1. CURRICULUM VITAE
PERSONAL DETAILS.
NAME : DZIMUZI
SURNAME : NYAKUNGWA
SEX : MALE
NATIONALITY : ZIMBABWEAN
MARITAL STATUS : MARRIED
DATE OF BIRTH : 13-06-83
NATIONAL ID NO : 48-100 705-Z-49
PASSPORT NUMBER : DN866101
DRIVER’S LICENCE : 44607JC
RESIDENTIAL & POSTAL : House Number 15256
ADDRESS - HARARE Kuwadzana Ext
Harare.
CONTACT TELEPHONE : Zim (+263)772 476 890, (+263)774 767 061
Zam (+260)976 111 013
Email address : dnyakungwa@gmail.com
Skype : dzimuzi.nyakungwa
2. PROFILE:
A qualified and experienced Quantity Surveyor, honesty, trustworthy following Christianity, willing
to develop the self through sharing and extracting new ideas with colleagues
AFFILIATION
Foreign full member of The Surveyors Institute of Zambia
TERTIARY EDUCATION
National certificate in Quantity surveying (2004)
National Diploma in Quantity Surveying (2005 to 2006)
College attended : Bulawayo Polytechnic
ACADEMIC QUALIFICATIONS
Ordinary level (Mutoko High School)
English C, Mathematics B, Integrated science B, Commerce B, Geography A, Bible knowledge C,
Building studies B, Shona B, and Agriculture B.
Advanced level (Mutoko High School)
Mathematics C, Geography D, Biology O, General paper E
EMPLOYMENT RECORD
ONE (01)
Employer : Thor Developments – Ndola Zambia
Post held : Quantity Surveyor
Date joined : October 2014 to date
Projects : (1) Global Industries Extraction Plant - US$3,500,000.00
(2) Global Industries Preparation Plant – US$4,000,000.00
TWO (02)
Employer : Flame Zambia - Lusaka
Post held : Quantity Surveyor
Date joined : February 2014 to September 2014
Projects : (1) PUMA Commercial building – US$4,000,000.00
3. THREE (03)
Employer : Searlcom Contractors
Post held : Estimation Quantity Surveyor
Date joined : September 2013 to January 2014
Projects : (1) Irvine’s Silo bases and associated civil works – US$1,000,000.00
(2) Mutare Toll plaza – US$3,000,000.00
(3) Rusape Toll plaza – US$2,500,000.00
FOUR (04)
Employer : Proconstruct Contractors
Post held : Projects Quantity Surveyor
Date joined : October 2013 to August 2014
Projects : (1) NSSA Hotel Beitbridge – US$20,000,000.00
FIVE (05)
Employer : Manco Project management and construction.
Post held : Projects Quantity Surveyor
Date joined : January 2008 to September 2011
Projects : (1) High court staff clinic, Harare – a US$25,000.00 job at Harare
High court staff clinic, November 2010 to January 2011
Conversion from a residential flat to a Lodge at number 5
Vincent Avenue, Khumalo suburb, Bulawayo. October 2009 to October 2010-
US$150,000.00
(2) Premier Service medical clinic (Rusape). Refurbishments of a
Two storey clinic an external kitchen and laundry and installation of
Guard house, boom gate and paving to the car parks and walkways. January
2008 to date worthy US$480,000.00
4. SIX (06)
Employer : Shomet construction.
Post held : Project Quantity Surveyor.
Date joined : April to December 2007.
Projects : (1) Construction of 2 x three storey three bed roomed flats capable
of containing two families per floor and a Physical check platform
by the Plumtree border post for Zimra.
(2) Fabrication and installation of structural steel roof and all associated
labour to it.
(3) Construction of a Silo base for 4No Silos diameter 18m each
and construction of a concrete Pump house at Donnington farm (Norton).
SEVEN (07)
Employer : Horstein construction
Post held : Project Quantity Surveyor
Date joined : January to April 2007
Projects : (1) Conversion from once a bakery to offices comprising a three
storey building with a basement for Econet
EIGHT (08)
Employer : Costain Zimbabwe
Post held : Assistant Project Quantity Surveyor
Date joined : January to December 2005
Projects : (1) Construction of Ceremonial hall with a basement and a
Mezzanine floor and three storey chemistry block at National
University of Science and Technology
(2) Construction of Spent grain hopper building, offloading shed
and an internal road at Delta beverages, Southerton Harare
5. Duties and responsibilities
1 Keeping Quantity Surveying records
2 Checking materials on site and preparing increased costs of inflation accounts
3 Preparing and costing Day works and Variation accounts
4 Measuring work executed, including abstracting and calculating quantities
5 Preparing applications for Interim payments, stage and final accounts and analyzing these
for cost control purposes
6 Measure and price value for extra works
7 Evaluate payments due to Subcontractors
8 Preparing and costing interim extension of time claims and other contractual claims
9 Site management duties
10 Subcontractors’ procurement
11 Rate build up in Estimation and Tendering
12 Site administration and control of funds
OTHER RESPONSIBILITIES HELD
1. April to November 2006 - Site Administrator (Horstein Construction)
2. March to November 2009 – Part time Tutor, Measurement of Construction Works (Speciss
college – Machipisa (Harare).
3. February to December 2003 – Ordinary level Mathematics teacher
Computer packages
1 Ms Excell, Ms Word, AutoCAD, Ms Project and Internet
References
Mr. R Madume Mr. Singizi - Manco (pvt) ltd
+263 712 878 334 (Costain Zimbabwe) (+263) 772 333 412
redmadume@yahoo.co.zw singizis@yahoo.com
Paul Covill (Searlcom Zimbabwe) Mr. A. Amos (Flame Zambia)
paul@searlcom.co.zw +263 772 595 325
+263778658773 amostwice@gmail.com