and home of TechTown innovative business incubator and acceleration center. This is a historically designated building contract architect for original Albert Kahn building documents and State Historical Preservation Office documents, if required. PROJECT NUMBER: DATE: PROJECT CONTACTS: Phoenix Contractors, Inc 2111 Golfside Ypsilanti, Michigan 48197 p 734 487 9640 f 734 487 1252 www.phoenixco.biz CONSTRUCTION MANAGER: ISSUED FOR: SITE MAP:LOCATION MAP:PROJECT DESCRIPTION: TechTown 440 Burroughs Street Detroit, Michigan 48202 p 313 921 9340 f 313 921 0986 www.techtownwsu.org OWNER: Ghafari Associates LLC. 17101 Michigan Ave. Dearborn, MI 48126 p 313 441 3000 f 313 441 1545 www.ghafari.com MECHANICAL ELECTRICAL + PLUMBING: Patrick Thompson Design, Inc. 486 West Milwaukee, Suite 100C Detroit, MI 48201 p 313 820 3268 www.patrickthompsondesign.com INTERIOR DESIGNER: Centric Design Studio, LLC 440 Burroughs Street, No. 170 Detroit, Michigan 48202 p 313 486 1908 f 313 216 2777 www.centricdesignstudio.com ARCHITECT: JMS Engineering Services, LLC 32401 West 8 Mile, Suite 2-5 Livoinia, MI 48152 p 313 399.2932 STRUCTURAL ENINEERING: INDEX OF DRAWINGS
  • 2. UP UP UPDN G.4 G F.4 F E.4 E D.4 D A.7 B B.5 C.5 C 765432 A.9 G.2 1 8 H A A.8 3.6 G.5 TECH TOWN MANAGEMENT 103 EVENT SPACE 1 126 EVENT SPACE 2 125 VESTIBULE 101 KRESGE CONNECT VIDEO CONFERENCING 108 TRAINING/ACCELERATION 112 STORAGE B 120 STORAGE A 107 ELEC 109 N.I.C N.I.C 71'-8" 97'-10" 130'-2" BUILDING CODE SUMMARY BUILDING AREA (PARA 502.1 BUILDING USE GROUP (CHAPTER 3) MIXED USE (TABLE 302.3.2 & PARA 302.3 TYPE OF CONSTRUCTION (CHAPTER 6) FIRE SUPPRESSION REQUIRED (SECTION 903) ALLOWABLE BUILDING HEIGHT (TABLE 503) HEIGHT MODIFICATIONS (SECTION 504) TABULAR FLOOR AREA PER STORY (TABLE 503) ACTUAL FLOOR AREA PER STORY (GROSS FLOOR AREA PARA 502.1) TOTAL AREA OCCUPANT LOAD PER STUDY (TABLE 1004.1.2 TOTAL OCCUPANT LOAD MAXIMUM LENGTH OF EXIT TRAVEL (TABLE 1015.1) MAXIMUM LENGTH OF DEAD END CORRIDOR (PARA 1016.3) CAPACITY OF EGRESS COMPONENTS EXIT ACCESS CORRIDORS (TABLE 1005.1 & PARA 1016.2) STAIRWAYS (TABLE 1005.1 & PARA 1009.1) RAMPS (TABLE 1005.1 & PARA 1010.5.1) DOORS (TABLE 1005.1 & PARA 1006.1.1) FIRE RESISTANCE RATINGS OF EGRESS COMPONENTS CORRIDORS (TABLE 1016.1 & PARA 1016.1) EXIT PASSAGEWAYS (PARA 1020.3) STAIR SHAFTS (PARA 1019.1) HORIZONTAL EXITS (PARA 1021.2) AREA OF REFUGE (PARA 1007.6.2) FIRE RESISTANCE RATING OF SEPARATIONS SHAFTS - OTHER THAN STAIRS (PARA 707.4) ATRIUMS (PARA 404.5) FURNACE ROOMS OVER 400,000 BTU (TABLE 302.1.1) BOILER ROOMS OVER 15 PSI & 10 HP (TABLE 302.1.1) STORAGE ROOMS OVER 100 SF (TABLE 302.1.1) WASTE AND LINEN COLLECTION ROOMS (TABLE 302.1.1) FIRE WALLS (TABLE 705.4) EXTERIOR WALLS (TABLE 602) FIRE RESISTANCE RATINGS OF STRUCTURAL ELEMENTS INTERIOR AND EXTERIOR BEARING WALLS, COLUMNS, BEAMS, GIRDERS, TRUSSES, AND ARCHES (TABLE 601) SUPPORTING MORE THAN ONE FLOOR, COLUMNS OR OTHER BEARING WALLS SUPPORTING ONE FLOOR ONLY SUPPORTING A ROOF ONLY 28,425 SQ. FT. B 0 HOUR TYPE 2B YES 3 STORIES N/A 23,000 YES TOTAL AREA 69,690 SQ. FT./FLOOR ALLOWABLE SEE EGRESS OCCUPANT LOAD TABLE SEE EGRESS OCCUPANT LOAD TABLE 300 FEET 50 FEET 0.15 INCHES/OCCUPANT 0.2 INCHES/OCCUPANT N/A 0.15 INCHES/OCCUPANT 0 HOUR N/A N/A N/A N/A N/A N/A N/A N/A 0 HOUR N/A 2 HOUR 0 HOUR 0 HOUR 0 HOUR 0 HOUR 20,638 SQ. FT. AREA OF SCOPE OF WORK MIXED USE - BUSINESS, ASSEMBLY & STORAGE UNIT 302.3.1 NON SEPARATED USES FULLY SPRINKLED BUILDING - EXISTING 1 STORY - 20 FEET 200% INCREASE FOR SPRINKLED BUILDING INCREASE TO 69,690 SQ. FT. WITH SPRINKLER SYSTEM WITH SPRINKLER SYSTEM 2 EXITS REQUIRED - 3 PROVIDED 32' MIN. EXISTING STAIRS 508.4 TABLE MIXED USE - BUSINESS & STORAGE USE GROUPS SEPARATION REQUIREMENTS EXISTING WALLS INTERIOR LOAD BEARING WALLS (0 HOUR) ALL INTERIOR WALL MICHIGAN BUILDING CODE 2009 EDITION (UNLESS OTHERWISE NOTED) MEANS OF EGRESS OCCUPANT LOAD (TABLE 1004.1.1) OCCUPANCY BUSINESS (B) SQUARE FEET OF FLOOR AREA PER OCCUPANT 100 NSF / OCCUPANT BUILDING FLOOR AREA FOR USE 20,638 SQUARE FEET OCCUPANT LOAD 270 OCCUPANTS PLUMBING FIXTURE COUNT MICHIGAN BUILDING CODE 2009 EDITION (UNLESS OTHERWISE NOTED) USE GROUP POPULATION = BUSINESS (B) NUMBER REQUIRED (TABLE 403.1): W/C: 1/XX OCC LAV: 1/XX OCC NUMBER PROVIDED JANITOR'S CLOSETS DRINKING FOUNTAINS WATER CLOSETS MALE 2 WC: 1/25 OCC FOR FIRST 50 WC: 1/50 FOR REMAINING 4 EXISTING 1 SERVICE SINK REQUIRED 1 SERVICE SINK PROVIDED 1 PER 100 (B) 2 DRINKING FOUNDATIONS REQUIRED 2 DRINKING FOUNDATION EXISTING FEMALE 2 WC: 1/25 OCC FOR FIRST 50 WC: 1/50 FOR REMAINING 4 EXISTING URINALS SEE NOTE 1 1 UNISEX MALE 2 LAV: 1/40 OCC FOR FIRST 50 WC: 1/80 FOR REMAINING 4 FEMALE 3 LAV: 1/40 OCC FOR FIRST 50 WC: 1/80 FOR REMAINING 4 UNISEX LAVATORIES BATHTUBS/SHOWERS MALE N/A FEMALE N/A 1 HOUR FIRE SEPARATION 2 HOUR FIRE SEPARATION EXIT EGRESS TRAVEL DISTANCE AREA OF WORK 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:37:58PM AG.02 Code Summary + Egress Plan 02/22/13 C.M/ C.B. S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/16" = 1'-0"A5.05 1 EGRESS PLAN 1/18/2013 QUALITY REVIEW CODE SUMMARY BUILDING: MICHIGAN BUILDING CODE 2009, WHICH INCLUDES MICHIGAN BARRIER-FREE DESIGN RULES MECHANICAL: MICHIGAN MECHANICAL CODE 2009 PLUMBING: MICHIGAN PLUMBING CODE 2009 ELECTRICAL: MICHIGAN ELECTRICAL CODE 2009, NEC ENERGY: 2009 MICHIGAN UNIFORM ENERGY CODE ZONING: PER CITY OF DETROIT ZONING ORDINANCE M3 GENERAL INDUSTRIAL DISTRICT 103.0000 RESEARCH OR TESTING LABORATORIES + BUSINESS PERMITTED AS MATTER OF RIGHT USE GROUP "B" NOTE TO CONTRACTORS EXIST RESTROOMS TO REMAIN. RESTROOMS NOT IN CONTRACT SCOPE FOR THIS PROJECT. NO CHANGES ARE REQUIRED 2/22/2013 PERMITS/BIDS Date: Submitted for:
  • 3. AB ANCHOR BOLT ABR ABRASIVE ABV ABOVE AC ACOUSTIC/ACOUSTICAL A/C AIR CONDITIONING ACC ACCESS ACH AIR CONDITIONING UNIT ADD ADDENDUM ADDN ADDITION ADDNL ADDITIONAL ADH ADHESIVE ADJ ADJUSTABLE AFF ABOVE FINISH FLOOR AGGR AGGREGATE AHU AIR HANDLING UNIT ALT ALTERNATE ALUM/AL ALUMINUM AMP AMPERE AMT AMOUNT ANCH ANCHOR & AND ANOD ANODIZED AP ACCESS PANEL APPD APPROVED APPROX APPROXIMATE ARCH ARCHITECT/ARCHITECTURAL ASPH ASPHALT ASSY ASSEMBLY @ AT AUTO AUTOMATIC AVG AVERAGE B/B BACK TO BACK BBD BULLETIN BOARD BD BOARD BETW BETWEEN BF BARRIER FREE BIT BITUMINOUS BJF BITUMINOUS JOINT FILLER BLDG BUILDING BLK BLOCK/BLOCKING BLVD BOULEVARD BM BEAM/BENCHMARK BOT BOTTOM BPL BASE PLATE BR BEDROOM/BRASS/BULLET RESISTANT BRG BEARING BRK BRICK BRL BEARING PLATE BS BOTH SIDES BSMT BASEMENT BTU BRITISH THERMAL UNIT BULL BULLETIN BUR BUILT-UP ROOF BW BOTH WAYS CA COMPRESSED AIR CAB CABINET CAT CATALOG NUMBER CB CATCH BASIN/CHALKBOARD C/C CENTER TO CENTER CCTV CLOSED CIRCUIT TELEVISION CEM CEMENT CER CERAMIC CF CUBIC FEET CFL COUNTER FLASHING CFM CUBIC FEET PER MINUTE CG CORNER GUARD CH COAT HOOK CI CAST IRON CIP CAST IRON PIPE/CAST IN PLACE CIR CIRCLE/CIRCULAR CJ CONTROL JOINT CL CENTERLINE/CLASS CLG CEILING CLL CONTRACT LIMIT LINE CLOS CLOSET CLR CLEAR CMU CONCRETE MASONRY UNIT CNL CHANNEL CNTR COUNTER CO CLEAN OUT/COMPANY COL COLUMN COMP COMPOSITION/COMPOSITE CONC CONCRETE COND CONDUIT CONF CONFERENCE CONN CONNECTION CONST CONSTRUCTION CONT CONTINUE/CONTINUOUS CONTR CONTRACTOR CORR CORRIDOR/CORRUGATED CP CONTROL PANEL CPL CEMENT PLASTER CSK COUNTERSINK CTR CENTER/CENTERED CUH CABINET UNIT HEATER CW COLDWATER CY CUBIC YARD CYC CYCLES CYL CYLINDER D DEEP/DEPTH DA DOUBLE ACTING DB DECIBEL DBL DOUBLE DES DESIGN DET DETAIL DF DRINKING FOUNTAIN DH DOUBLE HUNG DIA DIAMETER DIAG DIAGONAL DIFF DIFFUSER DIM DIMENSION DISC DISCONNECT DISP DISPENSER/DISPOSAL DIV DIVIDER/DIVISION DL DEAD LOAD DN DOWN DO DITTO DP DAMPPROOFING DR DOOR/DRAIN/DINING ROOM DRN DRAIN DS DOWN SPOUT DT DRAIN TILE DUP DUPLICATE DW DISHWASHER DWG DRAWING E EAST EA EACH EB EXPANSION BOLT EC ELECTRICAL CONTACTOR/EXPOSED CONSTRUCTION E/E END TO END EE EACH END EF EACH FACE/EXHAUST FAN EG EXHAUST GRILLE EIFS EXTERIOR INSULATION AND FINISH SYSTEM EJ EXPANSION JOINT EJF EXPANSION JOINT FILLER EL/ELEV ELEVATION/ELEVATOR ELAST ELASTOMERIC ELEC ELECTRIC/ELECTRICAL EMER EMERGENCY ENCL ENCLOSURE/ENCLOSED ENTR ENTRANCE/ENTRY EP ELECTRICAL PANEL EPDM ETHYLENE PROPYLENE DIENE MONOMER EQ EQUAL/EQUIVALENT EQUIP EQUIPMENT ER EXHAUST REGISTER ESC ESCALATOR EST ESTIMATE ETC ETCETERA EW EACH WAY EWC ELECTRIC WATER COOLER MT METAL THRESHOLD MTD MOUNTED MTG MEETING MTL METAL/METTALIC MTL WP METALLIC WATERPROOFING MULL MULLION N NORTH NA NOT APPLICABLE NAT NATURAL NIC NOT IN CONTRACT NO or # NUMBER NOM NOMINAL NOR NORMAL NRC NOISE REDUCTION COEFFICIENT NTS NOT TO SCALE OA OUTSIDE AIR/OVERALL OBGL OBSCURE GLASS OC ON CENTER OD OUTSIDE DIAMETER/OUTSIDE DIMENSION OF OUTSIDE FACE DIMENSION OFF OFFICE OH OPPOSITE HAND/OVERHEAD O/O OUT TO OUT OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED OPER OPERATOR/OPERATION OPG OPENING OPP OPPOSITE ORIG ORIGINAL ORN ORNAMENTAL OZ OUNCE PA PUBLIC ADDRESS PASS PASSAGE/PASSENGER PBD PARTICLE BOARD PC PIECE/PIECES/PRECAST CONCRETE PCF POUNDS PER CUBIC FOOT PCP PRECAST CONCRETE PANEL PE PASSANGER ELEVATOR PERF PERFORATED PERIM PERIMETER PERM PERMANENT PERP PERPENDICULAR PG PAGE PKG PARKING PL PLATE/PROPERTY LINE PLAS PLASTER PLAT PLATFORM PLBG PLUMBING PLF POUNDS PER LINEAR FOOT PLWD PLYWOOD PNL PANEL POL POLISHED PORT PORTABLE POS POSITION/POSITIVE PR PAIR PREFAB PREFABRICATED PRL PARALLEL PROJ PROJECT/PROJECTION PROP PROPERTY/PROPOSED PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT POINT/PAINT PTD PAINTED PTN PARTITION PVG PAVING PVC POLYVINYLCLORIDE PVMT PAVEMENT QTY QUANTITY QTR QUARTER EX EXPOSED EXC EXCAVATED EXH EXHAUST EXIST EXISTING EXP EXPANSION EXT EXTERIOR F DEGREES FAHRENHEIT FA FIRE ALARM FAB FABRICATED FACP FIRE ALARM CONTROL PANEL FAS FASTENER FD FLOOR DRAIN FDAPR FIRE DAMPER FDC FIRE DEPARTMENT CONNECTION FDN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF FACTORY FINISH F/F FACE TO FACE/FINISH TO FINISH FFE FINISH FLOOR ELEVATION FF&E FIXTURES, FURNISHINGS AND EQUIPMENT FH FIRE HYDRANT FHC FIRE HOSE CABINET FIG FIGURE FIN FINISH/FINISHED FIN FLR/FF FINISH FLOOR FIXT FIXTURE FLASH FLASHING FLG FLOORING/FLASHING/FLANGE FLR FLOOR FLUOR FLUORESCENT FPM FEET PER MINUTE FPR FIREPROOF/FIREPROOFING FR FIRE RETARDANT FRM FRAME FS FULL SIZE FT FEET/FOOT FTG FOOTING FTP FULLY TEMPERED FTR FINNED TUBE RADIATION FURN FURNISH/FURNISHED FURR FURRING/FURRED FUT FUTURE FVC FIRE VALVE CABINET FVS FIRE VALVE STATION G GAS GA GAUGE GAL GALLON GALV GALVANIZED GB GRAB BAR GC GENERAL CONTRACTOR GENL GENERAL GF GROUND FACE GFRC GLASS FIBER REINFORCED CONCRETE GL GLASS/GRID LINE GND GROUND GPH GALLONS PER HOUR GPM GALLONS PER MINUTE GWB GYPSUM WALL BOARD GYP GYPSUM H HIGH HB HOSE BIBB HC HOLLOW CORE HD HEAVY DUTY HDWD HARDWOOD HDWE HARDWARE HEX HEXAGON HHWR HEATING HOT WATER RETURN HHWS HEATING HOT WATER SUPPLY HM HOLLOW METAL HORIZ HORIZONTAL HP HIGH POINT/HORSE POWER/HIGH PRESSURE HR HOUR HS HEAT STRENGTHENED HT HEIGHT HTG HEATING HTR HEATER H/V HEATING AND VENTILATION HVAC HEATING, VENTILATING AND AIR CONDITIONING HVC HOSE VALVE CABINET HW HOT WATER HWH HOT WATER HEATER ID IDENTIFICATION/INSIDE DIAMETER IE INVERT ELEVATION IN or " INCH/INCHES INCAND INCANDESCENT INCL INCLUDE/INCLUDING INFO INFORMATION INSUL INSULATATE/INSULATION INT INTERIOR/INTERNAL INTER INTERMEDIATE INV INVERT IS INSIDE JB JUNCTION BOX/JOINT BACKER JC JANITOR CLOSET JF JOINT FILLER JR JUNIOR JST JOIST JT JOINT K KIP (1000#) KD KNOCK DOWN KIT KITCHEN KO KNOCK OUT KP KICK PLATE LAB LABORATORY LAM LAMINATE/LAMINATED LAV LAVATORY LEV LEVEL LF LINEAR FEET/FOOT LG LONG LH LEFT HAND LHRB LEFT HAND REVERSE BEVEL LIN LINEAR DIFFUSER LL LIVE LOAD LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LOC LOCATION LP LIGHTING PANEL/LOW POINT LSF LIGHT GAUGE STEEL FRAMING LT LIGHT/LAUNDRY TRAY LTG LIGHTING LV LOW VOLTAGE LW LIGHT WEIGHT LWC LIGHT WEIGHT AGGREGATE CONCRETE MACH MACHINE MAINT MAINTENANCE MAS MASONRY MATL MATERIAL MAU MAKE-UP AIR UNIT MAX MAXIMUM MC MEDICINE CABINET/MECHANICAL CONTRACTOR MCC MOTOR CONTROL CENTER MDOT MICHIGAN DEPARTMENT OF TRANSPORTATION MDS METAL DIVIDER STRIP MECH MECHANICAL MED MEDIUM MEMB MEMBRANE MES METAL EDGE STRIP MEZZ MEZZANINE MFR MANUFACTURER MH MANHOLE MI MISCELLANEOUS IRON MIN MINIMUM MISC MISCELLANEOUS MK MARK ML METAL LATH mm MILLIMETER MO MASONRY OPENING MOD MODEL/MODULE MOV MOVEABLE R RISER RAD or R RADIUS RAG RETURN AIR GRILLE RC RAIN CONDUCTOR RCP REFLECTED CEILING PLAN RD ROAD/ROOF DRAIN REBAR REINFORCEMENT BAR REC RECESS RECV RECEIVE/RECEIVING REF REFER/REFERENCE REFL REFLECTIVE/REFLECTED REFR REFRIGERATOR REG REGISTER REINF REINFORCED CONCRETE/REINFORCE/REINFORCEMENT REM REMOVE/REMOVABLE REQD REQUIRED RET RETURN REV REVISED/REVISION RFG ROOFING RH RIGHT HAND RHR RIGHT HAND REVERSE RM ROOM RND ROUND RO ROUGH OPENING ROW RIGHT OF WAY RS ROOF SUMP RTU ROOF TOP UNIT RV ROOF VENTILATION RWC RAIN WATER CONDUCTOR S SOUTH/STORM/SINK SA SUPPLY AIR SAG SUPPLY AIR GRILLE SAN SANITARY SAR SUPPLY AIR REGISTER SB SOIL BEARING SC SOLID CORE SCHED SCHEDULE SD SUPPLY DUCT/DIFFUSER SECT SECTION SF SQUARE FEET/SQUARE FOOT/SUPPLY FAN SHR SHOWER SHT SHEET SIM SIMILAR SNT SEALANT SOG SLAB ON GRADE SP SPACING SPEC SPECIFICATION SPKLR SPRINKLER SPKR SPEAKER SQ SQUARE STAG STAGGERED STC SOUND TRANSMISSION CLASS SS SERVICE SINK SST STAINLESS STEEL ST STREET STD STANDARD STIFF STIFFENER STL STEEL STM STEAM STOR STORAGE STRL STRUCTURAL SUB SUBSTATION SUPP SUPPORT SURF SURFACE/SURFACING SUSP SUSPEND/SUSPENSION SW SWITCH SYM SYMBOL/SYMMETRICAL SYS SYSTEM T THERMOSTAT/TREAD T/ TOP OF TAN TANGENT T&B TOP AND BOTTOM T&G TONGUE AND GROOVE TB TEST BOARING/TOWEL BAR TBD TACKBOARD/TO BE DETERMINED TD TRENCH DRAIN TECH TECHNICAL TEL TELEPHONE TEMP TEMPERATURE/TEMPORARY/TEMPERED THK THICK/THICKNESS THR THRESHOLD THRU THROUGH/THROUGHOUT TOS TOP OF STEEL/TOP OF SLAB TP TANGENT POINT TRAN TRANSOM/TRANSFORMER TS TUBE SECTION/TUBE STEEL/THICKENED SLAB TV TELEVISION TW THROUGH WALL TYP TYPICAL UC UNDERCUT UG UNDERGROUND UH UNIT HEATER UL UNDERWRITER'S LABORATORY ULT ULTIMATE UNEX UNEXCAVATED UNFIN UNFINISHED UON UNLESS OTHERWISE NOTED UR URINAL USGS UNITED STATES GEOLOGICAL SURVEY VAC VACUUM VAR VARIABLE/VARIES VCP VITRIFIED CLAY PIPE VENT VENTILATE/VENTILATION VERT VERTICAL/VERTICALLY VEST VESTIBULE VIF VERIFY IN FIELD VIT VITREOUS VOL VOLUME VR VAPOR RETARDER VTR VENT THRU ROOF W WIDE/WIDTH/WEST/WASTE/WATTS W/ WITH WC WATER CLOSET WCAB WALL CABINET WD WOOD WH WALL HYDRANT WL WORKING LINE WM WATER METER WO WINDOW OPENING W/O WITHOUT WP WATERPROOFING/WATERPROOF/WEATHERPROOF WP WORKING POINT WR WASTE RECEPTICLE/WATER RESISTANT WSCT WAINSCOT WT WEIGHT/WATERTIGHT W/W WALL TO WALL WWF WELDED WIRE FABRIC WWM WELDED WIRE MESH WGL WIRE GLASS YD YARD YP YIELD POINT YR YEAR YS YIELD STRENGTH 101 1 View Name 1/8" = 1'-0"A101 A101 2 3 4 1 0 Room name 101 Name Elevation A101 1 DESCRIPTION STARTS AT WALL SURFACE DESIGNATED WALL CONSTRUCTION TYPE NUMBER AS SEEN ON WALL TYPE SHEET. 1 A-101.01 MATCH LINE A-102.01 A-101.01 MATCH LINE A-102.01 SHEET IDENTIFICATION NUMBER (INDICATES SHEET NUMBER OF DRAWING) SHEET IDENTIFICATION NUMBER (INDICATES SHEET NUMBER WHERE DRAWN) 0 SHEET IDENTIFICATION (INDICATES SHEET WHERE DRAWN) IDENTIFICATION NUMBER (NUMBER ON SHEET WHERE DRAWN) SHEET IDENTIFICATION (INDICATES SHEET WHERE DRAWN) COLUMN IDENTIFICATION FOR EXISTING CONSTRUCTION COLUMN IDENTIFICATION FOR NEW CONSTRUCTION SHEET IDENTIFICATION DETAIL & ENLARGED PLAN LOCATION INDICATION SECTION INDICATION SIMILAR TO IDENTIFIED DETAIL ELEVATION INDICATION COLUMN INDICATION NORTH INDICATION REVISION IDENTIFICATION DIMENSION LINE IDENTIFICATION REVISION CLOUD IDENTIFICATIONDOOR IDENTIFICATION OPENINGS (DOOR & BORROWED LIGHT) SHALL REPEAT ROOM NUMBER ASSIGNED TO ROOM. MULTIPLE OPENINGS TO ROOM SHALL REPEAT ROOM NUMBER WITH A POSTSCRIPT LETTER FOR EACH ADDITIONAL OPENING REQUIRED. 101 / 101A / 101B FOR NUMBER NEEDED ROOM NAME AND NUMBER IDENTIFICATION IDENTIFICATION NUMBER (NUMBER ON SHEET WHERE DRAWN) SHEET IDENTIFICATION (INDICATES SHEET WHERE DRAWN) WINDOW IDENTIFICATION WALL IDENTIFICATION CEILING HEIGHT IDENTIFICATION LEVEL INDICATION INDICATES DIRECTION OF VIEW DESCRIPTION STARTS AT WALL SURFACE DESIGNATED MATCHLINE IDENTIFICATION REFERENCE SYMBOLS 8'-0" 1 A101 1i 1t 0' - 2" 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:38:19PM AG.03 Reference Symbols + Abbreviations 02/22/13 CM S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI Date: Submitted for: 2/22/2013 PERMITS/BIDS
  • 4. UP TectonicCopyright2007 UP UP DN T T T T T UP UP G.4 G F.4 F E.4 E D.4 D A.7 B B.5 C.5 C 765432 A.9 G.2 1 8 H A A.8 3.6 G.5 EXIST MAINTENANCE OFFICE EXIST LOADING DOCK EXIST STORAGE EXIST STORAGE EXIST ELEV MACHINE ROOM EXIST ELEV NO 3 EXIST STAIR NO 3 EXIST CORRIDOR EXIST GENERATOR ROOM EXIST BOILER ROOM EXIST ELEV NO 1 EXIST STAIR NO 1 EXIST MEN EXIST WOMEN EXIST JC EXIST STAIR NO 2 EXIST ELEV NO 2 EXIST VESTIBULE EXIST FIRE PUMP ROOM EXIST IT EXIST STORAGE EXIST STORAGE EXIST CONF EXIST OFFICE EXIST PRE FUNCTION EXIST MAILBOXES EXIST CONF EXIST CONF EXIST CONF EXIST CONF EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST CAFE EXIST SERVICE EXIST KITCHENEXIST COPY ROOM EXIST OPEN OFFICE EXIST SERVICE/ SECURITY DESK EXIST OFFICE EXIST OFFICE EXIST STORAGE EXIST OFFICE EXIST CORRIDOR EXIST LUNCH EXIST MECH EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST CONF EXIST CONF EXIST STORAGE EXIST STORAGE EXIST STORAGE EXIST OFFICE EXIST OFFICE EXIST CONF EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OPEN OFFICE EXIST OFFICE EXIST UNISEX EXIST OFFICE EXIST OFFICEEXIST OFFICE EXIST CORRIDOR EXIST VESTIBULE EXIST MAINTENANCE OFFICE EXIST KITCHENETTE EXIST MAILBOXES EXIST MECH EXIST OFFICE 150'-0" 30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0" 188' - 6" 10'-8"2'-8"1'-2"6'-6"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"6'-0"6'-2"8'-6" 1 1 11 8 1 1 10 1 10 1 10 1 8 1 1 1 1 1 1 1 1 8 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8 1 8 1 8 1 3 1 1 1 8 1 1 11 1 1 1 1 1 1 11 1 1 1 1 1 1 1 11 1 1 2 9 1 1 1 3 1 8 11 1 1111 11 12 VIF 3'-0" 1 14 13 13 13 3 3 33 3 13 13 13 13 13 EXISTING MILLWORK AND SINK TO REMAIN 11 8 16 A5.09 13 EXISTING CHASE TO REMAIN 19 18 19 19 EXISTING TO BE REMOVED EXISTING TO REMAIN EXISTING FLOOR FINISH TO BE REMOVED NIC - NOT IN CONTRACT DEMOLITION - LEGEND ALL WALLS, CEILINGS, DOORS AND FLOOR FINISHES SHALL BE REMOVED UNLESS NOTED OTHERWISE OR SHOWN AS REMAINING. SEE MECH AND ELEC DEMO DRAWINGS FOR ADDITIONAL DEMO WORK AND FOR SERVICES THAT MUST REMAIN ACTIVE. SAWCUT AND REMOVE FLOOR SLAB AS REQUIRED FOR UTILITIES. COORDINATE WITH MECH AND ELEC DRAWINGS. PATCH AND REPAIR ALL EXISTING MATERIALS TO REMAIN AS NEEDED WHERE REMOVAL OF EXISTING CONSTRUCTION OR WHERE THE REQUIRED OF NEW CONSTRUCTION, ALTERS THE EXISTING MATERIALS. DEMO DRAWINGS SHOW GENERAL INTENT AND AREA. EXACT EXTENT IS TO BE DETERMINED BY FIELD VERIFICATION AND COORDINATION WITH THE CONTRACT DOCUMENTS. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. ALL CONDITIONS SHALL BE FIELD VERIFIED DURING BID PROCESS. NOTIFY ARCHITECT AND/OR CONSTRUCTION MANAGER OF ALL CONDITIONS AFFECTING INTENT OF NEW CONSTRUCTION. ALL DOOR HARDWARE TO BE REMOVED AND SALVAGED. TURN OVER TO OWNER'S REPRESENTATIVE UPON COMPLETION OF DEMOLITION PHASE. ALL ITEMS TO REMAIN SHALL BE CLEANED, INSPECTED AND VERIFIED OF WORKING ORDER. NOTIFY ARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE IF ANY ITEM IS NOT IN WORKING ORDER. CONTRACTOR TO LOCATE ON SITE INDIVIDUAL DUMPSTER FOR RECYCLE DEMOLITION ITEMS PER N.I.H. REGULATIONS. COORDINATE FINAL LOCATIONS WITH OWNER'S REPRESENTATIVE. EXISTING FIRE EXIT SIGNS, STROBES, HORNS, SPEAKER AND SMOKE DETECTORS. SEE ARCHITECTURAL + ELECTRICAL DRAWINGS. CONTRACTOR TO REMOVE ALL FURNITURE, FILE CABINETS AND STORAGE UNITS UNLESS OTHERWISE NOTED. CONTRACTOR TO REMOVE ALL ART WORK, SIGNAGE, MARKER BOARDS, TACK BOARDS, PROJECTION SCREENS AND CLOCKS. SALVAGE AND COORDINATE STORAGE WITH OWNER FOR REUSE. SEE ARCHITECTURAL FOR REUSE LOCATION. ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE LOCAL AND STATE CODES. SEE MECHANICAL, AND ELECTRICAL DEMOLITION DRAWINGS FOR ADDITIONAL SCOPE OF DEMOLITION AND NEW WORK. DEMOLITION - GENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 10 1 2 3 REMOVE EXISTING PARTITION, DOORS AND ASSOCIATED COMPONENTS. REMOVE PORTION OF WALL AND ASSOCIATED COMPONENTS AS REQUIRED FOR NEW OPENING. REMOVE PLUMBING FIXTURES, SEE MECH FOR ADDITIONAL SCOPE. RECEPTION DESK TO REMAIN FOR PRECONSTRUCTION PHASE- REMOVAL, DEMOLITION TO BE COORDINATED WITH CONSTRUCTION MANAGER. REMOVE SIDE LITE, GLASS AND ASSOCIATED COMPONENTS. REMOVE CARPET TILE FLOOR AS REQUIRED FOR WORK. SALVAGE FOR RECYCLING + COORDINATE STORAGE WITH OWNER. REMOVE TILE FLOORING IN CAFE. REMOVE EXISTING MILLWORK/CASEWORK AND ASSOCIATED COMPONENTS TO FACILITATE WORK. REMOVE EXISTING EXHAUST FAN VENT FROM EXISTING WINDOW PANE. SEE SHEET AD1.01 & MECH. FOR ADDITIONAL SCOPE. REMOVE EXISTING MAILBOXES AND ASSOCIATED COMPONENTS TO FACILITATE WORK. SALVAGE AND COORDINATE STORAGE WITH OWNER FOR REUSE. SEE A1.01 FOR REUSE LOCATION. REMOVE EXISTING DOOR, FRAME AND ASSOCIATED COMPONENTS TO FACILITATE WORK. (RECYLE DOORS). COORDINATE WITH CM/OWNER FOR STORAGE. REMOVE EXISTING ACOUSTICAL PANEL AND ASSOCIATED COMPONENTS. EXISTING STUD FRAMING, GYP. BD. SOFFIT AND GYP. BD. ON KITCHEN SIDE TO REMAIN. REMOVE EXISTING EQUIPMENT. REMOVE EXISTING ELECTRICAL EQUIPMENT. SEE ELEC. FOR ADDITIONAL SCOPE. REMOVE ROLLER SHADES AND SALVAGE FOR REUSE. COORDINATE STORAGE WITH CM/ OWNER. REMOVE EXISTING TUBE STEEL COLUMN AND HEADER PATCH / REPAIR FLOOR AS NEEDED TO FACILITATE NEW WORK. REMOVE REACH-IN COOLER- STORE FOR REUSE- COORDINATE WITH CM/ OWNER. EXISTING CARPET TILES TO REMAIN DURING 1ST PHASE OF DEMOLITION / CONSTRUCTION. TILE TO BE REMOVED AS REQUIRED FOR WORK. SALVAGE FOR REYCLING, COORDINATE STORAGE WITH OWNER. SEE SHEET AD1.02 FOR TEMPORARY CONSTRUCTION LAYOUT. COORDINATE PHASING REMOVAL WITH CM / OWNER. EXISTING CERAMIC FLOOR TILES TO REMAIN DURING 1ST PHASE OF DEMOLITION / CONSTRUCTION. SEE SHEET AD1.02 FOR TEMPORARY CONSTRUCTION LAYOUT. FLOOR TILES TO BE TO BE REMOVED AS REQUIRED FOR NEW WORK. FLOOR AREA TO BE LEVELED, PATCHED, & PREPED FOR NEW FLOOR FINISH. COORDINATE PHASING REMOVAL WITH CM / OWNER. 4 5 6 7 8 9 11 DEMOLITION - KEYNOTES 12 13 14 15 16 17 19 18 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:34:12PM AD1.01 First Floor Demolition Plan 02/22/13 CM D. Thomas 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/8" = 1'-0"A5.05 1 FIRST FLOOR DEMOLITION PLAN 1/18/2013 QUALITY REVIEW 2/22/2013 PERMITS/BIDS Date: Submitted for: NOTE TO CONTRACTOR THIS IS A HISTORICALLY DESIGNATED BUILDING. WINDOWS ARE TO REMAIN AS IS. CONTACT ARCHITECT FOR ORIGINAL BUILDING DOCUMENTS AND STATE HISTORIC PRESERVATION OFFICE DOCUMENTS, IF REQUIRED. REFERENCE SHEETS AD3.01 & AD3.02 FOR FURTHER CLARITY OF DEMOLITION SCOPE. SEE SHEET A1.01, MECH & ELEC DRAWINGS FOR REQUIRED FLOOR SAW CUT LOCATIONS.
  • 5. UP TectonicCopyright2007 UP UP DN T T T T G.4 G F.4 F E.4 E D.4 D A.7 B B.5 C.5 C 765432 A.9 G.2 1 8 H A A.8 3.6 G.5 1' - 6" RELOCATION OF EXISTING MAILBOXES FOR TEMPORARY CONSTRUCTION (TYP) EXIST SERVICE/ SECURITY DESK EXIST VESTIBULE EXIST SERVICE/ SECURITY DESK EXIST STAIR NO 2 EXIST ELEV NO 2 PRIOR TO DEMO KEEP EXISTING BACK WALL (V.I.F.) 31' - 1" 15'-2" A A A A PROVIDE TEMPORARY HEATING AND COOLING FOR TEMPORARY RECEPTION/ ELEVATOR AREA DURING CONSTRUCTION. PROVIDE TEMPORARY DATA AND TELEPHONE FOR TEMPORARY RECEPTION/ ELEVATOR LOBBY DURING CONSTRUCTION. PROVIDE TEMPORARY ELECTRIC AND LIGHTING WITH LOCAL SWICTH WITH ADEQUATE ILLUMINATION FOR OWNER USE OF TEMPORARYRECEPTION/ EVEVATOR AREA DURING CONSTRUCTION. TEMPORARY CONSTRUCTION DRAWINGS SHOW GENERAL INTENT AND AREA. EXACT EXTENT IS TO BE DETERMINED BY FIELD VERIFICATION AND COORDINATION WITH THE CONTRACT DOCUMENTS. ALL CONDITIONS SHALL BE FIELD VERIFIED DURING BID PROCESS. NOTIFY ARCHITECT AND/OR CONSTRUCTION MANAGER OF ALL CONDITIONS AFFECTING INTENT OF TEMPORARY CONSTRUCTION RECEPTION / ELEVATOR LOBBY. ALL TEMPORARY CONSTRUCTION ITEMS TO REMAIN SHALL BE CLEANED, INSPECTED AND VERIFIED OF WORKING ORDER. NOTIFY ARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE IF ANY ITEM IS NOT IN WORKING ORDER. REUSE EXISTING FIRE EXIT SIGNS, STROBES, HORNS, AND SMOKE DETECTORS. PROVIDE DUST FREE PARTITIONS AND TRAFFIC AREA IN TEMPORARY RECEPTION/ ELEVATOR LOBBY DURING CONSTRUCTION. REUSE OF EXISTING OWNER'S MAILBOXES IS TWO PHASED- PHASE 1- TEMPORARY CONSTRUCTION AREA - RECEPTION /ELEVATOR LOBBY. PHASE 2 - FINAL LAYOUT- MAILBOXES ROOM #118 TEMPORARY CONSTRUCTION - GENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 3/1/201312:10:55PM AD1.02 Temporary Construction Plan 02/22/13 CM S.LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/8" = 1'-0"A5.05 1 FIRST FLOOR TEMPORARY CONSTRUCTION PLAN Date: Submitted for: 2/22/2013 PERMITS/BIDS NOTE TO CONTRACTOR TEMPORARY CONSTRUCTION PLAN TO BE VERIFY BY CONSTRUCTION MANAGER AND SUBCONTRACTORS. THE INTENT OF THE TEMPORARY CONSTRUCTION PLAN IS TO GIVE THE CONTRACTOR A BASIS TO PRICE AND CONSTRUCT TEMPORARY PARTITIONS TO ALLOW BUILDING ACCESS FOR THE TENANTS OF THE BUILDING ON THE UPPER FLOORS, TENANTS MAIL BOX ACCESS AND RECEPTION DESK FUNCTIONS. PARTITION LAYOUT, EGRESS ACCESS, CONTRACTOR ACCESS POINTS ARE TO BE VERIFIED WITH CONSTRUCTION MANAGER AND BUILT TO STATE CODES. NOTE TO CONTRACTOR LAYOUT MUST ACCOMMODATE (19) EXISTING RELOCATED MAILBOXES- TEMPORARY CONSTRUCTION LAYOUT SHOW FOR PRICING ONLY.
  • 6. G.4 G F.4 F E.4 E D.4 D A.7 B B.5 C.5 C 765432 A.9 G.2 1 8 H A A.8 3.6 G.5 EXIST MAINTENANCE OFFICE EXIST LOADING DOCK EXIST STORAGE EXIST STORAGE EXIST ELEV MACHINE ROOM EXIST ELEV NO 3 EXIST STAIR NO 3 EXIST GENERATOR ROOM EXIST BOILER ROOM EXIST ELEV NO 1 EXIST STAIR NO 1 EXIST MEN EXIST WOMEN EXIST JC EXIST STAIR NO 2 EXIST ELEV NO 2 EXIST PUMP ROOM EXIST IT EXIST STORAGE EXIST STORAGE EXIST CONF EXIST OFFICE EXIST PRE FUNCTION EXIST MAILBOXES EXIST CONF EXIST CONF EXIST CONF EXIST CONF EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST CAFE EXIST SERVICE EXIST COPY ROOM EXIST OPEN OFFICE EXIST SERVICE/ SECURITY DESK EXIST OFFICE EXIST OFFICE EXIST STORAGE EXIST OFFICE EXIST CORRIDOR EXIST KITCHEN EXIST LUNCH EXIST MECH EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST CONF EXIST CONF EXIST STORAGE EXIST STORAGE EXIST OFFICE EXIST CONF EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OPEN OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICEEXIST OFFICE EXIST VESTIBULE EXIST MAINTENANCE OFFICE EXIST MAINTENANCE OFFICE EXIST LOADING DOCK EXIST STORAGE EXIST STORAGE EXIST ELEV MACHINE ROOM EXIST ELEV NO 3 EXIST STAIR NO 3 EXIST CORRIDOR EXIST GENERATOR ROOM EXIST BOILER ROOM EXIST ELEV NO 1 EXIST STAIR NO 1 EXIST MEN EXIST WOMEN EXIST JC EXIST STAIR NO 2 EXIST ELEV NO 2 EXIST VESTIBULE EXIST PUMP ROOM EXIST IT EXIST STORAGE EXIST STORAGE EXIST KITCHEN EXIST CONF EXIST OFFICE EXIST PRE FUNCTION EXIST MAILBOXES EXIST CONF EXIST CONF EXIST CONF EXIST CONF EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST CAFE EXIST SERVICE EXIST KITCHEN EXIST COPY ROOM EXIST OPEN OFFICE EXIST SERVICE/ SECURITY DESK EXIST OFFICE EXIST OFFICE EXIST STORAGE EXIST OFFICE EXIST CORRIDOR EXIST KITCHEN EXIST LUNCH EXIST MECH EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST CONF EXIST CONF EXIST CONF EXIST STORAGE EXIST OFFICE EXIST STORAGE EXIST OFFICE EXIST OFFICE EXIST CONF EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OPEN OFFICE EXIST OFFICE EXIST UNISEX EXIST OFFICE EXIST OFFICEEXIST OFFICE EXIST CORRIDOR EXIST VESTIBULE EXIST MAINTENANCE OFFICE 30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0" 188' - 6" 10'-8"2'-8"1'-2"6'-6"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"6'-0"6'-2"8'-6" 150'-0" N.I.C N.I.CN.I.C N.I.C N.I.CN.I.C N.I.C N.I.C N.I.C N.I.C. - NOT IN CONTRACT 7 4 4 7 11 TYP.TYP. 6 6 TYP. TYP. 8 TYP. 6 6 6 6 3 3 5 66 TYP. 10 10 10 1 TYP. 1 TYP. 1 TYP. 7 TYP. 7 TYP. 9TYP. 9TYP. 9 TYP. 6 1 TYP. 1 TYP. 1 TYP. 1 TYP. 1 TYP. 1 TYP. 4444 4 4 4 4 4 4 4 4 1 TYP. 1 TYP. 1 TYP. 1 TYP. 1 TYP. 1 TYP. 1 TYP. 1 TYP. 8 TYP. 8 TYP. 8 TYP. 6 TYP. 2 9 TYP. 11 DEMOLITION CEILING LEGEND RECESSED CAN LIGHT FIXTURE 2X4 PARABOLIC (REUSE) LINEAR SUSPENDED REMOVE EXISTING LINEAR LIGHT FIXTURE AND ASSOCIATED COMPONENTS TO FACILITATE WORK. SALVAGE + COORDINATE STORAGE WITH OWNER FOR REUSE. MAIN DUCT WORK RUNS TO REMAIN. COORDINATE WITH MECHANICAL DRAWINGS. REMOVE EXISTING GYP. BD. CEILING, AND ASSOCIATED COMPONENTS REQUIRED TO FACILITATE WORK. REMOVE EXISTING LAY-IN CEILING +GRID AND ASSOCIATED COMPONENTS REQUIRED TO FACILITATE WORK. REMOVE EXISTING ACOUSTICAL PANEL CEILING CLOUD AND ASSOCIATED COMPONENTS REQUIRED TO FACILITATE WORK. STORE EXISTING RECESSED CAN LIGHT FIXTURE FOR RECYCLING /SALVAGE + COORDINATE STORAGE WITH OWNER FOR REUSE. REMOVE EXISTING ACOUSTICAL LAY-IN CLOUD AND ASSOCIATED COMPONENTS. EXISTING 2X4 PARABOLIC FIXTURE RECESSED. SALVAGE + COORDINATE STORAGE WITH OWNER. EXISTING LIGHT FIXTURE TO REMAIN. CONTRACTOR TO CLEAN FIXTURE AND/OR LENS COVERS AFTER CONSTRUCTION. EXISTING CEILING TO REMAIN. REMOVE EXISTING TRACK LIGHTING. 1 2 3 4 5 6 7 8 9 CEILING DEMOLITION - KEYNOTES 10 11 ALL WALLS, CEILINGS, DOORS AND FLOOR FINISHES SHALL BE REMOVED UNLESS NOTED OTHERWISE OR SHOWN AS REMAINING. SEE MECH AND ELEC DEMO DRAWINGS FOR ADDITIONAL DEMO WORK AND FOR SERVICES THAT MUST REMAIN ACTIVE. SAWCUT AND REMOVE FLOOR SLAB AS REQUIRED FOR UTILITIES. COORDINATE WITH MECH AND ELEC DRAWINGS. PATCH AND REPAIR ALL EXISTING MATERIALS TO REMAIN AS NEEDED WHERE REMOVAL OF EXISTING CONSTRUCTION OR WHERE THE REQUIRED OF NEW CONSTRUCTION, ALTERS THE EXISTING MATERIALS. DEMO DRAWINGS SHOW GENERAL INTENT AND AREA. EXACT EXTENT IS TO BE DETERMINED BY FIELD VERIFICATION AND COORDINATION WITH THE CONTRACT DOCUMENTS. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. ALL CONDITIONS SHALL BE FIELD VERIFIED DURING BID PROCESS. NOTIFY ARCHITECT AND/OR CONSTRUCTION MANAGER OF ALL CONDITIONS AFFECTING INTENT OF NEW CONSTRUCTION. ALL DOOR HARDWARE TO BE REMOVED AND SALVAGED. TURN OVER TO OWNER'S REPRESENTATIVE UPON COMPLETION OF DEMOLITION PHASE. ALL ITEMS TO REMAIN SHALL BE CLEANED, INSPECTED AND VERIFIED OF WORKING ORDER. NOTIFY ARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE IF ANY ITEM IS NOT IN WORKING ORDER. CONTRACTOR TO LOCATE ON SITE INDIVIDUAL DUMPSTER FOR RECYCLE DEMOLITION ITEMS PER N.I.H. REGULATIONS. COORDINATE FINAL LOCATIONS WITH OWNER'S REPRESENTATIVE. EXISTING FIRE EXIT SIGNS, STROBES, HORNS, SPEAKER AND SMOKE DETECTORS. SEE ARCHITECTURAL + ELECTRICAL DRAWINGS. CONTRACTOR TO REMOVE ALL FURNITURE, FILE CABINETS AND STORAGE UNITS UNLESS OTHERWISE NOTED. CONTRACTOR TO REMOVE ALL ART WORK, SIGNAGE, MARKER BOARDS, TACK BOARDS, PROJECTION SCREENS AND CLOCKS. SALVAGE AND COORDINATE STORAGE WITH OWNER FOR REUSE. SEE ARCHITECTURAL FOR REUSE LOCATION. ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE LOCAL AND STATE CODES. SEE MECHANICAL, AND ELECTRICAL DEMOLITION DRAWINGS FOR ADDITIONAL SCOPE OF DEMOLITION AND NEW WORK. DEMOLITION - GENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:35:43PM AD2.01 First Floor Demolition Reflected Ceiling Plan 02/22/13 C.M S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/8" = 1'-0"A5.05 1 DEMOLITION FIRST FLOOR REFLECTED CEILING PLAN 1/18/2013 QUALITY REVIEW 2/22/2013 PERMITS/BIDS Date: Submitted for: NOTE TO CONTRACTOR: 196 REUSED LENIAR LIGHTING FIXTURES. SAVE 20% FOR PARTS USED FOR RETROFITTING FIXTURES. CONTRACTOR TO FEILD VERIFY LIGHTING FIXTURE COUNT.
  • 7. 10 1 2 3 REMOVE EXISTING PARTITION, DOORS AND ASSOCIATED COMPONENTS. REMOVE PORTION OF WALL AND ASSOCIATED COMPONENTS AS REQUIRED FOR NEW OPENING. REMOVE PLUMBING FIXTURES, SEE MECH FOR ADDITIONAL SCOPE. RECEPTION DESK TO REMAIN FOR PRECONSTRUCTION PHASE- REMOVAL, DEMOLITION TO BE COORDINATED WITH CONSTRUCTION MANAGER. REMOVE SIDE LITE, GLASS AND ASSOCIATED COMPONENTS. REMOVE CARPET TILE FLOOR AS REQUIRED FOR WORK. SALVAGE FOR RECYCLING + COORDINATE STORAGE WITH OWNER. REMOVE TILE FLOORING IN CAFE. REMOVE EXISTING MILLWORK/CASEWORK AND ASSOCIATED COMPONENTS TO FACILITATE WORK. REMOVE EXISTING EXHAUST FAN VENT FROM EXISTING WINDOW PANE. SEE SHEET AD1.01 & MECH. FOR ADDITIONAL SCOPE. REMOVE EXISTING MAILBOXES AND ASSOCIATED COMPONENTS TO FACILITATE WORK. SALVAGE AND COORDINATE STORAGE WITH OWNER FOR REUSE. SEE A1.01 FOR REUSE LOCATION. REMOVE EXISTING DOOR, FRAME AND ASSOCIATED COMPONENTS TO FACILITATE WORK. (RECYLE DOORS). COORDINATE WITH CM/OWNER FOR STORAGE. REMOVE EXISTING ACOUSTICAL PANEL AND ASSOCIATED COMPONENTS. EXISTING STUD FRAMING, GYP. BD. SOFFIT AND GYP. BD. ON KITCHEN SIDE TO REMAIN. REMOVE EXISTING EQUIPMENT. REMOVE EXISTING ELECTRICAL EQUIPMENT. SEE ELEC. FOR ADDITIONAL SCOPE. REMOVE ROLLER SHADES AND SALVAGE FOR REUSE. COORDINATE STORAGE WITH CM/ OWNER. REMOVE EXISTING TUBE STEEL COLUMN AND HEADER PATCH / REPAIR FLOOR AS NEEDED TO FACILITATE NEW WORK. REMOVE REACH-IN COOLER- STORE FOR REUSE- COORDINATE WITH CM/ OWNER. EXISTING CARPET TILES TO REMAIN DURING 1ST PHASE OF DEMOLITION / CONSTRUCTION. TILE TO BE REMOVED AS REQUIRED FOR WORK. SALVAGE FOR REYCLING, COORDINATE STORAGE WITH OWNER. SEE SHEET AD1.02 FOR TEMPORARY CONSTRUCTION LAYOUT. COORDINATE PHASING REMOVAL WITH CM / OWNER. EXISTING CERAMIC FLOOR TILES TO REMAIN DURING 1ST PHASE OF DEMOLITION / CONSTRUCTION. SEE SHEET AD1.02 FOR TEMPORARY CONSTRUCTION LAYOUT. FLOOR TILES TO BE TO BE REMOVED AS REQUIRED FOR NEW WORK. FLOOR AREA TO BE LEVELED, PATCHED, & PREPED FOR NEW FLOOR FINISH. COORDINATE PHASING REMOVAL WITH CM / OWNER. 4 5 6 7 8 9 11 DEMOLITION - KEYNOTES 12 13 14 15 16 17 19 18 1 1 1 1 1 11 1 13 3 3 3 3 3 3 8 8 13 13 8 8 8 8 10 10 10 1 8 8 4 8 12 11 11 11 11 17 14 1 11 1 PICTURES TAKEN @ EXISTING CAFE ENTRY PICTURES TAKEN @ RECEPTION AREA PICTURES TAKEN EXISTING LUNCH ROOM AREA PICTURES TAKEN @ MAIL ROOM AREA PICTURES TAKEN OF TYPICAL DEMOLITION CONDITIONS PICTURES TAKEN @ EXISTING CAFE KITCHEN PICTURES TAKEN @ EXISTING CAFE RESTROOM 9 15 15 5 15 18 1818 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:36:09PM AD3.01 Demolition Photos 02/22/13 SR S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/18/2013 QUALITY REVIEW 2/22/2013 PERMITS/BIDS Date: Submitted for:
  • 8. REMOVE EXISTING LINEAR LIGHT FIXTURE AND ASSOCIATED COMPONENTS TO FACILITATE WORK. SALVAGE + COORDINATE STORAGE WITH OWNER FOR REUSE. MAIN DUCT WORK RUNS TO REMAIN. COORDINATE WITH MECHANICAL DRAWINGS. REMOVE EXISTING GYP. BD. CEILING, AND ASSOCIATED COMPONENTS REQUIRED TO FACILITATE WORK. REMOVE EXISTING LAY-IN CEILING +GRID AND ASSOCIATED COMPONENTS REQUIRED TO FACILITATE WORK. REMOVE EXISTING ACOUSTICAL PANEL CEILING CLOUD AND ASSOCIATED COMPONENTS REQUIRED TO FACILITATE WORK. STORE EXISTING RECESSED CAN LIGHT FIXTURE FOR RECYCLING /SALVAGE + COORDINATE STORAGE WITH OWNER FOR REUSE. REMOVE EXISTING ACOUSTICAL LAY-IN CLOUD AND ASSOCIATED COMPONENTS. EXISTING 2X4 PARABOLIC FIXTURE RECESSED. SALVAGE + COORDINATE STORAGE WITH OWNER. EXISTING LIGHT FIXTURE TO REMAIN. CONTRACTOR TO CLEAN FIXTURE AND/OR LENS COVERS AFTER CONSTRUCTION. EXISTING CEILING TO REMAIN. REMOVE EXISTING TRACK LIGHTING. 1 2 3 4 5 6 7 8 9 CEILING DEMOLITION - KEYNOTES 10 11 1 2 11 1 2 9 2 7 3 6 3 6 4 8 5 6 1 7 4 8 TECHTOWN GENERAL LIGHTING CONDITIONS 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:36:28PM AD3.02 Demolition Photos 02/22/13 SR S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/18/2013 QUALITY REVIEW 2/22/2013 PERMITS/BIDS Date: Submitted for:
  • 9. UP UP UP DN T T T T UP UP G.4 G F.4 F E.4 E D.4 D A.7 B B.5 C.5 C 765432 A.9 G.2 6'-0" ELEC 109 1 8 H A A.8 3.6 G.5 RECEPTION/SECURITY DESK 129 STORAGE A 107 TECH TOWN MANAGEMENT 103 STORAGE B 120 A5.08 KRESGE CONNECT VIDEO CONFERENCING 108 EVENT SPACE 2 125 EVENT SPACE 1 126 CONFERENCE ROOM 1 127 CONFERENCE ROOM 2 128 CONF ROOM 5 124 TECH TOWN CONF RM 105 DIRECTORS OFFICE 104 COPY CENTER 137 A5.01 4 A5.03 4 COORIDOR 4 119 ELEVATOR LOBBY 102 MEETING RM 4 117 MTG RM 3 116 MTG RM 2 115 MEETING RM 1 114 A5.03 3 EXIST MAINTENANCE OFFICE EXIST LOADING DOCK EXIST STORAGE EXIST STORAGE EXIST ELEV MACHINE ROOM EXIST ELEV NO 3 EXIST STAIR NO 3 EXIST CORRIDOR EXIST GENERATOR ROOM EXIST BOILER ROOM EXIST STAIR NO 1 EXIST MEN EXIST WOMEN EXIST JC EXIST STAIR NO 2 EXIST ELEV NO 2 EXISTING FIRE PUMP ROOMEXIST IT COPIER/PRINTER CO-WORKING AREA - A 136 COORIDOR 1 110 PHONE 132 PHONE 133 PHONE 134 CO-WORKING AREA - B 130 CO-WORKING CONFERNCE 135 EXIST MECH ROOM COORIDOR 2 111 TRAINING/ACCELERATION 112 KITCHENETTE B 013 KITCHEN AREA 131 5'-6"8'-0"5'-6"5'-10"8'-0"5'-10" A5.03 6 3 A5.10 6'-2" 17' - 6" A5.03 2 A5.01 1 30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0" 188' - 6" 10'-8"2'-8"1'-2"6'-6"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"6'-0"6'-2"8'-6" 150'-0" KITCHENETTE A 106 B A1 A1 A1 A1 A1 A1A1 B B A1 A A1 A5.082 A6.01 1 WOOD BENCH LOCKERS B A A C A B B A1 A1 A1 A1 1 A5.10 A1 A1 A1 A1 A1 C A1 B 126A 125A 124123122 120 105 104 102 127 126B 128 125B 139 132 133 134109 117 114 126C 125C VESTIBULE 101 13' - 0" 10'-11"+/- 5 1 A5.08 6 A5.087 A5.08 9 A5.0910 A5.08 10 8 A5.09 7 13'-4"+/- EQ EQ 12'-6"42'-6"15'-0"5'-3" EQEQ 44' - 11" A5.03 5 19'-2" 6'-11"14'-4"5'-3" A5.01 5 1' - 3" LINE OF RECEPTION/ SECURITY DESK. SEE A5.01 A6.01 2 A6.01 6 A6.01 4 A5.05 1 116 115 A5.01 2 A5.03 1 A5.03 8 103 108 112 15' - 0" 14' - 5" 15' - 0" CONF ROOM 4 123 CONF ROOM 3 122 A5.10 7 4 A5.10 MAINTENANCE ROOM 139 CLEAR OPENING 16' - 10" CLEAR OPENING 20' - 0" OPERABLE PARTITION 1'-4" 1'-7" LINE OF OVERHEAD DOOR ABOVE (TYP) A6.01 3 A6.01 3 Sim OPERABLE PARTITION A6.01 3 Sim 108A108B108C A A1 REPAIR EXIST FLOOR TO MATCH A5.09 A5.09 11 17'-8" 140 28'-1" A A E A 6"STUD 5'-2" 8'-6" TALL GYP BD ON METAL STUD PARTITION A5.09 8 FEC FEC FEC FEC C FEC 7'-6" A5.09 14 A5.09 15 A5.10 5 2 A5.10 A5.09 15Sim 12 A5.09 12 Sim A6.02 1 Sim A6.02 1 Sim A1 ALIGN EXIST AND NEW PARTITIONS PARTITION TO BE 6" STUD FROMDESK 6'-6"CLEAR VIDEO CONF. TV OF/CI A5.054 A5.05 5 6 6" STUD PARTITION VIDEO CONF. TV OF/CI VIDEO CONF. TV OF/CI N.I.C. - NOT IN CONTRACT A6.02 13 ESTIMATED AREAS OF EXIST. CONC. SLAB TO BE CUT AND PATCHED FOR NEW UNDERGROUND UTILITIES. COORDINATE WITH MECHANICAL AND ELECTRICAL SHEETS FOR EXACT LOCATIONS (TYP.) CLEAR 9' - 2" 12' - 8" A5.09 8 Sim A1 A1 ALIGN RECEPTIONDESK WITHPARTITION A6.02 12 EXISTING DOOR, SEE DOOR SCHEDULE SHEET A7.01 141 COORIDOR 3 121 MAIL BOXES 118 SAW CUT FLOOR AREAS FOR UNDERGROUND UTILITIES 11' - 11" 10' - 7" REMOVE EXISTING PANIC DOOR HARDWARE. PROVIDE NEW DELAYED EGRESS PANIC HARDWARE PER BASIS OF DESIGN DETEX DE EasyKit IT SHALL BE EACH TRADE CONTRACTORS RESPONSIBILITY TO VISIT THE SITE AND FAMILIARIZE HIMSELF/ HERSELF WITH ALL EXISTING CONDITIONS. EACH CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND OTHERWISE VERIFY ALL DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS INDICATED AND/ OR SHOWN ON THE DRAWINGS. SHOULD ANY ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR SHALL NOT PROCEED WITH THE WORK AFFECTED THEREBY UNTIL REPORTING THE SAME TO THE ARCHITECT AND OWNER REPRESENTATIVE FOR CLARIFICATION AND/ OR CORRECTION. DIMENSIONS FOLLOWED BY +/- SHALL BE REVIEWED AND ALL NECESSARY ADJUSTMENTS MADE PRIOR TO FABRICATION AND/OR INSTALLATION OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK. VERIFY QUANTITY, SIZE AND LOCATION OF ALL FLOOR AND WALL OPENINGS FOR MECHANICAL AND ELECTRICAL WORK WITH THE APPROPRIATE TRADE. PROVIDE ALL OPENINGS SHOWN OR REQUIRED FOR COMPLETION OF WORK. PROVIDE FIRE WATCH DURING FIELD CUTTING AND WELDING OPERATIONS MEETING OWNERS REQUIRED. THE CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OF ALL UTILITIES IN WORK AREAS PRIOR TO PROCEEDING WITH CONSTRUCTION. ALL DISCREPANCIES SHALL BE DOCUMENTED AND FORWARDED TO ARCHITECT AND OWNER REPRESENTATIVE OF ACTION. IT IS THE CONTRACTOR RESPONSIBILITY TO INVESTIGATE FIELD CONDITIONS AND PROVIDE AS NEEDED TEMPORARY SUPPORTS, SHORING AND STRUCTURES AND UNDERGROUND UTILITIES DURING EXECUTION ALL PHASES OF WORK. RELEVANT DIMENSIONS AND ELEVATIONS FOR EQUIPMENT INSTALLATIONS SHALL BE VERIFIED AGAINST MANUFACTURES CERTIFIED EQUIPMENT DRAWINGS. ALL NEW GYPSUM BOARD CONSTRUCTION TO BE PRIMED AND PAINTED TO MATCH THE EXISTING ADJACENT CONSTRUCTION. VERIFY EXTEND OF PAINTING WITH ARCHITECT AND OWNER REPRESENTATIVE FOR CLARIFICATION AND/ OR ACTION. PROVIDE NEW WB-1 AT NEWLY CREATED ROOMS PARTITIONS AND EXISTING EXTERIOR CONCRETE WALLS (SEE 8.02 FOR FINISHES). DO NOT SCALE DRAWINGS TO DETERMINE SIZES AND DIMENSIONS. USE FIGURED DIMENSIONS ONLY. DIMENSIONS ARE TO FINISHED FACE OF WALLS UNLESS OTHERWISE NOTED. ALL PERIMETER DIMENSION ARE FROM FACE OF PERIMETER WALLS. ALL PENETRATIONS TO RATED FLOORS, CEILINGS AND WALLS SHALL BE SEALED AND FIRE STOPPED TO FIRE RATING EQUAL TO THE CONSTRUCTION BEING PENETRATED. NEW WORK SHALL ALIGN TO MATCH EXISTING WORK UNLESS NOTED OTHERWISE. SEE SHEET A6.01 FOR WALL TYPE DETAILS. ALL WORK TO CONFORM TO REQUIREMENTS OF THE LOCAL AND STATE CODES. CONSTRUCTION - GENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 3/1/201312:09:45PM A1.01 First Floor Plan 02/22/13 CM Checker 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/8" = 1'-0"A5.05 1 FIRST FLOOR PLAN NOTE TO CONTRACTOR THIS IS A HISTORICALLY DESIGNATED BUILDING. WINDOWS ARE TO REMAIN AS IS. CONTACT ARCHITECT FOR ORIGINAL BUILDING DOCUMENTS AND STATE HISTORIC PRESERVATION OFFICE DOCUMENTS, IF REQUIRED. 1/18/2013 QUALITY REVIEW 2/22/2013 PERMITS/BIDS S. LITTLE Date: Submitted for: D. THOMAS
  • 10. G.4 G F.4 F E.4 E D.4 D A.7 B B.5 C.5 C 765432 A.9 G.2 1 8 H A A.8 3.6 G.5 TECH TOWN MANAGEMENT 103 DIRECTORS OFFICE 104 TECH TOWN CONF RM 105 STORAGE A 107 CONF ROOM 5 124 ? ? ELEC 109 EVENT SPACE 2 125 EVENT SPACE 1 126 CONFERENCE ROOM 1 127 CONFERENCE ROOM 2 128 RECEPTION/SECURITY DESK 129 VESTIBULE 101 COPY CENTER 137 KRESGE CONNECT VIDEO CONFERENCING 108 STORAGE B 120 CO-WORKING AREA - B 130 MEETING RM 1 114 MTG RM 2 115 MTG RM 3 116 MEETING RM 4 117 COORIDOR 1 110 CO-WORKING AREA - A 136 PHONE 132 PHONE 133 PHONE 134 CO-WORKING CONFERNCE 135 COORIDOR 2 111 ELEVATOR LOBBY 102 COORIDOR 4 119 EXIST MAINTENANCE OFFICE EXIST LOADING DOCK EXIST STORAGE EXIST STORAGE EXIST ELEV MACHINE ROOM EXIST ELEV NO 3 EXIST STAIR NO 3 EXIST CORRIDOR EXIST GENERATOR ROOM EXIST BOILER ROOM EXIST STAIR NO 1 EXIST MEN EXIST WOMEN EXIST JC EXIST STAIR NO 2 EXIST ELEV NO 2 EXIST PUMP ROOM EXIST IT EXIST MAINTENANCE ROOM EXIST MECH ROOM 30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0" 188' - 6" 10'-8"2'-8"1'-2"6'-6"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"10'-10"6'-0"6'-2"8'-6" 150'-0" CONF ROOM 3 122 CONF ROOM 4 123 6'-1" 8' - 0"8' - 0"8' - 0" 8' - 6" 8' - 6"8' - 6" 8' - 0" 7' - 6" 7' - 6" 7' - 6" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 6" A6.03 4 3' - 0" 14' - 0" CENTER LINE 3'-0"12'-0" 7'-5"7'-5" 1'-8" 8' - 0" 8' - 0" 12'-0"1'-8" 14' - 0" 4' - 7" 14' - 0" 7' - 5" 23'-11" 11' - 9" 23' - 0" 11'-6"6'-5" 17' - 9" 8'-0" 17' - 10" 8'-0" 38' - 0" 14'-0" 6'-0"6'-0" A6.02 15 7' - 6" A6.03 4 Sim 4'-0"6'-0"4'-0"4'-0"6'-0"4'-0" 0' - 6" 38' - 0" 0' - 6" 0' - 6" 38' - 0" 0' - 6" PROJECTOR MOUNTED TO UNDERSIDE OF STRUCTURE OF/CI (TYP.) RETRACTABLE PROJECTOR OF/CI EXISTING CEILING & LIGHT FIXTURES 2x2 LAY-IN ACOUSTIC CEILING CLOUD (TYP.) EXISTING CEILING TO REMAIN 2X2 ACOUSTIC LAY-IN CEILING 2X2 ACOUSTIC LAY-IN CEILING CLOUD. CENTER IN ROOM (AT EVENT SPACE 1 & 2 AND CONF. ROOMS 1 & 2 EQ EQ 11' - 3" 11' - 3" 11' - 3" 5' - 8" 14'-0"(TYP.)7'-8" 8' - 6" 8' - 0" 8' - 0" 4'-8"4'-8"4'-8"4'-8" LIGHTS TO BE CENTERED ABOVE ISLAND ALIGN A6.03 6 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5'-0"5'-0"5'-0"5'-0"5'-0"5'-0"2'-6" 6' - 1" 3' - 10"3' - 10" HIDDEN LINE OF GYP. BD. CEILING ABOVE. SEE A5.03 17 A6.02 17 A6.02 Sim EXPOSED CEILING EXPOSED CEILING CEILING PLAN LEGEND LINEAR SUSPENDED LINEAR SUSPENDED (4) COMBINED IN 'X' FORMATION (REUSE) FABRIC CORD PENDANT LIGHT (GROUP OF 5 LIGHTS) LINEAR SUSPENDED (REUSE) 2X4 PARABOLIC (REUSE) SUPPLY AIR DIFFUSER 2'X4' RECESSED LIGHT FIXTURE 4' LINEAR PENDANT LIGHT WALL SCONCE RECESSED DOWNLIGHT 2'X2' LAY-IN OR ACOUSTICAL CLOUD GYPSUM BOARD CEILING PENDANT LIGHT (8" & 14") RETURN AIR DIFFUSER EXIT SIGN N.I.C. - NOT IN CONTRACT REFER TO SHEET AG.02 FOR FIRE RATED WALL LOCATIONS. REFER TO SHEET A1.01 FOR WALL TYPES. REFER TO ROOM FINISH SCHEDULE FOR PAINTING REQUIREMENTS. REFER TO SHEET A8.03 FOR FURNITURE INFORMATION. PROVIDE CEILING COORDINATION SHOP DRAWINGS FOR ARCHITECT APPROVAL. PATCH, REPAIR, CLEAN AND PREP CONCRETE CEILING AND DUCTWORK FOR PAINT. CEILING IS EXPOSED TO EXISTING CONCRETE STRUCTURE AND PAINTED EXCEPT WHERE INDICATED. COORDINATE ALL LIGHTING FIXTURES, POWER/DATA OUTLETS, SWITCHES, PANELS, EQUIPMENT, AND ASSOCIATED COMPONENTS WITH ELECTRICAL DRAWINGS. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE. COORDINATE ALL MECHANICAL DIFFUSERS, EQUIPMENT, FIRE PROTECTION AND ASSOCIATED COMPONENTS WITH MECHANICAL DRAWINGS. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL SCOPE. COORDINATE ALL EGRESS, FIRE ALARM, STROBES, EXIT SIGNS, PULL BOXES WITH FIRE PROTECTION AND ELECTRICAL DRAWINGS. ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE LOCAL AND STATE CODES. CEILING GENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:27:29PM A2.02 First Floor Reflected Ceiling Plan 02/22/13 CM Checker 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/8" = 1'-0"A5.05 1 FIRST FLOOR REFLECTED PLAN NOTE TO CONTRACTOR: PROVIDE CEILING COORDINATION SHOP DRAWING FOR ARCHITECT APPROVAL INCLUDE ALL MECHANICAL/ ELECTRICAL RUNS. S. LITTLE Date: Submitted for: 1/18/2013 QUALITY REVIEW 2/22/2013 PERMITS/BIDS NOTE TO CONTRACTOR: EXISTING CONCRETE BEAMS + STRUCTURE PAINT PER FINISH SCHEDULE. EXPOSED DUCTWORK IS REMOVED FROM ELEVATIONS (FOR CLARITY) PAINT TO MATCH EXIST STRUCTURE ABOVE (SEE FINISH SCHEDULE). LIGHTING REMOVED FROM ELEVATIONS (FOR CLARITY). STOREFRONT SYSTEM GLASS TO BE TEMPERED (TYP.).
  • 11.
  • 12.
  • 13. T T B C 3 A5.092 1' - 5" 4' - 11" 3' - 5" A6.01 5 6 A5.091 1'-6"8'-9" A5.09 5 EQ EQ 3 4 10' - 6" 9 A6.02 5 A6.02 15'-10" 3' - 4" RELOCATED MAILBOXES (TYP.) COUNTER TOP COUNTER TOP C 43.6 MEETING RM 4 117 MTG RM 2 115 MTG RM 3 116 11' - 11" EQ EQ 14'-4"6'-11" FEC A5.09 16 A5.09 16Sim SEE SHEET A5.06 FOR ELEVATIONS & MILLWORK E 4 ELEC 109 1'-1"6'-5" A5.08 3 6'-1" EXISTING TRANSFORMER (ABOVE) LINE OF CEILING ABOVE. SEE A2.02 ALIGN 11'-11" ALIGN WITH IT WALL INFORMATION KIOSK AREA, MILLWORK TO BE DETERMINED BY OWNER 4 H VESTIBULE 101 4'-11" ALIGN EXISTING GYP BD WALLS TO REMAIN (PAINT PER FINISH SCHEDULE) SHEET A8.02. F E.4 E 32 KRESGE CONNECT VIDEO CONFERENCING 108 A5.10 7 A6.01 8 A AA A D 10' - 8" 17' - 6" 7' - 6" EQEQ 0' - 5" CENTERPARTITIONTOROOM 12'-8" CENTER LINE 2'-0" 2'-0" CLOSET SHELF, MOUNTED WITH METAL ROD COUNTERTOP ON BASE CABINETS 1' - 0" 3 A6.02 LINE OF GYP. BD. CEILING ABOVE. COORDINATE WITH SHEET A2.02 & SECTION 4 ON SHEET A5.10 AUDIO VISUAL EQUIPMENT CLOSET E 7 8 ALIGN EQ EQ EQ A6.02 1 7'-6" 1' - 4" 1'-4" SS-1 SHELF @ 20" A.F.F. (TYP.) H COPY CENTER 137 A6.02 2 ALIGN A5.054 A5.05 5 COPIER EQUIPMENT. OF/CI 2' - 0" 5' - 0" 4' - 0" 4'-0"10'-0" LINE OF CEILING CLOUD ABOVE. SEE SHEET A2.02 WALL CABINETS ABOVE COPY CENTER ISLAND. SEE 5/A5.05 BASE CABINET COUNTER TOP. SEE 4/A5.05 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:28:29PM A5.03 Enlarged Plans 02/22/13 D. Thomas Checker 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/4" = 1'-0"A1.01 4 ENLARGED PLAN - MAIL BOXES 1/4" = 1'-0"A1.01 3 ENLARGED PLAN - MEETING ROOMS 1/4" = 1'-0"A1.01 2 ENLARGED PLAN - INFORMATION/BULLITEN 1/4" = 1'-0"A1.01 1 ENLARGED PLAN - VESTIBULE 1/4" = 1'-0"A1.01 8 ENLARGED PLAN - KRESGE CONNECT - VIDEO CONFERNCING 1/4" = 1'-0"A1.01 5 ENLARGED PLAN - PHONE BOOTHS 1/4" = 1'-0"A1.01 6 ENLARGED PLAN - COPY CENTER S. LITTLE Date: Submitted for: 1/18/2013 QUALITY REVIEW 2/22/2013 BIDS/PERMITS
  • 14.
  • 15.
  • 16. 43.6 8'-0" 2'-2" ELECTRONIC EQUIPMENT TO BE DETERMINED BY OWNER GYP. BD. HANGING SOFFIT INFORMATION KIOSK AREA, MILLWORK TO BE DETERMINED BY OWNER CORRIDOR 2 CORRIDOR 1 D C.5 C 20' - 2" GLASS + ALUM. STOREFRONT SYSTEM. ALL GLASS TO BE TEMPERED (SEE A7.01) 7'-2" EQEQEQEQ 17' - 0" (5 EQUAL SPACES)DOOR OPENING E.4ED.4DB.5 C.5C EXISTING GYPSUM BOARD FOR FINISHES SEE: SCHEDULE WOOD SLIDING DOOR WITH GLASS (EXPOSED DOOR HARDWARE CLEAR ANODIZED FINISH) EXIST IT ROOM DOOR FLOATING GYP. BD. SOFFIT SUSPENDED FROM STRUCTURE ABOVE WALL BASE PER SCHEDULE NEW GYP. BD. GYP. BD. CONTROL JOINT BETWEEN NEW + EXISTING GYP. BD. HOLLOW METAL DOOR AS SCHEDULED INFORMATION KIOSK MILLWORK TO BE DETERMINED BY OWNER F.4 F E.4 15' - 11" 17' - 10" TECHTOWN MANAGEMENT KRESGE CONNECT GLASS + ALUM. STOREFRONT WINDOW SYSTEM - ALL GLASS TO BE TEMPERED (SEE SHEET A7.01) GYP. BD. PAINT PER SCHEDULE 9' - 9" (3 EQUAL SPACES) AS SCHEDULED DOOR OPENING AS SCHEDULED DOOR OPNG. 14' - 8" (5 EQUAL SPACES) 7'-2" EQEQEQEQ 7'-2" EQEQEQEQ 5/8" EXISTING GYP. BD - PAINT PER FINISH SCHEDULE EXISTING ENTRY + STOREFRONT TO REMAIN 2" BASE PER SCHEDULE EXIST FIN TUBE TO REMAIN. PAINT TO MATCH CONCRETE WALL (SEE SCHEDULE) GYP. BD. CONTROL JOINT COPY CENTER ISLAND MILLWORK (SEE A5.05). PT-1 FACE AND UNDERSIDE OF GYP. BD. SOFFIT EXIST ROLLING SHADES REINSTALLED AT ALL EXTERIOR WINDOWS (TYP.) GYP. BD. SOFFIT SUSPENDED FROM STRUCTURE ABOVE LINE OF GYP. BD. CEILING BEYOND A6.02 11 Sim F E.4 E D.4 D B.5C.5 C EXISTING CONCRETE BEAM STRUCTURE + DUCTWORK PT -1 @ FACE AND UNDERSIDE OF GYP. BD. SOFFIT. SEE A2.02 FOR REFERENCE GYP. BD. CONTROL JOINT @ ALIGNMENT IF EXISTING + NEW GYP. BD. 2" BASE PER SCHEDULE EXISTING GYP. BD. PT-2 SLIDING WOOD DOOR W/GLASS - EXPOSED ALUM. HARDWARE EXIST. COLUMN INFORMATION KIOSK MILLWORK TO BE DETERMINED BY OWNER EXIST. COLUMN 8'-0" EXISTING COLUMN GYP. BD. SOFFIT SUSPENDED FROM STRUCTURE ABOVE A6.02 10 A6.02 11 6 5 4'x8' SHEETS OF BALTIC BIRCH PLYWOOD PRE-FINISHED WITH HIDDEN FASTENERS CONFERENCE ROOM SIGNAGE OF/CI (TYP.) WOOD DOOR W/ GLASS (SEE FLOOR PLAN AND DOOR SCHEDULE FOR DOOR TYPES AND ADDITIONAL INFORMATION 654' x 8' SHEETS OF BALTIC BIRCH PLYWOOD PRE-FINISHED W/ HIDDEN FASTENERS EXTEND PLYWOOD TO UNDERSIDE OF DECK AND ABOVE DUCTWORK GLASS + ALUM. STOREFRONT SYSTEM. SEE SHEET A7.01 FOR ADDITIONAL INFORMATION CORRIDOR 1 KITCHEN 3/4" REVEAL 20' - 2" (6 EQUAL SPACES) 20' - 2" (6 EQUAL SPACES) 7'-2" EQEQEQEQ - --- 4 3.6 GYP. BD. CONTROL JOINT FINISH OF EXISTING GYP. BD. TO BE DETERMINED BY OWNER 7' - 0" (2 EQ. SPACES) 3' - 9" SCHEDULED DOOR AS GLASS + ALUM. STOREFRONT SYSTEM EQEQEQEQ 7'-2" 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:28:50PM A5.08 Interior Elevations 02/22/13 C.M. S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/4" = 1'-0"A5.03 3 ELEV OF KIOSK INFORMATION AREA 1/4" = 1'-0"A1.01 2 EXTERIOR ELEV OF TRAINING ROOM 1/4" = 1'-0"A1.01 5 WEST ELEV AT MEETING ROOMS 1/4" = 1'-0"A1.01 1 EXTERIOR ELEV AT TECH TOWN MANAGEMENT 1/4" = 1'-0"A1.01 6 ELEV AT COPY CENTER 1/4" = 1'-0"A1.01 7 ELEV AT EAST WALL OF MEETING ROOMS 1/4" = 1'-0"A1.01 9 ELEV AT COORIDOR 3 (LOOKING SOUTH) 1/4" = 1'-0"A1.01 10 ELEV AT CONF ROOMS 1 & 2 (LOOKING NORTH) 1/4" = 1'-0"A1.01 8 ELEV AT ELEVATOR LOBBY NOTE TO CONTRACTOR: EXISTING CONCRETE BEAMS + STRUCTURE PAINT PER FINISH SCHEDULE. EXPOSED DUCTWORK IS REMOVED FROM ELEVATIONS (FOR CLARITY) PAINT TO MATCH EXIST STRUCTURE ABOVE (SEE FINISH SCHEDULE). LIGHTING REMOVED FROM ELEVATIONS (FOR CLARITY). STOREFRONT SYSTEM GLASS TO BE TEMPERED (TYP.). Quality Review 1/18/2013 1/18/2013 QUALITY REVIEW Date: Submitted for: 2/22/2013 BIDS/PERMITS
  • 17. E.4 E D.4 D B.5C.5 C 1 A5.10 4'x 8' SHEETS OF BALTIC BIRCH PLYWOOD PRE-FINISHED WITH HIDDEN FASTENERS WOOD DOOR WITH FULL GLASS (TYPICAL) + ALUMINUM FRAME OVERHEAD DOOR (HANGER STYLE) EXISTING CONCRETE BEAM & STRUCTURE CORRIDOR 3 RECEPTION 3/4" REVEAL AT BASE OF PLYWOOD PANELS 1 A6.03 Sim B.5 4" MTL STUD - SUPPORT (BEYOND) COUNTER SS-1COUNTER SS-1 2" BASE AS SCHEDULED RELOCATED MAILBOXES 3'-0" B.5B.5 RELOCATED MAIL BOXESCOUNTER SS-1 A6.02 4 6'-3" 2" BASE AS SCHEDULED 3 COUNTER SS-1 2" BASE AS SCHEDULED GYP. BD. PAINT RELOCATED MAIL BOXES BEYOND GYP. BD. PAINT E.4ED.4DB.5 C.5C CONFERENCE ROOM SIGNAGE OF/CI (TYP.) BUTT SEAMS (NO EXPOSED FASTENERS) TYPICAL BALTIC BIRCH PLYWOOD TO UNDERSIDE OF DECK (ABOVE DUCTWORK) CORRIDOR 3/4" REVEAL AT BASE OF PLYWOOD PANELS RECEPTION 3 RELOCATED MAILBOXES EXIST CONC COLUMN (BEYOND) GYP. BD. PAINT 2" BASE TYP. COUNTER SS-1 GYP. BD. PAINT 3 GYPSUM BOARD PAINT (TYPICAL) EXISTING CONCRETE BEAM + STRUCTURE GYPSUM BOARD PAINT (TYPICAL) 2" BASE (TYP.) GYP. BD. PAINT DRY ERASE PAINT (THIS AREA) 4'-0"3'-0" 10' - 3" GYP. BD. PAINT 8'-6" EXISTING CONCRETE BEAM + STRUCTURE KITCHEN MILLWORK SEE 5/A5.01 GYP. BD. PAINT 2" BASE (TYP.) F REMOVE EXIST FILM COATING FROM EXISTING GLAZING (TYP. ALL PANES IN OLD RESTROOM) REMOVE EXISTING EXHAUST LOUVER. REPLACE W/GLAZING PANE TO MATCH EXIST REMOVE EXIST PARTITIONS AND CEILING. SEE AD1.01 & AD2.01 FOR ADDITIONAL SCOPE REMOVE EXIST TOILET FIXTURES AND ACCESSORIES. SEE AD1.01 & MECH DWG FOR ADDITIONAL SCOPE REMOVE EXIST MILLWORK. SEE AD1.01 FOR ADDITIONAL SCOPE 6 EXIST FIN TUBE TO REMAIN. PAINT TO MATCH CONCRETE WALL (SEE FINISH SCHEDULE) (HISTORICAL) EXISTING WINDOW. ROLLING SHADE (SEE FINISH SCHEDULE) EXITING CONCRETE BEAM. PAINT (SEE SCHEDULE) EXISTING GYP. BD.. PAINT (SEE SCHEDULE) EXISTING CONCRETE BEAM + STRUCTURE ACOUSTIC LAY-IN CEILING CLOUD SUSPENDED FROM EXIST STRUCTURE ABOVE CENTER CLOUD IN ROOM. SEE A2.02 GYP. BD. - PAINT 2" BASE PER SCHEDULE LIGHTING FIXTURE AS SCHEDULED (TYP.) CONFERENCE ROOM 1 EXISTING COLUMN 8'-6" DRY ERASE PAINT THIS AREA 4'-0"3'-0" B.5C DRY ERASE PAINT THIS AREA 2" BASE (TYP.) 2'X2' ACOUSTIC LAY- IN CEILING SUSPENDED FROM STRUCTURE ABOVE GYP. BD. PAINT 4'-0"3'-0" 4 3.6 2" BASE AS SCHEDULED EXIST COLUMN 3'-0"4'-0" 7'-6" DRY ERASE PAINT THIS AREA ACOUSTIC LAY-IN CEILING SUSPENDED FROM STRUCTURE ABOVE GYP. BD. - PAINT 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:29:05PM A5.09 Interior Elevations 02/22/13 C.M / C.B S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/4" = 1'-0"A1.01 10 ELEV AT EVENT SPACE 1 & 2 (LOOKING WEST) 1/4" = 1'-0"A5.03 1 ELEV AT MAIL BOX ISLAND (LOOKING WEST) 1/4" = 1'-0"A5.03 2 ELEV AT MAIL BOX AREA (LOOKING WEST) 1/4" = 1'-0"A5.03 6 ELEV AT MAIL BOX ISLAND (LOOKING EAST) 1/4" = 1'-0"A5.03 5 ELEV AT MAIL BOX ISLAND (LOOKING SOUTH) 1/4" = 1'-0"A1.01 7 ELEV AT EVENT SPACE (LOOKING EAST) 1/4" = 1'-0"A5.03 3 ELEV AT MAIL BOX (LOOKING SOUTH) 1/4" = 1'-0"A5.03 4 ELEV AT MAIL BOX (LOOKING NORTH) 1/18/2013 QUALITY REVIEW 1/4" = 1'-0"A1.01 11 ELEV AT CONF 4 1/4" = 1'-0"A1.01 8 ELEV AT KITCHEN (LOOKING SOUTH) 1/4" = 1'-0"AD1.01 13 ELEV AT EXIST RESTROOM/LOUNGE 1/4" = 1'-0"A1.01 14 TYPICAL INTERIOR ELEV AT EXTERIOR WINDOW 1/4" = 1'-0"A1.01 15 ELEV AT CONFERENCE ROOM 1 1/4" = 1'-0"A1.01 12 ELEV AT CONF ROOM 3 1/4" = 1'-0"A5.03 16 ELEV AT MEETING RM 4 Date: Submitted for: 2/22/2013 BIDS/PERMITS NOTE TO CONTRACTOR: EXISTING CONCRETE BEAMS + STRUCTURE PAINT PER FINISH SCHEDULE. EXPOSED DUCTWORK IS REMOVED FROM ELEVATIONS (FOR CLARITY) PAINT TO MATCH EXIST STRUCTURE ABOVE (SEE FINISH SCHEDULE). LIGHTING REMOVED FROM ELEVATIONS (FOR CLARITY). STOREFRONT SYSTEM GLASS TO BE TEMPERED (TYP.).
  • 18. 1ST LEVEL 0' - 0" 2ND LEVEL 13' - 0" 6 5 A6.03 2 VERTICAL OPERABLE PARTITION POCKET ENCLOSURE STL SUPPORT (TYP) EXISTING CONC BEAM (BEYOND) 1 A6.03 EXISTING COLUMNEXISTING COLUMN LOCATE GYP. BD. ACCESS PANELS AT OPERABLE PARTITION MOTOR (TYP.) OVERHEAD HANGING STYLE DOOR VERTICAL OPERABLE PARTITION CORRIDOR 2 CEILING HANGERS AS REQUIRED (TYP.) CEILING AS SCHEDULED 1ST LEVEL 0' - 0" 2ND LEVEL 13' - 0" E.4ED.4DB.5 C.5C 8'-0" OVERHEAD DOOR OPENING BEYOND EXIST COLUMN (BEYOND) OPERABLE PARTITION OVERHEAD DOOR CONTROLLER (BEYOND) OVERHEAD DOOR OPENING BEYOND DOOR BEYOND (TYP) 8'-0" A6.03 3 A7.01 16 DOOR BEYOND ACOUSTIC LAY-IN CEILING ACOUSTICAL LAY-IN CEILING CLOUD PROJECTOR MOUNTED TO STRUCTURE ABOVE OF/CI PROJECTOR MOUNTED TO STRUCTURE ABOVE OF/CI VERTICAL OPERABLE PARTITION CONTROL SWITCH. SEE SECTION 2, THIS SHEET FOR LOCATION DIMENSIONS 1ST LEVEL 0' - 0" 2ND LEVEL 13' - 0" F E.4 E RETRACTABLE CEILING MOUNTED PROJECTOR WITH STL SUPPORT MOUNTED TO EXIST STRUCTURE ABOVE. OF/CI A6.02 6 A6.06 1 SIM. PARTITION BEYOND. SEE A1.01 FOR PARTITION TYPES EXISTING PARTITION 2X2 ACOUSTIC LAY-IN CEILING. SEE A2.02 GYP. BD. CEILING SEE A2.02. ALIGN WITH PARTITION BEYOND 8'-6" 8'-0" PARTITION BEYOND A6.02 8 WALL MOUNTED PROJECTION SCREEN OF/CI 1ST LEVEL 0' - 0" 2ND LEVEL 13' - 0" E D.4 D C.5 C 0' - 6" 0' - 6" 4'-0" VERTICAL OPERABLE PARTITION CONTROL SWITCH CONFERENCE ROOM 3 CONFERENCE ROOM 1 EVENT SPACE 1 EVENT SPACE 2 VERTICAL OPERABLE PARTITION 8'-6" 8'-6" DOOR BEYOND DOOR BEYOND WALL MOUNTED PROJECTION SCREEN OF/CI WALL MOUNTED PROJECTION SCREEN OF/CI ACOUSTICAL LAY-IN CEILING CLOUD ACOUSTICAL LAY-IN CEILING CLOUD CEILING HANGERS AS REQUIRED (TYP.) EXISTING CONCRETE BEAM + STRUCTURE WALL MOUNTED PROJECTION SCREEN OF/CI PROJECTOR OF/CI GYP. BD. PAINT PER SCHEDULE 2" BASE AS SCHEDULED F.4 4'-0"3'-0" GYP. BD. PAINT PER SCHEDULE DRY ERASE PAINT (THIS AREA) 2" BASE AS SCHEDULED EXISTING CONCRETE BEAM + STRUCTURE 3 2 CEILING AS SCHEDULED EXISTING CONCRETE STRUCTURE 2" BASE AS SCHEDULED A6.02 7 8'-0" A6.02 7 Sim (7) 30" BASE CABINETS = 17' - 6" SS-1 COUNTER TOP WITH 4" BACK SPLASH BI-FOLD DOORS. SEE A1.01 AND A7.01 FOR DOOR TYPES (TYP.) 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:29:36PM A5.10 Interior Sections 02/22/13 C.M / D.T S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1/4" = 1'-0"A1.01 1 SECTION @ EVENT SPACE 2 1/4" = 1'-0"A1.01 3 SECTION THROUGH CONF ROOMS & EVENT SPACES 1/4" = 1'-0"A1.01 4 KRESGE CONNECT-VIDEO CONFERENCING 1/4" = 1'-0"A1.01 2 SECTION AT EVENT SPACES 1 & 2 1/4" = 1'-0"A1.01 5 ELEV AT TECHTOWN CONF ROOM (SOUTH WALL) 1/4" = 1'-0"A1.01 6 ELEV AT TECHTOWN CONF ROOM (EAST WALL) 1/4" = 1'-0"A1.01 7 ELEV AT KRESGE CONNECT-VIDEO CONFERENCING Date: Submitted for: NOTE TO CONTRACTOR: EXISTING CONCRETE BEAMS + STRUCTURE PAINT PER FINISH SCHEDULE. EXPOSED DUCTWORK IS REMOVED FROM ELEVATIONS (FOR CLARITY) PAINT TO MATCH EXIST STRUCTURE ABOVE (SEE FINISH SCHEDULE). LIGHTING REMOVED FROM ELEVATIONS (FOR CLARITY). STOREFRONT SYSTEM GLASS TO BE TEMPERED (TYP.). 1/18/2013 QUALITY REVIEW 2/22/2013 BIDS/PERMITS
  • 19. 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20138:23:01PM A5.11 3-D Interior Views 02/22/13 D.T S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1 VIEW LOOKING EAST FROM LOBBY2 VIEW FROM EVENT SPACE 2 LOOKING EAST 3 VIEW OF MAILBOX AREA Date: Submitted for: 1/18/2013 QUALITY REVIEW 2/22/2013 BIDS/PERMITS
  • 20. C 3 CAULK WHERE COL & WALL MEET COUNTERTOP WD BLOCKING WHERE REQUIRED CAULK WHERE GYP BD & COLUMN MEET (TYP) GYP. BD. ON MTL STUDS @ 16" O.C. (TYP.) ALIGN ALUM STOREFRONT SYSTEM SS-1 COUNTERTOP EXIST RELOCATED MAILBOXES ALIGN EXIST COL A A 2' - 10" WOOD TRIM CONTINUOUS ACOUSTIC SEALANT EACH SIDE 5/8" GYP BD 4" MTL STUD (6" METAL STUD WHERE NOTED ON PLAN). CONTINUOUS ACOUSTIC SEALANT EACH SIDE (TYPE A1) 0' - 5" CEILING AS SCHEDULED UNDERSIDE OF EXISTING CONC. STRUCTURE ACOUSTIC INSULATION AT PARTITION TYPE A1 ONLY 1/2" PLYWOOD PANEL SECURED W/ HIDDEN FASTENERS 4" MTL STUD 5/8" GYP BD WALL BASE RE: SCHEDULE 0' - 6" ACOUSTIC INSULATION CEILING AS SCHEDULED CONTINUOUS ACOUSTIC SEALANT EACH SIDE CONTINUOUS ACOUSTIC SEALANT EACH SIDE UNDERSIDE OF EXISTING CONC. STRUCTURE 0'-5 1/2" 5 5/8" GYP BD (BOTH SIDES) (RE: PLAN FOR WALL TYPE) 0' - 5"0' - 5" SEALANT BOTH SIDES (TYP) ALUM STOREFRONT SYSTEM W/ FULL GLASS (TYP) 1' - 0" 1/2" RE: ARCHITECTURAL PLAN FOR WALL TYPE E 5 CAULK AT COLUMN (TYP.) WD BLOCKING WHERE REQD (TYP) GYP. BD. ON MTL STUDS @ 16" O.C. (TYP.) EXIST CONC COLUMN RE: ARCHITECTURAL PLAN FOR WALL TYPE EVENT SPACE 1 CONFERENCE ROOM 1 CONFERENCE ROOM 2 D 6 OPERABLEPARTITION 1'-1"(TYP.)@ VIF 2' - 3" VIF 2' - 0" EXIST COL OPERABLE PARTITION WD BLOCKING WHERE REQD 1' - 3" 5/8"GYP BD ON 3 5/8" MTL STUD (BOTH SIDES) B D D D 5 EXIST CONC COL VIF 1' - 5" VIF 1' - 5" 1'-1" EVENT SPACE 2 EVENT SPACE 1 CAULK AT COLUMN (TYP.) D D F 3 CAULK TYPICAL AT COLUMN WD BLOCKING WHERE REQD GYP. BD. ON MTL STUDS @ 16" O.C. (TYP.) D D D D EXIST COL KRESGE CONNECT VIDEO CONFERENCING 5/8" TYPE X GYP BD 0' - 5" CEILING AS SCHEDULED CONTINUOUS ACOUSTIC SEALANT EACH SIDE GYP. BD. CLOSURE UNDERSIDE OF EXISTING CONC. STRUCTURE 4" MTL STUD 1 HOUR RATED UL DESIGN U465 BASE AS SCHEDULED 5/8" GYP BD 4" MTL STUD 0' - 5" UNDERSIDE OF EXISTING CONC STRUCTURE CEILING AS SCHEDULED CONTINUOUS ACOUSTIC SEALANT EACH SIDE CONTINUOUS ACOUSTIC SEALANT EACH SIDE 5/8" GYP BD HORIZONTAL MTL BRACING ACOUSTIC INSULATION 0' - 5" 1/2" FIRE RESISTANT PLYWOOD PAINTED TO MATCH WALL TYPE. UNDERSIDE OF EXISTING CONC. STRUCTURE 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 3/1/201312:10:00PM A6.01 Wall Types + Interior Plan Details 02/22/13 D. Thomas S. Little 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1 1/2" = 1'-0"A5.03 5 PLAN DETAIL @ MAIL BOXES COUNTER 1 1/2" = 1'-0" A & A1 GYPSUM BOARD WALL 1 1/2" = 1'-0" B GYPSUM BOARD WALL WITH PLYWOOD PANELS 1 1/2" = 1'-0"A1.01 2 PLAN DETAIL @ CONF RM 1 & 2 1 1/2" = 1'-0"A1.01 1 PLAN DETAIL @ CONF RM 2 1 1/2" = 1'-0"A1.01 3 PLAN DETAIL @ CONF RM & EVENT SPACE 1 1 1/2" = 1'-0"A1.01 4 PLAN DETAIL @ OPERABLE PARTITION 1 1/2" = 1'-0"A1.01 6 PLAN DETIAL @ OPERABLE PARTITIONS 1 1/2" = 1'-0"A5.03 8 PLAN DEAIL @ KRESGE CONNECT 1 1/2" = 1'-0" C GYPSUM BOARD FIRE RATED WALL 1 1/2" = 1'-0" D GYPSUM BOARD WALL (1 SIDED) 1 1/2" = 1'-0"A5.01 E GYPSUM BOARD CHASE WALL 1/18/2013 QUALITY REVIEW 2/22/2013 PERMITS/BIDS Date: Submitted for:
  • 21. EXIST STEEL COLUMN 5/8" GYP BD ON METAL STUDS @ 16" O.C. SEE A1.01 FOR PARTITION TYPES SEALANT BOTH SIDES EXISTING STOREFRONT 8 VIF 3 1/4" EXISTING WINDOW MULLION TAPE & FLOAT 5/8" GYP BD ON METAL STUDS NEOPRENE GASKET W/ ADHESIVE PROVIDE ACOUSTIC INSULATION BETWEEN ALUM. CHANNELS .063 ALUM. ENCLOSURE FINISH TO MATCH ALUM. WINDOW - SET IN SEALANT AND SECURE TO WINDOW AND ALUM. CHANNEL WITH COUNTERSUNK SCREWS @ 6" O.C. 90.00° FIXTU R ES TO C EN TER AR R AN G E LIG H T FIXTU R ES TO C EN TER AR R AG N G E LIG H T NOTE: EXISTING FIXTURES ARRANGED IN LAYOUT ABOVE AT AREAS SHOWN ON CEILING PLAN (A2.02). SEE DETAIL 16, THIS SHEET FOR ISOMETRIC VIEW AND TYPICAL MOUNTING HEIGHTS CONTRACTOR TO MOUNT LOWER FIXTURE AT 8'-0" FROM FINISHED FLOOR TO BOTT. OF LIGHT FIXTURE CONTRACTOR TO MOUNT HIGHER FIXTURE AT 8'-6" FROM FINISHED FLOOR TO BOTT. OF LIGHT FIXTURE VAREIS SPACER (TYP) LIGHT FIXTURE (TYP) 10'-53/4"+/- 4'-2" 0'-8" 5'-6"A.F.F. 0'-4" 1' - 4" 0' - 4" 0'-3" SOLID SURFACE SHELF & BRACKET @ 36" O.C. MAX. PROVIDE BRACE @ EACH END GYP. BD. ON METAL STUD. SEE SHEET A1.01 FOR PARTITION TYPES 1 1/2" DIA. METAL ROAD W/ END BRACKETS WALL REINFORCEMENT STUD FRAMING 1' - 6" 0'-2" 3'-0"A.F.F. SOLID SURFACE BRACKETS (3 EQUALLY SPACED) SOLID SURFACE COUNTER TOP WALL REINFORCEMENT STUD FRAMING SEALANT 4" MTL STUD WITH FRAMING @ 16" O.C. (TYP.) 5/8" GYP. BD. ON METAL STUD (TYP.) RELOCATED MAILBOXES 1X2 WD TRIM (TYP.) HORIZONTAL BRACING SLOPE 3/4" FIRE RESISTANT PLYWOOD PAINTED TO MATCH WALL TYPE 3' - 3" 2'-5" VIF 3'-2" 6'-1"0'-3" RELOCATED MAILBOXES GYP. BD. ON METAL STUD. SEE A1.01 FOR PARTITION TYPES 1' - 6" 1' - 6" WIRE HANGERS AS REQUIRED FOR SUSPENDED CEILINGS 0'-6" SEEPLAN 0' - 8" CEILING AS SCHEDULED 5/8" GYP. BD. ON METAL STUDS @ 16" O.C. SECURE TO STRUCTURE ABOVE ALUM FRAME EDGE WITH MATCHING FINISH CORNER BEAD 0' - 6" EXISTING PARTITION SEE A1.01 WIRE HANGERS AS REQUIRED FOR SUSPENDED CEILINGS CEILING AS SCHEDULED ALUM EDGE FRAME WITH MATCHING FINISH CEILING AS SCHEDULED EXISTING WALL SEE A1.01 FOR PARTITION TYPES ALUM EDGE FRAME WITH MATCHING FINISH AT GYP. BD. PROVIDE 1/4" JOINT 5/8" GYP. BD. ON METAL STUDS @ 16" O.C. ALUM. TRIM. FINISH TO MATCH SOFFIT. GYP. BD. PARTITION SEE A1.01 FOR TYPE WIRE SOFFIT HANGER AS REQUIRED (TYP.) CORNER BEAD NOTE: SEE DETAIL 10, THIS SHEET FOR SIM NOTES & DIMENSIONS ALUM STOREFRONT SYSTEM W/ FULL GLASS (TYP) ALIGN NEW PARTITION WITH EXIST. GYP. BD. (BOTH SIDES) ON METAL STUDS. SEE SHT. A1.01 FOR PARTITION TYPES SEALANT BOTH SIDES SEMI-RECESSED FIRE RATED CABINET NON-RATED WALL ASSEMBLY, SEE PLAN FOR TYPE FE GYP. BD. CEILING HT. 8' - 6" WIRE HANGER AS REQUIRED (TYP.) 5/8" GYP. BD. ON METAL STUDS @ 16" O.C. CORNER BEAD GYP. BD. PARTITION SEE A1.01 FOR TYPE EXISTING GYP. BD. PARTITION. SEE A1.01 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:32:32PM A6.02 Interior Details 02/22/13 D.T / C.B S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1 1/2" = 1'-0"A5.03 2 PLAN DETAIL AT COPY CENTER 3" = 1'-0"A1.01 1 PLAN DETAIL@ WINDOW 3/8" = 1'-0"A2.02 15 LIGHTING FIXTURE LAYOUT DETAIL 16 LIGHT FIXTURE ISOMETRIC VIEW 1/2" = 1'-0" 14 TYPICAL PENDANT LIGHT FIXTURE 1 1/2" = 1'-0"A5.03 3 COAT ROD AND SHELF DETAIL Date: Submitted for: 1 1/2" = 1'-0"A5.09 4 COUNTER DETIAL AT MAIL BOX 1/18/2013 QUALITY REVIEW 2/22/2013 BIDS/PERMITS 1" = 1'-0"A5.03 9 SECTION AT MAIL BOX ISLAND 1" = 1'-0"A5.03 5 SECTION THROUGH MAILBOX NOTE: SEE DETAIL 9, THIS SHEET FOR TYP. NOTES & DIMENSIONS 1 1/2" = 1'-0"A5.10 6 COMPOSITE CEILING DETAIL AT KRESGE CONNECT ROOM 1 1/2" = 1'-0"A5.10 7 CEILING EDGE DETAIL AT KRESGE CONNECT ROOM 1 1/2" = 1'-0"A5.10 8 EDGE CEILING DETAIL AT KRESGE CONNECT ROOM 1 1/2" = 1'-0"A5.08 10 SOFFIT DETAIL AT PARTITION 1 1/2" = 1'-0"A5.08 11 SOFFIT EDGE DETAIL 1 1/2" = 1'-0"A1.01 12 PLAN DETAIL @ ELEVATOR LOBBY 1" = 1'-0"A1.01 13 FIRE EXTINGUISHER DETAIL 1 1/2" = 1'-0"A2.02 17 CEILING DETIAL AT KRESGE CONNECT
  • 22. SEALANT BENT ANGLE REFER TO STRUCTURAL DRAWING FOR ADDITIONAL SCOPE HEADER DOUBLE BULB SEAL 5/8" GYP. BD. ON METAL STUDS 1/2" BALTIC BIRCH PLYWOOD RE: ARCHITECTURAL PLAN EXISTING CONC BEAM BEYOND DOOR (OPEN POSITION) D 18"x18"GYP.BD.ACCESSPANEL 1'-7"STUDSPACINGFOR VIF 1'-8"+/-1'-9" 6' - 1" CEILING 8' - 0" (2) LAYERS 5/8" GYP. BD. (ACOUSTIC BARRIER AS PER ASTM E 557 EXISTING CONC BEAM MOTOR (BEYOND) SUSPENDED CEILING GYP. BD. SOFFIT ON METAL STUDS @ 16" O.C. BATT INSULATION DEFLECTION MATERIAL (TYP.) DIAGONAL BRACING AS REQUIRED (TYP.) ELECTRICAL CONTROL BOX (PAINT TO MATCH SOFFIT) 5/8" GYP. BD. ON 3 5/8" METAL STUD @ 16" O.C. (TYP.) ACOUSTIC OPERABLE PARTITION PANEL POCKET PANEL 9' - 2" VIF 1'-5"+/- EXISTING COLUMN BEYOND UNDERSIDE OF EXISTING STRUCTURE NOTE: REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL SCOPE 1/2" PLYWOOD PANEL ON GYP. BD. ON METAL STUDS. SEE FINISH SCHEDULE FOR PLYWOOD TYPE & SHEET A1.01 FOR PARTITION TYPES DOOR FRAME ASSEMBLY. SEE STRUCTURAL OVERHEAD DOOR ASSEMBLY STEEL ANGLES SEE STRUCTURAL D 5 5 A6.03 GYP. BD. SOFFIT ON METAL STUDS OPERABLE PARTITION PANEL EXISTING COLUMN 5/8" GYP. BD. ON METAL STUDS EXISTING STRUCTURAL BEAM ABOVE (TYP.) ALIGN GYP.BD. SOFFIT WITH GYP.BD. PARTITION (TYP.) CEILING 8' - 0" DIAGONAL BRACING AS REQUIRED 5/8" GYP. BD. SOFFIT ON METAL STUDS @ 16; O.C. 5/8" GYP. BD. ON METAL STUDS @ 16" O.C. CORNER BEAD UNDERSIDE OF EXISTING STRUCTURE F 5 2' - 4" 2'-4" EQ EQ EQ EQ 2'-4"EQEQ 11'-6" 23' - 0" LIGHTING FIXTURE. SEE SHEET A2.02 EXISTING COLUMN GYP. BD. CEILING CLOUD 8' - 0" - --- 11 A6.02 SIM.A6.03 7 LIGHTING FIXTURE. SEE SHEET A2.02 & ELECTRICAL SHEETS FOR FIXTURE TYPE & ADDITIONAL SCOPE (TYP.) 0'-3"0'-4" 0' - 4"0' - 2" 0' - 4" 0' - 2" 0'-5"0'-2" USE DETAIL 6, THIS SHEET FOR LOCATION OF CENTER LIGHT FIXTURE #1. LOCATE LIGHT FIXTURES #2 THRU #5 USING DIMENSIONS SHOWN ON THIS DETAIL CENTER LIGHT FIXTURE #1 LIGHT FIXTURE #3 LIGHT FIXTURE #2LIGHT FIXTURE #5 LIGHT FIXTURE #4 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20138:21:08PM A6.03 Interior Details 02/22/13 C.M S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI 1 1/2" = 1'-0"A5.10 2 SECTION DETAIL @ HEAD OVERHEAD DOOR 1 1/2" = 1'-0"A5.10 3 OPERABLE WALL DETAIL @ CEILING 1/18/2013 QUALITY REVIEW 2/1/2013 PERMITS/BIDS Date: Submitted for: 1 1/2" = 1'-0"A5.09 1 JAMB DETAIL OF OVERHEAD DOOR 1" = 1'-0"A2.02 4 CEILING PLAN DETAIL @ OPERABLE PARTITION 1 1/2" = 1'-0"A6.03 5 SECTION DETAIL AT SOFFIT 1/4" = 1'-0"A2.02 6 CEILING AT RECEPTION/SECURITY DESK 1" = 1'-0"A6.03 7 LIGHTING DETAIL
  • 23.
  • 24.
  • 25. GF CB D EA 6" W DOOR WIDTH 6" W DOORHEIGHT 1'-0"HGT SAFETY GLASS TYPE-1 ALUM. FRAME (TYP.) 5/8" GYP BD RE: ARCHITECTURAL PLAN FOR WALL TYPE 5/8" GYP BD RE: ARCHITECTURAL PLAN FOR WALL TYPE ALUM. FRAME (TYP.) EXISTING GYP BD. WALL ALIGN 5/8" GYP BD RE: ARCHITECTURAL PLAN FOR WALL TYPE CAULK BOTH SIDES (TYP) 5/8" GYP BD RE: ARCHITECTURAL PLAN FOR WALL TYPE ALUM. FRAME (TYP.) 0'-4" 5/8" GYP BD RE: ARCHITECTURAL PLAN FOR WALL TYPE 5/8" GYP BD W/ PLYWD RE: ARCHITECTURAL PLAN FOR WALL TYPE 20' - 2"DOOR WIDTH DOORHEIGHT 17' - 10" DOOR WIDTH DOORHEIGHT 15' - 11" H DOORHEIGHT DOOR WIDTH DOOR WIDTH DOORHEIGHT 7' - 0" DOOR WIDTH DOORHEIGHT 20' - 2" A B C ALUMINUM STOREFRONT WOOD - 5 PLY - FULL GLASS WOOD - 5 PLY - FULL GLASS SLIDER HOLLOW METAL EXISTING HOLLOW METAL DOOR WOOD BIFOLD DOOR GLASS OVERHEAD DOOR- (HANGER - STYLE) D E F G DOOR TYPE - LABELS 5/8" GYPSUM BD RE: ARCHITECTURAL PLAN FOR WALL TYPE GLASS TYPE RE: SCHEDULE ALUM. STOREFRONT SYSTEMALUM. CLOSURE PIECE (TYP.) CAULK BOTH SIDES (TYP) ALUM. CLOSURE PIECE (TYP.) 2 1/2" 0' - 4" 5/8" GYP BD RE: ARCHITECTURAL PLAN FOR WALL TYPE SEALANT BOTH SIDES (TYP) RE: ARCHITECTURAL PLAN FOR WALL TYPE STOREFRONT FRAME W/ FULL GLASS EXIST CONC FLOOR DOOR SCHEDULE INDICATES NEW DOORS AND EXISTING DOORS REQUIRING MODIFICATIONS. CONTRACTOR SHALL COORDINATE THE KEYING OF NEW, REWORKED AND EXISTING DOOR WITH OWNER'S REQUIREMENTS. ADDITIONAL DOORS DISCOVERED THAT REQUIRE MODIFICATION SHALL BE PROMPTLY REPORTED TO THE ARCHITECT. LOCATION DOORS FRAMES A MINIMUM OF 4" FROM THE CORNER TO THE BACK OF FRAME UNLESS OTHERWISE INDICATED UNDERCUT DOORS AS REQUIRED TO CLEAR FINISH FLOOR MATERIALS AND TO MAINTAIN FIRE RATING. DOORS SHALL BE SINGLE SWING. (UNLESS OTHER WISE NOTED) SEE PROJECT MANUAL FOR DOOR HARDWARE SETS SECTION 087100 DOOR HARDWARE. REMARKS: WOOD TYPE DOOR TO BE ROTARY CUT WHITE BIRCH GLASS TYPE- TYPE 1 - SAFETY GLASS (TEMPERED GLASS) GENERAL NOTES - DOORS 1. 2. 3. 4. 5. 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com Project number JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 2/28/20137:33:24PM A7.01 Door Schedule 02/22/13 C.M S. LITTLE 12-29 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI Door Schedule Door Number Door Fire Rating Hardware Frame Frame Frame Frame Frame CommentsWidth Height Thickness Material Finish Type Material Finish Jamb Head 102 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 3 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A 103 6' - 0" 7' - 0" 0' - 1 1/2" ALUM ANODIZE 5 5 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - H, DOUBLE DOOR 104 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 105 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 108 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 2 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A 108A 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY 108B 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY 108C 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY 109 3' - 0" 7' - 0" 0' - 2 1/2" HM PAINT 1HR 6 EXIST. HM PAINT 12 & 13/A7.01 10/A7.01 DOOR TYPE - D, COLOR SELECTION IN SHOP DWG 112 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 1 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A 114 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 6 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 115 3' - 0" 7' - 0" 0' - 2" WOOD STAIN 3 1 DOOR TYPE - C, GYP. BD. FRAMELESS ENTRY 116 3' - 0" 7' - 0" 0' - 2" WOOD STAIN 3 DOOR TYPE - C, GYP. BD. FRAMELESS ENTRY 117 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 120 4' - 0" 6' - 8" 0' - 2" HM PAINT 6 1 HM PAINT 12 & 13/A7.01 10/A6.03 DOOR TYPE - E, COLOR SELECTION IN SHOP DWG 122 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 123 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 124 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 2 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 125A 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 125B 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 125C 12' - 0" 8' - 0" 0' - 2" ALUM ANODIZE NONE ALUM ANODIZE 1/A6.03 2/A6.03 DOOR TYPE - G, OVERHEAD HANGER DOOR 126A 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 126B 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 126C 12' - 0" 8' - 0" 0' - 2" ALUM ANODIZE NONE ALUM ANODIZE 1/A6.03 2/A6.03 DOOR TYPE - G, OVERHEAD HANGER DOOR 127 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 2 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 128 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 2 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 132 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 133 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 134 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B 139 4' - 0" 6' - 8" 0' - 2" HM PAINT 6 1 HM PAINT 12 & 13/A7.01 10/A7.01 DOOR TYPE - E, REUSE OF EXISTING DOOR 1 1/2" = 1'-0" 10 HM DOOR HEAD DETAIL 1 1/2" = 1'-0" 7 WD DOOR HEAD DETAIL 1 1/2" = 1'-0" 13 HM JAMB @ HINGE 1 1/2" = 1'-0" 12 HM DOOR @ STRIKE 1 1/2" = 1'-0" 8 WD DOOR DETAIL JAMB 1 1/2" = 1'-0" 9 WD DOOR JAMB DETAIL @ STRIKE 1/4" = 1'-0" 4 STOREFRONT GLAZING TYPE 1/4" = 1'-0" 2 STOREFRONT FRAME KRESGE CONNECT VIDEO CONFERENCING 1/4" = 1'-0" 5 TECH TOWN MANAGEMENT STOREFRONT TYPE 2 1/4" = 1'-0" 3 STOREFRONT FRAME ELEVATOR LOBBY 1/4" = 1'-0" 6 STOREFRONT FRAME TRAINING ROOM 1/4" = 1'-0" FRAME ELEVATION 1 1/2" = 1'-0" 14 STOREFRONT DOOR HEAD DETAIL 1 1/2" = 1'-0" 15 STOREFRONT DOOR JAMB DETAIL 1/18/2013 QUALITY REVIEW 1 1/2" = 1'-0" 16 STOREFRONT SILL 2/22/2013 PERMITS/BIDS Date: Submitted for: NOTE: STOREFRONT FRAME DIMENSIONS - SEE SHEET A5.08 - INTERIOR ELEVATIONS FOR THE DIMENSIONS FOR THE STOREFRONT FRAMING. ALL GLASS IS TO BE SAFETY GLASS TYPE GL - 1. FLUSH METAL DOOR (TYP) SAFETY GLASS TYPE GL -1 TYP. FOR ALUM DOORS 1 NOTE: DIMENSION S TYPICAL FOR DOOR TYPES A, B AND C. SAFETY GLASS TYPE GL-1 (TYP.) SAFETY GLASS TYPE GL-1 (TYP.) 141 EXIST. EXIST. EXIST. EXIST. EXIST. 8 EXIST. EXIST. EXIST. DOOR TYPE - E, REUSE OF EXISTING DOOR
  • 26.
  • 27.
  • 28.
  • 29. LC Skyfold wall LC Skyfold wall 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 www.centricdesignstudio.com Do Not Scale Drawings Date Drawn by Checked by Client: Project: Location: Consultants: Seal: Sheet Title: Date: Submitted for: 440 Burroughs St. Detroit, MI 48202 12-29Project number TechTown First Floor Renovations JMS Engineering Services 32401 West 8 Mile, Suite 2-5 Livonia, MI 48152 | 313.399.2932 Patrick Thompson Design 485 Milwaukee Ave. Ste. 100C Detroit, MI 48202 | 313.820.3268 www.patrickthompsondesign.com Ghafari Associates, LLC 17101 Michigan Ave. Dearborn, MI 48126 USA TEL +1.313.441.3000 www.ghafari.com S - 1 PARTITION SUPPORT FRAMING PLAN AND DETAILS DECEMBER, 2012 JMS JMS 122112 2 / 22 / 2013 BIDS/PERMITS