SlideShare a Scribd company logo
1 of 31
Download to read offline
AS 2067 – Substations and High Voltages Installations


 Peter Willis
 Committee Member EL-43
 Standards Australia


                                          DIgSILENT Pacific
                        Perth Office

                        Suite 11 · 189 St Georges Terrace · Perth · Western Australia · 6000 · Australia
                        Peter Willis, Hai Le, Randy Supangat, John Hall and Suzanne Robertson



                        Melbourne Office

                        Suite 8 Level 2 · 437 St Kilda Road · Melbourne · Victoria · 3004 · Australia
                        Koos Theron, Kate Bebejewska, Karen Theron and Brad Henderson



DIgSILENT Pacific PowerFactory Training                                                                    1
AS 2067 – Substations and High Voltages Installations




     DISCUSSION
       •History of AS 2067 and HV sections of The Wiring Rules
       •Legislative References
       •Related Requirements– HV Submissions
       •The New Standard (5 years in the making...already getting old)
       •Interpretation & Practical Outcomes




DIgSILENT Pacific PowerFactory Training                             2
AS2067 - 1984
It wasn’t broken so why change it?



 IEC standards have a way of stating of the obvious exhaustively
 It was a matter dealing with known issues and unknown issues.


      Reports that say that something hasn't happened are
      always interesting to me, because as we know, there are
      known knowns; there are things we know we know. We
      also know there are known unknowns; that is to say we
      know there are some things we do not know. But there
      are also unknown unknowns - the ones we don't know we
      don't know.


DIgSILENT Pacific PowerFactory Training                            3
Role of Standards


•     Standards development via Standards Australia is a consensus-based process.
•     It takes time, but is the best approach
•     Requires participation, continuity, good project management and $$$
•     Committees made up of organisations represented by individuals.
      -P.Willis - Engineers Australia representative (one of two)
      -funded by DIgSILENT and personally.
•     Community consultation rounds are taken very seriously and extensively
      debated. Most public comments came from organisations already represented.
•     Very little comment came out of Western Australia....

Ultimately, it is a case that:


‘End users deserve the standards they get.....’

DIgSILENT Pacific PowerFactory Training                                         4
AS 2067 – A History

    History of AS 2067
    Switchgear Assemblies and Ancillary equipment
    for alternating voltages above 1kV’
             •Last Published 1984
             •Fell out of step with various reforms of The
             Wiring Rules
             •Overlapped & contradicted many other
             standards, particularly in Earthing
             •Intended to exclude requirements for specific
             apparatus, but often failed to do so.
             •Served us well for 25 years, but revision long
             overdue

DIgSILENT Pacific PowerFactory Training                        5
AS 2067 – A Mandated Standard in WA

    Legaslative References (WA)
    Electricity (Licensing) Regulations 1991
    Part 5 — Regulation of electrical work
    [48.      Repealed in Gazette 6 Sep 1996 p. 4415.]
    49.       Electrical work to be carried out in accordance with certain requirements
     (1)      A person shall carry out electrical work in accordance with the requirements of —
              (a) the Australian/New Zealand Wiring Rules as amended from time to time;
              (b) the W A Electrical Requirements as amended from time to time,

             and the following standards, as published by Standards Australia and amended from time to
             time, where those standards are relevant to the electrical work being carried out, namely —

    AS 2067: “Switchgear Assemblies and Ancillary Equipment for A/C Voltages above 1Kv”;
    .....
    ....




DIgSILENT Pacific PowerFactory Training                                                                    6
AS 2067 – A Mandated Standard in WA

    Legaslative References (WA)
    Mines Safety and Inspection Regulations 1995
    Part 5 — Electricity in mines
    5.1. Terms used in this Part
    ....
    electrical work has the same meaning as in the Electricity (Licensing) Regulations 1991;

    5.18. High voltage installations
    .....
    (2) Each responsible person at a mine must ensure that —
    .....
    (d)        any safety equipment required to be provided under the Electricity Regulations 1947
    is provided in respect of any high voltage installation at the mine;
    (e)        any methods of work required to be complied with under the Electricity
    Regulations 1947 are complied with in respect of any high voltage installation at the mine;
    and
    ....


DIgSILENT Pacific PowerFactory Training                                                              7
AS 2067 – A Mandated Standard in WA

    Legaslative References (WA)
    WA Electrical Requirements July 2008




    WA Electrical Requirements Amendment 1




DIgSILENT Pacific PowerFactory Training      8
AS 2067 & The Wiring Rules

    Electrical Bulletin No. 41 / Electrical Focus No. 41




DIgSILENT Pacific PowerFactory Training                    9
AS 2067 – A Mandated Standard in WA

    Electrical Bulletin No. 45

       AS 2067:2008 Substations and high voltage installations exceeding 1kV a.c.
       This extensively revised and retitled Australian Standard was published on 12 December 2008.
       Appendix K of AS/NZS 3000:2007 Wiring rules, dealing with consumers’ high voltage
       installations, is redundant and no longer applies.

       The Standard applies to network operator and consumer-owned substations, and consumer-owned
       high voltage installations. This Standard is listed with other mandatory standards in Section 12.11
       of the WA Electrical Requirements.

       The new AS 2067 comes into force on 1 July 2009. Projects in the design or tender stage may be
       constructed to the 1984 version of the Standard, provided the network operator, or EnergySafety
       as appropriate, has received the Preliminary Notice prior to this date.

       Projects must comply with the new Standard if their Preliminary Notice is submitted after 1 July
       2009. Project design work about to start should adopt the new Standard.




DIgSILENT Pacific PowerFactory Training                                                                      10
AS 2067 – 1984


   1984 Document- Sections
           •Ratings of equipment
           •Design & Construction
           •Marking & Identification
           •Control & Indication
           •Auxiliary Systems (Electrical & Air)
           •Electrical Clearances for Switchgear
           •Electrical Clearance for Safety
           •Tests
           •Appendices –
                    Design of Earthing Systems, Functional Identification of
                    Small Wiring, Design of Compressed Air Systems, Provision
                    of Safety Clearances & Work Sections, Joining busbars.
DIgSILENT Pacific PowerFactory Training                                         11
AS 2067 – 1984


   1984 Version - Sections
   •Ratings of equipment
   •Design & Construction
   •Marking & Identification
   •Control & Indication
   •Auxiliary Systems (Electrical & Air)
   •Electrical Clearances for Switchgear
   •Electrical Clearance for Safety
   •Tests
   •Appendices –
       Design of earthing systems
       Jointing busbars
       Functional identification of small wiring
       Design of compressed air systems
       Work Sections
DIgSILENT Pacific PowerFactory Training            12
AS 2067 – 2008


   2008 Version

   •Scope–
       •For an electrical network operator, covers substations but not
       the distribution systems.
       •Covers power stations and interconnecting lines & cables
       between power stations if on the same site
       •Consumer and Customer electrical installation, serving
       factories, commercial facilities, industrial plants, institutional
       facilities and mine sites.




DIgSILENT Pacific PowerFactory Training                                     13
AS 2067 – 2008


   2008 Version
   Sections–
       • Electrical Requirements
       • Structural Requirements
       • Climatic & Environmental Conditions
       • Insulation Co-ordination
       • High Voltage Equipment
       • General Requirements
       • Safety Measures
       • Protection, Control & Auxiliary Measures
       • Earthing Systems
       • Inspection & Testing
       • Operation & Maintenance
       • Requirements for Consumer High Voltage Installations


DIgSILENT Pacific PowerFactory Training                         14
AS 2067 – 2008


   2008 Version
   Same
   -Safety clearances
   -Substation fences

   Same but different
   -Barriers & Obstacles
   -Egress & access

   Significantly changed
   -Earthing

   New
   -Protection against fire (transformer clearances)
   -Oil Containment
   -Protection against arcing faults
   -Transportable buildings
DIgSILENT Pacific PowerFactory Training                15
HV Changes to The Wiring Rules


   1 Ohm target resistance to earth – GONE!

   10 Ohm target resistance to earth – GONE!

   30 Ohm target resistance to earth – GONE!

   New notices of completion make no mention of having to achieve
   any specific resistance.

   So...do we throw our earth resistance meters away?

   Absolutely not - they are part of the Touch & Step solution.



DIgSILENT Pacific PowerFactory Training                             16
The Wiring Rules-2007


7.6 HIGH VOLTAGE ELECTRICAL INSTALLATIONS
7.6.1 Scope

The provisions of this Clause 7.6 apply to electrical installations and those portions of electrical
    installations operating at high voltage.

For protection and earthing purposes, this Clause also applies to all the electrical equipment up to and
    including any low voltage cables and switchgear associated with high voltage transformers.

This Clause 7.6 does not apply to the following:
      (a) Electric discharge illumination systems.
      (b) X-ray equipment.
      (c) High frequency equipment.
      (d) High voltage wiring and electrical equipment enclosed within self-contained electrical
          equipment and supplied at low voltage where appropriate precautions have been taken to
          prevent contact with high voltage conductors.




DIgSILENT Pacific PowerFactory Training                                                                    17
Wiring Rules
7.6.2 Application
7.6.2.1 In Australia
In Australia electrical installations and those portions of electrical installations operating at high
voltage shall be installed in accordance with the requirements of Appendix K.

NOTE:
   A standard providing requirements for the design and installation of high voltage installations is
   currently under development. This Standard will take the form of a revision of AS 2067—1984,
   which is currently cited in legislation in some States for particular facets of high voltage
   electrical design and installation.
   Following publication of the revised AS 2067, the design and installation of high voltage electrical
   installations is to be in accordance with the requirements of that Standard.
   A transition period (nominally six months) will apply, following publication of the revised AS 2067,
   for the construction of high voltage installations designed to the requirements of Appendix K of this
   Standard.




DIgSILENT Pacific PowerFactory Training                                                                    18
Wiring Rules
7.6.3 Issues relevant to high voltage installations
      When designing high voltage electrical installations, consideration must be given to a range of issues that are not
      normally as significant an issue for installations less that 1 kV.
      Such issues include the following:
       (a) Insulation levels to withstand highest voltage and/or impulse withstand voltages.
       (b) Minimum clearances to live parts taking into account electrode configurations and impulse withstand
            voltages.
       (c) Minimum clearances under special conditions.
       (d) The application of various devices connected to the system.
       (e) The methods of installation of equipment, cables and accessories.
       (f) General requirements of installations regarding choice of circuit arrangement, documentation, transport
            routes, lighting, operational safety and labelling.
       (g) Special requirements with respect to buildings.
       (h) Protection measures with respect to access.
       (i) Protection measures with respect to fire.
       (j) Provision of earthing such that the system operates under all conditions and ensures safety of human life
            where there is legitimate access.
       (k) Testing.




DIgSILENT Pacific PowerFactory Training                                                                                19
New Notices




DIgSILENT Pacific PowerFactory Training   20
Interpretation – Substation Buildings


Indoor Substation Buildings:
- Must comply to Building Code, but there are still BCA issues.
- Must take into account pressure from any arcing faults
- Exterior surface accessible to public must not be removable
- External windows are ‘unbreakable’
- Aisles must be 750mm minimum and not restricted by permanent
   mechanisms, such as switchgear trucks in isolated position
- Escape routes much achieve 600mm in the direction of escape, even when
   removable parts or open doors intrude the path. Ideally such doors close in
   the direction of escape.
- Maximum length of escape route must comply to Section D of BCA.
- No simple rule to the 1-Door or 2-Door question.




DIgSILENT Pacific PowerFactory Training                                          21
Interpretation – Substation Doors


Indoor Substation Buildings Access Doors:
- Shall be secured to prevent unauthorised access
- Shall open outwards, except where the action of others may block the door
      (suggest this is approached with great caution)
-     Position to not be blocked by parked vehicles
-     Must be opened from inside without a key by latch or simple means even
      when locked from the outside
-     Panic bars or large levers shall be fitted to all outward opening doors used for
      egress from rooms contain HV switchgear.
-     Minimum 1980mm high and 750mm wide.
-     Sliding and rolling doors not permitted as escape doors.




DIgSILENT Pacific PowerFactory Training                                              22
Interpretation – Oil Containment


Protection against leakage of insulating liquid
-     The qty of insulating liquid in equipment, the volume of water from rain and fire
      suppression, proximity to water courses and soil conditions shall be considered in the
      selection of a containment system
-     Emphasis the use of sumps, which is non-typical in WA industry.
-     Every indoor and outdoor high voltage installation containing equipment
      with more than 500 litres of a liquid dielectric such as transformer insulating
      oil, shall have provision for containing the total volume of any possible
      leakage. Leakage can occur due to many reasons including equipment tank rupture,
      and can cause a fire hazard as well as other environmental hazards. If the liquid
      dielectric is combustible, then it should be provided with a flame trap and containment
      tank. A suitable arrangement is depicted in Figures 6.3 to 6.8. These figures are
      included as examples of what may be provided and do not prevent the use of other
      containment/separation systems that achieve the overall objective of AS 1940—2004,
      Appendix H.




DIgSILENT Pacific PowerFactory Training                                                     23
Interpretation – SF6 Leakage


SF6 Leakage (Above Ground Substations)
-     Cross ventilation is sufficient, but requirements are that ½ of the ventilation required
      shall be close to ground.
-     Mechanical ventilation may be required




DIgSILENT Pacific PowerFactory Training                                                          24
Interpretation – Protection


Determining the need for protection
-     Utility committee members had strong views on escalating the protection issues.
-     “Power system protection is a field of engineering expertise requiring specialised
      education, training and expertise. This is applicable both with respect to design and
      field activities. Provision of protection functions within a substation and high voltage
      installation shall be carried out by competent persons”
-     Protection grading studies are required, but the engineering service industry needs to
      be aware that numerical relays/IED’s are complex and a very hands-on approach is
      required to get the required outcomes.


Protection & Auxiliary supplies
-     Essential and non-essential supplies shall be categorised.
-     UPS’s are now recognised as important, but must be redundant with auto-changover.
-     5 Hour minimum storage no longer required.




DIgSILENT Pacific PowerFactory Training                                                          25
Interpretation – Earthing


Fundamental Requirements
- Driven by current limit of the human body
- Translates into Touch and Step tolerance
- Essentially is probabilistic in terms of population factors, but not yet factoring
   co-incident risk.
- There are no target resistances anymore.

Earthing Systems
-     Interconnected or Separated
-     Interconnected is the favoured approach


Design Flowchart




DIgSILENT Pacific PowerFactory Training                                            26
Interpretation – Inspection & Testing


Verifications that shall be achieved:
- Minimum clearances of live parts, barriers, heights etc
- Functional tests of settings, circuitry and programming
- Inspection of markings, safety signs and safety devices
- Correct fire ratings
- Emergency exists
- Earthing systems

Tests:
- Power-frequency test for switchgear
- Voltage test for cables

Records:
- All required measurements and tests to be kept for life of the asset
DIgSILENT Pacific PowerFactory Training                                  27
Interpretation – Operation and Maintenance


Each Installation shall have :
- Operational manual describing normal, emergency and maintenance
   procedures, as well as safety instructions for the operation of the HV
   Installation
- A set of up-to-date drawings and diagrams, to enable operators to provide
   safe and efficient interventions.
- Manufacturers O&M manuals and test reports.
- Emergency routes to nearest hospital & emergency phone numbers.




DIgSILENT Pacific PowerFactory Training                                       28
Global Earth




DIgSILENT Pacific PowerFactory Training   29
Global Earth (continued)




DIgSILENT Pacific PowerFactory Training   30
HV Submissions in WA

              HV Installation
              completed by in
              house license on
              their own assets
              connected to a
              Network Operator


              HV Installation
              completed by
              Electrical Contractor
              on assets connected
              to Network Operator




DIgSILENT Pacific PowerFactory Training   31

More Related Content

Similar to Jeep AS 2067 Presentation By Peter Willis

Inspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceInspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceAnkit Saxena
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal KristyDyer
 
Mark powell resume2017
Mark powell resume2017Mark powell resume2017
Mark powell resume2017Mark Powell
 
H08 Principles of Power Systems Design
H08 Principles of Power Systems Design H08 Principles of Power Systems Design
H08 Principles of Power Systems Design phase3-120A
 
Introduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical designIntroduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical designAsif Eqbal
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016Konstantinos Valvis
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and StandardsSolar Reference
 
BS 7671 - 18th Edition Widescreen PP Rev 4
BS 7671 - 18th Edition Widescreen PP Rev 4BS 7671 - 18th Edition Widescreen PP Rev 4
BS 7671 - 18th Edition Widescreen PP Rev 4Paul Meenan
 
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...kevinfok
 
Tct ccs master 180917 rev b
Tct ccs master 180917 rev bTct ccs master 180917 rev b
Tct ccs master 180917 rev bDamian Connelly
 
Resume - Scott Nieass 2016
Resume - Scott Nieass 2016Resume - Scott Nieass 2016
Resume - Scott Nieass 2016Scott Nieass
 
Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer
 
Bs 3871 mcb and mccb in ac circuits
Bs 3871 mcb and mccb in ac circuitsBs 3871 mcb and mccb in ac circuits
Bs 3871 mcb and mccb in ac circuitsVasudev Mogili
 
Glen Mayes resume 2016
Glen Mayes resume 2016Glen Mayes resume 2016
Glen Mayes resume 2016Glen Mayes
 
HV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdfHV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdfOGBONNAYAMARTINS1
 

Similar to Jeep AS 2067 Presentation By Peter Willis (20)

Stephen-Hayles
Stephen-HaylesStephen-Hayles
Stephen-Hayles
 
Inspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceInspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_compliance
 
Inspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code ComplianceInspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code Compliance
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal
 
Mark powell resume2017
Mark powell resume2017Mark powell resume2017
Mark powell resume2017
 
H08 Principles of Power Systems Design
H08 Principles of Power Systems Design H08 Principles of Power Systems Design
H08 Principles of Power Systems Design
 
Introduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical designIntroduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical design
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
BS 7671 - 18th Edition Widescreen PP Rev 4
BS 7671 - 18th Edition Widescreen PP Rev 4BS 7671 - 18th Edition Widescreen PP Rev 4
BS 7671 - 18th Edition Widescreen PP Rev 4
 
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
 
Tct ccs master 180917 rev b
Tct ccs master 180917 rev bTct ccs master 180917 rev b
Tct ccs master 180917 rev b
 
14 berdner hawaiian adv inverters
14 berdner   hawaiian adv inverters14 berdner   hawaiian adv inverters
14 berdner hawaiian adv inverters
 
20150209111021 tech spn dtd 29.jan 2015
20150209111021 tech spn dtd 29.jan 201520150209111021 tech spn dtd 29.jan 2015
20150209111021 tech spn dtd 29.jan 2015
 
Resume - Scott Nieass 2016
Resume - Scott Nieass 2016Resume - Scott Nieass 2016
Resume - Scott Nieass 2016
 
Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer Resume 29012015
Iain Palmer Resume 29012015
 
Bs 3871 mcb and mccb in ac circuits
Bs 3871 mcb and mccb in ac circuitsBs 3871 mcb and mccb in ac circuits
Bs 3871 mcb and mccb in ac circuits
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
 
Glen Mayes resume 2016
Glen Mayes resume 2016Glen Mayes resume 2016
Glen Mayes resume 2016
 
HV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdfHV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdf
 

More from Engineers Australia

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAEngineers Australia
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Engineers Australia
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDEEngineers Australia
 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonEngineers Australia
 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleEngineers Australia
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Engineers Australia
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Engineers Australia
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Engineers Australia
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1Engineers Australia
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEPEngineers Australia
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1Engineers Australia
 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksEngineers Australia
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...Engineers Australia
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1Engineers Australia
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEngineers Australia
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Engineers Australia
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...Engineers Australia
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark BushEngineers Australia
 

More from Engineers Australia (20)

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WA
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDE
 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff Boughton
 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of Fremantle
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1
 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocks
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1
 
111125 IChemE Palmer
111125 IChemE Palmer111125 IChemE Palmer
111125 IChemE Palmer
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural Events
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark Bush
 

Recently uploaded

Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030tarushabhavsar
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified Binance Account
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Omaninstagramfab782445
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance managementVaishnaviGunji
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfbelieveminhh
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 

Recently uploaded (20)

Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 

Jeep AS 2067 Presentation By Peter Willis

  • 1. AS 2067 – Substations and High Voltages Installations Peter Willis Committee Member EL-43 Standards Australia DIgSILENT Pacific Perth Office Suite 11 · 189 St Georges Terrace · Perth · Western Australia · 6000 · Australia Peter Willis, Hai Le, Randy Supangat, John Hall and Suzanne Robertson Melbourne Office Suite 8 Level 2 · 437 St Kilda Road · Melbourne · Victoria · 3004 · Australia Koos Theron, Kate Bebejewska, Karen Theron and Brad Henderson DIgSILENT Pacific PowerFactory Training 1
  • 2. AS 2067 – Substations and High Voltages Installations DISCUSSION •History of AS 2067 and HV sections of The Wiring Rules •Legislative References •Related Requirements– HV Submissions •The New Standard (5 years in the making...already getting old) •Interpretation & Practical Outcomes DIgSILENT Pacific PowerFactory Training 2
  • 3. AS2067 - 1984 It wasn’t broken so why change it? IEC standards have a way of stating of the obvious exhaustively It was a matter dealing with known issues and unknown issues. Reports that say that something hasn't happened are always interesting to me, because as we know, there are known knowns; there are things we know we know. We also know there are known unknowns; that is to say we know there are some things we do not know. But there are also unknown unknowns - the ones we don't know we don't know. DIgSILENT Pacific PowerFactory Training 3
  • 4. Role of Standards • Standards development via Standards Australia is a consensus-based process. • It takes time, but is the best approach • Requires participation, continuity, good project management and $$$ • Committees made up of organisations represented by individuals. -P.Willis - Engineers Australia representative (one of two) -funded by DIgSILENT and personally. • Community consultation rounds are taken very seriously and extensively debated. Most public comments came from organisations already represented. • Very little comment came out of Western Australia.... Ultimately, it is a case that: ‘End users deserve the standards they get.....’ DIgSILENT Pacific PowerFactory Training 4
  • 5. AS 2067 – A History History of AS 2067 Switchgear Assemblies and Ancillary equipment for alternating voltages above 1kV’ •Last Published 1984 •Fell out of step with various reforms of The Wiring Rules •Overlapped & contradicted many other standards, particularly in Earthing •Intended to exclude requirements for specific apparatus, but often failed to do so. •Served us well for 25 years, but revision long overdue DIgSILENT Pacific PowerFactory Training 5
  • 6. AS 2067 – A Mandated Standard in WA Legaslative References (WA) Electricity (Licensing) Regulations 1991 Part 5 — Regulation of electrical work [48. Repealed in Gazette 6 Sep 1996 p. 4415.] 49. Electrical work to be carried out in accordance with certain requirements (1) A person shall carry out electrical work in accordance with the requirements of — (a) the Australian/New Zealand Wiring Rules as amended from time to time; (b) the W A Electrical Requirements as amended from time to time, and the following standards, as published by Standards Australia and amended from time to time, where those standards are relevant to the electrical work being carried out, namely — AS 2067: “Switchgear Assemblies and Ancillary Equipment for A/C Voltages above 1Kv”; ..... .... DIgSILENT Pacific PowerFactory Training 6
  • 7. AS 2067 – A Mandated Standard in WA Legaslative References (WA) Mines Safety and Inspection Regulations 1995 Part 5 — Electricity in mines 5.1. Terms used in this Part .... electrical work has the same meaning as in the Electricity (Licensing) Regulations 1991; 5.18. High voltage installations ..... (2) Each responsible person at a mine must ensure that — ..... (d) any safety equipment required to be provided under the Electricity Regulations 1947 is provided in respect of any high voltage installation at the mine; (e) any methods of work required to be complied with under the Electricity Regulations 1947 are complied with in respect of any high voltage installation at the mine; and .... DIgSILENT Pacific PowerFactory Training 7
  • 8. AS 2067 – A Mandated Standard in WA Legaslative References (WA) WA Electrical Requirements July 2008 WA Electrical Requirements Amendment 1 DIgSILENT Pacific PowerFactory Training 8
  • 9. AS 2067 & The Wiring Rules Electrical Bulletin No. 41 / Electrical Focus No. 41 DIgSILENT Pacific PowerFactory Training 9
  • 10. AS 2067 – A Mandated Standard in WA Electrical Bulletin No. 45 AS 2067:2008 Substations and high voltage installations exceeding 1kV a.c. This extensively revised and retitled Australian Standard was published on 12 December 2008. Appendix K of AS/NZS 3000:2007 Wiring rules, dealing with consumers’ high voltage installations, is redundant and no longer applies. The Standard applies to network operator and consumer-owned substations, and consumer-owned high voltage installations. This Standard is listed with other mandatory standards in Section 12.11 of the WA Electrical Requirements. The new AS 2067 comes into force on 1 July 2009. Projects in the design or tender stage may be constructed to the 1984 version of the Standard, provided the network operator, or EnergySafety as appropriate, has received the Preliminary Notice prior to this date. Projects must comply with the new Standard if their Preliminary Notice is submitted after 1 July 2009. Project design work about to start should adopt the new Standard. DIgSILENT Pacific PowerFactory Training 10
  • 11. AS 2067 – 1984 1984 Document- Sections •Ratings of equipment •Design & Construction •Marking & Identification •Control & Indication •Auxiliary Systems (Electrical & Air) •Electrical Clearances for Switchgear •Electrical Clearance for Safety •Tests •Appendices – Design of Earthing Systems, Functional Identification of Small Wiring, Design of Compressed Air Systems, Provision of Safety Clearances & Work Sections, Joining busbars. DIgSILENT Pacific PowerFactory Training 11
  • 12. AS 2067 – 1984 1984 Version - Sections •Ratings of equipment •Design & Construction •Marking & Identification •Control & Indication •Auxiliary Systems (Electrical & Air) •Electrical Clearances for Switchgear •Electrical Clearance for Safety •Tests •Appendices – Design of earthing systems Jointing busbars Functional identification of small wiring Design of compressed air systems Work Sections DIgSILENT Pacific PowerFactory Training 12
  • 13. AS 2067 – 2008 2008 Version •Scope– •For an electrical network operator, covers substations but not the distribution systems. •Covers power stations and interconnecting lines & cables between power stations if on the same site •Consumer and Customer electrical installation, serving factories, commercial facilities, industrial plants, institutional facilities and mine sites. DIgSILENT Pacific PowerFactory Training 13
  • 14. AS 2067 – 2008 2008 Version Sections– • Electrical Requirements • Structural Requirements • Climatic & Environmental Conditions • Insulation Co-ordination • High Voltage Equipment • General Requirements • Safety Measures • Protection, Control & Auxiliary Measures • Earthing Systems • Inspection & Testing • Operation & Maintenance • Requirements for Consumer High Voltage Installations DIgSILENT Pacific PowerFactory Training 14
  • 15. AS 2067 – 2008 2008 Version Same -Safety clearances -Substation fences Same but different -Barriers & Obstacles -Egress & access Significantly changed -Earthing New -Protection against fire (transformer clearances) -Oil Containment -Protection against arcing faults -Transportable buildings DIgSILENT Pacific PowerFactory Training 15
  • 16. HV Changes to The Wiring Rules 1 Ohm target resistance to earth – GONE! 10 Ohm target resistance to earth – GONE! 30 Ohm target resistance to earth – GONE! New notices of completion make no mention of having to achieve any specific resistance. So...do we throw our earth resistance meters away? Absolutely not - they are part of the Touch & Step solution. DIgSILENT Pacific PowerFactory Training 16
  • 17. The Wiring Rules-2007 7.6 HIGH VOLTAGE ELECTRICAL INSTALLATIONS 7.6.1 Scope The provisions of this Clause 7.6 apply to electrical installations and those portions of electrical installations operating at high voltage. For protection and earthing purposes, this Clause also applies to all the electrical equipment up to and including any low voltage cables and switchgear associated with high voltage transformers. This Clause 7.6 does not apply to the following: (a) Electric discharge illumination systems. (b) X-ray equipment. (c) High frequency equipment. (d) High voltage wiring and electrical equipment enclosed within self-contained electrical equipment and supplied at low voltage where appropriate precautions have been taken to prevent contact with high voltage conductors. DIgSILENT Pacific PowerFactory Training 17
  • 18. Wiring Rules 7.6.2 Application 7.6.2.1 In Australia In Australia electrical installations and those portions of electrical installations operating at high voltage shall be installed in accordance with the requirements of Appendix K. NOTE: A standard providing requirements for the design and installation of high voltage installations is currently under development. This Standard will take the form of a revision of AS 2067—1984, which is currently cited in legislation in some States for particular facets of high voltage electrical design and installation. Following publication of the revised AS 2067, the design and installation of high voltage electrical installations is to be in accordance with the requirements of that Standard. A transition period (nominally six months) will apply, following publication of the revised AS 2067, for the construction of high voltage installations designed to the requirements of Appendix K of this Standard. DIgSILENT Pacific PowerFactory Training 18
  • 19. Wiring Rules 7.6.3 Issues relevant to high voltage installations When designing high voltage electrical installations, consideration must be given to a range of issues that are not normally as significant an issue for installations less that 1 kV. Such issues include the following: (a) Insulation levels to withstand highest voltage and/or impulse withstand voltages. (b) Minimum clearances to live parts taking into account electrode configurations and impulse withstand voltages. (c) Minimum clearances under special conditions. (d) The application of various devices connected to the system. (e) The methods of installation of equipment, cables and accessories. (f) General requirements of installations regarding choice of circuit arrangement, documentation, transport routes, lighting, operational safety and labelling. (g) Special requirements with respect to buildings. (h) Protection measures with respect to access. (i) Protection measures with respect to fire. (j) Provision of earthing such that the system operates under all conditions and ensures safety of human life where there is legitimate access. (k) Testing. DIgSILENT Pacific PowerFactory Training 19
  • 20. New Notices DIgSILENT Pacific PowerFactory Training 20
  • 21. Interpretation – Substation Buildings Indoor Substation Buildings: - Must comply to Building Code, but there are still BCA issues. - Must take into account pressure from any arcing faults - Exterior surface accessible to public must not be removable - External windows are ‘unbreakable’ - Aisles must be 750mm minimum and not restricted by permanent mechanisms, such as switchgear trucks in isolated position - Escape routes much achieve 600mm in the direction of escape, even when removable parts or open doors intrude the path. Ideally such doors close in the direction of escape. - Maximum length of escape route must comply to Section D of BCA. - No simple rule to the 1-Door or 2-Door question. DIgSILENT Pacific PowerFactory Training 21
  • 22. Interpretation – Substation Doors Indoor Substation Buildings Access Doors: - Shall be secured to prevent unauthorised access - Shall open outwards, except where the action of others may block the door (suggest this is approached with great caution) - Position to not be blocked by parked vehicles - Must be opened from inside without a key by latch or simple means even when locked from the outside - Panic bars or large levers shall be fitted to all outward opening doors used for egress from rooms contain HV switchgear. - Minimum 1980mm high and 750mm wide. - Sliding and rolling doors not permitted as escape doors. DIgSILENT Pacific PowerFactory Training 22
  • 23. Interpretation – Oil Containment Protection against leakage of insulating liquid - The qty of insulating liquid in equipment, the volume of water from rain and fire suppression, proximity to water courses and soil conditions shall be considered in the selection of a containment system - Emphasis the use of sumps, which is non-typical in WA industry. - Every indoor and outdoor high voltage installation containing equipment with more than 500 litres of a liquid dielectric such as transformer insulating oil, shall have provision for containing the total volume of any possible leakage. Leakage can occur due to many reasons including equipment tank rupture, and can cause a fire hazard as well as other environmental hazards. If the liquid dielectric is combustible, then it should be provided with a flame trap and containment tank. A suitable arrangement is depicted in Figures 6.3 to 6.8. These figures are included as examples of what may be provided and do not prevent the use of other containment/separation systems that achieve the overall objective of AS 1940—2004, Appendix H. DIgSILENT Pacific PowerFactory Training 23
  • 24. Interpretation – SF6 Leakage SF6 Leakage (Above Ground Substations) - Cross ventilation is sufficient, but requirements are that ½ of the ventilation required shall be close to ground. - Mechanical ventilation may be required DIgSILENT Pacific PowerFactory Training 24
  • 25. Interpretation – Protection Determining the need for protection - Utility committee members had strong views on escalating the protection issues. - “Power system protection is a field of engineering expertise requiring specialised education, training and expertise. This is applicable both with respect to design and field activities. Provision of protection functions within a substation and high voltage installation shall be carried out by competent persons” - Protection grading studies are required, but the engineering service industry needs to be aware that numerical relays/IED’s are complex and a very hands-on approach is required to get the required outcomes. Protection & Auxiliary supplies - Essential and non-essential supplies shall be categorised. - UPS’s are now recognised as important, but must be redundant with auto-changover. - 5 Hour minimum storage no longer required. DIgSILENT Pacific PowerFactory Training 25
  • 26. Interpretation – Earthing Fundamental Requirements - Driven by current limit of the human body - Translates into Touch and Step tolerance - Essentially is probabilistic in terms of population factors, but not yet factoring co-incident risk. - There are no target resistances anymore. Earthing Systems - Interconnected or Separated - Interconnected is the favoured approach Design Flowchart DIgSILENT Pacific PowerFactory Training 26
  • 27. Interpretation – Inspection & Testing Verifications that shall be achieved: - Minimum clearances of live parts, barriers, heights etc - Functional tests of settings, circuitry and programming - Inspection of markings, safety signs and safety devices - Correct fire ratings - Emergency exists - Earthing systems Tests: - Power-frequency test for switchgear - Voltage test for cables Records: - All required measurements and tests to be kept for life of the asset DIgSILENT Pacific PowerFactory Training 27
  • 28. Interpretation – Operation and Maintenance Each Installation shall have : - Operational manual describing normal, emergency and maintenance procedures, as well as safety instructions for the operation of the HV Installation - A set of up-to-date drawings and diagrams, to enable operators to provide safe and efficient interventions. - Manufacturers O&M manuals and test reports. - Emergency routes to nearest hospital & emergency phone numbers. DIgSILENT Pacific PowerFactory Training 28
  • 29. Global Earth DIgSILENT Pacific PowerFactory Training 29
  • 30. Global Earth (continued) DIgSILENT Pacific PowerFactory Training 30
  • 31. HV Submissions in WA HV Installation completed by in house license on their own assets connected to a Network Operator HV Installation completed by Electrical Contractor on assets connected to Network Operator DIgSILENT Pacific PowerFactory Training 31