PROJECT MANAGEMENT

     CPM/PERT
Project


 “Aproject is a series of activities directed
 to accomplishment of a desired objective.”


  Plan your work first…..then work
  your plan
Network analysis
Introduction


Network analysis is the general name given to certain specific
techniques which can be used for the planning, management and
control of projects.
One definition of a project:
“A project is a temporary endeavour undertaken to create a "unique"
product or service”
   Developed in 1950’s

                                  History           CPM by DuPont for chemical plants
                                                
                                                   PERT by U.S. Navy for Polaris missile




CPM was developed by Du Pont and the emphasis was on the
trade-off between the cost of the project and its overall
completion time (e.g. for certain activities it may be possible
to decrease their completion times by spending more money -
how does this affect the overall completion time of the
project?)

PERT was developed by the US Navy for the planning and control of
the Polaris missile program and the emphasis was on completing the
program in the shortest possible time. In addition PERT had the
ability to cope with uncertain activity completion times (e.g. for a
particular activity the most likely completion time is 4 weeks but it
could be anywhere between 3 weeks and 8 weeks).
CPM - Critical Path Method

   Definition: In CPM activities are shown as a network of
    precedence relationships using activity-on-node network
    construction
     – Single estimate of activity time
     – Deterministic activity times



    USED IN : Production management - for the jobs of
      repetitive in nature where the activity time estimates can
      be predicted with considerable certainty due to the
      existence of past experience.
PERT -
      Project Evaluation & Review Techniques
   Definition: In PERT activities are shown as a network of
    precedence relationships using activity-on-arrow network
    construction
     – Multiple time estimates
     – Probabilistic activity times



    USED IN : Project management - for non-repetitive jobs
      (research and development work), where the time and cost
      estimates tend to be quite uncertain. This technique uses
      probabilistic time estimates.
Gantt chart




                                                           Originated by H.L.Gantt in 1918

Advantages                                  Limitations
- Gantt charts are quite commonly used.     - Do not clearly indicate details regarding
They provide an easy graphical              the progress of activities
representation of when activities (might)
take place.                                 - Do not give a clear indication of
                                            interrelation ship between the separate
                                            activities
CPM/PERT

These deficiencies can be eliminated to a large extent by
  showing the interdependence of various activities by means of
  connecting arrows called network technique.

   Overtime CPM and PERT became one technique

   ADVANTAGES:
     – Precedence relationships
     – large projects
     – more efficient
The Project Network

   Use of nodes and arrows


     Arrows       An arrow leads from tail to head directionally
    – Indicate ACTIVITY, a time consuming effort that is required to
      perform a part of the work.



      Nodes       A node is represented by a circle
    - Indicate EVENT, a point in time where one or more activities start
       and/or finish.
Activity on Node & Activity on Arrow

Activity on Node                Activity on Arrow

- A completion of an activity   - An arrow represents a task,
  is represented by a node         while a node is the
                                   completion of a task
                                - Arrows represent order of
                                   events
Activity Slack

Each event has two important times associated with it :
- Earliest time , Te , which is a calendar time when a event can
    occur when all the predecessor events completed at the earliest
    possible times
-   Latest time , TL , which is the latest time the event can occur with
    out delaying the subsequent events and completion of project.

   Difference between the latest time and the earliest time of an event
    is the slack time for that event


Positive slack : Slack is the amount of time an event can be delayed
    without delaying the project completion
Critical Path


   Is that the sequence of activities and events where there is no
    “slack” i.e.. Zero slack


   Longest path through a network
   minimum project completion time
Benefits of CPM/PERT

   Useful at many stages of project management
   Mathematically simple
   Give critical path and slack time
   Provide project documentation
   Useful in monitoring costs
Questions Answered by CPM & PERT

   Completion date?
   On Schedule?
   Within Budget?
   Critical Activities?
   How can the project be finished early at the least cost?
example
Illustration of network analysis of a minor redesign of a product and
its associated packaging.


The key question is: How long will it take to complete this project ?
For clarity, this list is kept to a minimum by specifying only
immediate relationships, that is relationships involving activities
that "occur near to each other in time".
Before starting any of the above activity, the questions
      asked would be


     •"What activities must be finished before this activity can start"


     •could we complete this project in 30 weeks?

     •could we complete this project in 2 weeks?



One answer could be, if we first do activity 1, then activity 2, then activity
3, ...., then activity 10, then activity 11 and the project would then take the sum
of the activity completion times, 30 weeks.


 “What is the minimum possible time in which we can complete this project ? “
We shall see below how the network analysis diagram/picture we construct
helps us to answer this question.
CRITICAL PATH TAKES 24 WEEKS FOR THE COMPLETION OF THE PROJECT
Packages are available to determine the shortest path
and other relevant information.
Data entry window
Output of the package
Limitations to CPM/PERT

   Clearly defined, independent and stable activities
   Specified precedence relationships
   Over emphasis on critical paths
Thank you

More Related Content

What's hot (20)

P E R T
P E R TP E R T
P E R T
 
Programme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt ChartProgramme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt Chart
 
Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)
 
Gantt PERT and CPM
Gantt PERT and CPMGantt PERT and CPM
Gantt PERT and CPM
 
Network Analysis, PERT, CPM
Network Analysis, PERT, CPMNetwork Analysis, PERT, CPM
Network Analysis, PERT, CPM
 
Pert and mbo
Pert and mboPert and mbo
Pert and mbo
 
pert/cpm
pert/cpmpert/cpm
pert/cpm
 
Project Management
Project Management Project Management
Project Management
 
Project management Using Pert
Project management Using PertProject management Using Pert
Project management Using Pert
 
PERT
PERTPERT
PERT
 
cpmpertmy (1)
cpmpertmy (1)cpmpertmy (1)
cpmpertmy (1)
 
Chapter 6 project management
Chapter 6 project managementChapter 6 project management
Chapter 6 project management
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
PERT-CPM : PROJECT MANAGEMENT TOOLS
PERT-CPM : PROJECT MANAGEMENT TOOLSPERT-CPM : PROJECT MANAGEMENT TOOLS
PERT-CPM : PROJECT MANAGEMENT TOOLS
 
Cpm n pert
Cpm n pertCpm n pert
Cpm n pert
 
Pert and cpm
Pert and cpmPert and cpm
Pert and cpm
 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 

Similar to 3...06 pert cpm

Similar to 3...06 pert cpm (20)

Pert -cpm
Pert  -cpmPert  -cpm
Pert -cpm
 
06 pert cpm
06 pert cpm06 pert cpm
06 pert cpm
 
Pert -cpm
Pert  -cpmPert  -cpm
Pert -cpm
 
time mamangement.ppt
time mamangement.ppttime mamangement.ppt
time mamangement.ppt
 
06 pert cpm (1)
06 pert cpm (1)06 pert cpm (1)
06 pert cpm (1)
 
PERT CPM Intro
PERT CPM IntroPERT CPM Intro
PERT CPM Intro
 
Pert cpm
Pert  cpmPert  cpm
Pert cpm
 
PERT/CPM
PERT/CPMPERT/CPM
PERT/CPM
 
CPM AND PERT
CPM AND PERTCPM AND PERT
CPM AND PERT
 
Advanced project management mod 4
Advanced project management mod 4Advanced project management mod 4
Advanced project management mod 4
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptx
 
Ch 5.pptx
Ch 5.pptxCh 5.pptx
Ch 5.pptx
 
Pert and gantt chart.pptx
Pert and gantt chart.pptxPert and gantt chart.pptx
Pert and gantt chart.pptx
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managers
 
Pert cpm
Pert cpm Pert cpm
Pert cpm
 
project network
project networkproject network
project network
 
Project managemen PERT VS CPM
Project managemen  PERT VS CPMProject managemen  PERT VS CPM
Project managemen PERT VS CPM
 
CPM and PERT
CPM and  PERTCPM and  PERT
CPM and PERT
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
Network analysis cpm module3
Network analysis cpm module3Network analysis cpm module3
Network analysis cpm module3
 

More from DEVIKA ANTHARJANAM (20)

Aquarium
AquariumAquarium
Aquarium
 
ECOSYSTEM BASED FISHERIES MANEGEMNT
ECOSYSTEM BASED FISHERIES MANEGEMNTECOSYSTEM BASED FISHERIES MANEGEMNT
ECOSYSTEM BASED FISHERIES MANEGEMNT
 
CODE OF CONDUCT FOR RESPONSIBLE FISHERIES
CODE OF CONDUCT FOR RESPONSIBLE FISHERIESCODE OF CONDUCT FOR RESPONSIBLE FISHERIES
CODE OF CONDUCT FOR RESPONSIBLE FISHERIES
 
Nimnaga. ecnmcs. territorial use rights 4th sem
Nimnaga. ecnmcs. territorial use rights 4th semNimnaga. ecnmcs. territorial use rights 4th sem
Nimnaga. ecnmcs. territorial use rights 4th sem
 
Neenu self presentation
Neenu self presentationNeenu self presentation
Neenu self presentation
 
Naveen
NaveenNaveen
Naveen
 
Mgmt organisations reshmiii
Mgmt organisations  reshmiiiMgmt organisations  reshmiii
Mgmt organisations reshmiii
 
Law of th sea ali
Law of th sea aliLaw of th sea ali
Law of th sea ali
 
INDIVIDUAL TRANSFERABLE QUATA SYSTEM
INDIVIDUAL TRANSFERABLE QUATA SYSTEMINDIVIDUAL TRANSFERABLE QUATA SYSTEM
INDIVIDUAL TRANSFERABLE QUATA SYSTEM
 
Integrated fisheries management i
Integrated fisheries management iIntegrated fisheries management i
Integrated fisheries management i
 
Abhinav semenar of thoma
Abhinav semenar of thomaAbhinav semenar of thoma
Abhinav semenar of thoma
 
Suraj 3 water act
Suraj 3  water actSuraj 3  water act
Suraj 3 water act
 
Suraj 2 environmental protection act-1986
Suraj 2  environmental protection act-1986Suraj 2  environmental protection act-1986
Suraj 2 environmental protection act-1986
 
Suraj 1 coastal zone notification 1991
Suraj 1 coastal zone notification 1991Suraj 1 coastal zone notification 1991
Suraj 1 coastal zone notification 1991
 
CO MANAGEMENT IN FISHERIES
CO MANAGEMENT IN FISHERIESCO MANAGEMENT IN FISHERIES
CO MANAGEMENT IN FISHERIES
 
Management of indian fisheries
Management of indian fisheriesManagement of indian fisheries
Management of indian fisheries
 
James
JamesJames
James
 
Hitha
HithaHitha
Hitha
 
3...man and mechine
3...man and mechine3...man and mechine
3...man and mechine
 
3...maintenance management
3...maintenance management3...maintenance management
3...maintenance management
 

Recently uploaded

APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCRalexsharmaa01
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 

Recently uploaded (20)

APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 

3...06 pert cpm

  • 2. Project  “Aproject is a series of activities directed to accomplishment of a desired objective.” Plan your work first…..then work your plan
  • 3. Network analysis Introduction Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. One definition of a project: “A project is a temporary endeavour undertaken to create a "unique" product or service”
  • 4. Developed in 1950’s History CPM by DuPont for chemical plants   PERT by U.S. Navy for Polaris missile CPM was developed by Du Pont and the emphasis was on the trade-off between the cost of the project and its overall completion time (e.g. for certain activities it may be possible to decrease their completion times by spending more money - how does this affect the overall completion time of the project?) PERT was developed by the US Navy for the planning and control of the Polaris missile program and the emphasis was on completing the program in the shortest possible time. In addition PERT had the ability to cope with uncertain activity completion times (e.g. for a particular activity the most likely completion time is 4 weeks but it could be anywhere between 3 weeks and 8 weeks).
  • 5. CPM - Critical Path Method  Definition: In CPM activities are shown as a network of precedence relationships using activity-on-node network construction – Single estimate of activity time – Deterministic activity times USED IN : Production management - for the jobs of repetitive in nature where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.
  • 6. PERT - Project Evaluation & Review Techniques  Definition: In PERT activities are shown as a network of precedence relationships using activity-on-arrow network construction – Multiple time estimates – Probabilistic activity times USED IN : Project management - for non-repetitive jobs (research and development work), where the time and cost estimates tend to be quite uncertain. This technique uses probabilistic time estimates.
  • 7. Gantt chart Originated by H.L.Gantt in 1918 Advantages Limitations - Gantt charts are quite commonly used. - Do not clearly indicate details regarding They provide an easy graphical the progress of activities representation of when activities (might) take place. - Do not give a clear indication of interrelation ship between the separate activities
  • 8. CPM/PERT These deficiencies can be eliminated to a large extent by showing the interdependence of various activities by means of connecting arrows called network technique.  Overtime CPM and PERT became one technique  ADVANTAGES: – Precedence relationships – large projects – more efficient
  • 9. The Project Network  Use of nodes and arrows Arrows An arrow leads from tail to head directionally – Indicate ACTIVITY, a time consuming effort that is required to perform a part of the work. Nodes  A node is represented by a circle - Indicate EVENT, a point in time where one or more activities start and/or finish.
  • 10. Activity on Node & Activity on Arrow Activity on Node Activity on Arrow - A completion of an activity - An arrow represents a task, is represented by a node while a node is the completion of a task - Arrows represent order of events
  • 11. Activity Slack Each event has two important times associated with it : - Earliest time , Te , which is a calendar time when a event can occur when all the predecessor events completed at the earliest possible times - Latest time , TL , which is the latest time the event can occur with out delaying the subsequent events and completion of project.  Difference between the latest time and the earliest time of an event is the slack time for that event Positive slack : Slack is the amount of time an event can be delayed without delaying the project completion
  • 12. Critical Path  Is that the sequence of activities and events where there is no “slack” i.e.. Zero slack  Longest path through a network  minimum project completion time
  • 13. Benefits of CPM/PERT  Useful at many stages of project management  Mathematically simple  Give critical path and slack time  Provide project documentation  Useful in monitoring costs
  • 14. Questions Answered by CPM & PERT  Completion date?  On Schedule?  Within Budget?  Critical Activities?  How can the project be finished early at the least cost?
  • 15. example Illustration of network analysis of a minor redesign of a product and its associated packaging. The key question is: How long will it take to complete this project ?
  • 16. For clarity, this list is kept to a minimum by specifying only immediate relationships, that is relationships involving activities that "occur near to each other in time".
  • 17. Before starting any of the above activity, the questions asked would be •"What activities must be finished before this activity can start" •could we complete this project in 30 weeks? •could we complete this project in 2 weeks? One answer could be, if we first do activity 1, then activity 2, then activity 3, ...., then activity 10, then activity 11 and the project would then take the sum of the activity completion times, 30 weeks. “What is the minimum possible time in which we can complete this project ? “
  • 18. We shall see below how the network analysis diagram/picture we construct helps us to answer this question.
  • 19. CRITICAL PATH TAKES 24 WEEKS FOR THE COMPLETION OF THE PROJECT
  • 20. Packages are available to determine the shortest path and other relevant information.
  • 22. Output of the package
  • 23. Limitations to CPM/PERT  Clearly defined, independent and stable activities  Specified precedence relationships  Over emphasis on critical paths