New Energy Conference-Zoe Wang from CGP Solar
- 2. CGP Profile
Solar panel
Frame TPT back board
silicon solar cells
2
- 6. Contents
1 Factory general information
2 Workshop Layout
3 Product Design
4 Process Design
5 Quality Assurance and Services
- 7. Solar panel factory general information
Hardware
Capacity Plan Staff arrangement Configuration
2011,Fist stage( 1.2011, solar panels
Finished): 2011, first stage: workship is 3400㎡ ,
Day Capacity:0.35MW; Sigle shift: 80; Clean air;
Month Capacity:
Triple shift: 240, 2.Major equipments:
10MW; Automatic Welding
Annual Capacity:
including QM,
Technical, Process Machines:2pcs
120MW。 Manual Welding
2012, Second stage improvement,
equipment, around 20 Machines: 8 groups、
(in operation): Laminating Machine:
Annual Capacity: people。
5pcs(2.2m*3.4m)
240MW。 IV testing machines:
2013,Third Stage 2pcs
(in preparation): ELMachine: 2pcs
Annual Capacity: The whole production
360MW。 line is automatic。
- 18. The solar energy street light series
太阳能墙头灯 太阳能草坪灯
Solar Garden light
Solar street light Solar wall lamp Solar Lawn light
18
- 23. CGP Solar are confident of supplying best products and services for you
Thanks!
CGP Solar