SlideShare une entreprise Scribd logo
1  sur  35
Télécharger pour lire hors ligne
1
Denver Gold Forum
September 22-25, 2013
CANADA’S NEXT
INTERMEDIATE
GOLD
PRODUCER
2
Forward Looking Information
This presentation contains certain forward-looking information as defined in applicable securities laws (referred to herein as “forward-looking
statements”). Specifically, this presentation contains forward-looking statements regarding 2013 guidance for gold production and total cash
costs, reserve and resource estimates, ore grade, expected mine life, average annual gold production, gold recovery, cash operating costs
and other costs, sensitivity to metal prices and other sensitivities, ramp-up of operations, mining rates reaching approximately 200,000 tpd
by year-end 2013, future operating plans, potential expansion opportunities, and plans for organic growth which includes growing mineral
reserves to more than 20 million ounces. Forward-looking statements involve known and unknown risks, uncertainties and other factors
which are beyond Detour Gold’s ability to predict or control and may cause Detour Gold’s actual results, performance or achievements to be
materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These
risks, uncertainties and other factors include, but are not limited to, gold price volatility, changes in debt and equity markets, the
uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental
legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the gold
exploration and development industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors”
in Detour Gold’s 2012 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com.
Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to,
assumptions about the following: the availability of financing for exploration and development activities; operating and capital costs; the
Company’s ability to attract and retain skilled staff; the mine development schedule; sensitivity to metal prices and other sensitivities; the
supply and demand for, and the level and volatility of the price of, gold; timing of the receipt of regulatory and governmental approvals for
development projects and other operations; the supply and availability of consumables and services; the exchange rates of the Canadian
dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve
and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business
and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking
statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. Detour Gold
undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new
information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking
statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements.
3
Notes to Investors
The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian National Instrument
43-101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. For United
States reporting purposes, the United States Securities and Exchange Commission (“SEC”) applies different standards in order to classify
mineralization as a reserve. In particular, while the terms “measured,” “indicated” and “inferred” mineral resources are required pursuant to
NI 43-101, the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC. Investors are
cautioned not to assume that any part or all of the mineral deposits in these categories constitute or will ever be converted into reserves. In
addition, “inferred” mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic
and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.
Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes inferred mineral
resources, except in rare cases.
On September 4, 2012, Detour Gold announced an updated mine production plan for the Detour Lake project. The NI 43-101 compliant
Technical Report for this update was filed on SEDAR on October 18, 2012. The following QPs participated in this update: BBA Inc., under
the direction of André Allaire, Eng., Vice-President, Markets – Mining and Metals and Patrice Live, Eng., Mining Manager; SGS Canada
Inc., under the direction of Michel Dagbert, Eng., Senior Geostatistician and Maxime Dupéré, P.Geo., Senior Geologist; and AMEC
Environment & Infrastructure, a Division of AMEC Americas Limited, David G. Ritchie M.Eng., P.Eng,
Senior Associate Geotechnical Engineer.
Information Containing Estimates of Mineral Reserves and Resources
Note Regarding Certain Measures of Performance
This presentation presents estimates of future “cash operating costs per tonne milled”, “cash operating costs per ounce of gold produced”,
“total cash costs per tonne milled” and “total cash costs per ounce of gold produced” which are not recognized financial measures under
GAAP. These non-GAAP financial measures are intended to provide additional information to investors. However, they do not have a
standardized meaning under GAAP and may not be comparable to similar measures presented by other gold producers. The estimates of
future cash operating costs per tonne milled and future cash operating costs per ounce of gold produced include estimated mining,
processing and site administration costs divided by estimated tonnes milled or gold ounces produced, respectively. The estimates of future
total cash costs per tonne milled and future total cash costs per ounce of gold produced include estimated mining, processing, site
administration, royalty and refining costs net of estimated silver by-product credits divided by estimated tonnes milled or gold ounces
produced, respectively. These future estimates are based upon the cash operating costs per tonne milled, the cash operating costs per
ounce of gold produced, the total cash costs per tonne milled and the total cash costs per ounce of gold produced that the Company
expects to incur to mine gold at the Detour Lake mine. Since the Detour Lake mine has not yet reached commercial production, there is no
reconciliation to actual GAAP measures provided as it is not practicable to reconcile these forward-looking non-GAAP financial measures to
the most comparable GAAP measures.
4
Invest in Detour Gold
Our Vision
Become a leading intermediate gold producer and
premier investment opportunity
ExecutionDisciplineFocus
5
Focused on One Core Asset
DETOUR LAKE – ONTARIO, CANADA
 Low-risk, safe mining jurisdiction
 100% owned large prospective land package of
630 km2 on Abitibi Greenstone Belt
› High quality, long life producing open
pit mine (15.6 M oz in reserves)
› Significant potential for production
growth
› Exploration upside for high-grade
mineralization
ONTARIO
Toronto
Timmins
DETOUR LAKE MINE
6
Note: Cash position at June 30, 2013 and share data at August 31, 2013. Conversion price for the
Notes is US$38.50.
Share Capital
FULLY DILUTED
161.7 M
OPTIONS & FN SHARE
COMMITMENTS
10.6 M
CONVERTIBLE
NOTES
13.0 M
ISSUED AND
OUTSTANDING
138.1 M
C$1.3 B
C$207 M
TOPSHAREHOLDERS
MARKET CAP
CASH POSITION
PAULSON & CO: 15%
INSTITUTIONS TOTAL: >80%
7
Execution = Detour Lake in 6 Years
2013
 Built Detour Lake on schedule
 Started gold production in February
 Reached commercial production in August
ACQUISITION
/DISCOVERY
2007
PRE-FEASIBILITY
STUDY
2009
FEASIBILITY
STUDY &
PERMITTING
2010
DEVELOPMENT
2011-12
PRODUCTION
2013
8
Strategy = Focused on Profitability
Objectives:
 Deliver on operational performance
 Generate positive cash flows
 Use cash flow to fund future organic
growth
 Provide return on capital
9
H1 2013
First gold pour in February
Secured $90 million credit facility
Commissioned second production line
25,000 m drilling program targeting high-grade
gold mineralization
Produced 74,738 ounces of gold in H1
H2 2013
Reached commercial production in August
 Gold production target of 270,000 oz for the year
 Year-end mineral resources/reserves update
2013 Objectives
10
Key Statistics
OP reserves (M oz) 15.6
Mill throughput (tpd) 55,000
Strip ratio (waste:ore) 3.7
Gold recoveries 91%
Average grade (g/t) 1.03
Estimated mine life (yrs) 21.5
Avg. production (oz/yr) 657,000
Initial capex (C$ B) 1.5
Sustaining capex (C$ B) 1.2
Detour Lake Mine at a Glance
Commercial production declared
on September 1, 2013
11
Processing Plant
 55,000 tpd conventional gravity and
CIP processing plant with two
production lines
 Primary crusher (90,000 tpd capacity)
 Each line has 1 secondary crusher,
1 pebble crusher, 1 SAG and 1 ball mill
Mine Operations
 Mining rates to +200,000 tpd by year-
end
 Mining fleet of 20 haul trucks & 5
shovels (incl. 2 rope shovels)
 Stockpile availability
Detour Lake Mine Ramp Up
12
2013 Q1 Q2
Ore tonnes mined (Mt) 1.29 2.70
Tonnes milled (Mt) 1.02 2.87
Mill grade (g/t Au) 0.64 0.76
Recovery (%) 80 83
Availability (%) 66 68
Gold produced (oz) 16,841 57,897
H1 2013 - Operation Statistics
13
2013 Ramp-up Guidance
Guidance 2013 Estimate
Gold production 270,000 oz
Total cash costs (1) US$1,100/oz
Sustaining capital (2) C$192 M
 Availability and recoveries continue to
trend in a positive direction
 Mining rates increasing towards target
rate of +200,000 tpd
 Hiring contractor in Q4 for pre-stripping
(adds US$100/oz in operating costs for
Q4 2013)
(1) For period September to December 2013 (post-commercial production).
(2) Advancing purchase of 3 haul trucks to 2013.
14
Near-term Agenda: At the Mine
Mine Operations:
 Open-up the pit to allow for increased flexibility in mining plans
 Increase access to higher grade ore
 Continue to improve:
› Shovel productivity with increased blasted inventory
› Haul truck cycle
› Haul road and pit floor quality
› Pit de-watering
Next Focus: Lowering CostsProduction Growth
15
Near-term Agenda: At the Mill
Processing Plant:
 Target +50,000 tpd capacity by year-end
› Improve availability (less unplanned downtime)
› Increase utilization
 Improve gold recovery
› Maximize use of gravity circuit
› Optimize leach circuit
Next Focus: Lowering CostsProduction Growth
16
Near-term Results: Free Cash Flow
Cost Reductions:
 Mining and milling unit costs to improve with increased
volume and efficiency - economy of scale
 Reduce current Tailings Facility costs – construction change
from “downstream” to approved “center line” design
 Opportunity to reduce power costs with Ontario provincial
program
Next Focus: Lowering CostsProduction Growth
17
Looking at 2014 and Beyond
In Progress:
 Year-end reserve and resource update
› New pit shell for Detour Lake (2011 drilling)
› Block A in resource category (2012 drilling)
 Detailed mine production plan for 2014
 Optimize 5-year production schedule
 Evaluate capacity expansion from 55,000 to 61,000 tpd
18
 Long-term growth of reserve base to
+20 M oz
› Reserve/resource update for
Detour Lake mine and Block A
 Large prospective land position of
630 km2
› Focus on high-grade gold
targets:
› Discovery of Zone 75 with
17.33 g/t over 4.4 m
Inferred M&I P&P
10M oz
20M oz
30M oz
15.6
14.9
11.4
8.8
Organic Growth Opportunities
19
*Note: Excludes drilling around Detour Lake and M zone (Block A).
Lower Detour
Area
15.6 M oz in Reserves
Organic Growth Opportunities
630 km2
20
Organic Growth Opportunities
25,000 m of drilling
in Q1 2013
17.33/4.4
21
Long Section across Zone 75
Organic Growth Opportunities
22
Organic Growth Opportunities
Near-term objectives (1-3 years):
 Detour Lake reserve/resource update (open pit west expansion)
 Evaluation of potential expansion options
23
Invest in Detour Gold
Our Vision
Become a leading intermediate gold producer and
premier investment opportunity
ExecutionDisciplineFocus
24
ADDITIONAL
INFORMATION
25
Detour Lake Profile
Detour Lake
Sept. 2012
Mine Plan(3)
Gold price (US$/oz) (1) 1,200
Foreign exchange rate (US$/Cdn$) 1.00
Fuel price (US$/barrel) 100
Income/mining tax rate (%) 25/10
Net Smelter Royalty (%) 2
Ore milled (Mt) 470.0
Waste mined (Mt) (4) 1,734
Strip ratio (waste:ore) 3.7
Avg. gold grade (g/t) 1.03
Total contained gold (M oz) 15.6
Estimated gold recovery (%) 91.0
Total recovered gold (M oz) 14.1
Mine life (years) 21.5
Avg. annual gold production (oz) 657,000
1. US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.
2. Press release Jan. 31, 2011 with Technical Report dated Mar. 15, 2011.
3. Press release Sept. 4, 2012 with Technical Report dated Oct. 18, 2012.
4. Includes low-grade stockpile.
AssumptionsMineParameters
@ US$850/oz
Tonnes
(millions)
Grade
(g/t)
Contained
Gold (‘000 oz)
Reserves (1)
Proven 101.6 1.29 4,222
Probable 368.4 0.96 11,351
P&P 470.0 1.03 15,573
Resources (2)
Measured 124.5 1.36 5,424
Indicated 554.3 1.00 17,836
M&I 678.8 1.07 23,261
Inferred 208.5 0.86 5,785
1. After a 95% mining recovery rate; Mining dilution factor of 15.5%.
2. Inclusive of mineral reserves.
26
Projected LOM Profile
Note: Excludes stripping adjustments.
800
700
600
500
400
300
200
100
0
Gold Production (‘000 oz)
LOM Avg. C$749/oz
1.6
1.4
1.2
1.0
0.8
0.6
0.4
0.2
0
1.8
Grade (g/t Au)
LOM Avg. 657,000 oz/yr
900
850
800
750
700
650
600
550
Total Cash Costs (C$/oz)
950
1000 900
Based on September 2012 Mine Production Plan
27
MAINTENANCE
LABOUR
POWER
DIESEL
G&A
ROYALTY+
OTHER
(2% NSR)
CONSUMABLES
29%
22%
18%
12%
8%
5%
6%
Breakdown of 2013-14 TCC
A 10% change in:
Diesel or power costs = $9/oz change in TCC
Cdn$ FX rate = $63/oz in TCC
Projected LOM Operating Costs
Operating Costs (LOM)
C$/t
milled
C$/t
mined
C$/oz
Mining costs 11.65 2.49 388
Processing cost 7.83 -- 260
G&A 1.86 -- 62
Cash operating costs 21.34 -- 710
Royalty (2%) and other 1.26 -- 42
Refining 0.12 -- 4
Silver credit (0.20) -- (7)
Total cash costs (TCC) 22.52 -- 749
Based on September 2012 Mine Production Plan
28
Conventional Milling Process
Primary Crusher
90,000 tpd
Mine Trucks
Secondary Crushers (2)
67,000 tpd
Pebble Crushers (2)
73,000 tpd
To
Market
Gold
Doré Bars
Gold
Furnace
Gold
Electrowinning
Carbon
Stripping
To
Gravity
Circuit
To
Gravity
Circuit
Stockpile SAG Mills (2)
55,000 tpd
Ball Mills (2)
55,000 tpd
CIP
Leach
Tailings
29
Grade Control
DDH Block model 40x40m drill spacing RC GC 20X10m & 10X10m drill spacing
< 0.3
< 0.5
< 0.8
< 2.0
> = 2.0
Block Gold Grade
(g/t)
Bench6252mBench6240m
Pit Contour at July 31, 2013
Grade Control Data Limit
30
Grade Control
DDH Block model 40x40m drill spacing RC GC 20X10m & 10X10m drill spacing
Bench6228m
< 0.3
< 0.5
< 0.8
< 2.0
> = 2.0
Block Gold Grade
(g/t)
Pit Contour at July 31, 2013
Grade Control Data Limit
RC 40X10m
31
2012 completed DH
Historical DH
Block A near-surface resource
Detour Lake
2011 year-end reserves = 15.6 M ozDH included in 2011 year-end
reserves
DH not included in 2011 year-end
reserves
Detour Lake & Block A
32
Focus on health and safety of our employees, the well-being of
our community and the protection of the natural environment
 Hiring in the region, giving priority to local Aboriginal communities:
 569 full-time employees*
 92% of workforce from region
 25% are Aboriginals
 Scholarship and job training
 Supporting local communities
 Business opportunities
 Participation in municipal development
 Corporate philanthropy
NORTHERN
ONTARIO
39%
COCHRANE
24%
COCHRANE
AREA
29%
REST OF
ONTARIO
5%
3%
OTHER
Corporate Responsibility
WORKFORCE ORIGIN
* As of August 31, 2013.
33
Analyst Coverage
Initiating
Research
Firm Analyst
07.06.11 Haywood Securities Kerry Smith
07.07.09 Paradigm Securities Don Blyth/Don MacLean
07.08.07 Raymond James Phil Russo
07.11.26 National Bank Financial Steve Parsons
07.12.20 Macquarie Capital Markets Mike Siperco
08.01.14 Canaccord Genuity Rahul Paul
08.07.14 TD Securities Dan Earle
08.09.04 RBC Capital Markets Dan Rollins
08.11.06 BMO Capital Markets John Hayes
09.06.17 Laurentian Bank Securities Eric Lemieux
10.05.19 CIBC World Markets Cosmos Chiu
10.07.22 Credit Suisse Securities Anita Soni
11.07.15 Bank of America Merrill Lynch TBA
13.04.16 Scotia Capital Leily Omoumi
13.08.14 Desjardins Capital Markets Michael Parkin
34
 Gerald Panneton
Founder, President & CEO
 Michael Kenyon
Executive Chairman
 Paul Martin
CFO
 Pierre Beaudoin
Chief Operating Officer
 Julie Galloway
Sr VP General Counsel &
Corporate Secretary
 Derek Teevan
Sr VP Corporate &
Aboriginal Affairs
 Pat Donovan
VP Corporate Development
 James Mavor
VP Finance
 Rachel Pineault
VP HR & Aboriginal Affairs
 James Robertson
VP Environment &
Sustainability
 Drew Anwyll
MGM/Director of Operations
 Andrew Croal
Director Technical Services
 Laurie Gaborit
Director Investor Relations
 Jean-Francois Metail
Director Reserves and Resources
 Bill Snelling
Director Corporate Systems & Controls
 Rickardo Welyhorski
Director Mineral Processing
 Charles Hennessey
Process Plant Maintenance Manager and
Deputy Mine General Manager
 Joshua Hurrell
Acting Mine Manager - Chief Geologist
 Mike Papadakis
Process Plant Manager
 Peter Crossgrove
 Louis Dionne
 Robert E. Doyle
 André Falzon
 Gerald Panneton
 Jonathan Rubenstein
 Graham Wozniak
 Ingrid Hibbard
 Michael Kenyon
 Alex G. Morrison
Management & Directors
Management
Directors
35
Gerald Panneton
President & CEO
Email: gpanneton@detourgold.com
Phone: 416.304.0800
Laurie Gaborit
Director Investor Relations
Email: lgaborit@detourgold.com
Phone: 416.304.0800
www.detourgold.com
Contact Information

Contenu connexe

Tendances

Dgc 14 01_28-29 - td mining conference
Dgc 14 01_28-29 - td mining conferenceDgc 14 01_28-29 - td mining conference
Dgc 14 01_28-29 - td mining conferenceDetourGold
 
Dgc 14 02_23-26 - bmo conference
Dgc 14 02_23-26 - bmo conferenceDgc 14 02_23-26 - bmo conference
Dgc 14 02_23-26 - bmo conferenceDetourGold
 
Dgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDetourGold
 
Dgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
DGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDetourGold
 
Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 14 09_04 - bo_aml conference
Dgc 14 09_04 - bo_aml conferenceDgc 14 09_04 - bo_aml conference
Dgc 14 09_04 - bo_aml conferenceDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 14 09_14 - denver gold forum
Dgc 14 09_14 - denver gold forumDgc 14 09_14 - denver gold forum
Dgc 14 09_14 - denver gold forumDetourGold
 
Dgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDetourGold
 
Td securities 2014 mining conference
Td securities 2014 mining conferenceTd securities 2014 mining conference
Td securities 2014 mining conferenceCompany Spotlight
 
Dgc 14 05_13-15 - baml conference
Dgc 14 05_13-15 - baml conferenceDgc 14 05_13-15 - baml conference
Dgc 14 05_13-15 - baml conferenceDetourGold
 
Dgc 14 06_10 - corporate presentation
Dgc 14 06_10 - corporate presentationDgc 14 06_10 - corporate presentation
Dgc 14 06_10 - corporate presentationDetourGold
 
Dgc 14 06_10-12 - corporate presentation
Dgc 14 06_10-12 - corporate presentationDgc 14 06_10-12 - corporate presentation
Dgc 14 06_10-12 - corporate presentationDetourGold
 

Tendances (16)

Dgc 14 01_28-29 - td mining conference
Dgc 14 01_28-29 - td mining conferenceDgc 14 01_28-29 - td mining conference
Dgc 14 01_28-29 - td mining conference
 
Dgc 14 02_23-26 - bmo conference
Dgc 14 02_23-26 - bmo conferenceDgc 14 02_23-26 - bmo conference
Dgc 14 02_23-26 - bmo conference
 
Dgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conference
 
Dgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conferenceDgc 14 06_17-18 - rbc conference
Dgc 14 06_17-18 - rbc conference
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
DGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor Forum
 
Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conference
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 14 09_04 - bo_aml conference
Dgc 14 09_04 - bo_aml conferenceDgc 14 09_04 - bo_aml conference
Dgc 14 09_04 - bo_aml conference
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 14 09_14 - denver gold forum
Dgc 14 09_14 - denver gold forumDgc 14 09_14 - denver gold forum
Dgc 14 09_14 - denver gold forum
 
Dgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conference
 
Td securities 2014 mining conference
Td securities 2014 mining conferenceTd securities 2014 mining conference
Td securities 2014 mining conference
 
Dgc 14 05_13-15 - baml conference
Dgc 14 05_13-15 - baml conferenceDgc 14 05_13-15 - baml conference
Dgc 14 05_13-15 - baml conference
 
Dgc 14 06_10 - corporate presentation
Dgc 14 06_10 - corporate presentationDgc 14 06_10 - corporate presentation
Dgc 14 06_10 - corporate presentation
 
Dgc 14 06_10-12 - corporate presentation
Dgc 14 06_10-12 - corporate presentationDgc 14 06_10-12 - corporate presentation
Dgc 14 06_10-12 - corporate presentation
 

En vedette

Presentation dgc 15-04_29 _ q1 2015 webcast
Presentation   dgc 15-04_29 _ q1 2015 webcastPresentation   dgc 15-04_29 _ q1 2015 webcast
Presentation dgc 15-04_29 _ q1 2015 webcastDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 15 05_12-14 - bo_aml conference
Dgc 15 05_12-14 - bo_aml conferenceDgc 15 05_12-14 - bo_aml conference
Dgc 15 05_12-14 - bo_aml conferenceDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 15 06_23 - cibc corporate presentation 1-1
Dgc 15 06_23 - cibc corporate presentation 1-1Dgc 15 06_23 - cibc corporate presentation 1-1
Dgc 15 06_23 - cibc corporate presentation 1-1DetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
Dgc 15 07_30 - corporate presentation
Dgc 15 07_30 - corporate presentationDgc 15 07_30 - corporate presentation
Dgc 15 07_30 - corporate presentationDetourGold
 

En vedette (8)

Presentation dgc 15-04_29 _ q1 2015 webcast
Presentation   dgc 15-04_29 _ q1 2015 webcastPresentation   dgc 15-04_29 _ q1 2015 webcast
Presentation dgc 15-04_29 _ q1 2015 webcast
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 15 05_12-14 - bo_aml conference
Dgc 15 05_12-14 - bo_aml conferenceDgc 15 05_12-14 - bo_aml conference
Dgc 15 05_12-14 - bo_aml conference
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 15 06_23 - cibc corporate presentation 1-1
Dgc 15 06_23 - cibc corporate presentation 1-1Dgc 15 06_23 - cibc corporate presentation 1-1
Dgc 15 06_23 - cibc corporate presentation 1-1
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Dgc 15 07_30 - corporate presentation
Dgc 15 07_30 - corporate presentationDgc 15 07_30 - corporate presentation
Dgc 15 07_30 - corporate presentation
 

Similaire à Denver Gold corporate presentation

Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDetourGold
 
Detour Gold corporate presentation
Detour Gold corporate presentationDetour Gold corporate presentation
Detour Gold corporate presentationDetourGold
 
Dgc 13 08_13_corporate
Dgc 13 08_13_corporateDgc 13 08_13_corporate
Dgc 13 08_13_corporateDetourGold
 
Dgc 14 09_25 - corporate presentation
Dgc 14 09_25 - corporate presentationDgc 14 09_25 - corporate presentation
Dgc 14 09_25 - corporate presentationDetourGold
 
2014 Denver Gold Forum
2014 Denver Gold Forum2014 Denver Gold Forum
2014 Denver Gold ForumDetourGold
 
2014 Denver Gold Forum
2014 Denver Gold Forum2014 Denver Gold Forum
2014 Denver Gold ForumDetourGold
 
Dgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDetourGold
 
Dgc 14 08_06 - corporate presentation
Dgc 14 08_06 - corporate presentationDgc 14 08_06 - corporate presentation
Dgc 14 08_06 - corporate presentationDetourGold
 
Dgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDetourGold
 
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDetourGold
 
Dgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDetourGold
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationDetourGold
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaDetourGold
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaDetourGold
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaDetourGold
 

Similaire à Denver Gold corporate presentation (15)

Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conference
 
Detour Gold corporate presentation
Detour Gold corporate presentationDetour Gold corporate presentation
Detour Gold corporate presentation
 
Dgc 13 08_13_corporate
Dgc 13 08_13_corporateDgc 13 08_13_corporate
Dgc 13 08_13_corporate
 
Dgc 14 09_25 - corporate presentation
Dgc 14 09_25 - corporate presentationDgc 14 09_25 - corporate presentation
Dgc 14 09_25 - corporate presentation
 
2014 Denver Gold Forum
2014 Denver Gold Forum2014 Denver Gold Forum
2014 Denver Gold Forum
 
2014 Denver Gold Forum
2014 Denver Gold Forum2014 Denver Gold Forum
2014 Denver Gold Forum
 
Dgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conference
 
Dgc 14 08_06 - corporate presentation
Dgc 14 08_06 - corporate presentationDgc 14 08_06 - corporate presentation
Dgc 14 08_06 - corporate presentation
 
Dgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentationDgc 15 03_02 - pdac corporate presentation
Dgc 15 03_02 - pdac corporate presentation
 
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6hDgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
Dgc 15 03_02-pdac-corporate-presentation_v001_c1cd6h
 
Dgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentationDgc 15 03_11 - corporate presentation
Dgc 15 03_11 - corporate presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, Florida
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, Florida
 
BMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, FloridaBMO Global Metals & Mining Conference, Florida
BMO Global Metals & Mining Conference, Florida
 

Plus de DetourGold

Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDetourGold
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDetourGold
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDetourGold
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcastDetourGold
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDetourGold
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDetourGold
 
Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1DetourGold
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDetourGold
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDetourGold
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDetourGold
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDetourGold
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLDetourGold
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDetourGold
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDetourGold
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDetourGold
 
Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1DetourGold
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDetourGold
 
Dgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDetourGold
 
Dgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDetourGold
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDetourGold
 

Plus de DetourGold (20)

Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentation
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_final
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentation
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentation
 
Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conference
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentation
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conference
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conference
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FL
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentation
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conference
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conference
 
Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forum
 
Dgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conference
 
Dgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentation
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentation
 

Dernier

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 

Dernier (20)

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 

Denver Gold corporate presentation

  • 1. 1 Denver Gold Forum September 22-25, 2013 CANADA’S NEXT INTERMEDIATE GOLD PRODUCER
  • 2. 2 Forward Looking Information This presentation contains certain forward-looking information as defined in applicable securities laws (referred to herein as “forward-looking statements”). Specifically, this presentation contains forward-looking statements regarding 2013 guidance for gold production and total cash costs, reserve and resource estimates, ore grade, expected mine life, average annual gold production, gold recovery, cash operating costs and other costs, sensitivity to metal prices and other sensitivities, ramp-up of operations, mining rates reaching approximately 200,000 tpd by year-end 2013, future operating plans, potential expansion opportunities, and plans for organic growth which includes growing mineral reserves to more than 20 million ounces. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Detour Gold’s ability to predict or control and may cause Detour Gold’s actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour Gold’s 2012 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; operating and capital costs; the Company’s ability to attract and retain skilled staff; the mine development schedule; sensitivity to metal prices and other sensitivities; the supply and demand for, and the level and volatility of the price of, gold; timing of the receipt of regulatory and governmental approvals for development projects and other operations; the supply and availability of consumables and services; the exchange rates of the Canadian dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements.
  • 3. 3 Notes to Investors The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian National Instrument 43-101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission (“SEC”) applies different standards in order to classify mineralization as a reserve. In particular, while the terms “measured,” “indicated” and “inferred” mineral resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, “inferred” mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes inferred mineral resources, except in rare cases. On September 4, 2012, Detour Gold announced an updated mine production plan for the Detour Lake project. The NI 43-101 compliant Technical Report for this update was filed on SEDAR on October 18, 2012. The following QPs participated in this update: BBA Inc., under the direction of André Allaire, Eng., Vice-President, Markets – Mining and Metals and Patrice Live, Eng., Mining Manager; SGS Canada Inc., under the direction of Michel Dagbert, Eng., Senior Geostatistician and Maxime Dupéré, P.Geo., Senior Geologist; and AMEC Environment & Infrastructure, a Division of AMEC Americas Limited, David G. Ritchie M.Eng., P.Eng, Senior Associate Geotechnical Engineer. Information Containing Estimates of Mineral Reserves and Resources Note Regarding Certain Measures of Performance This presentation presents estimates of future “cash operating costs per tonne milled”, “cash operating costs per ounce of gold produced”, “total cash costs per tonne milled” and “total cash costs per ounce of gold produced” which are not recognized financial measures under GAAP. These non-GAAP financial measures are intended to provide additional information to investors. However, they do not have a standardized meaning under GAAP and may not be comparable to similar measures presented by other gold producers. The estimates of future cash operating costs per tonne milled and future cash operating costs per ounce of gold produced include estimated mining, processing and site administration costs divided by estimated tonnes milled or gold ounces produced, respectively. The estimates of future total cash costs per tonne milled and future total cash costs per ounce of gold produced include estimated mining, processing, site administration, royalty and refining costs net of estimated silver by-product credits divided by estimated tonnes milled or gold ounces produced, respectively. These future estimates are based upon the cash operating costs per tonne milled, the cash operating costs per ounce of gold produced, the total cash costs per tonne milled and the total cash costs per ounce of gold produced that the Company expects to incur to mine gold at the Detour Lake mine. Since the Detour Lake mine has not yet reached commercial production, there is no reconciliation to actual GAAP measures provided as it is not practicable to reconcile these forward-looking non-GAAP financial measures to the most comparable GAAP measures.
  • 4. 4 Invest in Detour Gold Our Vision Become a leading intermediate gold producer and premier investment opportunity ExecutionDisciplineFocus
  • 5. 5 Focused on One Core Asset DETOUR LAKE – ONTARIO, CANADA  Low-risk, safe mining jurisdiction  100% owned large prospective land package of 630 km2 on Abitibi Greenstone Belt › High quality, long life producing open pit mine (15.6 M oz in reserves) › Significant potential for production growth › Exploration upside for high-grade mineralization ONTARIO Toronto Timmins DETOUR LAKE MINE
  • 6. 6 Note: Cash position at June 30, 2013 and share data at August 31, 2013. Conversion price for the Notes is US$38.50. Share Capital FULLY DILUTED 161.7 M OPTIONS & FN SHARE COMMITMENTS 10.6 M CONVERTIBLE NOTES 13.0 M ISSUED AND OUTSTANDING 138.1 M C$1.3 B C$207 M TOPSHAREHOLDERS MARKET CAP CASH POSITION PAULSON & CO: 15% INSTITUTIONS TOTAL: >80%
  • 7. 7 Execution = Detour Lake in 6 Years 2013  Built Detour Lake on schedule  Started gold production in February  Reached commercial production in August ACQUISITION /DISCOVERY 2007 PRE-FEASIBILITY STUDY 2009 FEASIBILITY STUDY & PERMITTING 2010 DEVELOPMENT 2011-12 PRODUCTION 2013
  • 8. 8 Strategy = Focused on Profitability Objectives:  Deliver on operational performance  Generate positive cash flows  Use cash flow to fund future organic growth  Provide return on capital
  • 9. 9 H1 2013 First gold pour in February Secured $90 million credit facility Commissioned second production line 25,000 m drilling program targeting high-grade gold mineralization Produced 74,738 ounces of gold in H1 H2 2013 Reached commercial production in August  Gold production target of 270,000 oz for the year  Year-end mineral resources/reserves update 2013 Objectives
  • 10. 10 Key Statistics OP reserves (M oz) 15.6 Mill throughput (tpd) 55,000 Strip ratio (waste:ore) 3.7 Gold recoveries 91% Average grade (g/t) 1.03 Estimated mine life (yrs) 21.5 Avg. production (oz/yr) 657,000 Initial capex (C$ B) 1.5 Sustaining capex (C$ B) 1.2 Detour Lake Mine at a Glance Commercial production declared on September 1, 2013
  • 11. 11 Processing Plant  55,000 tpd conventional gravity and CIP processing plant with two production lines  Primary crusher (90,000 tpd capacity)  Each line has 1 secondary crusher, 1 pebble crusher, 1 SAG and 1 ball mill Mine Operations  Mining rates to +200,000 tpd by year- end  Mining fleet of 20 haul trucks & 5 shovels (incl. 2 rope shovels)  Stockpile availability Detour Lake Mine Ramp Up
  • 12. 12 2013 Q1 Q2 Ore tonnes mined (Mt) 1.29 2.70 Tonnes milled (Mt) 1.02 2.87 Mill grade (g/t Au) 0.64 0.76 Recovery (%) 80 83 Availability (%) 66 68 Gold produced (oz) 16,841 57,897 H1 2013 - Operation Statistics
  • 13. 13 2013 Ramp-up Guidance Guidance 2013 Estimate Gold production 270,000 oz Total cash costs (1) US$1,100/oz Sustaining capital (2) C$192 M  Availability and recoveries continue to trend in a positive direction  Mining rates increasing towards target rate of +200,000 tpd  Hiring contractor in Q4 for pre-stripping (adds US$100/oz in operating costs for Q4 2013) (1) For period September to December 2013 (post-commercial production). (2) Advancing purchase of 3 haul trucks to 2013.
  • 14. 14 Near-term Agenda: At the Mine Mine Operations:  Open-up the pit to allow for increased flexibility in mining plans  Increase access to higher grade ore  Continue to improve: › Shovel productivity with increased blasted inventory › Haul truck cycle › Haul road and pit floor quality › Pit de-watering Next Focus: Lowering CostsProduction Growth
  • 15. 15 Near-term Agenda: At the Mill Processing Plant:  Target +50,000 tpd capacity by year-end › Improve availability (less unplanned downtime) › Increase utilization  Improve gold recovery › Maximize use of gravity circuit › Optimize leach circuit Next Focus: Lowering CostsProduction Growth
  • 16. 16 Near-term Results: Free Cash Flow Cost Reductions:  Mining and milling unit costs to improve with increased volume and efficiency - economy of scale  Reduce current Tailings Facility costs – construction change from “downstream” to approved “center line” design  Opportunity to reduce power costs with Ontario provincial program Next Focus: Lowering CostsProduction Growth
  • 17. 17 Looking at 2014 and Beyond In Progress:  Year-end reserve and resource update › New pit shell for Detour Lake (2011 drilling) › Block A in resource category (2012 drilling)  Detailed mine production plan for 2014  Optimize 5-year production schedule  Evaluate capacity expansion from 55,000 to 61,000 tpd
  • 18. 18  Long-term growth of reserve base to +20 M oz › Reserve/resource update for Detour Lake mine and Block A  Large prospective land position of 630 km2 › Focus on high-grade gold targets: › Discovery of Zone 75 with 17.33 g/t over 4.4 m Inferred M&I P&P 10M oz 20M oz 30M oz 15.6 14.9 11.4 8.8 Organic Growth Opportunities
  • 19. 19 *Note: Excludes drilling around Detour Lake and M zone (Block A). Lower Detour Area 15.6 M oz in Reserves Organic Growth Opportunities 630 km2
  • 20. 20 Organic Growth Opportunities 25,000 m of drilling in Q1 2013 17.33/4.4
  • 21. 21 Long Section across Zone 75 Organic Growth Opportunities
  • 22. 22 Organic Growth Opportunities Near-term objectives (1-3 years):  Detour Lake reserve/resource update (open pit west expansion)  Evaluation of potential expansion options
  • 23. 23 Invest in Detour Gold Our Vision Become a leading intermediate gold producer and premier investment opportunity ExecutionDisciplineFocus
  • 25. 25 Detour Lake Profile Detour Lake Sept. 2012 Mine Plan(3) Gold price (US$/oz) (1) 1,200 Foreign exchange rate (US$/Cdn$) 1.00 Fuel price (US$/barrel) 100 Income/mining tax rate (%) 25/10 Net Smelter Royalty (%) 2 Ore milled (Mt) 470.0 Waste mined (Mt) (4) 1,734 Strip ratio (waste:ore) 3.7 Avg. gold grade (g/t) 1.03 Total contained gold (M oz) 15.6 Estimated gold recovery (%) 91.0 Total recovered gold (M oz) 14.1 Mine life (years) 21.5 Avg. annual gold production (oz) 657,000 1. US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015. 2. Press release Jan. 31, 2011 with Technical Report dated Mar. 15, 2011. 3. Press release Sept. 4, 2012 with Technical Report dated Oct. 18, 2012. 4. Includes low-grade stockpile. AssumptionsMineParameters @ US$850/oz Tonnes (millions) Grade (g/t) Contained Gold (‘000 oz) Reserves (1) Proven 101.6 1.29 4,222 Probable 368.4 0.96 11,351 P&P 470.0 1.03 15,573 Resources (2) Measured 124.5 1.36 5,424 Indicated 554.3 1.00 17,836 M&I 678.8 1.07 23,261 Inferred 208.5 0.86 5,785 1. After a 95% mining recovery rate; Mining dilution factor of 15.5%. 2. Inclusive of mineral reserves.
  • 26. 26 Projected LOM Profile Note: Excludes stripping adjustments. 800 700 600 500 400 300 200 100 0 Gold Production (‘000 oz) LOM Avg. C$749/oz 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0 1.8 Grade (g/t Au) LOM Avg. 657,000 oz/yr 900 850 800 750 700 650 600 550 Total Cash Costs (C$/oz) 950 1000 900 Based on September 2012 Mine Production Plan
  • 27. 27 MAINTENANCE LABOUR POWER DIESEL G&A ROYALTY+ OTHER (2% NSR) CONSUMABLES 29% 22% 18% 12% 8% 5% 6% Breakdown of 2013-14 TCC A 10% change in: Diesel or power costs = $9/oz change in TCC Cdn$ FX rate = $63/oz in TCC Projected LOM Operating Costs Operating Costs (LOM) C$/t milled C$/t mined C$/oz Mining costs 11.65 2.49 388 Processing cost 7.83 -- 260 G&A 1.86 -- 62 Cash operating costs 21.34 -- 710 Royalty (2%) and other 1.26 -- 42 Refining 0.12 -- 4 Silver credit (0.20) -- (7) Total cash costs (TCC) 22.52 -- 749 Based on September 2012 Mine Production Plan
  • 28. 28 Conventional Milling Process Primary Crusher 90,000 tpd Mine Trucks Secondary Crushers (2) 67,000 tpd Pebble Crushers (2) 73,000 tpd To Market Gold Doré Bars Gold Furnace Gold Electrowinning Carbon Stripping To Gravity Circuit To Gravity Circuit Stockpile SAG Mills (2) 55,000 tpd Ball Mills (2) 55,000 tpd CIP Leach Tailings
  • 29. 29 Grade Control DDH Block model 40x40m drill spacing RC GC 20X10m & 10X10m drill spacing < 0.3 < 0.5 < 0.8 < 2.0 > = 2.0 Block Gold Grade (g/t) Bench6252mBench6240m Pit Contour at July 31, 2013 Grade Control Data Limit
  • 30. 30 Grade Control DDH Block model 40x40m drill spacing RC GC 20X10m & 10X10m drill spacing Bench6228m < 0.3 < 0.5 < 0.8 < 2.0 > = 2.0 Block Gold Grade (g/t) Pit Contour at July 31, 2013 Grade Control Data Limit RC 40X10m
  • 31. 31 2012 completed DH Historical DH Block A near-surface resource Detour Lake 2011 year-end reserves = 15.6 M ozDH included in 2011 year-end reserves DH not included in 2011 year-end reserves Detour Lake & Block A
  • 32. 32 Focus on health and safety of our employees, the well-being of our community and the protection of the natural environment  Hiring in the region, giving priority to local Aboriginal communities:  569 full-time employees*  92% of workforce from region  25% are Aboriginals  Scholarship and job training  Supporting local communities  Business opportunities  Participation in municipal development  Corporate philanthropy NORTHERN ONTARIO 39% COCHRANE 24% COCHRANE AREA 29% REST OF ONTARIO 5% 3% OTHER Corporate Responsibility WORKFORCE ORIGIN * As of August 31, 2013.
  • 33. 33 Analyst Coverage Initiating Research Firm Analyst 07.06.11 Haywood Securities Kerry Smith 07.07.09 Paradigm Securities Don Blyth/Don MacLean 07.08.07 Raymond James Phil Russo 07.11.26 National Bank Financial Steve Parsons 07.12.20 Macquarie Capital Markets Mike Siperco 08.01.14 Canaccord Genuity Rahul Paul 08.07.14 TD Securities Dan Earle 08.09.04 RBC Capital Markets Dan Rollins 08.11.06 BMO Capital Markets John Hayes 09.06.17 Laurentian Bank Securities Eric Lemieux 10.05.19 CIBC World Markets Cosmos Chiu 10.07.22 Credit Suisse Securities Anita Soni 11.07.15 Bank of America Merrill Lynch TBA 13.04.16 Scotia Capital Leily Omoumi 13.08.14 Desjardins Capital Markets Michael Parkin
  • 34. 34  Gerald Panneton Founder, President & CEO  Michael Kenyon Executive Chairman  Paul Martin CFO  Pierre Beaudoin Chief Operating Officer  Julie Galloway Sr VP General Counsel & Corporate Secretary  Derek Teevan Sr VP Corporate & Aboriginal Affairs  Pat Donovan VP Corporate Development  James Mavor VP Finance  Rachel Pineault VP HR & Aboriginal Affairs  James Robertson VP Environment & Sustainability  Drew Anwyll MGM/Director of Operations  Andrew Croal Director Technical Services  Laurie Gaborit Director Investor Relations  Jean-Francois Metail Director Reserves and Resources  Bill Snelling Director Corporate Systems & Controls  Rickardo Welyhorski Director Mineral Processing  Charles Hennessey Process Plant Maintenance Manager and Deputy Mine General Manager  Joshua Hurrell Acting Mine Manager - Chief Geologist  Mike Papadakis Process Plant Manager  Peter Crossgrove  Louis Dionne  Robert E. Doyle  André Falzon  Gerald Panneton  Jonathan Rubenstein  Graham Wozniak  Ingrid Hibbard  Michael Kenyon  Alex G. Morrison Management & Directors Management Directors
  • 35. 35 Gerald Panneton President & CEO Email: gpanneton@detourgold.com Phone: 416.304.0800 Laurie Gaborit Director Investor Relations Email: lgaborit@detourgold.com Phone: 416.304.0800 www.detourgold.com Contact Information